You are on page 1of 44

Title MAIN CABLE ROUTE DRAWING

Document No. ELT-01-EE-DWG-0006


Revision No. 2
Page No. 1 of 43

MAIN CABLE ROUTE DRAWING

Project Title : Andres LNG Terminal Expansion Project


Location : Punta Caucedo, Boca Chica, Dominican Republic
Owner : ENERGÍA NATURAL DOMINICANA ENADOM, S. R. L.
Contractor : POSCO Engineering & Construction Co., Ltd.
Discipline : Electrical

FOR CONSTRUCTION

2 10 May 2022 Issued for Construction H.S Shin D.H Choi H.S.Yoo J.M Oh

1 30 Nov 2021 Issued for Construction H.S Shin D.H Choi H.S.Yoo J.M Oh

0 10 Sep 2021 Issued for Construction H.S Shin D.H Choi H.S.Yoo J.M Oh

B 26 Aug 2021 Issued for Approval H.S Shin D.H Choi H.S.Yoo J.M Oh

A 22 Jul 2021 Issued for Approval H.S Shin D.H Choi H.S.Yoo J.M Oh

Rev. No. Issue Date Revision Text Prepared Checked Reviewed Approved

The contents of this document are the sole property of POSCO E&C. Any rights not expressly granted herein
are reserved. Reproduction, transfer or distribution of part or all of the contents in any form without the prior
written permission of POSCO E&C is prohibited.
Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


1

12
3
OTI WTI

2 OTI WTI
4

13

EXISTING

14 8 7

9 10

11

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

4491 4491 4491 4491 4491


N : 900.000

4491
EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

4100
THIS DWG.
4150 4350
4150 4350 4350 4150
4150

4100
4300 4300
4100
4100
4100 4100 4100 4100
4100
4350
4100
300 4100
300 300
300
300
300
300 300 300
300

3900
250

3700
2250 4041 4041 250
3900

3700 3700

3900
3700

3700
3700 3700 3700

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

4941 THIS DWG.


4941
4941

4800
4800
4600 4600 4600
4600

4800

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Integrated

MVx2
MVx1(4491),LVx1(4041) (4491,4941) LVx2
(4491,4941)
LVx1 MVx1
(4491), (4491)
Cx1 LVx2
(4041) (4491,4941)

2022-07-19 17:26:00
POSCO ENC CONFIDENTIAL 김현우(revolkhw)
KEY PLAN

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

THIS DWG.

Change the support


type because can't
anchoring to Block
Wall

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

THIS DWG.

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLOW
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

THIS DWG.

X X X X X X X X

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLOW

DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

THIS DWG.

Correct route

Wrong route
(Refer to
sheet.3)

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

Instrument tray

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

300
EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

THIS DWG.

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

THIS DWG.

Change the support


type because can't
anchoring to Block
Wall

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W

DOWN

FLOW

N : 1200.000

N : 1100.000

Support type
EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

THIS DWG.

Support type

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

E 1.721.042
N 1.313.140

UP
N
W
DO

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

U-channel
N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

Expansion Joint(It means Gab)


N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

Tray

Expansion Joint
Additional
U-channel must
needed.
(Electric and
Instrument Tray)

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

OTI WTI

OTI WTI

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

MV LV THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

LV C,S N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

MV
LV
MV

C,S

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


C-1 C-2
KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W

DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

01-01, 03-01,
13050 12600
02-01,
13050

Expansion Joint
32

TP3

TP4
TP2
Section "O"

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

LV
EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

LV

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

Expansion Joint

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

MT MT
LT
N : 900.000

EXISTING
FACILITIES

LT EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

CT
LT

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

Expansion Joint
Expansion Joint

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W

DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W

DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

THIS DWG.

Expansion Joint
Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W

DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

THIS DWG.

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

THIS DWG.

Expansion Joint

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

THIS DWG.

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W

DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

THIS DWG.

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W

DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

THIS DWG.

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W
DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


KEY PLAN

E : 1000.000

E : 1100.000

E : 1200.000

E : 1300.000

E : 1400.000

E : 1500.000

E : 1600.000

E : 1700.000

E : 1800.000

E : 1900.000

E : 2000.000

E : 2100.000
N : 1400.000

FLOW

FLOW

FLOW
E 1.721.042

DOWN
N 1.313.140
N : 1300.000

UP

UP
FLO
W

DOWN

FLOW

N : 1200.000

N : 1100.000

EXISTING
POWER BLOCK

E 1.881.342
N 1.011.740 EXISTING
N : 1000.000 JETTY

N : 900.000

EXISTING
FACILITIES

EXISTING
SOLAR PANEL

N : 800.000

EXISTING
SEAWATER
INTAKE

THIS DWG.

Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.


Andres LNG Terminal Expansion Project

POSCO Engineering & Construction Co., Ltd.