1. Introduction of LESCO ........................................................................................ 1
1.1. Company History:............................................................................................................... 1
1.2. Vision: ................................................................................................................................ 1
1.3. Mission Statement: ............................................................................................................ 1
1.4. Organization Structure (Organogram) of the Office of Assistant Manager (O) ..................... 2
1.5. Organizational Structure of the Office of Assistant Manager (CS)/RO, LESCO ...................... 3
1.6. Organization Structure (Organogram) of the Office of Deputy Manager (O) ....................... 4
1.7. Organization Structure (Organogram) of the Office of Manager (O).................................... 5
2. Abbreviations ...................................................................................................... 6
.3 Commercial Procedure Form List ..................................................................... 11
4. Electricity Tariff with Codes ............................................................................. 15
5. Tariff/Meter Terms used in Billing ................................................................... 17
5.1. Tariff: ............................................................................................................................... 17
5.2. TOD Tariff: ....................................................................................................................... 17
5.3. TOU Meter: ...................................................................................................................... 17
5.4. Peak (T1) and Off-Peak (T2) Timing................................................................................... 17
5.5. How to Charge / Bill, MDI (Load) Under TOD Tariff ........................................................... 17
6. General Definitions: .......................................................................................... 18
6.1. Single Part Tariff ............................................................................................................... 18
6.2. Two Part Tariff ................................................................................................................. 18
6.3. Minimum charges: ........................................................................................................... 18
6.4. Fixed Charges: .................................................................................................................. 18
6.5. Billing Demand: ................................................................................................................ 18
6.6. Variable Charges: ............................................................................................................. 18
6.7. Maximum Demand:.......................................................................................................... 18
6.8. Sanctioned Load: .............................................................................................................. 19
6.9. Authority:......................................................................................................................... 19
7. Domestic Tariff A-1a ......................................................................................... 20
7.1. TARIFF SLABS AND RATES ................................................................................................. 20
7.2. CALCULATION OF BILL ...................................................................................................... 20
7.3. Calculation of MDI TOU/ TOD Bill ..................................................................................... 21
8. Procedure of New Connections ........................................................................ 22
8.1. Application Form .............................................................................................................. 22
8.2. Processing Applications for New Connections .................................................................. 23
8.3. General System Description for New Connections ............................................................ 23
8.4. Time Limit for New Connections (in Days) ........................................................................ 23
8.5. Issuance of Demand Notices ............................................................................................ 24
8.6. Verification of the Test Report ......................................................................................... 24
8.7. Stores Requisitions ........................................................................................................... 24
8.8. Service Connection Order................................................................................................. 24
8.9. Individual Consumer's file ................................................................................................ 24
8.10. Responsibility of SDO Regarding New Connection ........................................................ 24
8.11. Billing to New connection ............................................................................................. 25
8.12. CIBS.............................................................................................................................. 25
9. Temporary Connection ..................................................................................... 26
9.1. Procedure for Application ................................................................................................ 26
10. CP-Form Used For New Connection & Billing .................................................. 27
10.1. CP-Form 01 – Register of Application and Agreement Forms and Abridged Conditions . 28
10.2. CP- Form 02 – Abridged Conditions of Supply ............................................................... 29
10.3. CP- Form 03 – Application and Agreement Form .......................................................... 36
10.4. CP- Form 04 - Sub-Divisional Office Service Connection Register................................... 38
10.5. CP- Form 05 - Service Estimate and Justification Form .................................................. 39
10.6. CP- Form 06 – Demand Notice for Service Connection Cost .......................................... 40
10.7. CP- Form 06A – Demand Notice for Security Deposit .................................................... 41
10.8. CP- Form 07 – Wiring Contractor’s Test Report ............................................................. 42
10.9. CP- Form 08 – Service Connection Order (Upto 40KW) ................................................. 45
10.10. CP- Form 08A – Service Connection Order (Above 40KW) ............................................. 46
10.11. CP- Form 13 – Consumer Statistics ............................................................................... 47
10.12. CP- Form 13A – List of New Connections Installed During the Month............................ 48
10.13. CP- Form 69 – Advise of Tariff/Other Changes (Change Notification) ............................ 49
10.14. CP- Form 136 – Master Data Addition/Change Form (Connection upto 40 KW) ............ 50
10.15. CP- Form 137 - Master Data Addition/Change Form (Connection Above 40KW)............ 51
11. Security Deposit Rates ..................................................................................... 52
12. Billing Schedule ................................................................................................ 53
13. TOU/TOD Meter Reading .................................................................................. 54
14. Percentage Checking of Meters Reading ......................................................... 55
15. Formulas ........................................................................................................... 56
15.1. Meter Accuracy ............................................................................................................ 56
