EPLAN Training 1
Project Wizard
EPLAN Training 2
Project Wizard
Precondition:
3. Next to the Templates field, click [...] to select a template for the project.
EPLAN Training 3
Project Wizard
4. In the Open dialog, switch to the directory Templates\EPLAN.
EPLAN Training 4
Project Wizard
7. To define a different storage location for the project, next to the Storage
location field, click [...].
EPLAN Training 5
Project Wizard
8. In the Find Folder dialog, select the directory where you want to save the new
project and click [OK].
EPLAN Training 6
Project Wizard
9. To check or modify the settings from the template for the project, click [Next].
The PPE tab opens. You can extend a project with PPE functionality.
The Structure tab will open and you can define the page and device
structure.
11. To accept all further settings from the template without changes, click [Finish].
EPLAN Training 7
Project Wizard
Precondition:
Project > New (Wizard). You have specified all of the settings in the Project tab and
clicked [Next].
1. In the PPE tab select the Create PPE project check box.
6. To define which settings and data are to be accepted from the PPE template,
in the Apply from template group box select or deselect the Property
groups of PCT loops / PCT loop elements, Configuration of properties
and Forms check boxes.
EPLAN Training 8
Project Wizard
7. To check or customize further settings, click [Next].
The Structure tab will open, where you can specify the page and device
structure.
EPLAN Training 9
Project Wizard
Precondition:
Project > New (Wizard). In the Project, and PPE tabs, you have defined all settings
and have clicked [Next].
1. To change the page structure, select an identifier scheme for the page
structure from the Pages drop-down list in the Structure tab.
2. To define editable separators for main identifiers and classification points for
sub-identifiers, next to the Separators field, click [...].
3. To define the device structure, select an identifier scheme from the General
Devices drop-down list.
EPLAN Training 10
Project Wizard
4. Select the identifier schemes for all further desired devices (terminal strips,
plugs, black boxes, PLC / bus boxes, cables, interruption points, busbars, fluid
devices, fluid distributors) in the same manner.
5. To treat terminal strips, plugs, cables and interruption points as fully numbered
devices, independently of the selected identifier scheme, select each Superior
check box.
The Page structure / Device structure dialog opens, where you can
define a user-defined project structure.
The Numbering tab will open, where you can define a plot frame and
numbering.
EPLAN Training 11
Project Wizard
8. To accept all further settings without changes, click [Finish].
EPLAN Training 12
Project Wizard
Precondition:
Project > New (Wizard). In the Project, PPE, and Structure tabs, you have defined
all settings and have clicked [Next].
EPLAN Training 13
Project Wizard
3. Select the file type Plot frame *.fn1, and select a file.
4. To see a preview of the plot frame, select the Preview check box.
5. Click on [Open].
2. To number the paths sequentially across page boundaries, select the option
Numbered consecutively (project-oriented).
EPLAN Training 14
Project Wizard
EPLAN Training 15
Project Wizard
2. To create or customize a format, click [...].
EPLAN Training 16
Project Wizard
EPLAN Training 17
Project Wizard
2. To create or customize a format, click [...].
EPLAN Training 18
Project Wizard
3. To check or customize further settings, click [Next].
The Properties tab will open, where you can define project properties.
EPLAN Training 19
Project Wizard
Precondition:
Project > New (Wizard). In the Project, PPE, Structure, and Numbering tabs, you
have defined all settings and have clicked [Next].
1. To filter the project properties view, select a category in the Category field of
the Properties tab.
EPLAN Training 20
Project Wizard
3. In the Property selection dialog, select a property and click [OK].
EPLAN Training 21
Project Wizard
4. To change the property, click the corresponding line in the Value column,
enter the new value and press [ENTER].
EPLAN Training 22
Project Wizard
6. To check or customize further settings, click [Next].
The Schematic tab will open, where you can define the first schematic
page.
EPLAN Training 23
Project Wizard
Precondition:
Project > New (Wizard). In the Project, PPE, Structure, Numbering, and
Properties tabs, you have defined all settings and have clicked [Next].
EPLAN Training 24
Project Wizard
2. To use an existing structure identifier, select one in the subsequent dialog and
click [OK].
3. To create a new structure identifier, enter the desired text for the structure
identifier in the fields of the available identifier blocks.
EPLAN Training 25
Project Wizard
The project-related settings for the new project will be displayed in all
EPLAN Training 26
Project Wizard
subordinate tree structure levels. You can keep these settings or change them
as needed.
EPLAN Training 27
Project Wizard
EPLAN Training 28