You are on page 1of 58
DOCUMENT TRANSMITTAL PROJECT: NOVOTEL PHNOM PENH Pasteur Square Co., ee TRANS. NO: NPP/PS-CS4/A/DT-7562 Project Office Novatel Phnom Penh DATE: 22 November 2022 Tet: 023 986 559 en 58s 5 FROM: Run Sreyneath REF: meee PAGE 1 OF 1 [ACTION | cory COMPANY ATTENTION a China Construction Fourth Engineering ‘Mr. Li Peng DWG/DOC NO. DESCRIPTION Dwe/D0C_ [OWG/DOC| ISSUE DATE_| REV. NO. (Zsets) | NPP/IRA/MEP-59T | Request Inspection installation for | 22 Nov 2022 | 00 (41 Pages) Busway Testing at Level 4 (EE Room) DOCUMENTS ARE SENT FOR: Cl REVIEWED WITHOUT COMMENTS C1 REJECTED 1 FOR INFORMATION 1 _ REVIEWED WITH COMMENTS (RS) C) FOR COMMENT 1] OTHER C1 _REVIEWED WITH COMMENTS (NRS) [] QUALITY ASSURANCE EY ACCEPTED OW CoNOITIONS AS NOTED Run Sreyneath Yours faithfully, PASTEUR SQUARE Co., Li. Received by: Date: 22. Woy.2022 Tony Pyles) DOCUMENT TRANSMITTAL PROJECT: NOVOTEL PHNOM PENH china construction : r . Fourth Engineerin TRANS. NO: NPP/CS4-PS/MEP/DT- 8327 Division Corp. Ltd Novotel Phnom Penh DATE: 3 November 2022 rr FROM: THANN OPAKLA Fax: REF: MEP IRA PAGE1OF 1 ‘ACTION | COPY "COMPANY ‘ATTENTION 7 Pasteur Square Co.,Ltd Mr. Cemnan Ibal 2sets Request for Inspect Installation for NPP/IRA/MEP-591 Busway Testing at Level 4 3 Nov 2022 00 (41 Pages) (EE Room) DOCUMENTS ARE SENT FOR: APPROVAL Cl construction (REPLY = C1 QUALITY ASSURANCE Co ASREQUESTED = INFORMED I £ FOR COMMENT INFORMATION THANN OPAKLA Tle Yours faithfully, 03 Nov csceca C Received By: _BY: A Date: ¢y exth_ 3.0 pA Confidentiality Notice: The information contained within ard accompanying this ransmision Ts covidertit belonging to the sender, which legal privleged. The information Is intended nly forthe use ofthe Indvgual oF ently named above. you are not the Intended recipient, reliance on the contents ofthis transmission information f sity ponte. you have recelved ths transmission In eer, please wmeciately Doty us by telephone to arrange for return ofthe original documents SF 8 Document Transmittal IRA Number [....S94....] uk PASTEUR SQUARE Co., Ltd. | NOVOTEL PHNOM PENH PROJECT IRA Type(s / aifiery ex.) INSPECTION REQUEST & APPROVAL (IRA) REQUEST FROM CONTRACTOR Description of Works Thepection tor busugy Aestng ot LA CEE room| Location: Bung /Level rd Extoral — ter Doe Ble) Road snr DrawingSpecs. Ret: [tachment work Package No. Werk Package Name: _ ora mee Bucy Aeching ot LA CEE room) Laboratory [Contractor Site/MEP Engineer: Ge IPS Site/MEP Engineer: (SioriNamerDate) ly Se (SigriNamerDate) REVIEWED BY PS QAQC/CSA/MEP ENGINEER Rejected Iispecion tobe carted ot [7] Received les than 24408 No Gontracor's Engineer Atended No Location indicated Work Not Yet Set Up lnspecton not requies — [] Drawing Not Yet Approved [No Test Equiment /Agenoy Inspection forcontmaton [—] Material Not Yet Approved Not Approved Material Resubmission fA] No Primary Test Results Attached Not Follow Approved Drawing [Reason forre-sbmisnon: Others (wite down in the deta Not Folow Speciation IPS Co.,Ltd. To Attend Re-schedulel__] [PS CSAIMEP Site Engineer: Re-scheduled Date & Time of Inspection INSPECTION REPORT (Enclose Inspection Result) PS QAQCICSA/MEP Site Engineer's Comments: ~ Please provide the protective peastic covey tor Hne but duct ~ Riral approval aller Testing ond torarmisstovily, Status I QApproved _GApproved with Comments ORejected Prepared by: [checked by) Name ajo Name. Slaun,frniehelide, 1 NOV ee Date Or MR: 2B rn Date: Ob Man. Aaad. Date IBAL. [Contractor Site/Project Manager PS Sertior SiteIMEP Engineer _|PS Construction/Project Manager t Jr ° IF 01A-~ Inspection Request & Approval Page 1 of t haem FIR ot | INSPECTION INSTALLATION OF DUCTING | WORK Revision | Date Preparedby | Check