15.2. Meter Slowness............................................................................................................ 56
15.3. Power Factor ................................................................................................................ 56
15.4. Load Factor .................................................................................................................. 56
15.5. Monthly Losses ............................................................................................................ 56
15.6. Progressive Losses ........................................................................................................ 56
16. Policy and Procedures on Detection Bills ........................................................ 57
16.1. Detection Billing for Theft of Energy ............................................................................. 57
16.2. Detection Billing for Direct Hooking.............................................................................. 57
16.3. Preparation of Detection bill for three month at 40 % Load Factor ............................... 61
17. Commercial Procedure Forms Related to Meter Reading ............................... 62
17.1. CP-Form 09 – Consumer Meter Reading Card (Upto 40KW) .......................................... 63
.17.2 CP-Form 09A – Consumer Meter Reading Card (Above 40KW)...................................... 65
17.3. CP-Form 11 – Meter Reading Record General Consumers............................................. 68
17.4. CP-Form 11A – Meter Reading Percentage Check Register for AM(O) ........................... 69
17.5. CP-Form 12 – Meter Reading Record – Maximum Demand Connections ...................... 70
17.6. CP-Form 12A – Meter Reading Percentage Check Register (meant for DM(O)/M(O) ..... 71
17.7. CP-Form 20 – Sub Divisional Office Meter Reading Programme Register....................... 72
17.8. CP-Form 21C – Meter Reading List................................................................................ 73
17.9. CP Form 23 – Meter Change Order ............................................................................... 75
17.10. MDI Meter Test Check Preform by M&T, One Phase Dead ............................................ 76
17.11. CP-Form 34C – Meter Reading List (MDI) Connection upto 500KWH ............................. 82
17.12. CP-Form 58 – Rise and Fall Register .............................................................................. 83
17.13. CP-Form 58A – Discrepancy Report .............................................................................. 84
17.14. CP-Form 69 – Change Notification Advice of Tariff/Other Changes ............................... 85
17.15. CP-Form 70 – Consumer’s Bill Despatch Book ............................................................... 86
17.16. CP-Form 73 – Sub-Divisional Office Re-routification and Re-numbering Register .......... 87
17.17. CP Form 75 – Bill Adjustment Note ............................................................................... 88
17.18. CP-Form 76 – Consumers Bill Delivery Book.................................................................. 89
17.19. CP-Form 84 – Advice to SDO for Error in Meter Reading List ......................................... 90
17.20. CP-Form 88A – Billing Assessment ................................................................................ 91
17.21. CP-Form 88L – Ledger Posting ...................................................................................... 92
17.22. CP-Form 88S – Bill Adjustments Posted At The Month End ........................................... 93
17.23. CP-Form 90 – List of Estimated Meter Readings............................................................ 94
17.24. CP-Form 94 – Statement of Units Billed Feeder-wise within Sub Division ...................... 95
17.25. CP-Form 95 – Bill Summary .......................................................................................... 96
18. Commercial Procedure Forms Related to Line Losses ..................................... 99
18.1. CP-Form 22 –Line Losses, Billing & Arrear Analysis...................................................... 100
18.2. CP-Form 22A – Feeder Wise Line Losses Analysis........................................................ 101
18.3. CP-Form 22B - 11KV FEEDERWISE UNITS SENT OUT FROM GRID STATION .................. 102
18.4. CP-Form 22E – Statement Showing Bundled Feeders/Load Shifted ............................. 103
18.5. Components of Electricity Bill (Commercial & Industrial) ............................................ 104
19. Electricity Act-1910 ........................................................................................105
SECTION 24 - (Discontinuance of supply to consumer neglecting to pay charges) ................... 105
SECTION 26 A - (Dishonest abstraction or consumption of energy)......................................... 105
SECTION 39, 39A (Theft of energy (Imprisonment/Fine) ......................................................... 105
SECTION 54-A. ....................................................................................................................... 105
SECTION 54-B. ....................................................................................................................... 105
SECTION 54-C Bar of Jurisdiction: ........................................................................................... 105
20. Commercial Procedure Forms Related to DCO, RCO & Recovery .................106
20.1. CP- Form 14 – Temporary Disconnection Order .......................................................... 107
20.2. CP- Form 15 – Sub-Divisional Office Temporary Disconnection Order Register............ 108
20.3. CP- Form 16 – Disconnection Order (To remove equipment) ...................................... 109
20.4. CP- Form 17 –Disconnection Order Register (Disconnection on Consumer’s Request) 110
20.5. CP- Form 18 – Application for Reconnection and Reconnection Order ........................ 111
20.6. CP- Form 19 – Sub-Divisional Office Reconnection Application Register ...................... 117
20.7. CP- Form 23 – Meter Change Order ............................................................................ 118
20.8. CP- Form 78 (CA 21) – Meter Movement Register (I/C Connection Section) ............... 121
20.9. CP- Form 79 (CA22) – Meter Movement Register (I/C D&R Section) .......................... 122
20.10. CP- Form 90 – List of Estimated Meter Reading .......................................................... 123
20.11. CP- Form 112 – List of Disconnection Orders issued (To Remove Equipment) ............. 124
20.12. CP- Form 112A – Outstanding Disconnection Orders (To Remove Equipment) ............ 125
20.13. CP- Form 114 – List of Outstanding Disconnection Orders (To Remove Equipment) .... 126
20.14. CP-Form 74 – Revenue Office Reconnection Application Register ............................... 128
20.15. Copy of MIS ................................................................................................................ 129
1. INTRODUCTION OF LESCO
1.2. Vision:
“To become the leader amongst the all utility companies in Pakistan through customer satisfaction.”
1
1.4. Organization Structure (Organogram) of the Office of Assistant Manager (Operation) /SDO, LESCO
Naib Qasid 01
Note:
ADDITIONAL REQUIRMANT TO BE MET AGAINST LENGTH OF LINE, NOS OF CONSUMERS AND SUB OFFICES AS PER PEPCO APPROVED YARD STICK AFTER OBTAINING
APPROVAL OF THE AUTHORITIES
AUTHORITY OF DRIVER /LORRY CLEANERS IS TO BE WORKED OUT AT THE SACLE OF HTV AND LTV VEHICLES
2
1.5. Organizational Structure of the Office of Assistant Manager (CS)/RO, LESCO
STENO-II 01
N/QASID 01
3
1.6. Organization Structure (Organogram) of the Office of Deputy Manager (Operation)/XEN, LESCO
Steno-II 01
N/Qasid 01
ADMN Section Accounts Section Technical Section Assistant Manager (Op) Assistant Manager
As per Sub-Division (CS) / R.O as per
of Division Division
4
1.7. Organization Structure (Organogram) of the Office of Manager (Operation)/ SE, LESCO
Manager (Operation)
