f 8 10 12 14 16 18 20 22
Longitud
2,447.36 4,900.56 2,950.04 1,942.58 2,579.34 0.00 0.00 0.00
(m)
Var (12m) 203.95 408.38 245.84 161.88 214.95 0.00 0.00 0.00
Peso (kg) 966.71 3,023.65 2,619.64 2,346.64 4,070.20 0.00 0.00 0.00
RESUMEN DE MATERIALES
ACERO DE REFUERZO fy=4200 Kg/cm2
Acero de refuerzo = 13,026.82 kg
HORMIGON f'c=210kg/cm2
Cadena de Amarre = 28.68 m3
Plintos = 40.75 m3
Columnas = 40.46 m3
OS
Long. Obs
total
1,836.48
2,447.36
463.32
686.76
96.00
123.20
246.00
60.00
28.80
520.00
272.50
1,060.00
116.76
219.12
183.36
60.00
1,221.12
976.08
516.84
772.48
100.64
264.60
141.60
227.20
510.04
329.64
153.34
120.54
360.00
220.00
50.00
50.00
386.10
25 28
0.00 0.00
0.00 0.00
0.00 0.00
ES
PLANILLA "2" DE ACEROS
Marca Tipo f No. D I M E N S I O N E S (m) Long. Long.
f 8 10 12 14 16 18 20 22 25
Longitud
0.00 0.00 639.70 437.04 0.00 0.00 0.00 0.00 0.00
(m)
Var (12m) 0.00 0.00 53.31 36.42 0.00 0.00 0.00 0.00 0.00
Peso (kg) 0.00 0.00 568.05 527.94 0.00 0.00 0.00 0.00 0.00
RESUMEN DE MATERIALES
ACERO DE REFUERZO fy=4200 Kg/cm2
Losas N+2,88, N+5,76, N+8,64,
1,096.00 kg
N+11,52, Templadores =
HORMIGON f'c=210kg/cm2
Losas = 81.23 m3
Obs
28
0.00
0.00
0.00
CUADRO DE CADENAS DE AMARRE
DIMENSIONES (m)
TIPO Acero longitudinal Estribo cerrado
Largo b h
Ca (1) 458.88 0.25 0.25 4 F 12 mm Mc 101 2549 F 8 mm
AMARRE
Volumen
bo cerrado
(m3)
Mc 102 28.68
28.68
CUADRO DE PLINTOS
DIMENSIONES ARMADURAS
UBICACIÓN TIPO No.
A B h fx
2B-2C-2D-2E-2F-2G-2H-2I-2J-
P1 18 1.80 2.20 0.30 11 F 14 mm
2K-6D-6E-6F-6G-6H-6I-6J-6K
33
INTOS
RMADURAS ARMADURAS
Vol. (m3)
fx fy 103 104 105
103 198
104 354
105 32
106 56
107 82
107b 20
108b 16
0 0
0 0
106 107 107b 108b
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 28 0 0 0 0 0 0 0 0
12 12 0 0 0 0 0 0 0 0 0 0
0 0 16 16 0 0 0 0 0 0 0 0
32 0 0 22 0 0 0 0 0 0 0 0
0 0 0 16 20 0 0 0 0 0 0 0
0 0 25 0 0 0 0 16 0 0 0 0
44 12 16 66 20 0 0 16 0 0 0 0
CUADRO DE COLUMNAS DE HORMIGON
Dimensiones b x l 0.35 X 0.50 0.40 X 0.50 0.35 X 0.55 0.35 X 0.55 0.35 X 0.55 0.35 X 0.55 0.40 X 0.65 0.40 X 0.65
2B-2C-2D-2E-2F-2G-2H-2I-
1E-1F-1G-1H-1-I1J-1K-1L-2L-
Ubicación 1A-2A-3A-4A-5A-1B-1C-1D
3-L4-L5L-5'L
2J-2K-26-B6-C6-D6-E6-F6- 3B-3K-4B-4K-5B-5K 7B-8B 7C-7D-8C-8D 6A 7A-8A
G6-H6-I6-J6K
Cantidad 10 11 20 6 2 4 1 2
Nivel superior 4.00 0.00 0.00 0.00 -3.23 -3.40 4.00 3.40
Nivel inferior -2.20 -2.20 -2.20 -2.20 -5.43 -5.60 -5.43 -5.43
Altura columna 6.20 2.20 2.20 2.20 2.20 2.20 9.43 8.83
Acero Longitudinal 80 F 14 mm Mc 108 88 F 14 mm Mc 109 280 F 16 mm Mc 110 72 F 16 mm Mc 110 24 F 16 mm Mc 110 48 F 16 mm Mc 110 12 F 16 mm Mc 111 24 F 16 mm Mc 112