By | Approved By Remarks oo la) | Revision Revision History Novorel "PE ot Client: PASTEUR SQAURE Co., Ltd Project Name: | NOVOTEL PHNOM PENH Description: | visual inspection Date: Geu-2e Referent OWG: Temperature (°C): Location: Phnom Penh Report Number: Visual inspection No. Check Points Status Comment Busway YES | NO Visual check if all the VISI-TITE bolts are 1 | tightened toa correct torque v The outer head of VISI- TITE bolt is broken off and the RED label is gone. Ihe outer of is-TITE bolts Broken of check [7 2 | for the bolt ifre-tightened to a correct torque of 95414 Num. 3 _| Visual check the earth connection of Fange-End/ | 77 Feed Unit/ PIU and the phase sequence. 4 _| Visual checkifthereis any damage, deformation | 7] or water stain on busway or other parts. 5 _| Measure the insulation resistance (use insulation | 7 resistance tester with 1000 VDC range). Fix the joint covers, tie channels and rubbers, 6 _| tighten all the screws which torque vu Tie Channel: 9.5-10.8 N.m. 7 _ | Make sure the alignment of busway for horizontal or vertical application. a Spring Hanger 1 | Visual check if the nuts on top of spring hangers W he-check obber WED Coordi are loosened Werke dowe 2 _| Check the compressed length of spring hanger basing on installation method statement. Overall Comments About Visual Inspection: HEPA O LR RAR AA ‘TESTING COMMISSIONING REPORT Busway Information: Tester Tool Information Manufacturer Schneider Electric Manufacturer Kyoritsu Busway Model tine tt Model/ Serial No. 3005A/. Run No, TRL.IRD Tested Voltage 1000 VOC Calibration Date Visual and measurement Inspection- Checked Item ‘Completed Remark Confirm route & level of busduct Yes [iq Not] Hanger and support Yes fi] No[—] Feeder Busducts Yes [7] Ne[] Plug-in unit. Yes [7] No [7] Inspection exposed sections of busway for any damage | Yes 7] No[—] Check color code Yes} Nof—] Confirm bolts tightening at connecting joints ves—ay Not] Verify Busway labeling and nameplate Yes] Not] Sealing around busduct & sleeve (Fire Barrier) Yes[—] NOT] [Rcborier doeatt courlefe ye Confirm Access & space for maintenance Ye EA] NO] Tnsulation & Continuity Test Yes Ev] NOL] Refer to Test Result Section Section 1, section 2 Section 1, Section 2, Section 3 Ty» OT fi = == i 1. Le Le é, 3 4 | w. | ww. | wv Figure A Figure B Figure C Tick the correct one PRRACOLERARAA INSULATION & CONTINUITY TEST. Resistance Measurement Test/insulation test (Test Voltage: 1000VDC) Section | U-W2 | 1-13 | 12-13 | U-N | W2-N | 13-N [L1-GND[L2-GND [L3- GND] N-GND TRL 6 ol LO oL|LOLT ofl os | OL! O/| @ “TRI cL | o a oz | Of | of 2. | oz Remark: The insulation resistance reading should not be less than 100 + length of run (in feet) or 30.5 + length of run {in meter). Neither less than 5 MQ. Continuity Test 13-GND OF LEN O- C63 TEGND_|_12-GND oh | O-F3 Section Yur Submission for Approvals subject to following conditions: 1 Accepted Accepted with Comments Oi Rejected Kuel approval otter T8C COMMENTS NCR No. contract agreements. Note: Accepting the T&C works in this inspection shall not relieve the contractor's responsibilities from this Witnessed by: ~TName: Sang Koon io Company: ttt Camntia Position: Elec Engineer Date: ou-1(- 2029 ‘Checked by: Tested by: Name: / eee | Prace the retaining clip and secure nut 78521.080.01 " @® cdaewise mounting 113 054 oer odour BURNS ‘Guesoor BUR | | PV suspend the hanger and adjust the hanger to the correct elevation p Install the bottom bolts e - esa aa To provide eaurqment for check~ tag the alignment while BUSWAY INSTALLATION ingtallation Voss. P65 Busway installation Joint assembly Be sure the busway are aligned oo property before connection. / supe cmos, . (¢

You might also like