Steno-I : 01
N/Qasid : 01
Tehsildar
Recovery
ADMN Com Asstt : 01 HDM-I : 01 Assistant Manager (op) Assistant Manager (CS)/R.O
Section Steno –II : 01 Tracer : 02 As per As per
Naib Qasid : 01 N/Q : 01 Sub Division of Circles Division of Circles
Supdt. : 01
Assistant : 01
Sr. Clerk : 01
Jr. Clerk : 01 Typist : 01
CKD/S.G : 01 Elamdar : 01
Sweeper : 01
5
2. ABBREVIATIONS
1 A/C Account
2 AAC All Aluminum Conductor
3 ACSR Aluminum Conductor Steel Reinforced
4 ALAO Assistant Land Acquisition Officer
5 AMCS Assistant Manager Customer Services
6 ATB Anti-Theft Box
7 AWG American Wire Gauge
8 BOD Board of Directors
9 BOQ Bill of Quantity
10 Btl Bottle
11 C.E.O Chief Executive Officer
12 C.Ex Chief Executive
13 CBA Collective Bargaining Agent
14 CBR Central Board of Revenue
15 CCC Central Control Cell
16 CDR Call Deposit Receipt
17 CL Casual Leave
18 CMC Carrier Management Cell
19 CNIC Computerized National Identy Card
20 CP Chain Page
21 CPPA Central Power Purchase Agency
22 CPU Central Processing Unit
23 CT Current Transformer
24 DA Documents Attached
25 DCA Deputy Chief Auditor
26 DCM Deputy Commercial Manager
27 DFA Draft For Approval
28 DFP Delegation of Financial Power
29 DO No Demy Official No.
30 Doz Dozen
31 E&OE Error & Omission Except
32 EHV Extra High Voltage
33 ELR Extra Low Voltage
34 EMB Electrical Measurement Book
35 ERP Enterprise Resource Planning /Program
36 F/A, F/B. F/C Flag/A, Flag/B, Flag/C
37 FCS Free Consignee Store
38 FD Finance Director
6
39 FESCO Faisalabad Electric Supply Company
40 FIFO First in First out
41 FOB Free on Board
42 FRO Fuse Replacement Order
43 GBHP Ghazi Barotha Hydro Power Project
44 GEPCO Gujranwala Electric Supply Company
45 GLI Group Life insurance
46 GM General Manager
47 GPF General Provident Fund
48 GSC Grid System Construction
49 GSO Grid System Operation
50 HESCO Hyderabad Electric Supply Company
51 HR&A Human Resource & Admn Director
52 HT High Tension
53 IESCO Islamabad Electric Supply Company
54 IPPs Independent Power Producers
55 GLI Group Life insurance
56 IRSA Indus River System Authority
57 ITD Information and Technology Director
58 IWASRI International Water Logging and Salinity Research Institute
59 JTO Job Transfer order
60 KVARA Kilo Volt Ampere Reactive Hour
61 KWH Kilo Watt Hour
62 L&CAD Legal & Corporate Affairs Director
63 LAC Leave Admissibility Certificate
64 LAO Land Acquisition Officer
65 LAP Leave on Average Pay
66 LESCO Lahore Electric Supply Company
67 LHAP Leave on half Average Pay
68 LIFO Last in First out
69 LLR Line Losses Register
70 LMO Lady Medical Officer
71 LOI Letter of Indent
72 LPC Last Pay Certificate
73 LPR Leave Pre Retirement
74 LT Low Tension
75 M&S Monitoring & Surveillance
76 MCO Meter Change Order
77 MDI Maximum Demand Indicator
78 MEPCO Multan Electric Supply Company
7
79 MO Medical Officer
80 MRFL Meter Reading Forwarding List
81 MRKS Meter Reading Kalmzoo Sheet
82 MRPR Mater Reading Kalmzoo Register
83 MS Medical Superintendent
84 MSR Material at site Register
85 NAB National Accountability Bureau
86 NEPRA National Electric Power Regulatory Authority
87 NESPAK National Engineering Services Pakistan
88 NFC Noting for consideration
89 NGSC New General Service Connection
90 NIQ Notice inviting Quotations
91 NIRC National Industrial Relation commission
92 NISC National Industrial Service Connection
93 NIT Notice Inviting Tenders
94 NPCC National Power Control Centre
95 NTDC National Transmission and Dispatch Company
96 NTN National Tax Number
97 OCB Oil Circuit Breaker
98 PC Meter Poly Carbonate Mater
99 PC Pole Pre stressed Corporate Pole
100 PEC Pakistan Engineering Council
101 PEMRA Pakistan Electric Media Regulatory Authority
102 PEPCO Pakistan Electric Power Company
103 Pes. Pieces
104 PESCO Peshawar Electric Power Supply Company
105 POL Petrol Oil & Lubrication
106 PPE Personal Protective Equipment
107 PPIB Private Power & Infrastructure Board
108 PPO Pension Pay Order
109 PSDP Public Sector Development Project
110 PT Power Transformer
111 PTO Please Turn Over
112 PTW Permit to work
113 PUC Page under Consideration
114 PVC Poly-vinald Volcanized Cable
115 PWF Pakistan WAPDA Foundation
116 QESCO Quetta Electric Supply Company
117 R/R Railway Receipt
118 RAFR Rise and Fall Register
8
119 S &GA Services & General Administration
120 S&I Surveillance & Investigation
121 SCARP Salinity Control and Reclamation Project
122 SCO Service Connection Order
123 SCR Service Connection Register
124 SID Service Insulated Distributor
125 SIS Self-Insurance Scheme
126 SJO Sunday Job Order
127 SOF Store Owing Formation
128 SOP Standing Operating Procedure
129 SR Store Requisition
130 SS&T Sub-Station & Transmission
131 T&P Tools & Plants
132 TD Technical Director
133 TDC Temporary Disconnection
134 TESCO Tribal area Electric Supply Company
135 TNO Transmission Network Operator
136 TOD Time of Day
137 TOU Time of Unit
138 TSG Technical Services Group
139 UO No. Urgent Official Number
140 VT Voltage
141 WCSR WAPDA Composite Schedule Rates
142 WCSS WAPDA Central Stationary Store
143 WEPS WAPDA Equipment Protection Scheme
144 WPP WAPDA Printing Press
145 WPPO WAPDA Power Privatization Organization
146 WWF WAPDA Welfare Fund
147 XXX Extremely Urgent
148 CIBS Customer information and billing system
149 FAS Fuel Adjustment Surcharge
150 ATM Automated transmission Machine
151 LCD Liquid Crystal Display
152 LED Light Emitted Diode
153 SIM Subscriber Identification Module
154 VISTA Visual Technology Age
155 USB Universal Serial Bus
156 CD Compact Disk
157 DB Data Base
158 DN Demand notice
9
159 MSB Meter security box
160 A&PSC Application and power supply contract
161 MF MULTIPLYING FACTOR
162 VAR VARIABLE CHARGES
163 FIX FIX CHARGES
164 EQ EQUALIZATION SURCHARGE
165 E.DUTY ELECTRICITY DUTY
166 GST GENERAL SALES TAX
167 R.S. TAX RETAILER SALES TAX
168 NJS NEELAM JHELUM SURCHARGE
169 I.TAX INCOME TAX
10
3. COMMERCIAL PROCEDURE FORM LIST
11
Sr# Form # Form Title
44 CP-25 Bank Scroll
45 CP-26 Security Deposit Register
46 CP-27 Consumer Card , maintain in Revenue office
47 CP-34 MDI reading list
48 CP-38 Disconnection Notice
49 CP-41 Return Of Consumer Billing An Collection
50 CP-42 Bank Query Letter
51 CP-45 Deposit Control Account
52 CP-48 Bank Account Recollection
Bank Account Recollection Of Collection Of Service Connection Cost Demand
53 CP-48A
Notices
54 CP-48B Bank Account Recollection Of Collection Of Security Deposit Demand Notices
55 CP-49 Collection And Remittance Summary
56 CP-51 Billing Cash Book By Bank Branch
57 CP-52 Bill Adjustment Note
58 CP-58 Rise And Fall Register
59 CP-58A Discrepancy Report
60 CP-61 List Of Permanently Disconnection Defaulters
61 CP-62A Month Wise Detail Of Arrears
62 CP-63 Electricity Enquiry Register
63 CP-64 Electricity Bill Enquiry
64 CP-65 Register Of Recorder
