Professional Documents
Culture Documents
TO CRANE OWNER
ASSOCIATED MODELS
AC 100-4L S/N 10553, 10555, 10557, 10571, 10581, 10583, 10589, 10590,10595
AC 130-5 S/N 35302, 35306, 35310, 35313, 35315, 35316, 35331, 35332,
35333, 35335, 35337, 35342, 35346, 35348, 35349, 35353, 35355,
35357, 35362, 35363
AC 160-5 S/N 38402, 38403, 38404, 38419, 38420, 38427, 38433, 38440,
38441, 38446, 38453, 38457, 38458
AC 220-5 S/N 82365, 82370, 82373, 82380, 82381, 82282, 82390, 82396,
82398, 82399, 82400, 82401, 82411, 82422, 82429, 82437,
82446, 82447, 82448, 82458, 82460, 82461, 82462, 82466, 82469,
82470
AC 250-5 S/N 82351, 82354, 82362, 82379, 82386, 82387, 82403, 82409,
82410, 82413, 82418, 82439, 82444, 82452, 82459
AC 300-6 S/N 85405, 85406, 85407, 85408, 85410
ISSUE
Terex has become aware that, for the cranes listed above, pressure increase in the hydraulic
system of the Main Boom Extension (MBE) can happen when the MBE is in the stowed position
and the hydraulic hose connectors are not plugged as per the operator’s manual instruction.
Pressure increase in the MBE hydraulic system may damage the MBE luffing cylinder which
can lead to oil leakage and slow lowering of the MBE during operation.
ACTION(S)
Terex will install a pressure relive valve on the MBE luffing cylinders.
As soon as possible, no later than 14 days from receipt of this Notice, please perform the following
action:
- Contact your local Terex office to arrange a service appointment for the pressure relive
valve installation.
Page 1 / 4
PRODUCT NOTICE ZWB PN 18 007-01
MANDATORY ACTION REQUIRED
WORK INSTRUCTIONS
Ref Terex WI: WI_ZWB PN 18 007-01
WARRANTY REIMBURSMENT
Costs of this campaign will be assumed by TEREX until June 30, 2021.
Page 2 / 4
PRODUCT NOTICE ZWB PN 18 007-01
MANDATORY ACTION REQUIRED
Completion form
To enable a safe and efficient use of our product, TEREX® provides information about mandatory
changes or checks.
Please fill in and return this form to your TEREX® contact as soon as you have completed the
work described in this bulletin.
Machine
Serial Number:
Type:
Kilometre / Miles Carrier: If applicable
Hours Carrier:
Hours Superstructure:
Work Completion
Work required in this bulletin has been completed…
… on Date (Month DD, YYYY):
… by Company:
… by Responsible person:
Remark (comment, suggestion):
Page 3 / 4
PRODUCT NOTICE ZWB PN 18 007-01
MANDATORY ACTION REQUIRED
Please fill in and return this form to your TEREX® contact if you are no longer the owner of this
machine
Machine
Serial Number:
Type:
Previous owner
Company:
Address:
Zip code / City:
Country:
Phone:
E-mail:
New owner
Company:
Address:
Zip code / City:
Country:
Phone:
E-mail:
Page 4 / 4