You are on page 1of 1

HM

7. THE SBC OF SOIL CONSIDER FOR THE DESIGNING OF RETAINING

400 kV TRANSMISSION DEVELOPMENT


3. THE RETAINING WALLS RW1, RW2, RW10, RW11 DESIGNED FOR

RETAINING WALL PLAN AT FOUNDATION LEVEL


FOR EXISTING LEVELS THE CONTRACTOR SHOULD REFER FROM
±0.000 PROJECT LEVEL INDICATES THE +2.250 OF NSD LEVEL,
2. THE TOP OF RETAINGING WALL SHOULD BE REFER FROM THE

ST-RIFFA-02
400 kV & 220 kV SUBSTATION AT RIFFA
4. FOR SECTIONS 1-1 TO 6-6 REFER DRAWING NO. ST-RIFFA-05

WALL IS 300 KPa PLATE LOAD SHOULD BE CONDUCTED TO

ISMAIL KHONJI ASSOCIATES

BOUNDARY WALL & SECURITY ROOM


5. THE GRADE OF CONCRETE BELOW GROUND C45/SRC.

SUBSTATION CIVIL WORK

CONSTRUCTION OF PERMANENT
TOPOGRAPHICAL SURVEY OF EXISTING PLOT

Consulting Engineers to the Energy Sector


1. FOR GENERAL NOTES REFER DWG. NO. ST-RIFFA-01.

(FOR FILLING AND CUTTING QUANTITIES).

AY 4
W 490
H IGH
AR
SURCHARGE LOAD OF 100KPa FROM THE FUTURE

HAW
6. COVER TO THE REBARS 75mm BELOW GROUND,

Tel: (+973) 1770 8118 Fax: (+973) 1770 0115


P.O. Box 5922, Manama, Kingdom of Bahrain
ALBA R/A

ISSUED FOR TENDER

2009 - 2013
NOTES ON SITE LEVEL:
ARCHITECTURAL ELEVATION DRAWINGS.
SITE

INTERNATIONAL
AY

Y
W

AR
GH

ND
HI
ER

OU
SK

OB
UA

PC
M
AL

BA

OFFICE
SITE
EXISTING
FENCE

960
.5336
EXISTING

X-458816.1
D

Y-2888978
A
O

EXISTING
R

BUILDING
EXISTING

+0.000
FRL
14
226
683 13
665
X-458803.6 .6082
Y-2889026.0
X-458785.2
12 Y-2888975
D
A
O

D
R

A
O KERB
G

D
11 R (TYP.) X 250 BACK
N

220kV CABLES INTERLOCK


125 ON A
TI

FOR
220kV FOR OPTIC THK.BRICKS LAID O
IS

R
SPACE FEEDER 80mm
EX

FUTURE CIRCUITS PAVING


L
X 250 BACK

CABLE
KERB

No.
AL REACTOR-4 05 TGOING/FIBER 220kVROAD
125 ON

W 10 FOR
BELOW
LAID

BANK
Y DUCT CABLES
AR FOR INCOMING/OU IBT
D 220kV 21kV
N SPACE FEEDER
CABLES
BANK

U 9 REACTOR-1
25MVar
BO FUTURE
CABLE
DUCT

REACTOR-3
FOR OPTIC

E HOLD
CAB.

ON
220kV

C
UP

8
N
FE
No. TGOING/FIBER
FUTURE

FOR IBT
K 220kV 21kV
BANK

CIRCUITS

N SPACE
LI FEEDER REACTOR-2
25MVar
DUCT

N FUTURE 7 +0250
AI
INCOMING/OU

REACTOR-2
CABLE FRL
CAB.