65 CP-69 Advise Of Tariff /Other Changes
66 CP-70 Consumer’s Bill Dispatch Book
67 CP-71 SDO Demand Notice Register
68 CP-71A Division Office Demand Notice Register
69 CP-72 Cheque Or Bank Draft Receipt Book
70 CP-72A Crossed Cheque Or Bank Draft Register
71 CP-73 SDO Re-Routification And Renumbering Register
72 CP-74 Revenue Office Reconnection Application Register
73 CP-75 Bill Adjustment Notes Register
74 CP-76 Consumer Bill Delivery Book
Advise To Company Computer Center And R.O About Rejection Of Application
75 CP-77
For New Connection
76 CP-78 Meter Movement Register (CA 21)
77 CP-79 Meter Movement Register (CA 22)
78 CP-80 Forwarding Memo For Document To Be Sent To WAPDA Computer Center
79 CP-81 Revenue Office Meter Reading List Register
80 CP-82 Data Batch Register
81 CP-83 Billing Control Register
82 CP-84 Advice To SDO Of Errors In Meter Reading Lists
83 CP-85 Consumer Bill
84 CP-86 Bill For Industrial
85 CP-87 Billing Exception List
86 CP-87A Age Analysis Report Of Billing Exceptions
87 CP-88 Bill Register
88 CP-88A Billing Assessment
12
Sr# Form # Form Title
89 CP-88L Ledger Posting
90 CP-88S Bill Adjustment Posted At The Month End
91 CP-89 Heavy Or Credit Balance List
92 CP-90 List Of Estimated Meter Reading
93 CP-90A Age analysis of cases of estimated
94 CP-91 WAPDA employee free Electricity assessment and payment summary
95 CP-92 Employee free electricity summary of allowance by batches
96 CP-93 WAPDA employee update forms
Statement of unit billed feeder wise within sub-division statement of unit
97 CP-94
billed within sub-division
98 CP-95 Billing Summary
99 CP-97 Consumers security deposited list
100 CP-98 Debtors control register
101 CP-99 Forwarding memo bank scrolls
102 CP-100 Daily cash list
103 CP-100A Register showing details of difference
104 CP-101 Weekly collection cash book by bank branches
105 CP-102 Weekly schedule of bank remittance by bank branches
106 CP-102A Remittance adjustment from
107 CP-103 Monthly schedule of weekly remittance by bank branches
108 CP-103A Remittance adjustment processed
109 CP-104 Divisional collection cash book
110 CP-105 List of surcharge levied in error computer input form.
111 CP-106 Weekly cash posted summary
112 CP-107 Unidentified cash list
113 CP-108 Divisional cash analysis summary
114 CP-109 Summary by batches
115 CP-110 Batch debtors ledger
116 CP-111 List of general adjustment processed
117 CP-111A Monthly report of bill adjustment carried out during the month
118 CP-112 List of disconnection order issued
119 CP-112A Outstanding Disconnection order
120 CP-114 List of outstanding disconnection orders
121 CP-114A Outstanding Disconnection order
122 CP-116 Security Deposit adjustment against debtors or repaid
123 CP-120A Energy debtors arrears analysis
124 CP-121 Consumer Batch Control Book
125 CP-125 Daily Cash Exceptions List
126 CP-126 Weekly List of Cash Received on behalf of other Divisions
127 CP-127 Weekly List of Cash Postings Made by other Divisions
128 CP-128 Monthly list of Cash Received on behalf of other Divisions
129 CP-130 Monthly list of journal Adjustment
130 CP-131 Inter Divisional journal Adjustments for MM/YY
131 CP-132 Inter Divisional unidentified cash adjustments for MM/YY
132 CP-134 Inter office Transactions processed (Output -Daily)
133 CP-135 Inter office Transactions processed (Output -monthly)
13
Sr# Form # Form Title
134 CP-136 Master Data Addition /Change Form (Connections upto 40 KW)
135 CP-137 Master Data Addition /Change Form (Connections above 40 KW)
136 CP-138 Consumer Meter Data Change Form
137 CP-139 Unidentified Cash / Debtor's Adjustment Form
138 CP-140 Street Light Addition Replacement / Removal Form
139 CP-149 List of Bad Debts written off
140 CP-152 Security Deposit Received /Adjusted and repaid (Input)
Transfer of Consumers Account from one batch to other within same Sub
141 CP-153
Division /Division
142 CP-154 Inter Division Transfer of Consumers Account form one Division to other
143 CP-155 Application for reduction of Load
144 CP-156 Application for Extension of Load
14
4. ELECTRICITY TARIFF WITH CODES
15
Code Name Description Status
TEMPORARY SUPPLY
55 E-1(55) Temporary Residential Supply (Non TOD) One Part Tariff
73 G-(73) Street Light, other than Local bodies connections (Non TOD) One Part Tariff
RESIDENTIAL COLONIES
76 H-1(76) Colonies attached to Industrial premises, having own T/F One Part Tariff
16
5. TARIFF/METER TERMS USED IN BILLING
5.1. Tariff:
Means the rates, charges, terms and condition for generation of electric power, transmission,
interconnection, distribution services and sales of electric power to consumers by LESCO.
LESCO will charge only such tariff from consumers as is approved by NEPRA and duly notified by
Government of Pakistan from time to time.
17
6. GENERAL DEFINITIONS:
18
6.8. Sanctioned Load:
Where applicable means the load in Kilowatt as applied for by the consumers and allowed / authorized by
the Company for usage by the consumer.
6.9. Authority:
Means NEPRA “The National Electric Power Regulatory Authority”
19
7. DOMESTIC TARIFF A-1a
20
7.3. Calculation of MDI TOU/ TOD Bill
OFF-
PEAK PEAK
STATUS (T2) (T1) TOTAL REMARKS
KWH 6669 1551 8220
Reading provided by SDO/XEN/SE for billing
KVARH 9966 272 10238
purpose
MDI 28.37 28.05 28.37
MDI TO BE BILL 28 28 28 Highest MDI to be Bill
POWER FACTOR 0.56 0.98 0.63 =COS (ATAN (KVARH/ KWH) )
STANDARD P.F 0.90 0.90 0.90 STANDARD P.F
LOW POWER FACTOR 0.3439 0.0000 0.2739 =STANDARD P.F-POWER FACTOR OBTAIN
LPF for penalty 0.34 0.27
LOAD FACTOR 32.20 7.57 39.69 =(KWH X100) / (730 X MDI R )
V/CHARGES 76693.5 27143 103836 Rate given
FIXED CHARGES 11200 MDI X Rate of Fixed charges
LPF ,PENALTY 6048 LPF X 2 X MDI (R) X RATE OF FIXED CHARGES
NJS 822 Units x Rate
Tariff Rationalization Sur As per tariff
Financing Coast Sur: 0.43 Pasia/units
ELECTRICITY DUTY 1557.54 1.50 % of V/Charges
GST 20849.1 17 % of( V/C +F/C+LPFP+E/D)
INCOM TAX 14349.06 10 % of( V/C +F/C+LPFP+E/D+GST)
EXTRA TAX 6132.077 5 % of( V/C +F/C+LPFP+E/D)
FURTHER TAX 1226.415 1 % of( V/C +F/C+LPFP+E/D)
5% of bill amount Rs.20000/- & 7.50 % if bill
SALE TAX amount above Rs. 20000/- IF CONSUMER NOT
REGISTERED
SALE TAX for Steel
Melters Rs.7.00 per units W.E.F 04-06-2014
TOTAL BILL 166020
21
8. PROCEDURE OF NEW CONNECTIONS
Note:
"Whenever Sub-Divisional Clerk goes out of office or is on leave, the SDO shall make alternate
arrangements by deputing another Senior Clerk to record the receipts and issues of the
Application and Agreement Forms and Abridged Conditions of Supply in the "Application Form
Register" to avoid hardship and inconvenience to the prospective consumer/ For the facility of
prospective Consumers, in addition to the Sub-Divisional Office, A & A Form and Abridged
Conditions shall also be made available in designated bank branches for each Sub-Division."
