Air System Sizing Summary for Master besd room

Project Name: Alhasan abartment 05-24-2021 


Prepared by: Mohanad 01:41PM 

Air System Information


    Air System Name ........................... Master besd room Number of zones ............................................................. 1
    Equipment Class ............................................... UNDEF Floor Area ................................................................... 35.0 m²
    Air System Type ................................................ SZCAV Location ................................................ Damascus, Syria

Sizing Calculation Information

    Calculation Months ..................................... Jan to Dec Zone L/s Sizing .................... Sum of space airflow rates


    Sizing Data .................................................. Calculated Space L/s Sizing ................ Individual peak space loads

Central Cooling Coil Sizing Data

    Total coil load ............................................................ 5.5 kW Load occurs at ................................................... Aug 1600


    Sensible coil load ..................................................... 5.5 kW OA DB / WB ...................................................... 39.4 / 21.9 °C
    Coil L/s at Aug 1600 ................................................ 418 L/s Entering DB / WB ............................................. 27.3 / 18.5 °C
    Max block L/s .......................................................... 418 L/s Leaving DB / WB .............................................. 15.5 / 14.6 °C
    Sum of peak zone L/s ............................................. 418 L/s Coil ADP ..................................................................... 14.1 °C
    Sensible heat ratio ............................................... 1.000 Bypass Factor .......................................................... 0.100
    m²/kW ....................................................................... 6.4 Resulting RH ................................................................. 53 %
    W/m² ..................................................................... 156.9 Design supply temp. ................................................... 14.4 °C
    Water flow @ 5.6 °K rise ........................................ 0.24 L/s Zone T-stat Check .................................................... 1 of 1 OK
Max zone temperature deviation .................................. 0.0 °K

Central Heating Coil Sizing Data

    Max coil load ............................................................ 7.0 kW Load occurs at ..................................................... Des Htg


    Coil L/s at Des Htg .................................................. 418 L/s W/m² ......................................................................... 199.6
    Max coil L/s ............................................................. 418 L/s Ent. DB / Lvg DB .............................................. 16.2 / 31.3 °C
    Water flow @ 11.1 °K drop ..................................... 0.15 L/s

Supply Fan Sizing Data

    Actual max L/s ......................................................... 418 L/s Fan motor BHP ........................................................... 0.00 BHP


    Standard L/s ............................................................ 384 L/s Fan motor kW ............................................................. 0.00 kW
    Actual max L/(s-m²) .............................................. 11.96 L/(s-m²) Fan static ......................................................................... 0 Pa

Outdoor Ventilation Air Data


    Design airflow L/s ...................................................... 80 L/s L/s/person ................................................................. 40.00 L/s/person
    L/(s-m²) ................................................................... 2.29 L/(s-m²)

Hourly Analysis Program v4.90 Page  1  of  6 


Zone Sizing Summary for Master besd room
Project Name: Alhasan abartment 05-24-2021 
Prepared by: Mohanad 01:41PM 

Air System Information


    Air System Name ........................... Master besd room Number of zones ............................................................. 1
    Equipment Class ............................................... UNDEF Floor Area ................................................................... 35.0 m²
    Air System Type ................................................ SZCAV Location ................................................ Damascus, Syria

Sizing Calculation Information

    Calculation Months ..................................... Jan to Dec Zone L/s Sizing .................... Sum of space airflow rates


    Sizing Data .................................................. Calculated Space L/s Sizing ................ Individual peak space loads

Zone Sizing Data

Maximum Maximum Zone


Cooling Design Minimum Heating Floor
Sensible Airflow Airflow Time of Load Area Zone
Zone Name (kW) (L/s) (L/s) Peak Load (kW) (m²) L/(s-m²)
Zone 1 4.4 418 418 Aug 1700 5.2 35.0 11.96

Zone Terminal Sizing Data


No Zone Terminal Sizing Data required for this system.

Space Loads and Airflows

Cooling Time Air Heating Floor


Zone Name / Sensible of Flow Load Area Space
          Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s-m²)
Zone 1
          Master bead room                1 4.4 Aug 1700 418 5.2 35.0 11.96

Hourly Analysis Program v4.90 Page  2  of  6 


Air System Design Load Summary for Master besd room
Project Name: Alhasan abartment 05-24-2021 
Prepared by: Mohanad 01:41PM 

