A B C D E F G H I J K L M N

262500 262490 262480 262470


N:
99
54

0
50
80
0

2
26
9 A B C

E:

9954850
RENO MATTRESSES RIP RAP

3900
8

Mid: 36+172.44
9954790

PT: 36+201.31
KM. 36+200
ALIGNMENT=HR-36
PC: 36+143

STATION=36+178.92
KM. 36+150

OFFSET=0.00m
NORTHING=9954822.83
EASTING=262499.44
.57

9954860
6000

RENO MATTRESSES RIP RAP

5
A B C

262530 262520 14000


262510 262500

ROAD LEVEL = 81.656


4
TOP CROWN LEVEL = 80.156
80 80
MAB (Q50) = 79.000
2930 MULTI PLATE ARC
6000 x 2930 6230
RIVER BED = 77.000
LEAN CONCRETE t=10cm

COMPACTED SAND BEDDING t=5cm

3 1200

COMPACTED GRAVEL t=30cm

1m SOIL REPLACEMENT (REQUIRED IF CBR IS


1500 3500 1600 4400 1600 3500 1500 LESSER THAN AS SPECIFIED)

8100 1400 8100


71 71

80.861
81.098

81.145

80.883
Eksisting Levels
2

81.651
81.656

81.656

81.618
Proposed Levels

L=57.73 L=300.94
Horizontal Geometry
R=300.00
1
36+150

36+175

36+200

36+215
Chainage

FOR APPROVAL
OWNER : PROJECT NO. : 337-ENG104-MC-UHMC-2022 SCALE : 1:100
PT. MARUWAI COAL
DRAWING NO. : ENG104-MC-C004 DRAWN : UA DESIGN : RYH
PROJECT : TITLE :
DRAFTING CHECK : ADP DESIGN CHECK : RYH
SITE ENGINEERING AND SUPERVISION LAYOUT PLAN AND LONGITUDINAL SECTION
OF UPGRADING HAULROAD MULTIPLATE ARC CULVERT KM 36 APPROVED : PRG REV:
0 FOR APPROVAL UA RYH PRG 30.01.2023

NO. REVISION Note: * indicates signatures on original issue of drawing or last revision of drawing Drawn Designer Project
Manager Date
PT. MARUWAI COAL STA 36+ 178 DATE : JAN 2023 A
A B C D E F G H I J K L M N

372 5250 5250 528


300 300

9
1125
550

12900 SELECTED BACKFILL MATERIAL

8 MULTIPLATE ARC
MAB (Q50) = 79.000 6000 x 2930

2930
6230
PEDESTAL MULTIPLATE ARC K-300
RENO MATTRESSES RIP RAP
RENO MATTRESSES RIP RAP

7
1800
LEAN CONCRETE t=10cm

COMPACTED SAND BEDDING t=5cm


1200

100
50
6
300
COMPACTED GRAVEL t=30cm
3100 13400 3100 1m SOIL REPLACEMENT (REQUIRED IF CBR IS
LESSER THAN AS SPECIFIED)
19600

CROSS SECTION A-A


5 SCALE 1:50
5250 5250 478
300

CONCRETE WALL K-300 SELECTED BACKFILL MATERIAL


1125
550

GEOTEXTILE NON WOVEN TS200

3 6230

NOTE:
2 1. GEOTEXTILLE SPECIFICATION WILL BE PROVIDED BY CONTRACTOR AND
PROPOSED TO BE REVIEW BY PROJECT OWNER
2. MINIMUM CBR VALUES FOR CULVERT BASE IS NOT LESS THAN 6% 600
3. FOR SELECTED MATERIAL PRIOR/BELOW GEOTEXTILE, THE DRY 1200 LEAN CONCRETE t=10cm
DENSITY TEST IS NOT LESS THAN 95% SMDD AND THE THICKNESS OF
EACH LAYER IS NOT MORE THAN 150mm (SPEC-0000-P0-C-00011 AND COMPACTED SAND BEDDING t=5cm
COMPACTED GRAVEL t=30cm
00021)
4. FOR OTHER SELECTED FILL (WITHOUT GEOTEXTILE) THE TEST SHALL BE 1m SOIL REPLACEMENT (REQUIRED IF CBR IS
1500 600 2000 1500 4100 1500
1 DRY DENSITY IN EVERY 30cm AND DCP TEST IN EVERY 100cm LESSER THAN AS SPECIFIED)
THICKNESS IS NOT LESS THAN 10%. (SPEC-0000-P0-C-00011 AND 00021) 19546
5. FOR OPEN CUT IS TO BE DISCUSSED IN SITU
6. REINFORCEMENT SPECIFICATION : BJTD 40 WITH Fy = 390 MPa CROSS SECTION B-B
7. DEVELOPMENT LENGTH MINIMUM 12db (REINFORCEMENT DIAMETER) SCALE 1:50 FOR APPROVAL
OWNER : PROJECT NO. : 337-ENG104-MC-UHMC-2022 SCALE : 1:100
PT. MARUWAI COAL
DRAWING NO. : ENG104-MC-C005 DRAWN : UA DESIGN : RYH
PROJECT : TITLE :
DRAFTING CHECK : ADP DESIGN CHECK : RYH
SITE ENGINEERING AND SUPERVISION CROSS SECTION A-A & B-B
OF UPGRADING HAULROAD MULTIPLATE ARC CULVERT KM 36 APPROVED : PRG REV:
0 FOR APPROVAL UA RYH PRG 30.01.2023

