You are on page 1of 3

Lampiran Bid Bulletin No.

584/PPBJ/PDC/X/2022

Bill Of Quantity

No. DESKRIPSI SPESIFIKASI PRODUCT PICTURE Harga Penawaran


Pembelian Material Pompa, Instalasi c/w Control Panel
Fabrication/Manufacturing in any country and licensed from the country origin (West Europe, USA,
Canada, Japan & Indonesia) *

Spesifikasi yang diminta Spesifikasi yang ditawarkan


I Item : Electric Fire Pump Package(1 Unit) Item : Electric Fire Pump Package(1 Unit) Rp 426.360.000
Pump Specification: Pump Specification:
Type : centrifugal end suction Type : centrifugal end suction
Brand : *reff keterangan diatas Brand : …......................................
Capacity : 750 USGPM Capacity : …...................................
Head : 100 m Head : …........................................
Suction Size : 150 mm - 6" Suction Size : ….............................
Discharge : 100 mm - 4" Discharge : …...............................
P Discharge : approx 15 bar P Discharge : …............................

Electric Motor Specification Electric Motor Specification


Brand : reff keterangan diatas Brand : …......................................
Spesifikasi : 380-400 V / 3 Ph / 50 Hz Spesifikasi :….................................
* Menyertakan Daya motor, (mandatory) HP : …………………………………
Katalog Engine dan Motor

II Item : Diesel Fire Pump Package (1 Unit) Item : Diesel Fire Pump Package(1 Unit) Rp 547.085.000
Pump Specification: Pump Specification:
Type : centrifugal end suction Type : centrifugal end suction
Brand : *reff keterangan diatas Brand : …......................................
Capacity : 750 USGPM Capacity : …...................................
Head : 100 m Head : …........................................
Suction Size : 150 mm - 6" Suction Size : ….............................
Discharge : 100 mm - 4" Discharge : …...............................
P Discharge : approx 15 bar P Discharge : …............................

Diesel Engine Specification Diesel Engine Specification


Brand : *reff keterangan diatas Brand : …........................................
Spesifikasi : Fuel Capacity 3 Hour Spesifikasi :….................................
Include: Muffler, Exhaust Piping, Battery rack, Battery free maintenance Include: ….......................................
Daily tank (fuel level glass indicator, ball valve NPT, (inlet,outlet dan drain), venting
* Menyertakan Daya Engine (mandatory) HP : …………………………………
Katalog Engine dan Motor
Lampiran Bid Bulletin No. 584/PPBJ/PDC/X/2022

