LARSEN & TOUBRO LIMITED

ECC DIVISION - EDRC

JOB No. SHEET


PROJECT "MULTI - PURPOSE TOWER" AT DARLEY ROAD, COLOMBO, SRI LANKA
O6118
REV. No. DATE
JOB NO. O6118 - C - TB - 01 - BQ - 0002
0
CALCULATED CHECKED
DICIPLINE Structural (BOQ of Substructure)

S.No Description Unit Quantity Rate Amount

1.0 EARTHWORK EXCAVATION


1.1 General Excavation by mechanical means using excavators,
JCB, Poclains etc., in all types of soil including soft / weathered
rock but excluding hard rock for foundations / basement
excavation; Dispose excavated material offsite by mechanical
means as directed to the approval of Employer. Disposal not
measured seperately. Rate to include for excavation for all leads
& lift, loading, unloading & double handling where required,
necessary equipments, tools & plants, dressing the excavation to
proper level and grade as required, dumping the soil in the
designated area approved by the Authorities, taking necessary
precautions to prevent any spillages or spoiling of the premises /
public roads during removal & transporting the soil, all
consumables including protecting the sides of excavation as per
the the nature of site soil condition and safety of excavation etc
complete, as directed.

Rate shall include cost of excavation of working space as


required, slopes and berms as per site soil condition/nature of the
site soil and safety of excavation. Rate shall also include for
refilling such excavation of working space with approved filling
material including consolidating to the required proctor density,
excavation at all levels and for the following depths below
average existing ground level, including shoring, strutting,
protecting sides from collapses, slush removal, pumping & bailing
out water, de-watering if any so as to keep foundations in dry
condition at any stage of work, drain the water away from the site
through sub drain and connecting into main drain, is deemed
included in the rates:

Note : Excavation will be measured on the basis of the horizontal


area of open mass excavation at the base for RCC raft
foundation / Retaining wall foundation or any other structures to
be built.The actual depth of excavation will be arrived at as the
difference between the spot levels taken at existing ground level
prior to excavation at a spacing of 3m intervals in both directions
and the final bottom level of founding level as per drawings.
Excavation taken by the Contractor for working space as
required, slopes and berms as per site soil condition / nature of
site soil and safety of excavation will not be measured. Quoted
rate shall be deemed to have considered the above stipulations.

a) Depth not exceeding 3.0m from existing level m3 15268


b) '-Ditto- but exceeding 3.0m and below 6.0m m3 15268
c) '-Ditto- but exceeding 6.0m and below 9.0m m3 15268
d) '-Ditto- but exceeding 9.0m and below 12.5m m3 17813
e) '-Ditto- but exceeding 12.5m upto maximum depth shown in
the drawings m3 -
LARSEN & TOUBRO LIMITED
ECC DIVISION - EDRC

JOB No. SHEET


PROJECT "MULTI - PURPOSE TOWER" AT DARLEY ROAD, COLOMBO, SRI LANKA
O6118
REV. No. DATE
JOB NO. O6118 - C - TB - 01 - BQ - 0002
0
CALCULATED CHECKED
DICIPLINE Structural (BOQ of Substructure)

S.No Description Unit Quantity Rate Amount


1.2 Excavation in hard rock / boulders (more than ½ Cum in size) to
required level for basement excavation, foundations / footings,
pile caps, under ground / water retaining structures etc.at any
depth and at all levels either by manual, by chiseling / wedging or
mechanical means other than blasting (which is prohibited)
including conveying excavated rock at designated area and
stacking for measurement as directed with all leads and lifts,
including shoring, strutting, protecting sides from collapses, slush
removal, etc.complete, as directed.

Rate shall include for disposing the rock by mechanical means as


detailed below including, breaking the rocks to the required size if
required, for easy conveyance, etc complete, as directed.
Note : .Length and breadth at bottom of foundation and depth
from the top of average ground level to the bottom of foundation
only should be excavated and the payment shall be
made.Excavation taken by the Contractor for working space as
required, slopes and berms as per site soil condition / nature of
site soil and safety of excavation will not be measured. Item shall
be measured from stacks of excavated hard rock, reduced by
40% for voids and such quantity arrived at shall only be paid.
Quoted rate shall be deemed to have considered the above
stipulation. (Provisional Quantity)

a) Depth not exceeding 3.0m from existing level m3 -


b) '-Ditto- but exceeding 3.0m and below 6.0m m3 -
c) '-Ditto- but exceeding 6.0m and below 9.0m m3 -
d) '-Ditto- but exceeding 9.0m and below 12.5m m3 -
e) '-Ditto- but exceeding 12.5m upto maximum depth shown in
the drawings m3 1527
1.3 Supplying and filling in foundations and the area wherever
required below ground level with the approved filling materials
either with excess excavated earth stockpiled at site and / or
approved imported earth in layers not exceeding 200 mm
thickness, including mixing, spreading, levelling, watering and
consolidating each layer with power / hand roller of required
capacity to obtain required proctor density as per relevant
specification etc. all complete and as directed. Rate shall include
for loading, unloading, transportation, hire and fuel charges for
tools and plants employed and other incidental charges etc.
complete and as directed.Rate shall also include for refilling the
excavation of working space as described above.

a) With excavated earth available within site m3 200


b) With approved earth obtained from outside m3 200
6.0 Piling Works

6.1 Mobilisation of plant and equipment, installation at site as


Lumps
directed and demobilisation of the same after completion of work.
um
LARSEN & TOUBRO LIMITED
ECC DIVISION - EDRC