22
8.2. Processing Applications for New Connections
These are divided into following five categories:-
CATEGORY- 1
General connections for load up to 15 KW.
CATEGORY-2
a) Tariff B-1 & B-2 for industrial supply tube well connections at 400 Volts for load up to 70 KW.
b) Other supplies and general connections above 15 KW and up to 40 KW at 400 Volts.
CATEGORY-3
a) Tariff B-2 for Industrial supply at 400 volts for load above 70 KW but not exceeding 500 KW
b) Tariff B-3 at 11 KV or 33 KV for load not exceeding 5000 KW.
CATEGORY-4
a) Tariff C-1 for Bulk Supply at 400 Volts.
b) Tariff C-2 for Bulk Supply at 11 KV or 33 KV.
c) Other supplies and general connections at 11 KV or 33 KV for load not Exceeding 5000 KW.
CATEGORY-5
a) Tariff B-4 for Industrial Supply at 66 KV or 132 KV or 220 KV for all loads
b) Tariff C-3 for Bulk Supply at 66 KV or 132 KV for all loads.
c) Other supplies and general connections at 66 KV, 132 KV or 220 KV for all Loads.
23
Acknowledged copy of the application duly stamped and signed on behalf of Wapda indicating the
registration number of the application is returned to the applicant.
Copies of all the applications are sent to the Revenue Office General Section on the day following
registration.
24
3. Hand over Consumer's Meter Reading Card (CP-Form-09) to the consumer after filling in all necessary
columns, and signature on CP-Form-08 against the specified space. Arrange filing of receipt in
Consumers File with Senior Clerk Connection Section.
Sign both copies of completed Service Connection Order. Pass daily both copies along with Stores
Requisition and CP-Form-140 (in respect of Street Light Connection) attached, to Senior Clerk
4. Ensure that Meter Reading Record Prepare (CP-Form-11). In case of connection load below 5 K.W &
CP-Form 12 in case load above 5 K.W & above.
SDO will personally ensure that Service Connection Orders along with Part-D of Service Estimate and
Justification Form and Stores Requisition along with CP- Form-140 (regarding Street Light Connection)
in respect of all new connections Installed on previous day have been dispatched to Revenue Officer.
The counterfoil of the Paid Demand Notice is received from the bank, and is checked against the copy
of Demand Notice received from the Sub-Divisional office, Circle Office and Company.
New connections and changes as advised by the Sub-Divisional Office, Divisional Office. Circle Office
and Company are advised to the Computer Centre on Classified CP-Forms which are prepared by the
Commercial Assistant Consumers Record and sent to the Computer Centre by him.
On daily basis all new connections and changes are checked to Computer Centre proof lists, from
the Consumers Individual Files to ensure that the Computer Master files are correct.
Computer Centre Proof Lists consist of the following:-
a) Master Data.
b) Master File Addition List.
c) List of duplicate Account numbers.
8.12. CIBS
Now all billing process is being done in AM(CS) office through customer information and billing
system.
25
9. TEMPORARY CONNECTION
a) A temporary electric power supply connection shall be provided by the LESCO subject to
the availability of load and the prevailing rules, when an applicant demands electric supply
for a specific time period not exceeding three months, which may be further extendable
on three-month basis up to 12 months by the load sanctioning authority subject to
clearance of outstanding dues. In case the connection is to be continued more than 12
months then it will be allowed under regular tariff upon fulfillment of requisite information
as explained for new connection in Chapter 2.
b) An applicant may apply for temporary connection for the following purposes:
i. Illumination and lighting for weddings, festival, functions, exhibitions or national
and religious ceremonies etc.
ii. Construction of buildings
iii. Testing of industrial equipment
iv. Any other emergent requirement of temporary nature
26
10. CP-FORM USED FOR NEW CONNECTION & BILLING
27
10.1. CP-Form 01 – Register of Application and Agreement Forms and Abridged
Conditions of Supply
28
10.2. CP- Form 02 – Abridged Conditions of Supply
29
30
31
32
33
34
35
10.3. CP- Form 03 – Application and Agreement Form
36
37
10.4. CP- Form 04 - Sub-Divisional Office Service Connection Register
38
10.5. CP- Form 05 - Service Estimate and Justification Form
39
10.6. CP- Form 06 – Demand Notice for Service Connection Cost
40
10.7. CP- Form 06A – Demand Notice for Security Deposit
41
10.8. CP- Form 07 – Wiring Contractor’s Test Report
42
43
44
10.9. CP- Form 08 – Service Connection Order (Upto 40KW)
45
10.10. CP- Form 08A – Service Connection Order (Above 40KW)
46
10.11. CP- Form 13 – Consumer Statistics
47
10.12. CP- Form 13A – List of New Connections Installed During the Month
48
10.13. CP- Form 69 – Advise of Tariff/Other Changes (Change Notification)
49
10.14. CP- Form 136 – Master Data Addition/Change Form (Connection upto 40
KW)
50
10.15. CP- Form 137 - Master Data Addition/Change Form (Connection Above
40KW)
51
11. SECURITY DEPOSIT RATES
Security Rates
Sr. No. Category of consumers
Rs. /KW as on 31-01-2011
1 Residential (Tariff A-1) Single Phase Supply
2 Urban Rs. 1220/-
3 Rural Rs. 630/-
4 Tariff A-1 (3-Phase Supply) Rs.
5 Commercial
6 Urban Rs. 1810/-
7 Rural Rs. 920/-
8 Tariff A-2 (3-Phase Supply)
9 Tariff B-1 Rs. 1580/-
10 Tariff B-2 Rs. 2010/-
11 Tariff B-3 Rs. 2380/-
22 Tariff-J Nil
52
12. BILLING SCHEDULE
53
13. TOU/TOD METER READING
54
14. PERCENTAGE CHECKING OF METERS READING
55
15. FORMULAS
56
16. POLICY AND PROCEDURES ON DETECTION BILLS
Domestic Premises:
i. Normal Premises: Three months detection bill will be charged to the consumer whereas
any detection beyond three months will be recovered from concerned WAPDA Employee
(S) at "fault".
ii. A.C Premises : Six (6) Months detection bill will be charged to the consumer whereas
beyond Six (6) months will be recovered from concerned WAPDA employee.
Note:
1. Above decisions are applicable to Domestic Single Phase & 3-Phase meters. and Single Phase
Commercial meters only,
2. Industrial connection and 3-Phase commercial connection cases will be decided by the
competent authority on merit.
