Professional Documents
Culture Documents
Perkiraan Tagihan Plat Berikutnya Dan Box
Perkiraan Tagihan Plat Berikutnya Dan Box
BETON 20 Mpa 3,52 3,52 3,52 3,52 14,96 29,04 3.588.817 104.219.259,76
PASANGAN BATU 50,15 50,15 50,15 50,15 2,26875 202,87 1.799.256 365.012.859,66
TOTAL 558.483.763,02
PPN 11 % 61.433.213,93
JUMLAH 619.916.976,96
POTONGAN 20 % 123.983.395,39
SISA 495.933.581,56