JOB No. SHEET


PROJECT "MULTI - PURPOSE TOWER" AT DARLEY ROAD, COLOMBO, SRI LANKA
O6118
REV. No. DATE
JOB NO. O6118 - C - TB - 01 - BQ - 0002
0
CALCULATED CHECKED
DICIPLINE Structural (BOQ of Substructure)

S.No Description Unit Quantity Rate Amount


6.2 Boring and casting normal Bored cast-in-situ piles by DMC
method of approximately 10m depth soil below basement in
accordance with drawings, enclosed technical specifications and
directions including setting out cardinal points, boring in over
burden through all stratas upto founding layer including
dewatering, chisselling through obstacles like boulders,
weathering rock and keeping the bored portion intact by using
Bentonite slurry (Specific gravity less than 1.08) including flushing
out by using pumps of adequate capacity, clearing the same out
of site, inserting the casing upto 2.0m depth and removal of
temporary casing, conducting SPT and soil classification tests
inside bore hole at termination depth. Concreting to be done till
the cut off level.

a) 1000mm dia pile Rmt 230


b) 1200mm dia pile Rmt 1620
c) 1500mm dia pile Rmt 2400
LARSEN & TOUBRO LIMITED
ECC DIVISION - EDRC

JOB No. SHEET


PROJECT "MULTI - PURPOSE TOWER" AT DARLEY ROAD, COLOMBO, SRI LANKA
O6118
REV. No. DATE
JOB NO. O6118 - C - TB - 01 - BQ - 0002
0
CALCULATED CHECKED
DICIPLINE Structural (BOQ of Substructure)

S.No Description Unit Quantity Rate Amount


6.3 Boring and casting normal Bored cast-in-situ piles of
approximately 2m depth inside hardrock below 10m deep soil in
accordance with drawings, enclosed technical specifications and
directions including setting out cardinal points, boring in over
burden through all stratas upto founding layer including
dewatering, chisselling through obstacles like boulders,
weathering rock and keeping the bored portion intact by using
Bentonite slurry (Specific gravity less than 1.08) including flushing
out by using pumps of adequate capacity, clearing the same out
of site, inserting the casing upto 2.0m depth and removal of
temporary casing, conducting SPT and soil classification tests
inside bore hole at termination depth. Concreting to be done till
the cut off level.

a) 1000mm dia pile Rmt 46


b) 1200mm dia pile Rmt 324
c) 1500mm dia pile Rmt 480
6.4 Providing Ready mixed reinforced cement concrete of M40 grade
using river sand, 20mm and down size coarse aggregates with
minimum cement content of 400 kg/cum and placing into the
bore by tremie method including compaction of concrete and
withdrawal of casing. The rate shall include cost of approved
ordinary Portland cement of specified grade, including, exposing
and welding of new bars of same dia with butt weld and/or lap
weld as per consultant's specifications.Design mix to be approved
by the consultants, Water cement ratio to be within 0.45, the
slump at pouring point to be maintained 140mm,+/-10mm. The
age of concrete while pouring shoud not exceed 2Hrs.

a) 1000mm dia pile Rmt 276


b) 1200mm dia pile Rmt 1944
c) 1500mm dia pile Rmt 2880
6.5 Providing and conducting routine load tests to 2.5 times the safe
load of piles as per BS 8004.
a) 1000mm dia pile Nos -
b) 1200mm dia pile Nos 1
c) 1500mm dia pile Nos 2
6.6 Conducting integrity tests on the piles under each cluster by
using a 6 lbs nylon tipped hand held hammer, glueing sensitive
accelerometer on top of the pile by petrowax or petrolium jelly
after making the pile head smooth and even by disc grinder,
providing stagewise and final report along with relevant
conclusions etc., as per the consultants direction,enclosed
technical specifications.

a) 1000mm dia pile Nos 1


b) 1200mm dia pile Nos 4
c) 1500mm dia pile Nos 5
6.7 Cutting the concrete in Piles till Cutoff level by mechanical means
and finishing the top to required level with CM 1:2 and
straightening the exposed reinforcement, welding the new bars of
same diameter by butt or lap weld if required.Rate to include
debri clearence, curing etc.,complete as per the drawings and
Consultant's instructions
a) 1000mm dia pile Nos 23
b) 1200mm dia pile Nos 162
c) 1500mm dia pile Nos 240
6.8 Same as item 6.2 but for Empty driving from existing
ground level to cut-off level & filling the same with sand
LARSEN & TOUBRO LIMITED
ECC DIVISION - EDRC

JOB No. SHEET


PROJECT "MULTI - PURPOSE TOWER" AT DARLEY ROAD, COLOMBO, SRI LANKA
O6118
REV. No. DATE
JOB NO. O6118 - C - TB - 01 - BQ - 0002
0
CALCULATED CHECKED
DICIPLINE Structural (BOQ of Substructure)

S.No Description Unit Quantity Rate Amount


a) 1000mm dia pile Rmt 276
b) 1200mm dia pile Rmt 1944
c) 1500mm dia pile Rmt 2880
Steel
6.9 Providing and fabricating reinforcement steel of high yield
strength ribbed bars of various diameters and grade fe 460
conforming to BS 5950 for reinforced concrete work. The work
includes cutting, bending, fabricating, welding and palcing in
posiiton according to drawings. The reinforcement including
supply and use of 18G black annealed binding wire double fold to
tie the bars in position and providing precast cement / PVC cover
blocks for main reinforcement to ensure specified cover, including
welding.
MT 410
Sub Total ( C/o to Summary) -----