You are on page 1of 1

MAKER NO 106675-300B

INJ.PUMP CALIBRATION DATA


DHI NO 65.11101-7395
DATE 2003. .
E/G MODEL DE12TIS SUFFIX ECILB
DAEWOO FOR USE M300-V
INJ.PUMP BODY GOVERNOR
INJ. ORDER 1-5-3--6-2-4 (DRIVE SIDE) PHASING 0-60-120-180-240-300
2
OPENING PRESSURE:1st 160kgf/cm
NOZZLE & HOLDER ASS'Y 105101-8460 2nd 220kgf/cm2
(A) STANDARD
CONDITION INJECTION PIPE(I_D, O_D, L) dia8.0×dia3.0 - 600 mm dia6.0×dia2.2 - 620 mm
FOR RIG
TEST OIL CALIBRATION OIL TEMPERATURE : 40±5 °C
105025-2240
(B) ENGINE NOZZLE & HOLDER ASS'Y
PARTS 105030-4711
CONDITION
INJECTION PIPE(I_D, L)

RACK DIAGRAM AND SETTING VALUE AT EACH POINT


INJECTION Q'TY ON RIG
CHECK RACK PUMP (mm3/1000ST) PRESS
POINT POSITION SPEED (A) (B) ENGINE
(mm) (RPM) STANDARD PARTS (mmHg)
CONDITION CONDITION
RACK POSITION mm

A 9.7 1050 120±2 - 0


B = 6.5 500 20±15 - 0
C R1(11.4) 700 (158) - 0


NOTCH : APPROX 15

INJECTION PUMP SPEED, rpm

BOOST PRESSURE DEPENDENT FULL-LOAD STOP(BOOST COMPENSATOR SPRING OPERATING POINT)


INJECTION Q'TY ON RIG
CHECK RACK PUMP (mm3/1000ST) PRESS
POINT POSITION SPEED (A) (B) ENGINE
(mm (RPM) STANDARD PARTS (mmHg)
CONDITION CONDITION

BCS SPRING : k=0.51kgf/mm

WEIGHT WEIGHT=740g LEVER RATIO(min/max) MIN. SPEED 1:1.2


MAX. SPEED 1:1.2
GOVERNOR SPRING K=7.2kgf/mm PLUNGER dia12, 22+45LEAD
3
IDLE SPRING K=1.9kgf/mm D/V RETRACTION VOLUME 130mm /st
2
START SPRING K=0.01kgf/mm D/V OPENING PRESSURE 19.6kgf/cm

BOOST COMPENSATOR SPRING K=0.51kgf/mm D/V SPRING k=0.87kgf/mm

FEED PUMP TIMER -

REMARK DRY WEIGHT


STATIC INJECTION TIMING : BTDC 6°
Kg

You might also like