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Aug 1600 HEATING DATA AT DES HTG
COOLING OA DB / WB      39.4 °C / 21.9 °C HEATING OA DB / WB      -2.0 °C / -3.0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 5 m² 636 - 5 m² - -
Wall Transmission 50 m² 897 - 50 m² 2362 -
Roof Transmission 35 m² 1132 - 35 m² 554 -
Window Transmission 5 m² 210 - 5 m² 386 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 35 m² 301 - 35 m² 564 -
Partitions 40 m² 687 - 40 m² 1289 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 350 W 350 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 0W 0 - 0 0 -
People 2 135 70 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 4349 70 - 5155 0
Zone Conditioning - 4166 70 - 4992 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 418 L/s 0 - 418 L/s 0 -
Ventilation Load 80 L/s 1327 -70 80 L/s 1994 0
Supply Fan Load 418 L/s 0 - 418 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 5492 0 - 6986 0
Central Cooling Coil - 5492 0 - 0 0
Central Heating Coil - 0 - - 6986 -
>> Total Conditioning - 5492 0 - 6986 0
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page  3  of  6 


System Psychrometrics for Master besd room
Project Name: Alhasan abartment 05-24-2021 
Prepared by: Mohanad 01:41PM 

August DESIGN COOLING DAY, 1600

TABLE 1:        SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°C) (kg/kg) (L/s) (ppm) (W) (W)
Ventilation Air Inlet 39.4 0.01070 80 400 1327 -70
Vent - Return Mixing Outlet 27.3 0.01096 418 526 - -
Central Cooling Coil Outlet 15.5 0.01096 418 526 5492 0
Central Heating Coil Outlet 15.5 0.01096 418 526 0 -
Supply Fan Outlet 15.5 0.01096 418 526 0 -
Cold Supply Duct Outlet 15.5 0.01096 418 526 - -
Zone Air - 24.4 0.01102 418 556 4166 70
Return Plenum Outlet 24.4 0.01102 418 556 0 -

    Air Density x Heat Capacity x Conversion Factor: At sea level = 1.207; At site altitude = 1.106 W/(L/s-K)
    Air Density x Heat of Vaporization x Conversion Factor: At sea level = 2947.6; At site altitude = 2701.6 W/(L/s)
    Site Altitude = 729.0 m

TABLE 2:        ZONE DATA

Zone Terminal Zone


Sensible Zone Zone Zone CO2 Heating Heating
Load T-stat Cond Temp Airflow Level Coil Unit
Zone Name (W) Mode (W) (°C) (L/s) (ppm) (W) (W)
Zone 1 4349 Cooling 4166 24.4 418 556 0 0

Hourly Analysis Program v4.90 Page  4  of  6 


System Psychrometrics for Master besd room
Project Name: Alhasan abartment 05-24-2021 
Prepared by: Mohanad 01:41PM 

WINTER DESIGN HEATING

TABLE 1:        SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°C) (kg/kg) (L/s) (ppm) (W) (W)
Ventilation Air Inlet -2.0 0.00280 80 400 -1994 0
Vent - Return Mixing Outlet 16.2 0.00280 418 439 - -
Central Cooling Coil Outlet 16.2 0.00280 418 439 0 0
Central Heating Coil Outlet 31.3 0.00280 418 439 6986 -
Supply Fan Outlet 31.3 0.00280 418 439 0 -
Cold Supply Duct Outlet 31.3 0.00280 418 439 - -
Zone Air - 20.5 0.00280 418 448 -4992 0
Return Plenum Outlet 20.5 0.00280 418 448 0 -

    Air Density x Heat Capacity x Conversion Factor: At sea level = 1.207; At site altitude = 1.106 W/(L/s-K)
    Air Density x Heat of Vaporization x Conversion Factor: At sea level = 2947.6; At site altitude = 2701.6 W/(L/s)
    Site Altitude = 729.0 m

TABLE 2:        ZONE DATA

Zone Terminal Zone


Sensible Zone Zone Zone CO2 Heating Heating
Load T-stat Cond Temp Airflow Level Coil Unit
Zone Name (W) Mode (W) (°C) (L/s) (ppm) (W) (W)
Zone 1 -5155 Heating -4992 20.5 418 448 0 0

Hourly Analysis Program v4.90 Page  5  of  6 


Psychrometric Analysis for Master besd room
Project Name: Alhasan abartment 05-24-2021 
Prepared by: Mohanad 01:41PM 

Location: Damascus, Syria


Altitude: 729.0 m.
Data for: August DESIGN COOLING DAY, 1600
0.020
1. Outdoor Air
2. Mixed Air
3. Central Cooling Coil Outlet
4. Supply Fan Outlet 0.018
5. Room Air

0.016

Specific Humidity ( kg/kg )


0.014

34 5 2 0.012
1

0.010

0.008

0.006

0.004

0.002

0.000
0 5 10 15 20 25 30 35 40
Temperature ( °C )

Hourly Analysis Program v4.90 Page  6  of  6 

You might also like