H
C IBT 1
10

+0.000
FUTURE

BAT.-
PLOTFORM

48V FRL
FOR 21kV
SPACE 220kV 6 REACTOR-3
2
40mm ABOVE GROUND.
LOADING

FEEDER 25MVar 48V


BAT.-
FUTURE 48V BOX-2
REACTOR-1
CABLE B
DN

BATTERY-2A FUSE
OFF

515 AR-1304
220V
FUSE
48V
BOX-1
D +1.760
.8726 A FFL BATTERY-2B +1.700
5 O PANTRY FFL
LINE

220V
X-458769.9 R RAIL
Y-2889069
PIPE

400kV CABLES D HAND


FOR OPTIC A ROOM STAIRCASE D
WATER

(TYP.) O BATTERY-1A
WORKSHOP TOILET
4

220V 220V
BOX-2 +1.760
07
20mm R FUSE FFL AR-1305
FINISH CIRCUITS REMOVABLE BATTERY
THK., STONE No. 220V BOX-1
PLOTFORM

GRAVEL SIZE 03 TGOING/FIBER 3


EXISTING

BATTERY-1B FUSE
150mm 829
2
220V
SINGLE OFFICE
L

.6054 -3
LOADING

AL
UP

EA CONCRETE KERB
INCOMING/OU R =D01+S1
A
ROOM X 250 BACK
W

SWITCHGEAR
F DOOR
G
X-458764.4
OFF

IN CEMENT FOR 21kV =D02+S1 125 ON


Y-2889037
UP
K +1.760 LAID
Y

R THK.
THK.PRECAST =D01
PA CORRIDOR
F ROLLER
FFL
+1.700 FFL
AR

SPACE -1 674
x 50mm ON 40mm FUTURE
=D03+S1
D
REACTOR SWITCHGEAR =D02 .3062
D

x 500 (TYP.)
PLATFORM

UP
MAINTENANCE

A
=D04+S1

+0.500
BANK

SWITCHGEAR
FRL 500 21kV O
FUTURE

PAVIORS 21kV =D03


CRANE

BEDDING 400kV, ROOM X-458749.8


DUCT

R
49
-2

BO

TILES
SWITCHGEAR

FUTURE

F =D05+S1
CAB.

MORTAR D8 =D04 Y-2888949


CE
PNLS.

CYLINDER
FOR

PLOTFORM +1.760 =D06+S1 =D05


WALL

TELECOM

21kV

CABLES
BANK

N2 FFL
N
PANEL

400kV
DUCT

LOADING +1.700 ROOM


FE

1
F =D07+S1
FFL DG
TRENCH

OFF
CONTROL

OPERATOR F =D06
=D08+S1

EMERGENCY
Y

=D07

DOOR WORKSTATION
BOUNDAR

=C15+S1
K
=C15

FACP
HVAC

CABLE

ROLLER
TRENCH

F 220kV
LI

2 PNLS. =D09+S1
TRENCH

CABLE

TRENCH

=D08
=C14+S1

FMS
N
=D09

CABLE

PNLS.
AI

DIST.
EXISTING

21kV

=D01 =D10+S1
CABLE

F
CHGR./DCDB
FFL
+1.760
TRENCH

CH

DC FIBRE =D01 +R1


F

=C14
CONTROL

REACTOR-
100MVAr) ROOM
F
PANELS
TRENCH

220V =D02+R1 +R2


SCMS
CONTROL

DIESEL ROOM
=C13+S1

BOARD =D02 +R2 =D11+S1 =D10


CABLE

(400kV, DIST. 400/220kV


PANEL
F
CABLE

400kV MAIN =D03


+R1 TANK
LV
F 400kV
415V 220kV PNLS. =D03 +R2 =D11
PNLS.
& ROOM
=D12+S1

=C13
+1.700
PDM
N
F COM. FUT. F =D05 +R1
+0.000
=C00+P3
FFL
400kV
PNLS. 400kV =D05
+R2
GIS FRL
AD
A
=C12+S1

PDM F PNLS +R1


=D06
+1.760 PROTN.REACTOR =D07 +R2
=D06
FFL 21kV FOR F
=C12

UP =D08 +R1 =D13+S1 =D12


PROTECTIO 220kV
TRENCH

CHGR./DCDB BD. =C15


+R2 =D08 +R1
604
F

DC
+R2

DN 48V F SUB =C15 +R1 F D8 .2390


220kV

SER. PNLS.
=D13
B
=C14 =D09 =D14+S1
F

+R2 AVR +R1


CABLE

STAIRCASE ESSEN. +R1


=C14 400kV =D09
+R2
CONTROL,
TRENCH

=C11+S1 415V =C13 =C13


+R2 PNLS. =D11
+R1 =D15+S1
X-458744.2
CABLE

PROTN.
TRENCH

=C11 =C12 +R1 BBF =D11 +R2 =D14


1 +R1 FUTURE 400kV F =D13 =D12 +R1 Y-2888923
CABLE
+R2=C1

+R1

406 F =D15
21kV

=C11 =D16+S1
.4098
400kV TRENCH

=C10 +R1 =C01


+R1 =D14
CONTROL

PANELS
UPS =C10 +R1 +R2 F =C01
+R2 =D14 +R1 =D17+S1
BBP ) GROUND
=C10

=C10+S1 =C09 +R1 F =C02


+R1 400kV F =D15+R1 +R2 =D16
CABLE

=C08 =C02 +R2 =D15 +R2 WATER


X-458754.6
+R1
=C07
+R2 =C03 +R1 =D16 =D18+S1 =D17 TANK
Y-2889050
F +R1
IBT-3
+R2

C
=C07
+R1 =C04 =C03 PANELS =D16
+R2
=C04+R1 BBP =D18
+R1 =D19+S1 400/220/21kV (TYP.)
INTERLOCK
=C09+S1 =C05 +R2 220kV F =D19 +R1 =D18
=C09 =C06 +R1 =D19 +R2 THK.BRICKS
=C06 +R1 =D20 =D20
+R1 =D20+S1 =D19 D8 (400MVA,
+R2

