1) What is Cable Schedule

Inputs Required
The information of the cable schedule consists
2) How-to Create Instrument Loop Diagram (ILD)?
3) What is the purpose of a positioner, and how does it enhance the performance of
a control valve?
4) What is reset-wind up?
5 ) List the disadvantages of the orifice plate
6) Different parts of a pressure gauge. Explain the use of hair
spring in the pressure gauge
7) Why thermo wells are used? What materials are used in thermo wells?
8) What are primary elements of measuring pressure?
9) Drawings required for the preparation of cable drum schedule are,
10) Junction Box Code
11) Instrument Air Header Schedule
12) use Shielded Cable and Twisted Pair Cables ?
13) Ingress Protection Rating
14) where will you install the transmitter for gases and steam line?