Professional Documents
Culture Documents
PEC2
PEC2
A. 150 mm
B. 125 mm
C. 200 mm
D. 100 mm
View Answer:
Answer: Option D
Solution:
2. Before starting any installation work, alteration, repair or extension on any electrical
system, what type of permit is needed?
A. Building permit
B. Working permit
C. Electrical Permit
D. Mayor’s permit
View Answer:
Answer: Option C
Solution:
3. The Philippine Electrical Code (PEC) is intended for ______ applications by government
bodies exercising legal jurisdiction over electrical installation.
A. Advisory
B. Optional
C. Mandatory
D. All of these
View Answer:
Answer: Option C
Solution:
1/17