Professional Documents
Culture Documents
Room-07 (Mezzanine) Cutting List
Room-07 (Mezzanine) Cutting List
12
3
638
2 5
8
0
12
691
92
750
750
750
6 10
709
6
68
8 9 10
750
93
822
832 1
170
261
605 2
750 750 750 89 161 750
1960
63
TO 7
8
750
750
750
13 14 15
24
63
22
8.9 1097
20
709 605
48
1
1011
11
23
55
691
5 11 3
582
750
750
2490
TOILET - 7
SLAB-01 SLAB-02
7.80 SQMT
862 C
1230
1333
A
750
750
4 16
700
12
3
100
6
93
10
822
85
1 2
17 1275 775 1091
261
750
63
709
48
1011
11
750
92
691
3 4 5 6
7
MUGALA WHITE SLAB SIZE 255X202CM
750 SLAB-03
22
605
1
65TH MEZZANINE ROOM - FLOORING
892
9
DATE: 23.01.2023 DRAWN BY: KHIZER
10
750
7 8 9 10 11
582
638 750 750 750 750
0
581
68
750
750
12 13 14 15 16
832
170
181
161 750 17
775 65TH TOILET (MEZZANINE)
FLOORING
MUGALA WHITE SLAB
SIZE 255X202CM
DRAWN BY : KHIZER,
DATE : 12/04/2023,
PROJECT : MARBLE CUTTING,
LOCATION : 65TH FLOOR,(07-B)
1460 1220
460
460
460
220
200
CONCEAL TOP EDGE CISTERN EDGE COVER
650
650
650
1 3 6
COLUMN COVERING
4
1800
1800
1800
2 7
460
460
958
180180
650
650
650
650
8 10 12
852 1460
DOORE EGDE
DOORE EGDE
1800
1800
1800
1800
9 250 11 13 65TH TOILET (MEZZANINE)
WALL CLADDING
MUGALA SUGER SLAB
850
5
SIZE 146X291CM
DRAWN BY : KHIZER,
DATE : 12/04/2023,
SLAB-04 SLAB-05 SLAB-06 PROJECT : MARBLE CUTTING,
LOCATION : 65TH FLOOR, (07-B)
1332
650
1 3 6 8 10 12
1460 958
580
2910
2
1800
4 7 9 11 13
1220
14
0
ELEVATION-A ELEVATION-B ELEVATION-C
T
9
8.
1230
1091 775 1275 17
1333
100 2420
700
1091
700
A
B
2355
133
1
SQ - 7
T
M
T
IL E
80
65TH TOILET (MEZZANINE)
WALL CLADDING DRAWN BY : KHIZER,
MUGALA SUGER SLAB DATE : 12/04/2023,
SIZE 146X291CM PROJECT : MARBLE CUTTING,
LOCATION : 65TH FLOOR,(07-B)