PUBLIC WORK DEPARTMENT

PWD NH DIVISION, JODHPUR (RAJASTHAN)


Widening and strengtheing of NH - 65 to two lane with paved shoulder from existing km 180+500 to 267+500 ( End
of Nagaur bypass to Netra village section ) in Rajasthan.

CONSULTANT : M/s SA INFRASTRUCTURE CONSULTANTS Pvt. Ltd.


CONTRACTOR : M/s PATEL INFRASTRUCTURE PVT.LTD.

Combined Grading (Confirmatory) of 40 mm Agg., 20mm, 10mm Agg., & Stone Dust for WMM
Sample No. : 03 Date of Testing :
Source of Material :PIPLCrusher Kasti Village Date of Sampling :
Type of Material : Crushed Tested by : Jointly

Total Wt. of Sample taken analysis: (gms).

MORT&H
% age Cum. % age Cum.
Sieve Size Wt. Retained Cum. Wt. Retained Specification on limit
Retained Passing for WMM

53.0 100

45.0 95-100

22.4 60-80

11.2 40-60

4.75 25-40

2.36 15-30

0.600 8-22

0.075 0-5

For JMF Mix Proportion :40MM =32 % ,20MM =22% , 10 MM= 18%, Stone Dust =28%
For the Contractor's Representative Authority's Engineer Representative
"Improvement and up- gradation from Muzaffarnagar-Miranpur Section of NH-
Name of 709 AD From (Km 97+450 to Km 123+450) on EPC Mode under NH (O) in the State
Project of Uttar Pradesh (Package-III)"

CLIENT AUTHORITY ENGINEER EPC CONTRACTOR

NATIONAL HIGHWAY AUTHORITY L.N MALVIYA INFRA PROJECTS


RCC DEVELOPERS LTD.(MEERUT)
OF INDIA PVT.LTD

Combined Grading (Confirmatory) of 40 mm Agg., 20mm, 10mm Agg., & Stone Dust for WMM

Sample No. : 01 Date of Testing :


Source of Material Date of Sampling :
Type of Material : Crushed Tested by : Jointly
Location

Total Wt. of Sample taken analysis: 26350 (gms).

MORT&H
% age Cum.
Sieve Size Wt. Retained Cum. Wt. Retained % age Cum. Passing Specification on limit
Retained for WMM

53.0 0 0 0.00 100 100

45.0 575 575 2.18 97.82 95-100

22.4 6586 7161 27.18 72.82 60-80

11.2 5980 13141 49.87 50.13 40-60

4.75 4568 17709 67.21 32.79 25-40

2.36 2260 19969 75.78 24.22 15-30

0.600 2560 22529 85.50 14.50 8-22

0.075 3240 25769 97.80 2.20 0-5

For JMF Mix Proportion :40MM =28 % ,20MM =22% , 10 MM= 20%, Stone Dust =30%
For the Contractor's Representative Authority's Engineer Representative
"Improvement and up- gradation from Muzaffarnagar-Miranpur Section of
Name of Project NH-709 AD From (Km 97+450 to Km 123+450) on EPC Mode under NH (O) in
the State of Uttar Pradesh (Package-III)"

CLIENT AUTHORITY ENGINEER EPC CONTRACTOR

NATIONAL HIGHWAY
AUTHORITY OF L.N MALVIYA INFRA PROJECTS PVT.LTD RCC DEVELOPERS LTD.(MEERUT)
INDIA

Individual Grading of 40 mm for JMF Of AIL


Source of Material : YAMUNANAGAR Date of Sampling :

Type of Material : Crushed Agg. Date of Testing :

S-1 Wt. of Sample 12374 grm

I.S.Sieve Size (mm) Wt. Retained (gm) %age wt retained %age Cum Wt. Retained %age Cum. Wt. Passing

