SCHEDULE OF LOADS AND CALCULATION

CKT. LOAD CB SIZE


LOAD DESCRIPTION 5W 10W 100W 180W 1000W WATTS VOLTS AMPS SIZE OF CONDUCTOR IN CONDUIT
NO. QTY. POLE AF AT

1 LIGHTING OUTLET 53 9 38 6 0 0 1025 230 4.46 2 50 20 2-3.5mm2 THHN & 1-2.0mm2 IN 20mmØ PVC

2 LIGHTING OUTLET 40 13 24 3 0 0 605 230 2.63 2 50 20 2-3.5mm2 THHN & 1-2.0mm2 IN 20mmØ PVC
CONVENIENCE
3
OUTLET
11 0 0 0 11 0 1980 230 8.61 2 50 20 2-3.5mm2 THHN & 1-2.0mm2 IN 20mmØ PVC

P A N E L
4 WASHING MACHINE 1 0 0 0 0 1 1000 230 4.35 2 50 20 2-3.5mm2 THHN & 1-2.0mm2 IN 20mmØ PVC

5 MICROWAVE 1 0 0 0 0 1 1000 230 4.35 2 50 20 2-3.5mm2 THHN & 1-2.0mm2 IN 20mmØ PVC

6 RANGE 1 0 0 0 0 0 8000 230 34.78 2 50 40 2-8.0mm2 THHN & 1-5.5mm2 IN 20mmØ PVC
CONVENIENCE
7 8 0 0 0 8 0 1440 230 6.26 2 50 20 2-3.5mm2 THHN & 1-2.0mm2 IN 20mmØ PVC
OUTLET

L O A D
KIKO ROSA MARSHALL
2-3.5mm2 THHN & 1-5.5.0mm2 IN 20mmØ PVC

KIK
8 1.5 HP ROOM ACU 1 0 0 0 0 1 2300 230 10 2 50 30

O
RO
SA
- PA
9 1.5 HP ROOM ACU 1 0 0 0 0 1 2300 230 10 2 50 30 2-3.5mm2 THHN & 1-5.5.0mm2 IN 20mmØ PVC

RK
LAN
EA
CC
SPARE - - - - - - - - - - - -

E
10

SS
ARNA

RO
AD
MISTRAL PLAINS MISTRAL
LDO
HIGH

UE
L EVEN
MISTRA

ENUE
WAY

EV
MISTRAL SAN FRANCISCO
MISTRAL EVENUE
ELEMENTARY PHASE 6C
MISTRAL SCHOOL
22 62 9 19 4 - - -
T O T A L 117 19650 - 85.44

VISTAL MALL Full Load Current @ 80% (DF) Demand Factor


PHASE 6B DF = (85.44) X 0.8 = 68.35 AMPERE

PHASE 7

GENERAL NOTES:
PHASE 6A
TOP OF METER POST
PHASE 5 PHASE 4 A. ALL ELECTRICAL WORKS SHALL BE DONE IN
LE RICA HOMES
2 POLE, 220 VOLTS
ACCORDANCE WITH THE RULES AND REGULATION
AB
ON

ALLDAY
IFA

SUPERMARKET
CIO

2 Ø G.I. CONDUIT PIPE


OF THE PHILIPPINE ELECTRICAL CODE AND WITH

2500
TIERRA NEVADA RC - COLUMN
CITY
MALL
PHASE 1
BASKETBALL
THE REQUIREMENTS OF THE LOCAL POWER
SITIO ELANG COURT

M1
KILOWATT
HOUR METERS COMPANY.
(WILL BE INSTALL

4900
AB

BOTTOM OF IN FENCE)
ON

SERVICE METER
IFA
CIO

PHASE 1 B. ALL MATERIALS TO BE USED SHALL BE NEW AND


SAN FRANCISCO GROUND LINE

2000
BARANGAY HALL
SUNNY BROKE 1 PHASE 2 APPROVED TYPE FOR THE LOCATION.
PHASE 1
SUNNY BROKE BASKETBALL
ELEMENTARY COURT GROUND ROD
7-ELEVEN SCHOOL
PHASE 3 NATURAL GRADE LINE ROAD GUTTER
C. THERE SHALL BE ONLY ONE (1) SERVICE DROP

400
ROAD
MINISTOP
ARNALDO HIGHW

MOTHER TERESA
SCHOOL
SERVICE LEVEL FROM THE POWER SOURCE.
NINEVEH BDO SUNNY BROKE 2 TO BUILDING
ACADEMY
K

E SERVICE ENTRANCE/METER POLE DET.


EE
CR

PHASE 1 NO TO SCALE D. ALL WIRINGS SHALL BE INSTALLED IN P.V.C. OR


3 7
AY

PUREGOLD SERVICE ENTRANCE RIGID STEEL CONDUIT RUN EMBEDED INSIDE THE
BROOKSIDE CONNECTED TO
ARNALDO HIGHWAY

EXISTING ELECTRICAL
AC SOURCE
HALLOW BLOCKS AND CONCRETE STRUCTURES,
SLABS, COLUMNS, OR IN RUN CONCEALED
THIS SITE M KWH M

2- 8mm²THHN/THW IN 40 mm. Ø EMT BETWEEN DOUBLE WALL, WOODEN PARTITION


60A MAIN
Gov. Luis A. Ferrer Jr. AND CLOSED WIRINGS ABOVE DROP CEILINGS.
National High School
20A 20A
PETRON
1 2
E. MINIMUM SIZE OF CONDUIT AND WIRE TO BE
20A 20A
USED SHALL BE 12mm. IN DIAMETER AND
3 4

E VICINITY MAP E LOCATION MAP 20A 40A


2-20mm.² TYPE TW.
1 7 NO TO SCALE NO TO SCALE
2 7 5 6

20A 30A F. ALL OUTLETS SHALL BE INSTALLED AT THE


7 8
FOLLOWING HEIGHTS ABOVE THE FINISH FLOOR
30A 30A
9 SPARE
LEVEL.
A. LIGHT SWITCH (1200mm or 1.20m)
GROUND CONNECTION
B. CONVENIENCE OUTLET (300mm or 0.30m)
C. PANEL BOARD (300mm or 0.30m)
E PANEL BOARD DIAGRAM D. TELEPHONE OUTLET (300mm or 0.30m)
4 7 NO TO SCALE
E. SAFETY SWITCH (1400mm or 1.40m)

FROM THE OFFICE OF ARCHITECT ENGINEER R.A. 9266. 33 Architecture Act of 2004 PROJECT TITLE OWNER DRAWN BY: NO. REVISIONS DATE. SHEET CONTENTS SHEET NO. E
Drawing and specification duly signed, stamped, or sealed as A PROPOSED 2 STOREY

1
instrument of service are the property and documents of the RESIDENTIAL BUILDING MS. JEANETH RAMIREZ AURELIO SUMEGUIN JR.
architect, whether the object for which they are made is
PRC NO. PRC NO. executed or not. It shall be unlawful for any person, without the
written consent of the architect or author of the said
LOCATION: ADDRESS: CHECKED BY:
PTR NO. PTR NO. documents to duplicate for use in the repetition and for other
BLK 14 LOT 3 PHASE 1 TIERRA
TIN NO. DATE. TIN NO. projects or builders whether executed partly or in whole. GEN. TRIAS CAVITE
NEVADA SAN FRANCISCO GEN.
IAPOA NO. PLACE. DATE/PLACE. TRIAS CAVITE 4107

You might also like