Whoever is found to have connected his installations, appliances and apparatus with the
works of licensee, for the purpose of supply of energy without its written consent,
commits an offense to be prosecuted under Section 39 & 39 A of the Electricity Act, 1910,
which requires an FIR to be lodged with Police.
Further to compensate the loss sustained on account of theft of electricity, in pursuance
of provisions of Section 48 ibid, a detection / assumption bill will be served, as per laid
down procedure, to such illegal and unregistered consumers, for assessing the amount of
energy deemed to have been dishonestly abstracted, consumed or used for the period
direct electrical connection from the aerial line/ supply line through artificial means,
The provisions of Section 26-A will be followed strictly.
The owner or occupier of the premises which are found, for the time being, connected
illegally for the purpose of supply of energy with the works of the licensee are liable for
payment of detection / assessment bill prepared and served to compensate the loss
sustained on account of theft of electricity.
57
Billing Procedure for Unregistered Consumers Direct Hooking
58
ACCOUNTABILITY
Whenever a competent authority, as defined iii Section (2) above, receives a detection /
assessment bill for a period exceeding three months for approval, such authority will ask for
fixation of responsibility for negligence in this regard. However, approval will not be held for
fixation of responsibility.
SERVICE OF DETECTION BILL
After approval of the detection bill by a competent authority, as in Section (2) above, details
thereof will be supplied to the Revenue Officer concerned. He will serve the detection /
assessment bill to the consumer along with details as well as reasons thereof. The Revenue Officer
will feed amount of detection I assessment bill to the Computer through relevant input form. The
computer will issue the separate detection / assessment bill without including it in the current
monthly bill. It will be included as arrears in the next current monthly bill. No officer other than a
Revenue Officer is authorized to issue detection bill and therefore, manual preparation of
detection bill should be avoided.
REVISION OF DETECTION BILL
Since utmost care is to be exercised in the preparation of detection / assessment bill in the first
instance, there should normally be no occasion to revise it. However, if at all necessity is felt to
revise a detection bill on the representation of the consumer then the revision of the detection
bill will be approved by a Review Committee as constituted below. However, simultaneously
committee will recommend disciplinary action to be taken against those who prepared wrong
detection bill in first instance.
(A). For review of detection / assessment bills approved by XEN
i) Superintending Engineer concerned (Convener)
ii) Circle Manager (M&T) (Member)
iii) XEN concerned (Member)
Note: -
Superintending Engineer concerned and one member of the committee will constitute
the quorum.
(B). For review of detection / assessment bills approved by S.E or Chief Executive Officer.
i) Chief Executive Officer of DISCO concerned (Convener)
ii) Regional Manager (M&T) (Member)
iii) S.E Concerned (Member)
Note: -
CEO and one member of the committee will constitute the quorum. Meeting of Review
Committees will be held on fortnightly basis.
Litigation / Disputes on Detection Bill
a. Neither Electricity Act, 1910 nor the Regulations of Generation, Transmission and Distribution of
Electric Power Act (XL of 1997) empower Electric Inspectors of Provisional Governments to assume
jurisdiction to entertain complaints and determination / adjudication upon the detection /
assessment bills served for theft of energy under Section-26-A of the Electricity Act, 1910.
59
b. Amount of the detection bill will not be excluded from the current monthly bills except where its
recovery is suspended by a competent authority as defined under Clause-C of Section-Xll of the
WAPDA Book of Financial Powers or by a court / forum of competent jurisdiction.
Recovery of Detection Bill
In case of default in payment of a detection bill the existing procedures laid down for recovery of
arrears including disconnection on account of default in payment will be followed
60
16.3. Preparation of Detection bill for three month at 40 % Load Factor
Calculation of Load in K.W /H.P
61
17. COMMERCIAL PROCEDURE FORMS RELATED TO METER READING
62
17.1. CP-Form 09 – Consumer Meter Reading Card (Upto 40KW)
63
64
17.2. CP-Form 09A – Consumer Meter Reading Card (Above 40KW)
65
66
67
17.3. CP-Form 11 – Meter Reading Record General Consumers
68
17.4. CP-Form 11A – Meter Reading Percentage Check Register for AM(O)
69
17.5. CP-Form 12 – Meter Reading Record – Maximum Demand Connections
Month of Year
Sr # METER STATUS Remarks
1 2 3 4 5 6 7 8 9 10 11 12
0 ALL SEGIMENTS ON
1 DATE
2 TIME
3 TOTAL KWH UNITS
4 TARIFF-1 (T-1)
5 TARIFF-2 (T-2)
6 TOTAL KVARH UNITS
7 TARIFF-1 (T-1)
8 TARIFF-2 (T-2)
TOTAL MAXIMUM
9 DEMAND (KW)
10 TARIFF-1 (T-1)
11 TARIFF-2 (T-2)
TOTAL MAXIMUM
12 DEMAND (SUM)
13 TARIFF-1 (T-1)
14 TARIFF-2 (T-2)
15 RE-SET NO.
INSTANTATIOUS LOAD
16 (KW)
17 Initial of the Officer/Official
70
17.6. CP-Form 12A – Meter Reading Percentage Check Register (meant for
DM(O)/M(O)
71
17.7. CP-Form 20 – Sub Divisional Office Meter Reading Programme Register
72
17.8. CP-Form 21C – Meter Reading List
73
74
17.9. CP Form 23 – Meter Change Order
75
17.10. MDI Meter Test Check Preform by M&T, One Phase Dead
LESCO TEST Check Performa Of Industrial Connection
HAVING Load of40 KW & Upto 500KW
1) Name & Address of Consumer WASA TUBEWELL
2) Reference NO. 11111-9000701/24
3) Tariff Applicable 45
4) Nature of Work Checking
5) Type of Connection (Industrial/Commercial) TUBEWELL
6) Kind of Industrial WATER SUPPLY
7) Supply Voltage 3x230/400V
8) Sanction Load 113 KW
9) Transformer,s (a)Make & Capacity/Sr. No. 200 KVA
(b) Independent/Combined Independent
10) Date of Checking/Visit 22-04-14
Particulars of Newly installed/Existing Metering Equipments Particulars of Removed Meter
Billing Meter Backup Meter Billing Meter Backup Meter
Type of Meter. LT TOU
KWH Meter No/TL# L204309
Make & Type KBK
Capacity 3x5(10)A
Imp/KWH-KVARH 10000imp
Revolution/KWH
KVARH Meter No/TL#
Make & Type
Capacity
Imp/KWH-KVARH
Revolution/KWH
Reading of Newly Installed/Existing Metering Equipments
Billing Meter Readings Backup Meter Readings
E. Current Transformers:
1. CTs Installed (Billing) make & type: ___ _______ CT Ratio: ____400/5A___ No. of CTs: _____04____ M.F. (New) ______80 x 1. 5
2. CTs Installed (Backup)make & type: _ _ CT Ratio: ____ No. of CTs: _____ M.F. (New) __________
3. CTs Removed make & type: ____________________CT Ratio: ____________ No. of CTs: __________ M.F. (New) ________
F. Meter/CTs wiring (in case of meter Installation)
Wired By: _ MUHAMMAD JAMIL _Helper ____________ ____________________
Checked BY: _Syed Tanveer Kazmi _Test Inspector _____ ____________________
Supervised By: __________________ ___________________ ____________________
G. Posal Orders/Wapda Security Slips
76
Standing committee visited the site on 22-04-2014 for checking of metering equipments as per request of
AM(O) Sanda Sub Division Detail of proceedings is as under:
i) Metering equipments LT TOU billing meter found installed outside the premises in 01 No. ATB
on structure.