53.0 0 0 0 100

45.0 0 0.00 0 100

22.4 11600 11600.00 93.74 6.26

11.2 755 12355.00 99.85 0.15

4.75

2.36

0.600

0.075

S-2 Wt. of Sample 12315 grm

I.S.Sieve Size (mm) Wt. Retained (gm) %age wt retained %age Cum Wt. Retained %age Cum. Wt. Passing

53.0 0 0 0 100

45.0 0 0.00 0 100

22.4 11130 11130.00 90.38 9.62

11.2 1149 12279.00 99.71 0.29

4.75

0.600

0.075

"Improvement and up- gradation from Muzaffarnagar-Miranpur Section of


Name of Project NH-709 AD From (Km 97+450 to Km 123+450) on EPC Mode under NH (O) in
the State of Uttar Pradesh (Package-III)"

CLIENT AUTHORITY ENGINEER EPC CONTRACTOR

NATIONAL HIGHWAY
AUTHORITY OF L.N MALVIYA INFRA PROJECTS PVT.LTD RCC DEVELOPERS LTD.(MEERUT)
INDIA

Individual Grading of 40 mm for JMF Of AIL


Source of Material : YAMUNANAGAR Date of Sampling :

Type of Material : Crushed Agg. Date of Testing :

S-3 Wt. of Sample 12550 grm

I.S.Sieve Size (mm) Wt. Retained (gm) %age wt retained %age Cum Wt. Retained %age Cum. Wt. Passing

53.0 0 0 0 100

45.0 0 0.00 0 100

22.4 11400 11400.00 90.84 9.16

11.2 807 12207.00 97.27 2.73

4.75

0.60

0.075

S-4 Wt. of Sample 12500 grm


I.S.Sieve Size (mm) Wt. Retained (gm) %age wt retained %age Cum Wt. Retained %age Cum. Wt. Passing
53.0 0 0 0 100
45.0 0 0.00 0 100
22.4 11400 11400.00 91.20 8.80
11.2 807 12207.00 97.66 2.34
4.75
0.60
0.075

S-5 Wt. of Sample 12600 grm

I.S.Sieve Size (mm) Wt. Retained (gm) %age wt retained %age Cum Wt. Retained %age Cum. Wt. Passing

53.0 0 0 0 100

45.0 0 0.00 0 100

22.4 11400 11400.00 90.48 9.52

11.2 807 12207.00 96.88 3.12

4.75

0.60

0.075
EPC CONTRACTOR REP. AUTHORITY ENGINEER5'S REP.
"Improvement and up- gradation from Muzaffarnagar-Miranpur Section of
Name of Project NH-709 AD From (Km 97+450 to Km 123+450) on EPC Mode under NH (O) in
the State of Uttar Pradesh (Package-III)"

CLIENT AUTHORITY ENGINEER EPC CONTRACTOR

NATIONAL
HIGHWAY
L.N MALVIYA INFRA PROJECTS PVT.LTD RCC DEVELOPERS LTD.(MEERUT)
AUTHORITY OF
INDIA

Individual Grading of 20 mm for JMF of AIL


Source of Material : Date of Sampling :
Type of Material : Crushed Agg. Date of Testing :
S-01. Wt. of Sample 13580 grm

I.S.Sieve Size (mm) Wt. Retained (gm) %age wt retained %age Cum Wt. Retained %age Cum. Wt. Passing

53.0 0 0 0 100
45.0 0 0 0 100

22.4 30 30.00 0.22 99.78

11.2 12894 12924.00 95.17 4.83


4.75 616 13540.00 99.71 0.29

2.36

0.600
0.075

S-02. Wt. of Sample 13445 grm

I.S.Sieve Size (mm) Wt. Retained (gm) %age wt retained %age Cum Wt. Retained %age Cum. Wt. Passing

53.0 0 0 0 100
45.0 0 0 0 100
22.4 55 55.00 0.41 99.59
11.2 12856 12911.00 96.03 3.97
4.75 502.0 13413.00 99.76 0.24
2.36 4 13417.00 99.79 0.21
0.600
0.075

"Improvement and up- gradation from Muzaffarnagar-Miranpur Section of


Name of Project NH-709 AD From (Km 97+450 to Km 123+450) on EPC Mode under NH (O) in
the State of Uttar Pradesh (Package-III)"

EPC Contractors Rep. Authority Engineer Rep.


