oon so Musanada MADHh incite consarwe Yousif General Contracting LLC.
Record Reference: 55550-00517 ZZ-VGC-GEN-DRT-0B62-00 Date: 2607 2023
Project Details: ‘Musanada Project Number:00-00-00-55550
Project Name: DELMA sland Police Station
Client: Abu Dhabi Police Employer: Abu Dhabi General Services Company (Musanada)
The Engineer: MADHI Engineering Consultant Contractor: Yousif Gen, Cont. LLC
DAILY SITE REPORTS
‘05:30AM ~ 12:30 PM
‘Working Time 12:30 - 03:00 Break
03:00PM — 06:00PM
‘Activities and Manpower Allocati
Activities of Today 26/07/2023
CIVIL WORKS
Remarks
Main Building:
Shifting raised floor material to inside the Main Building
Fixing Skirting in FF .
‘Applying epoxy Paint in Control rooms & BMS rooms | FutDIL_Y
at ce ‘ED
External Work: 4
Installing the Detainee fence ((tHiiN [IC Foxit PANE _
favow0 _Dertwoe fue)
MEP Work: Ry
‘Access Panel installation in GF Main Building (ELV) ~ 4
1 Fixing Glanding in generator room
Working in Power & Light above ceiling for Ceiling Clearance
CIVIL WORKS
Activities of Next Working Day 27/07/2023
Main Building:
Shitting raised floor material to inside the Main Building
Fixing Skirting in FF
Applying epoxy Paint In Control rooms & BMS rooms
External Work:
Installing the Detainee fence
MEP Team:
‘Access Panel installation in GF Main Building (ELV)
Daily Report Page | 1Musanada MADH nate coins Yousif General Contracting L1.C.
. ~
OL mee Wiese
Fixing Glanding in generator room
Working in Power & Light above ceiling for Ceiling Clearance
Equipment Type:
Hours used Tool
Skid Loader/ 80d Cat No. Today/ | Equipment Type: No, | our
machine
Wheel Loader/Shovel z 70-| Brenvator 3 3
1B 3 0] Roller Compactor 7 70
“Tele handler/Boom loader 3 0-| 10 Ton pickup ° °
Generator z 20-| Loading Ter Tuck i rc
Plate Compactor z 20_| Grinder 3 30
Woodeutting Machine z 20-| Water Tanker (4500 gal) ° o
Grane (600n) ° 0 Stee! Cutting Machine 7 70
Bus ° 0-| 3 Ton pickup o 3
Total ® [Mobi Crane (S0ton]
3 120
In Direct Man Power
Craft Type co Craft Type Main Contractor
Project Manager 1 Project Engineer (MEP) :
Planning Engineer 1 Mechanical Engineer 5
Electrical Engineer T
GA/OC Engineer : Document Controller =
Project Engineer 1 Supervisor
Engineer (MEP) z MEP Draftsman :
Technical Manager : Nurse z
‘Arch. Engineer
Draftsman :
Surveyor 1
Site Engineer
HSE Coordinates 0
HSE Engineer 1
Safety Officer :
Purchasing 1
Document Controller : zZ
Secretary, o Total: 08 Z
Daily Report Page |2cesar GLO pp SNL
MAOH} encnceenc consuitares ‘Yousif General Contracting L.L.C.
Direct Man Power
Main Main | CraftType | Sub-
Crane Type contractor | TPE | Contractor Contracto
Civil
Foreman > Foreman : Electrical §/C a
Carpenter on Electricians = Ceiling
Masons 03 Plumber 1 ‘Star Ultimate 2]
Steel Fixer OL Helper 2 ‘ACTechnician | - |
Helpers 7 ‘Al Qaisar
Drivers 03 Tile
Electrician OL Techno roof
Security oe Blue Line 4
Painters on
; . Total: 14
Total: 19/ Total: a” /
Indirect Man Power:08 Total Manpower: 44
Weather Observation1:
Time: (07-00 AM Humidity 70% | Ferry transportation
Temperature: | 45°C Precipitation: | 0%
‘Weather Observation2:
Time: (01-00 PM. Humidity 75% __| Ferry transportation
Temperature: | 46°C Precipitation: | 0%
Prepared by:
tartan AUG
Engineers Comments: XK S
HPL AC Ae tomy he 6 OMEN to tre = Penal nlrb
— CAWACKDL MoGUWHD to DEPLON AC OTE The GupctUAc Fr GIL: Nile
SCTINIGIING Nemley 49 WILIME Tie pene wots £7 care.
PONWATTOR (5 NUN 17 Pee AT ote THe Edeinie NUNS Fol WL Y
Mer Wry fo find uNeueAD tail oF NO Ar oe.
~Pnkgtias OF ioe AT Ge Tey (heey
—THLET OrMPATTON ONT AS Fer Prater CUMS (NtTURT ION AN QUILL Kor fe Keebo
AC ter GUNMONT AIG OF MALILE, OF WME KE tte. LOGON 1% RemwiNgO TP Tue
(WONT OTH. fori
Daily Report