iii) Accuracy/phase test of LT TOU billing meter was checked on 86.3 KW running load and 7.7KW
heater load& found meter Stop on Blue phase .
iv) Loss of revenue sustained by LESCO: on account of meter stop on Blue phase be recovered from
consumer.
v) AM(O) is advised to arranged 02 Nos. new LT TOU meters & 05 Nos. 400/5A CTs & 01No. ATB
for replacement of billing & backup meter installed in separated ATB
77
LESCO TEST Check Performa Of Industrial Connection
HAVING Load of 40 KW & Upto 500KW (Date & Time Disturbed)
1) Name & Address of Consumer MUHAMMAD FAISAL
2) Reference NO. 11111-9904002-24
3) Tariff Applicable B-2
4) Nature of Work Checking
5) Type of Connection (Industrial/Commercial) Industrial
6) Kind of Industrial
7) Supply Voltage 3x230/400V
8) Sanction Load 68 KW
9) Transformer,s (a)Make & Capacity/Sr. No. 100 KVA
(b) Independent/Combined Independent
10) Date of Checking/Visit 24-06-2015
Particulars of Newly installed/Existing Metering Equipments Particulars of Removed Meter
Billing Meter Backup Meter Billing Meter Backup Meter
Type of Meter. LT TOU LT TOU
KWH Meter No/TL# 86440 88529
Make & Type MTL MTL
Capacity 3x5(10)A 3x5(10)A
Imp/KWH-KVARH 10000 IMP 10000IMP
Revolution/KWH
KVARH Meter No/TL#
Make & Type
Capacity
Imp/KWH-KVARH
Revolution/KWH
Reading of Newly Installed/Existing Metering Equipments
Billing Meter Readings Backup Meter Readings
2 01-01-10 8 736.214 14 43.305 2 01-01-10 8 706.268 14 42.399
3 01:43:05 9 1444.365 15 43.859 3 01:46:43 9 1461.057 15 43.026
4 5996.115 10 1.542 16 42 4 5938.062 10 1.529 16 39
5 2131.072 11 1.542 17 0.610 5 2018.819 11 1.529 17 0.609
6 3865.045 12 0.000 18 0.91 6 3919.244 12 0.000 18 1.00
7 2180.579 13 44.735 19 0.89 7 2167.325 13 43.795 19 0.90
Reading of Removed Metering Equipments
Billing Meter Readings Backup Meter Readings
E. Current Transformers:
1. CTs Installed (Billing) make & type: ___ ___ _ CT Ratio: ____200/5A__No. of CTs: _____ ____M.F. (New) ______40
2. CTs Installed (Backup)make & type: _ _ CT Ratio: ____ 200/5A _ No. of CTs: _____ ___M.F. (New) ____40
3. CTs Removed make & type: ____________________CT Ratio: ____________ No. of CTs: ___________ M.F. (New) ________
F. Meter/CTs wiring (in case of meter Installation)
Wired By: _Muhammmad Jamil _Helper ____________ ____________________
Checked BY: _ Syed Tanveer Kazmi _Test Inspector _____ ____________________
Supervised By: __________________ ___________________ ____________________
G. Posal Orders/Wapda Security Slips
Newly/Already Pasted Removed During Checking Pasted After Checking
On TOU Billing T/C+Body _ ____ ______________________ ___________ __________
On TOU B/up T/C+Body ____ _____ ______________________ _____________________
On KVARH T/C+Body __________________ ______________________ _____________________
Inside Billing ATB Lid Glass __________________ ______________________ ______________________
Inside B/up ATB Lid Glass __________________ ______________________ ______________________
Outside of metering ATB _BJ886180-89 ______________________ ______________________
Outside of B/up ATB _BJ886190-96 ____ ______________________ ______________________
78
Standing committee visited the site on 24-06-2015 for checking of metering equipment as per
request of AM(O) Sanda sub Division , Detail of proceedings is as under:-
i) Metering equipments both LT TOU Billing & LT TOU backup meters found installed
outside the premises in 02 Nos. ATB on structure.
iii) Accuracy/phase test of both LT TOU Billing & LT TOU backup meter were checked on
7.4 KW heater load and found both meter within specified limits whereas LT TOU
billing and backup meter Date & time disturbed and off peak reading stop.
Consumer/Authorized
4) Representative
79
LESCO TEST Check Performa Of Industrial Connection
HAVING Load of40 KW & Upto 500KW (Checking)
1) Name & Address of Consumer HUMZA BAIG
2) Reference NO. 11112- 9621324/24
3) Tariff Applicable B-2
4) Nature of Work Checking
5) Type of Connection (Industrial/Commercial) Industrial
6) Kind of Industrial
7) Supply Voltage 3x230/400V
8) Sanction Load 60 KW
9) Transformer,s (a)Make & Capacity/Sr. No. 100 KVA
(b) Independent/Combined Independent
10) Date of Checking/Visit 23-09-2014
Particulars of Newly installed/Existing Metering Equipments Particulars of Removed Meter
Billing Meter Backup Meter Billing Meter Backup Meter
Type of Meter. LT MDI
KWH Meter No/TL# B-015095
Make & Type SB
Capacity 3x100/5A
Imp/KWH-KVARH -
Revolution/KWH 27.77
KVARH Meter No/TL# C-019697
Make & Type SB
Capacity 3x100/5A
Imp/KWH-KVARH
Revolution/KWH 27.77
Reading of Newly Installed/Existing Metering Equipments
Billing Meter Readings Backup Meter Readings
KWH 695827
KVARH 374411
MDI 11.74
CUM 3037.13
RESET 184
Needle 69568x10
Reading of Removed Metering Equipments
Billing Meter Readings Backup Meter Readings
E. Current Transformers:
1. CTs Installed (Billing) make & type: ___ ___ _ CT Ratio: ____100/5A__No. of CTs: _____ ____M.F. (New) ______01
2. CTs Installed (KVARH)make & type: _ _ CT Ratio: ____ _ No. of CTs: _____ ____M.F. (New) ______01
3. CTs Removed make & type: ____________________CT Ratio: ____________ No. of CTs: ___________ M.F. (New) ________
F. Meter/CTs wiring (in case of meter Installation)
Wired By: _Muhammmad Jamil _Helper ____________ ____________________
Checked BY: _ Syed Tanveer Kazmi _Test Inspector _____ ____________________
Supervised By: __________________ ___________________ ____________________
G. Posal Orders/Wapda Security Slips
Newly/Already Pasted Removed During Checking Pasted After Checking
On TOU Billing T/C+Body _ ____ ______________________ ___________ __________
On TOU B/up T/C+Body ____ _____ ______________________ _____________________
On KVARH T/C+Body __________________ ______________________ _____________________
Inside Billing ATB Lid Glass __________________ ______________________ ______________________
Inside B/up ATB Lid Glass __________________ ______________________ ______________________
Outside of metering ATB _Washed ______________________ ______________________
Outside of B/up ATB __________________ ______________________ ______________________
80
Standing committee visited the site on 23-09-2014 for checking of metering equipments as per
request of AM(O) Gulshn – e - Ravi sub Division . Detail of proceedings is as under:-
i) Metering equipments LTMDI KWH & KVARH meters found installed outside the
premises in 01 NO. ATB on structure.