CLIENT AUTHORITY ENGINEER EPC CONTRACTOR
NATIONAL
HIGHWAY
L.N MALVIYA INFRA PROJECTS PVT.LTD RCC DEVELOPERS LTD.(MEERUT)
AUTHORITY OF
INDIA

Individual Grading of 20 mm for JMF of AIL


Source of Material : Date of Sampling :
Type of Material : Crushed Agg. Date of Testing :
S-3. Wt. of Sample 15066 grm

I.S.Sieve Size (mm) Wt. Retained (gm) %age wt retained %age Cum Wt. Retained %age Cum. Wt. Passing
53.0 0 0 0 100
45.0 0 0 0 100

EPC Contractors Rep. Authority Engineer Rep.


"Improvement and up- gradation from Muzaffarnagar-Miranpur Section of
Name of Project NH-709 AD From (Km 97+450 to Km 123+450) on EPC Mode under NH (O) in
the State of Uttar Pradesh (Package-III)"

CLIENT AUTHORITY ENGINEER EPC CONTRACTOR

NATIONAL
HIGHWAY
L.N MALVIYA INFRA PROJECTS PVT.LTD RCC DEVELOPERS LTD.(MEERUT)
AUTHORITY OF
INDIA

Individual Grading of 10 mm for JMF of AIL


Source of Material : Date of Sampling :
Type of Material : Crushed Agg. Date of Testing :
S-1. Wt. of Sample 13220 grm

I.S.Sieve Size (mm) Wt. Retained (gm) %age wt retained %age Cum Wt. Retained %age Cum. Wt. Passing

53.0 0 0 0 100
45.0 0 0 0 100

22.4 0 0 0 100
11.2 2345 2345.00 17.74 82.26

4.75 9085 11430.00 86.46 13.54


2.36 1260 12690.00 95.99 4.01
0.600 213 12903.00 97.60 2.40

0.075

S-2. Wt. of Sample 13954 grm

I.S.Sieve Size (mm) Wt. Retained (gm) %age wt retained %age Cum Wt. Retained %age Cum. Wt. Passing

53.0 0 0 0 100
45.0 0 0 0 100
22.4 0 0 0 100
11.2 3116 3116.00 22.33 77.67
4.75 9250 12366.00 88.62 11.38
2.36 1076 13442.00 96.33 3.67
0.600 191 13633.00 97.70 2.30
0.075

Contractor's Rep. Authority Engineer's Rep.

EPC Contractor's Rep. Authority Engineer's Rep.


"Improvement and up- gradation from Muzaffarnagar-Miranpur Section of
Name of Project NH-709 AD From (Km 97+450 to Km 123+450) on EPC Mode under NH (O) in
the State of Uttar Pradesh (Package-III)"

CLIENT AUTHORITY ENGINEER EPC CONTRACTOR

NATIONAL
HIGHWAY
L.N MALVIYA INFRA PROJECTS PVT.LTD RCC DEVELOPERS LTD.(MEERUT)
AUTHORITY OF
INDIA

Individual Grading of Stone Dust for JMF of AIL


Source of Material : Date of Sampling :
Type of Material : Crushed Agg. Date of Testing :
S-1. Wt. of Sample 1266 grm

I.S.Sieve Size (mm) Wt. Retained (gm) %age wt retained %age Cum Wt. Retained %age Cum. Wt. Passing