Estribo cerrado 828 F 10 mm Mc 115 324 F 10 mm Mc 115 588 F 10 mm Mc 116 176 F 10 mm Mc 117 60 F 10 mm Mc 117 118 F 10 mm Mc 117 126 F 10 mm Mc 118 236 F 10 mm Mc 118
Estribo adicional 1 F 10 mm Mc F 10 mm Mc 294 F 10 mm Mc 120 88 F 10 mm Mc 121 30 F 10 mm Mc 121 59 F 10 mm Mc 121 63 F 10 mm Mc 122 118 F 10 mm Mc 122
Volumen (m3) 10.85 4.84 8.47 2.54 0.85 1.69 2.45 4.59
B 25 B 40 B
H 40 H 50 H
A = 40 X 65 A = 40 X 55 A =
B 40 B 40 B
H 65 H 55 H
35
55
12
19.25 cm2
A var As tot Var
1.13 13.6 Aumente
1.54 18.5 Aumente
2.01 24.1 Ok
2.54 30.5 Ok
3.14 37.7 Ok
3.80 45.6 Ok
4.91 58.9 Ok
30 X 50
30
50
15 cm2
A var As tot Var
1.13 9.0 Aumente
1.54 12.3 Aumente
2.01 16.1 Ok
2.54 20.4 Ok
3.14 25.1 Ok
3.80 30.4 Ok
4.91 39.3 Ok
Carga P 0.90 t/m2
Esfuerzo Suelo 12.00 t/m2
entrepiso = =
COMPROBACION PLINTO COMPROBACION PLINTO
A cooperante = 17.72 m2 A cooperante = 11.76 m2
No. Pisos = 3 Und No. Pisos = 3 Und
A= 2.00 m A= 1.50 m
B= 1.60 m B= 1.40 m
A plinto = 3.99 m2 A plinto = 2.65 m2
3.20 2.10
Aumente Aumente
COMPROBACION PLINTO COMPROBACION PLINTO COMPROBACION PLINTO
A cooperante = 18.07 m2 A cooperante = 19.94 m2 A cooperante = 20.85 m2
No. Pisos = 3 Und No. Pisos = 3 Und No. Pisos = 3 Und
A= 1.80 m A= 2.80 m A= 2.00 m
B= 1.80 m B= 2.80 m B= 1.90 m
A plinto = 4.07 m2 A plinto = 4.49 m2 A plinto = 4.69 m2
< que < que < que
3.24 7.84 3.80
Aumente Ok Aumente
COMPROBACION PLINTO COMPROBACION PLINTO COMPROBACION PLINTO
A cooperante = 12.29 m2 A cooperante = 16.38 m2 A cooperante = 16.05 m2
No. Pisos = 3 Und No. Pisos = 3 Und No. Pisos = 3 Und
A= 1.50 m A= 2.00 m A= 2.00 m
B= 1.50 m B= 1.50 m B= 1.50 m
A plinto = 2.77 m2 A plinto = 3.69 m2 A plinto = 3.61 m2
< que < que < que
2.25 3.00 3.00
Aumente Aumente Aumente
COMPROBACION PLINTO COMPROBACION PLINTO COMPROBACION PLINTO
A cooperante = 10.72 m2 A cooperante = m2 A cooperante = m2
No. Pisos = 3 Und No. Pisos = Und No. Pisos = Und
A= 1.40 m A= 1.00 m A= 1.00 m
B= 1.40 m B= 1.00 m B= 1.00 m
A plinto = 2.41 m2 A plinto = 0.00 m2 A plinto = 0.00 m2
< que < que < que
1.96 1.00 1.00
Aumente Ok Ok
COMPROBACION PLINTO COMPROBACION PLINTO COMPROBACION PLINTO
A cooperante = m2 A cooperante = m2 A cooperante = m2
No. Pisos = Und No. Pisos = Und No. Pisos = Und
A= m A= m A= m
B= m B= m B= m
A plinto = 0.00 m2 A plinto = 0.00 m2 A plinto = 0.00 m2
< que < que < que
0.00 0.00 0.00
Ok Ok Ok
CUADRO DE
Tipo CM1 CM2 CM2 CM3
Dimension (mm) 500x250 400x250 400x250 400x250
2B-2C-2D-2E-
2F-2G-2H-2I-
Ubicación 3B-3K-5B-5K 4B-4K 6A
2J-2K-6F-6G-
6H-6I-6J-6K
Cantidad 16 4 2 1
Nivel inferior (m) 0.00 0.00 0.00 0.00