NO. REVISION Note: * indicates signatures on original issue of drawing or last revision of drawing Drawn Designer Project
Manager Date
PT. MARUWAI COAL STA 36+ 178 DATE : JAN 2023 A
A B C D E F G H I J K L M N

9 2000 5250 5250 2000


303
300 589 300 GEOTEXTILE NON WOVEN TS200

SELECTED BACKFILL MATERIAL

CONCRETE WALL K-300

LEAN CONCRETE t=10cm


6

COMPACTED SAND BEDDING t=5cm


COMPACTED GRAVEL t=30cm
DETAIL REFER TO 1m SOIL REPLACEMENT (REQUIRED IF CBR IS
21506
MATERIALS VENDOR D16-150 LESSER THAN AS SPECIFIED)
CROSS SECTION C-C
5 D13-100 SCALE 1:50

D13-100 HORIZONTAL LINKS


D16-300 30
300
300
500 D25-150 D16-150
DWLS
500 600 D16-150 2D16
4 VERTICAL LINKS
8D16
D16-300
D25-150

60
7D16 1800

6230
5230
2D16

3 8D16 3000
CROSS SECTION 1-1
1 D16-300 1
SCALE 1:10
CROSS SECTION PEDESTAL MULTIPLATE ARC
SCALE 1:25 60
500 D25-100
1200 1500 600 1500 500 D16-150
NOTE: 600 60
1. GEOTEXTILLE SPECIFICATION WILL BE PROVIDED BY CONTRACTOR AND 60
2 1200
PROPOSED TO BE REVIEW BY PROJECT OWNER 600 D25-150 D16-150
2. MINIMUM CBR VALUES FOR CULVERT BASE IS NOT LESS THAN 6%
1600 3500 600 D25-150
3. FOR SELECTED MATERIAL PRIOR/BELOW GEOTEXTILE, THE DRY
DENSITY TEST IS NOT LESS THAN 95% SMDD AND THE THICKNESS OF
EACH LAYER IS NOT MORE THAN 150mm (SPEC-0000-P0-C-00011 AND
00021) DETAIL PEDESTAL MULTIPLATE ARC DETAIL KANTILEVER WALL CROSS SECTION KANTILEVER WALL
4. FOR OTHER SELECTED FILL (WITHOUT GEOTEXTILE) THE TEST SHALL BE SCALE 1:25 SCALE 1:50 SCALE 1:50
1 DRY DENSITY IN EVERY 30cm AND DCP TEST IN EVERY 100cm
THICKNESS IS NOT LESS THAN 10%. (SPEC-0000-P0-C-00011 AND 00021)
5. FOR OPEN CUT IS TO BE DISCUSSED IN SITU
6. REINFORCEMENT SPECIFICATION : BJTD 40 WITH Fy = 390 MPa
7. DEVELOPMENT LENGTH MINIMUM 12db (REINFORCEMENT DIAMETER) FOR APPROVAL
OWNER : PROJECT NO. : 337-ENG104-MC-UHMC-2022 SCALE : 1:100
PT. MARUWAI COAL
DRAWING NO. : ENG104-MC-C006 DRAWN : UA DESIGN : RYH
PROJECT : TITLE :
DRAFTING CHECK : ADP DESIGN CHECK : RYH
SITE ENGINEERING AND SUPERVISION CROSS SECTION C-C & DETAIL FOUNDATION
OF UPGRADING HAULROAD MULTIPLATE ARC CULVERT KM 36 APPROVED : PRG REV:
0 FOR APPROVAL UA RYH PRG 30.01.2023

NO. REVISION Note: * indicates signatures on original issue of drawing or last revision of drawing Drawn Designer Project
Manager Date
PT. MARUWAI COAL STA 36+ 178 DATE : JAN 2023 A