53.0 0 0 0 100
45.0 0 0 0 100
22.4 0 0 0 100
11.2 0 0 0 100
4.75 69 69.00 5.45 94.55
2.36 137 206.00 16.27 83.73
0.600 280 486.00 38.39 61.61
0.075 660 1146.00 90.52 9.48

S-2 Wt. of Sample 1276 grm

I.S.Sieve Size (mm) Wt. Retained (gm) %age wt retained %age Cum Wt. Retained %age Cum. Wt. Passing

53.0 0 0 0 100
45.0 0 0 0 100
22.4 0 0 0 100
11.2 0 0 0 100
4.75 88 88.00 6.90 93.10
2.36 153 241.00 18.89 81.11
0.600 208 449.00 35.19 64.81
0.075 699 1148.00 89.97 10.03

Contractor's Rep. Authority Engineer's Rep.

EPC Contractor's Rep. Authority Engineer's Rep


"Improvement and up- gradation from Muzaffarnagar-Miranpur Section of NH-
Name of Project 709 AD From (Km 97+450 to Km 123+450) on EPC Mode under NH (O) in the State
of Uttar Pradesh (Package-III)"

CLIENT AUTHORITY ENGINEER EPC CONTRACTOR

NATIONAL HIGHWAY AUTHORITY


L.N MALVIYA INFRA PROJECTS PVT.LTD RCC DEVELOPERS LTD.(MEERUT)
OF INDIA

AVG. GRADATION
40 mm Aggregate
I.S.Sieve Size (mm) S1 S2 S3 S4 S5 Average
53.0 100 100 100 100 100 100.00
45.0 100 100 100 100 100 100.00
22.4 6.26 9.62 9.16 8.80 9.52 8.67
11.2 0.15 0.29 2.73 2.34 3.12 1.73
4.75
2.36
0.600
0.075
AVG. GRADATION
20 mm Aggregate
I.S.Sieve Size (mm) S1 S2 S3 S4 S5 Average
53.0 100 100 100 100 100 100.00
45.0 100 100 100 100 100 100.00
22.4 99.78 99.59 99.5 99.61 99.60 99.62
11.2 4.83 3.97 8.56 7.51 8.17 6.61
4.75 0.29 0.24 1.1 1.22 1.07 0.78
2.36 0.21 0.92 0.97 0.68 0.70
0.600
0.075
AVG. GRADATION
10 mm Aggregate
I.S.Sieve Size (mm) S1 S2 S3 S4 S5 Average
53.0 100 100 100 100 100 100.00
45.0 100 100 100 100 100 100.00
22.4 100 100 100 100 100 100.00
11.2 82.26 77.67 84.55 85.45 85.16 83.02
4.75 13.54 11.38 17.94 18.17 17.87 15.78
2.36 4.01 3.67 5.11 5.65 5.57 4.80
0.600 2.4 2.3 3.76 3.78 3.88 3.22
0.075
AVG. GRADATION
Stone Dust
I.S.Sieve Size (mm) S1 S2 S3 S4 S5 Average
53.0 100 100 100 100 100 100.00
45.0 100 100 100 100 100 100.00
22.4 100 100 100 100 100 100.00
11.2 100 100 100 100 100 100.00
4.75 94.55 93.10 93.78 93.59 93.54 93.71
2.36 83.73 81.11 81.74 81.59 81.37 81.91
0.600 61.61 64.81 64.96 63.17 64.33 63.78
0.075 9.48 10.03 11.42 9.69 12.24 10.57

EPC Contractor's Representative Authority's Engineer Representative


PUBLIC WORK DEPARTMENT
PWD NH DIVISION, JODHPUR (RAJASTHAN)
Widening and strengtheing of NH - 65 to two lane with paved shoulder from existing km 180+500 to 267+500 ( End of Nagaur
bypass to Netra village section ) in Rajasthan.
CONSULTANT : M/s SA INFRASTRUCTURE CONSULTANTS Pvt. Ltd.
CONTRACTOR : M/s PATEL INFRASTRUCTURE PVT.LTD.