No. DESKRIPSI SPESIFIKASI PRODUCT PICTURE Harga Penawaran


III Control Panel (1 Lot) - Standing type Rp 249.150.000
For Diesel Fire Pump, Electric Fire Pump dan existing Jockey Pump, complied with accessories panel ….................................................................
(gland cable type (PG)) , cable tray .................
Scope of Supply : Control Panel, pressure switch, cable to pump,termination ….................................................................................
Menggunakan relay contactor
Untuk lampu indikator protection menggunakan fuse
Untuk power control menggunakan MCB
Untuk breaking capacity MCCB sebesar 50 kA
Untuk MCB breaking capacity sebesar 10 kA
IV Fabrication line header dischange 8" dan line discharge 6" include NDT (PT, RT 20%), hydro test - Rp 404.250.000
akan difungsikan di FAT Test
Accessories (Brand country sesuai BoQ)
- MRV (Main Relief Valve) 4" #150 (Certified). 1 EA
- Flowmeter (fixed diplacement type) 4" #150 (Certified).1 EA
- Pressure Indicator (PI) 3/4" (Certified). 5 EA
- Rubber flexible joint in discharge 6", 4 EA
- Rubber flexible joint in discharge 4", 1 EA
- Rubber flexible joint in discharge 2", 1 EA
- GATE VALVE, CS A105, #150, 6" 4 EA (Certified)
- GATE VALVE, CS A105, #150, 4" 1 EA (Certified)
- CHECK VALVE, CS A105, #150, 6" 2 EA (Certified)
- BALL VALVE, BALL CS A105, #800, 3/4" 8 EA (Certified)
- WELDOLLET #3000, 3/4" 8 EA
- Y Strainer 6" - 150# - 2 EA
- Y Strainer 4" - 150# - 1 EA …..................................................................................
- WELDOLLET #3000, 2" 1 EA
- FLANGE SO, RF SCH 40 CS A105 #150 8" 2 EA (Certified)
- FLANGE SO, RF SCH 40 CS A105 #150 6" 12 EA (Certified)
- FLANGE SO, RF SCH 40 CS A105 #150 4" 8 EA (Certified)
- BLIND FLANGE, CS A105, #150, 8" 2 EA (Certified)
- REDUCING TEE, BW ASTM A234 GR, SCH 40, 8"X6", 2 EA (Certified)
- REDUCING TEE, BW ASTM A234 GR, SCH 40, 8"X4", 2 EA (Certified)
- CON REDUCER BW ASTM A234 GR. SCH 40 4"X6", 2 EA (Certified)
- SPIRAL WOUNDED, SS304L, #150 8", 2 EA
- SPIRAL WOUNDED, SS304L, #150 6", 12 EA
- SPIRAL WOUNDED, SS304L, #150 4", 8 EA
- STUDBOLT & NUT (Hot Deep Galvanize) 3/4" X 110, 16 EA
- STUDBOLT & NUT (Hot Deep Galvanize) 3/4" X 100, 96 EA
- PIPE ERW, ASTM A53 GR B SCH 40, 8" 6 M (Certified)
- PIPE ERW, ASTM A53 GR B SCH 40, 6" 6 M (Certified)
V Item : Mandatori Performa Test Rp 60.500.000
Scope of Test : Electric Pump dan Diesel Pump (including witness test di Workshop Mitra kerja) Scope of Test
:….....................................................
VI Installation Rp 165.000.000
Scope of work : Connect pumps to existing pipework, termination cable from Fire Pumps (Electric and
Diesel) and jockey pump to supplied panel
Lampiran Bid Bulletin No. 584/PPBJ/PDC/X/2022

No. DESKRIPSI SPESIFIKASI PRODUCT PICTURE Harga Penawaran


VI Item Jokey Pump (1 Unit) OPTIONAL
Pump Specification:
Type : VTA
Brand : *reff keterangan diatas
Capacity : 30 USGPM
Head : 100 m
Suction Size : 90 mm (ANSI) ….................................................................................. Rp 205.975.000
Discharge : 60 mm (ANSI)
P Discharge : approx 15 bar

Electric Motor Specification


Brand : reff keterangan diatas
Spesifikasi : 3,7 kW/3~400V /50Hz-IP68
============================================================================== Rp 2.058.320.000,00
Delivery Time Material On Destination, ==== 30 days ARO Delivery Time Material On Destination ….......................
FAT
Destination : Gedung Graha PDSI, Jakarta Timur Destination :
Termin Pembayaran :
- Termin I : 80%
- Termin II : 20%
Terbilang :
xxxxxxxxxxxxxxxxxxxxxxxx (Ditulis dalam bentuk rupiah)
Note : (exclude PPN)
Sesuai Regulasi NFPA 20
Melampirkan surat dukungan Keagenan/Distributor/Agreement Letter
Jaminan After sales 5 tahun
Mempunyai kantor Perwakilan, Warehouse dan Workshop perbaikan pompa di Indonesia
Melampirkan Data Sheet dari Material yang ditawarkan (Engine, Motor, Pump, Control Panel)
PDC menyerahkan scope drawing P&ID dan Layout Pompa kepada peserta tender sebagai acuan
Pemenang tender menyerahkan Isomatric, Shop drawing & Single Line Diagram
Penyedia barang wajib menyertakan Function Acceptance Test (FAT) termasuk sparepart dari pabrikan
Dimensi Pompa dan equipment tidak boleh melebihi dimensi skid.
Witness test di Workshop Mitra kerja di Indonesia
Scope of work termasuk commissioning (include sparepart) dan training
Instalasi pompa akan disupervisi penyedia sampai proses commissioning
Melampirkan datasheet dimensi dan berat untuk pompa dan fuel tank
Fuel tank dengan kapasitas 2 Hour operation dilengkapi fuel level glass indicator dengan end connection NPT
Selama pengiriman untuk packing dipastikan kokoh dan aman dengan wrapping plastik
Instalasi Panel untuk Jockey Pump Existing Min 18.5 kW

You might also like