iii) Accuracy/phase test of LT MDI KWH billing meter was checked on 7.7 KW heater
load and found accuracy within specified limits.
iv) AM(O) is advised to arranged 01No. new LT TOU meter, 01 No. ATB & 05 Nos. 100/5A
CTs for replacement, as per NEPRA policy.
Consumer/Authorized
4) Representative
81
17.11. CP-Form 34C – Meter Reading List (MDI) Connection upto 500KWH
82
17.12. CP-Form 58 – Rise and Fall Register
83
17.13. CP-Form 58A – Discrepancy Report
84
17.14. CP-Form 69 – Change Notification Advice of Tariff/Other Changes
85
17.15. CP-Form 70 – Consumer’s Bill Despatch Book
86
17.16. CP-Form 73 – Sub-Divisional Office Re-routification and Re-numbering
Register
87
17.17. CP Form 75 – Bill Adjustment Note
88
17.18. CP-Form 76 – Consumers Bill Delivery Book
89
17.19. CP-Form 84 – Advice to SDO for Error in Meter Reading List
90
17.20. CP-Form 88A – Billing Assessment
91
17.21. CP-Form 88L – Ledger Posting
92
17.22. CP-Form 88S – Bill Adjustments Posted At The Month End
93
17.23. CP-Form 90 – List of Estimated Meter Readings
94
17.24. CP-Form 94 – Statement of Units Billed Feeder-wise within Sub Division
95
17.25. CP-Form 95 – Bill Summary
96
97
98
18. COMMERCIAL PROCEDURE FORMS RELATED TO LINE LOSSES
99
18.1. CP-Form 22 –Line Losses, Billing & Arrear Analysis
100
18.2. CP-Form 22A – Feeder Wise Line Losses Analysis
101
CP-22B
11KV FEEDERWISE UNITS SENT OUT FROM GRID STATION
Grid Station _____________________ CP FORM-22-B of 156
PREVIOUS
PLYING ROUND METER
READING SUB- SUB SUB SUB- SUB -
FACTOR PRESENT UNITS COML STATUS
CODE NAME DIV. %AGE DIV. %AGE DIV. %AGE DIV. %AGE DIV. %AGE
READING SENTOUT CODE CHANGE
CODE CODE CODE CODE CODE
(C ) (Y)
102
Division / 132 KV Grid ____________________ XEN SS& T Division Area Electricity Board___________
Sinature with Stamp & Date Director Commmercial / Circle DCM
Signature with stamp & Date
18.3. CP-Form 22B - 11KV FEEDERWISE UNITS SENT OUT FROM GRID
18.4. CP-Form 22E – Statement Showing Bundled Feeders/Load Shifted from
One Feeder to other Feeder
103
18.5. Components of Electricity Bill (Commercial & Industrial)
STATUS REMARKS
KWH
KVARH Reading provided by SDO/XEN/SE for billing purpose
MDI
MDI TO BE BILL Highest MDI to be Bill
POWER FACTOR =COS (ATAN (KVARH/ KWH) )
STANDARD P.F STANDARD P.F
LOW POWER FACTOR =STANDARD P.F-POWER FACTOR OBTAIN
LPF for penalty
LOAD FACTOR =(KWH X100) / (730 X MDI R )
V/CHARGES Rate given
FIXED CHARGES MDI X Rate of Fixed charges
LPF ,PENALTY LPF X 2 X MDI (R) X RATE OF FIXED CHARGES
NJS Units x Rate
Tariff Rationalization Sur As per tariff
Financing Coast Sur: 0.43 Pasia/units
ELECTRICITY DUTY 1.50 % of V/Charges
GST 17 % of( V/C +F/C+LPFP+E/D)
INCOM TAX 10 % of( V/C +F/C+LPFP+E/D+GST)
EXTRA TAX 5 % of( V/C +F/C+LPFP+E/D)
FURTHER TAX 1 % of( V/C +F/C+LPFP+E/D)
SALE TAX 5% of bill amount Rs.20000/- & 7.50 % if bill amount above Rs.
20000/- IF CONSUMER NOT REGISTERED
SALE TAX for Steel Melters
Rs.7.00 per units W.E.F 04-06-2014
TOTAL BILL
104
19. ELECTRICITY ACT-1910
SECTION 54-A.
Charges for supply of energy recoverable as arrears of Land Revenue
SECTION 54-B.
Requisition of Police Assistance.
105
20. COMMERCIAL PROCEDURE FORMS RELATED TO DCO, RCO &
RECOVERY
106
20.1. CP- Form 14 – Temporary Disconnection Order
107
20.2. CP- Form 15 – Sub-Divisional Office Temporary Disconnection Order
Register
108
20.3. CP- Form 16 – Disconnection Order (To remove equipment)
109
20.4. CP- Form 17 – Sub Division Office Disconnection Order Register
(Disconnection on Consumer’s Request)
110
20.5. CP- Form 18 – Application for Reconnection and Reconnection Order
111
112
113
114
115
116
20.6. CP- Form 19 – Sub-Divisional Office Reconnection Application Register
117
20.7. CP- Form 23 – Meter Change Order
118
119
120
20.8. CP- Form 78 (CA 21) – Meter Movement Register (To be maintained by
I/C Connection Section)
121
20.9. CP- Form 79 (CA22) – Meter Movement Register (To be maintained by
I/C D&R Section)
122
20.10. CP- Form 90 – List of Estimated Meter Reading
123
20.11. CP- Form 112 – List of Disconnection Orders issued (To Remove
Equipment)
124
20.12. CP- Form 112A – Outstanding Disconnection Orders
(To Remove Equipment)
125
20.13. CP- Form 114 – List of Outstanding Disconnection Orders (To Remove
Equipment)
126
127
20.14. CP-Form 74 – Revenue Office Reconnection Application Register
128
20.15. Copy of MIS
129