Combined Grading (Theoretically) of 40 mm Agg., 20mm, 10mm Agg., & Stone Dust for WMM

Mix
Avg % Avg.% Avg.% Avg.% proportion MORT&H
Upper Lower Mid.
Sieve Size passing of passing of passing of passing of Specification on
limit Limit Limit
40mm agg. 20mm agg. 10mm agg. stone dust limit for WMM
A:B:C:D
28:22:20:30
53.0 100 100 100 100 100.00 100 100 100 100

45.0 100.00 100 100 100 100.00 100 95 98 95-100

22.4 8.67 99.62 100 100 74.34 80 60 70 60-80

11.2 1.73 6.61 83.02 100 48.54 60 40 50 40-60

4.75 0.78 15.78 93.71 31.44 40 25 33 25-40

2.36 0.70 4.80 81.91 25.69 30 15 23 15-30

0.600 3.22 63.78 19.78 22 8 15 8-22

0.075 10.57 3.17 8 0 4 0-8

For JMF Mix Preparation =40MM =28 % ,20MM =22% , 10MM 20%, Stone Dust =30%

MIX DESIGN OF AIL

90

80

70
%AGE OF PASSING

60

50

40

30

20

10

0
0.0 0.1 1.0 10.0 100.0

SIEVE SIZE

Column L

For the Contractor's Representative Authority's Engineer Representative


"Improvement and up- gradation from Muzaffarnagar-Miranpur Section
Name of Project of NH-709 AD From (Km 97+450 to Km 123+450) on EPC Mode under NH
(O) in the State of Uttar Pradesh (Package-III)"

CLIENT AUTHORITY ENGINEER EPC CONTRACTOR

NATIONAL HIGHWAY AUTHORITY RCC DEVELOPERS LTD.


L.N MALVIYA INFRA PROJECTS PVT.LTD
OF INDIA (MEERUT)

Combined Grading (Theoretically) of 40 mm Agg., 20mm, 10mm Agg., & Stone Dust for WMM

Mix
Avg % Avg.% Avg.% Avg.% proportion MORT&H
Upper Lower
Sieve Size passing of passing of passing of passing of limit Limit Mid. Limit Specification on
40mm agg. 20mm agg. 10mm agg. stone dust limit for WMM
A:B:C:D
28:22:20:30
53.0 100 100 100 100 100.00 100 100 100 100

45.0 100.00 100 100 100 100.00 100 95 98 95-100

22.4 8.67 99.62 100 100 74.34 80 60 70 60-80

11.2 1.73 6.61 83.02 100 48.54 60 40 50 40-60

4.75 0.78 15.78 93.71 31.44 40 25 33 25-40

2.36 0.70 4.80 81.91 25.69 30 15 23 15-30

0.600 3.22 63.78 19.78 22 8 15 8-22

0.075 10.57 3.17 8 0 4 0-8

For JMF Mix Preparation =40MM =28 % ,20MM =22% , 10MM 20%, Stone Dust =30%

MIX DESIGN OF WMM

100

90

80

70
%AGE OF PASSING

60

50

40

30

20

10

0
0.1 0.6 2.4 4.8 11.2 22.4 45.0 53.0

SIEVE SIZE

Mix proportion Upper limit Lower Limit Mid. Limit

EPC Contractor's Representative Authority's Engineer Representative


"Improvement and up- gradation from Muzaffarnagar-Miranpur
Name of Section of NH-709 AD From (Km 97+450 to Km 123+450) on EPC Mode
Project under NH (O) in the State of Uttar Pradesh (Package-III)"

CLIENT AUTHORITY ENGINEER EPC CONTRACTOR

NATIONAL HIGHWAY RCC DEVELOPERS LTD.


