Professional Documents
Culture Documents
Engine Room Machinery
Engine Room Machinery
Bow Thruster
- Elektro motor BT
- Servo motor (Hydraulic pump system) for Pitch BT (manual operate in here with handle to
control pitch)
- Cooling pump for Cooling elektro motor system
- Fan system
- Control Panel
a. Electric control panel (Power)
b. Electronic panel
c. Alarm panel
- LO Tank (Header tank), usually placed in elsewhere, above BT Room, not far with BT Room
- FW Pump 1 & 2
- Hydrophore Tank (If using hydrophore system)
- Sewage tank
- Vaccum pump or ejector pump
- Discharge pump for transfer liquid from sewage tank to sewage holding tank
- Compressor for slosh (mengaduk) liquid in sewage tank
- Discharge pump for transfer liquid from sewage holding tank to overboard