FUTURE =D21 +R2 80mm


(TYP.)
RO
PAVING
TRENCH

D8
BACK

=D21 +R1 =D21+S1


F

=D20 D 20mm
ROOM =C08+S1 2 +R2
FINISH
220kV
+R1=D2

KERB
=C08

ON

=D22
A STONE
CABLE

THK.,
GIS =D21
TRENCH

+R2 =D22+S1
LAID
X 250

O GRAVEL SIZE
=C00+P2

CABLE

R 150mm
TRENCH

TANK
D
125
BANK

+1.760 =D22 SINGLE


CABLE

400kV FFL
21kV
TRENCH

WATER
FUTURE

DUCT

)
CONTROL

FIRE
FUTURE

CAB.
400kV
CABLE
E

=C07+S1
=C07 400/220/21kV
IBT-2
BASEMENT

(400MVA,
F
=C06+S1
400kV CABLES

D8
657
EXTENDED

=C06
.2647 G
D8
OPTIC

X-458747.8 WATER
HOUSE
GOING/FIBER

=C05+S1
+0250 FIRE
FOR

Y-2889024
=C05
120MVAr) FRL PUMP
H
CIRCUITS

REACTOR-1 )
(400kV,
J
INCOMING/OUT

TRENCH
=C04

CONTROL

=C04+S1
=C00+P1
No.

A
CABLE

400/220/21kV
IBT-1
05

=C03+S1

AR-1304
K
TRENCH

=C03 (400MVA, WALL


D8
400kV

L
CABLE

D
C

=C02+S1
A BOUNDARY
AR-1305 =C02 O FOR
R
SPACE
=C01+S1

REACTOR
FUTURE EXISTING
=C01

400kV,
D8
M INTERLOCK(TYP.)
THK.
BRICKS
N 80mm
PAVING BANK
DUCT
UP

CAB.
FUTURE
P DOOR
BANK
BANK
ROLLER DUCT
PLOTFORM DUCT CAB.
CRANE +1.700 CAB.
MAINTENANCE
PLATFORM LOADING FFL FUTURE
WALL

OFF
STAIRCASE

BANK
DUCT
BOUNDARY

DN
Q
CAB.
PIT GATE
TRENCH

+0.500
FRL FUTURE
CABLE

EXISTING
BACK
EXISTING

R
KERB
ON

HOUSE
LAID
X 250

TRAFO-1
125

D
A
O
HOUSE R
NG
STATCOM BUILDING.

475 TRAFO-2
.6749 TI
IS
EX
X-458702.9 WMH
Y-2889010
057
148
X-458687.0
Y-2889006.1
REFERENCE

VERIFY THE SBC.

06.01.2021
40
29

KEY PLAN

ELEVATION - D
RW11 RW11 RW10
15719 29986
NORTH

29986
PLANT

25 EJ 25 EJ 29995
25 EJ
N

27071 18659
4562 25432
10

11

RW10
NORTH
TRUE

3300
4300

3300
25 EJ
T.O.FOOTING
+14.250

T.O.FOOTING
+14.700
T.O.FOOTING
+13.700

T.O.FOOTING

T.O.FOOTING
+13.500

+13.720
14274

10
4300

11
ROOM(ABOVE LVL.)

2450
RW2
25 EJ

19282
SECURITY

+15.600
T.O.FOOTING
ELEVATION - E

c
16
9
9
RW1

4527

+13.100
56627

T.O.FOOTING 5
77
30213

11
RETAINING WALL
16
1200

RW9A
GATE

R8000
RW9
8000

250 THK.
12 EJ

400
X
X

800

4800
RW2
7108

6887
R8000
25 EJ

2450
RW2
9513

RW2
17

17

12
2643 2
8757 RW
- F

T.O.FOOTING
+15.650
N

12
IO

48
150

15
AT

RW2
15

2450
EV

98
4
EL

EJ

256

12 EJ
+13.100
RW
25

T.O.FOOTING

16027
+16.050
0 T.O.FOOTING
350

RETAINING WALL PLAN AT FOUNDATION LEVEL


29943

ELEVATION - C
10233

+13.700
T.O.FOOTING

13
13

20435
GATE

+16.450
6000

T.O.FOOTING

12 EJ
3000
1700

15194
8

RW3
EXISTING 400kV STATION
+17.342
+13.912 T.O.FOOTING

8687
T.O.FOOTING
27135
RW5
29994

400/200/21kV)
(400MVA,

2500
ELEVATION - F

IBT-4

1700
25 EJ

GATE
6000
1700
2800
RW6

16002

+14.221

5724
T.O.FOOTING

TO ARCHITECTURAL ELEVATION DRAWING.


TOP OF RETAINING WALL SHOULD REFER

56
83
+17.540
T.O.FOOTING
29975

8998
7
7
RW7

00
21802

2550

17
NG
TI
+14.621

.F 0
O 4
O

T. 17.5
O
T.O.FOOTING
25 EJ

3
9

00
T.O.FOOTING

RW
T.O.FOOTING
20

T.O.FOOTING
T.O.FOOTING
EJ

17
20

2
T
25

3
.O. +1

14
FO 5

+16.530
5

+16.575
.7

+15.980

1
+15.590
OTI 44

1200
9

4
NG
60
RW8
13

4917
1900

14
B
308
0 -

4
24659 10793 32521
25405 N
IO

1
3
25 EJ 25 EJ

5
6
25 EJ
20151 29888 29987 T
A
RW3A V
E
L
E
ELEVATION - A

You might also like