L.N MALVIYA INFRA PROJECTS PVT.LTD
AUTHORITY OF INDIA (MEERUT)

WATER ABSORPTION TEST


[ As Per IS-2386 (Part 3) ]

Date of Sampling : Date of Testing :

Sample No. :01 Source of Material Yamunanagar

Type of Material : AIL- 40 mm Tested by :Jointly

Sl. No. Description Trail-I Trail-II Trail-III

Weight of Saturated surface dry sample


1 (grms) 1260 1120 1098

2 Weight of Oven dry sample (grms) 1252 1114 1091

3 Weight of Water (grms) 8 6 7

4 Absorption (%) 0.639 0.539 0.642

Average Water Absorption (% ) 0.606

Remarks :

EPC Contractor's Representative Authority's Engineer Representative


"Improvement and up- gradation from Muzaffarnagar-Miranpur Section of
Name of NH-709 AD From (Km 97+450 to Km 123+450) on EPC Mode under NH (O) in
Project the State of Uttar Pradesh (Package-III)"

CLIENT AUTHORITY ENGINEER EPC CONTRACTOR

NATIONAL HIGHWAY RCC DEVELOPERS LTD.


L.N MALVIYA INFRA PROJECTS PVT.LTD
AUTHORITY OF INDIA (MEERUT)

WATER ABSORPTION TEST


[ As Per IS-2386 (Part 3) ]

Date of Sampling : Date of Testing :

Sample No. :01 Source of Material Yamunanagar

Type of Material : AIL- 20 mm Tested by :Jointly

Sl. No. Description Trail-I Trail-II Trail-III

1 Weight of Saturated surface dry sample (grms) 2145 2244 2340

2 Weight of Oven dry sample (grms) 2127 2228 2320

3 Weight of Water (grms) 18 16 20

4 Absorption (%) 0.846 0.718 0.862

Average Water Absorption (% ) 0.809

Remarks :
For the Contractor's Representative Authority's Engineer Representative
"Improvement and up- gradation from Muzaffarnagar-Miranpur
Name of Section of NH-709 AD From (Km 97+450 to Km 123+450) on EPC Mode
Project under NH (O) in the State of Uttar Pradesh (Package-III)"

CLIENT AUTHORITY ENGINEER EPC CONTRACTOR

NATIONAL HIGHWAY RCC DEVELOPERS LTD.


L.N MALVIYA INFRA PROJECTS PVT.LTD
AUTHORITY OF INDIA (MEERUT)

WATER ABSORPTION TEST


[ As Per IS-2386 (Part 3) ]

Date of Sampling : Date of Testing :

Sample No. :01 Source of Material Yamunanagar

Type of Material : AIL- 10 mm Tested by :Jointly

Sl. No. Description Trail-I Trail-II Trail-III

Weight of Saturated surface dry sample


1 (grms) 1560 1422 1740

2 Weight of Oven dry sample (grms) 1544 1406 1719

3 Weight of Water (grms) 16 16 21

4 Absorption (%) 1.036 1.138 1.222

Average Water Absorption (% ) 1.132

Remarks :
Remarks :

For the Contractor's Representative Authority's Engineer Representative


"Improvement and up- gradation from Muzaffarnagar-Miranpur
Name of Section of NH-709 AD From (Km 97+450 to Km 123+450) on EPC Mode
Project under NH (O) in the State of Uttar Pradesh (Package-III)"

CLIENT AUTHORITY ENGINEER EPC CONTRACTOR

NATIONAL HIGHWAY RCC DEVELOPERS LTD.


