Merits Consulting Engineers Ltd

contact@merits.mu

Control panels Yes (final commissioning on-site)

Terminal units (fan coil units, etc) Yes (final commissioning on-site)

Wiring No

Communications network No

Sensors No

Actuators No

Integration gateways Partial

• Ensure that a record of all settings, set-points and offsets are maintained throughout the pre-commission-
ing period.

• Ensure that all final physical adjustments to the field devices are indelibly marked.

• Ensure that all packaged plant interfaced with the BMS is fully tested and commissioned by the manufac-
turer or installer.

• Ensure that the BMS is pre-commissioned in accordance with the following requirements of CIBSE Code C
(Commissioning of automatic control systems).

• Table 16 CIBSE Code C automatic control systems pre-commissioning requirements

Pre-commissioning action CIBSE Code C section reference

Control applications software C5.2

Control panels C5.3

Wiring C5.4

Communications networks C5.5

Sensors C5.6

Actuators and valves C5.7

Digital inputs/outputs C5.8

Pneumatic actuation with microprocessor control C5.9

Field control devices C5.10

W17 Telfair Version 0 TESTING AND COMMISSIONING | Page 11 of 19


Testing & Commissioning Specification Published on 2023-07-17 ID: A828.TNC01
Template ID: MCE-TE-RP-0003; Template Version: 1.0