Nivel superior (m) 8.00 9.09 9.45 4.00
Altura columna (m) 8.00 9.09 9.45 4.00
Perimetro L (m) 1.50 1.30 1.30 1.30
Espesor (mm) 8 8 8 12
Peso (kg) 12,057.60 2,968.43 1,543.00 489.84
Peso Total (kg)
CUADRO DE
Tipo Pl1 Pl2 Pl2 Pl3
Cantidad 16 4 2 1
Dimension (mm) 650x400 450x400 450x400 550x400
Espesor (mm) 12 12 12 15
Peso (kg) 391.87 97.97 48.98 30.62
Peso Total (kg)
12449.472
UADRO DE COLUMNAS METALICAS
CM3 CM3 CM3 CM3 CM4 CM4
400x250 400x250 400x250 400x250 400x200 400x200
2 2 2 4 1 2
0.00 0.00 -3.23 -3.40 0.00 -3.23
3.40 6.80 6.80 6.80 6.80 3.40
3.40 6.80 10.03 10.20 6.80 6.63
1.30 1.30 1.30 1.30 1.20 1.20
15 15 15 15 12 12
1,040.91 2,081.82 3,070.68 6,245.46 768.67 1,498.91
36,286.92
1G-1H-1I-1J-
6B-6C-6D-6E 1K-1L-2L-3L- 5L-6L
4L
4 9 2 51
0.00 0.00 0.00
8.00 4.00 3.00
8.00 4.00 3.00
1.50 1.50 1.50
12 6 6
4,521.60 2,543.40 423.90
36,286.92
220.54
16.54
220.54
Peso (kg)
1,689.95
929.47
1,872.88
913.03
1,272.01
915.85
7,593.20
252.78
18.96
252.78
Peso (kg)
1,863.18
1,024.75
1,334.81
650.72
1,458.22
1,049.92
7,381.60
224.08
16.81
224.08
Peso (kg)
4,110.51
2,003.87
2,327.31
1,861.84
10,303.53
418.11
31.36
418.11
Peso (kg)
2,669.63
1,301.44
3,971.07
Peso (kg)
3,280.05
1,990.31
1,868.28
5,270.36
1,938.95
439.61
2,378.56
187.05
38.88
225.93
12,505.50
12,505.50
VIGAS METALICAS GRADAS
898.15
441.99
1,340.13
PERFILES METALICOS SOBRE GRADAS
Perfil Tipo L (m) Cant. Peso/m
(kg)
GRADAS
1 Perfil T:150x100x3 T 227.26 1 11.78
2,729.51
2,729.51
RESUMEN TOTAL DE CANTIDADES MATERIAL
Varillas de refuerzo fy=4200kg/cm2 (kg) 14,122.82
COLOR
EJE 5¨-5 0.35 1,040 6.50
NATURAL
COLOR
EJE 5-4 0.35 1040 4500
NATURAL
Cantidad 16 4 2 1
Nivel inferior (m) 0.00 0.00 0.00 0.00
Nivel superior (m) 8.00 9.09 9.45 4.00
Altura columna (m) 8.00 9.09 9.45 4.00
Perimetro L (m) 1.50 1.30 1.30 1.30
Espesor (mm) 8 8 8 12
Peso (kg) 12,057.60 2,968.43 1,543.00 489.84
Peso Total (kg)
CUADR
Tipo Pl1 Pl2 Pl2 Pl3
Cantidad 16 4 2 1
Dimension (mm) 650x400 450x400 450x400 550x400
Espesor (mm) 12 12 12 15
Peso (kg) 391.87 97.97 48.98 30.62
Peso Total (kg)
CUADRO DE CUBIERTA GALPON
AREA TOTAL AREA K/G
AREA SECCION
Kg/M2 Kg/M2 T/S M2 ENTRE TOTAL
mm
EJES ENTRE EJES
2 2 2 4 1
0.00 0.00 -3.23 -3.40 0.00
3.40 6.80 6.80 6.80 6.80
3.40 6.80 10.03 10.20 6.80
1.30 1.30 1.30 1.30 1.20
15 15 15 15 12
1,040.91 2,081.82 3,070.68 6,245.46 768.67
36,286.92
TIPO DE
GEOMETRIA MEDIDAS MM. CANT PRECIO
ACERO
Disco de desvaste
NORTON 10 und
7x1/4x 7/8
Estilpanel/techos
6500 104
galvalume e=0.40mm
Estilpanel/techos
4500 104
galvalume e=0.40mm
condor Anticorrosivo gris 25 galones