L.N MALVIYA INFRA PROJECTS PVT.LTD
AUTHORITY OF INDIA (MEERUT)

WATER ABSORPTION TEST


[ As Per IS-2386 (Part 3) ]

Date of Sampling : Date of Testing :

Sample No. :01 Source of Material Yamunanagar

Type of Material Stone Dust Tested by :Jointly

Sl. No. Description Trail-I Trail-II Trail-III

Weight of Saturated surface dry sample


1 (grms) 536 580 542

2 Weight of Oven dry sample (grms) 526.5 570 532

3 Weight of Water (grms) 9.5 10 10

4 Absorption (%) 1.804 1.754 1.880

Average Water Absorption (% ) 1.813

Remarks :
For the Contractor's Representative Authority's Engineer Representative
"Improvement and up- gradation from Muzaffarnagar-Miranpur Section
Name of Project of NH-709 AD From (Km 97+450 to Km 123+450) on EPC Mode under NH
(O) in the State of Uttar Pradesh (Package-III)"

CLIENT AUTHORITY ENGINEER EPC CONTRACTOR

NATIONAL HIGHWAY
L.N MALVIYA INFRA PROJECTS PVT.LTD RCC DEVELOPERS LTD.(MEERUT)
AUTHORITY OF INDIA

AGGREGATE INTER LAYER DESIGN REPORT


1.1 : Proposed Materials : 40 mm. = 28%

20 mm. = 22%

10 mm. = 20%

Stone Dust = 30%

1.2 : PHYSICAL REQUIREMENTS OF MATERIALS

Test Result of
Requirements as per
Sl.No Nature of Test Test Method Proposed Remerks
MORTH
material

1 Mix Gradation Gradation Table 400-13 of MORTH Results Enclosed Satisfactory

2 Plasticity Index As Per IS : 2720 Part V (1970) Maximum 6% Non Plastic Satisfactory

40 mm - 0.606 Satisfactory

20 mm - 0.809 Satisfactory
Water Absorption
3 of Coarse & Fine As Per IS : 2386 ( Part-III ) Maximum 2%
Aggregate
10 mm - 1.132 Satisfactory

Dust - 1.813 Satisfactory

Aggregater Impact
4 As Per IS : 2386 ( Part-IV ) Maximum 30% 16.82% Satisfactory
Value

Combined
5 Flakiness & As Per IS : 2386 ( Part-I ) Maximum 35% 21.98% Satisfactory
Elongation

Combined Water
6 As Per IS : 2386 ( Part-III ) Maximum 2% 1.118 Satisfactory
Absorption

Remarks :

EPC Contractor's Representative Authority's Engineer Representative


1.3 Selected Gradation
The Selected gradation for AGGREGATE INTER LAYER (AIL) is as given below
Sieve Size % of Passing Specification Limit
53.0 100.00 100
45.0 100.00 95-100
22.4 74.34 60-80
11.2 48.54 40-60
4.75 31.44 25-40
2.36 25.69 15-30
0.600 19.78 8.-22
0.075 3.17 0-5

1.4 Test on Blended Aggregate ( Selected gradation )


After blending of all aggregate the following test were
1 Sieve analysis
2 Moisture Density Relationship by using modified proctor test
3 Liquid Limit & Plasicity Index
4 Water Absorption
5 Aggregate Impact Value
6 Combined Flakness & Elongation

1.5 Characterstic of Adopted Mix


1 Proportion of the Mix
40 mm 28% 27.44%
20 mm 22% 21.56%
10 mm 20% 19.60%
Stone Dust 30% 29.40%
Bitumen Emulsion (AS PER IRC 37-2012) 2%
2 Maximum Dry Density gm/cc
3 Optimum Moisture Content
4 Liquied Limit 21.50%
5 Plasticity Index Non-Plasic
6 Water Absorption 1.118
40 mm 0.606
20 mm 0.809
10 mm 1.132
Stone Dust 1.813
7 Aggregate Impact Value 16.82%
8 Combine Flakiness & Elongation Index 21.98%
9 Combine Water Absorption 40 mm 28.00% 0.606 0.170 %
20 mm 22.00% 0.809 0.178 %
10 mm 20.00% 1.132 0.226 %
Stone Dust 30.00% 1.813 0.544 %
:- 1.118 %
EPC Contractor's Representative Authority's Engineer Representative