Professional Documents
Culture Documents
Report Produksi Armindo Drilling Juni 2023
Report Produksi Armindo Drilling Juni 2023
12 12
17 45 (2 Duplicate, 2 Break)
15 60 (2 Blank, 2 Break & 1 Duplicate)
7 31 (1 Duplicate & 1 Break)
0 34 (1 Break & 1 Blank)
90
20 32
9 54 (2 Duplicate, 2 Break)
13 14 (Sample (1 Break)
12 14 (1 Break, 1 Duplicate)
3 37 (1 Break & - 1 Blank)
16,6 51
0 54 (2 Duplicate, 2 Break)
16 17 (1 Duplicate)
26 40 (1 Break)
2 16 (1 Break, 1 Duplicate)
10 47 (1 Break - 1 Blank)
3 0
15
17 58 (1 Break & 1 Blank)
6 22 (1 Break, 1 Duplicate)
11 59 (1 Break, 1 Blank)
3 6
3 37 (1 Break, 1 Duplicate)
8 8
11 10 (1 Duplicate & 1 Break)
16 39 (1 Break, 1 Duplicate, 1 Blank)
2 61 (1 Break, 1 Blank, 1 Duplicate)
2 2
0 6
0 8
0 10 (1 Duplicate & 1 Break)
0 39 (1 Break, 1 Duplicate, 1 Blank)
10 13 (1 Duplicate)
0 6
0 8
17 31 Sample (1 Duplicate & 2 Break)
14 53 (1 Break, 1 Duplicate, 1 Blank)
15 29 (1 Duplicate, 1 Blank)
264
14 20
4 12
25 57 Sample (1 Duplicate, 3 Break)
11
13 42 (1 Duplikat, 1 Blank)
2 22
6 19 (1 Duplikat)
11 13 (1 Duplikat, 1 Break)
6 18 (1 Break)
10 52 (1 Duplikat, 1 Blank)
22 23(1Duplikat)
6 25(1duplikat)
6 19 sample (1duplikat)
6 25(2break)
20 22(1duplikat,1Blank)
18 42(1Duplikat ,Blank)
1 26( Duplikat)
1 20(1 Duplikat,1Break)
18 18
16 39(1Duplikat,1Blank Dan 1 Break)
18 42(1Duplikat ,Blank)
1 26( Duplikat)
1 20(1 Duplikat,1Break)
18 18
16 39(1Duplikat,1Blank Dan 1 Break)
10 52(1duplikat,1Blank)
11 13 (1duplikat,1Blank)
2 22(1Duplikat,1break)
16 34
3 42(1Duplikat,1Blank & 1 Break)
14 16 (1Duplikat,1Blank)
6 19(Duplikat ,1 Blank)
24 29(Blank 1 break 4)
16 51(1Blank)
25 28(1 duplikat ,1 Blank ,1break)
18 34(1duplikt,1blank)
10 30(2duplikat,1blank)
12
20
32 33(1duplikat)
5 39(1duplikt,1blank)
6 36(2duplikat,1blank)
6 48 sampel (blank 1 , Break 5
18 39 (1 duplikat)
6 39(1duplikat)
9 11(1duplikat,Blank))
0
10
16
12
9
10
2
10
25
9
13
7
13
6
0
4
8
1
7
0
0
5
0.3
7
0
REMARKS
Shaft gear box patah, 12 pipa jatuh berhasil terangkat semuanya
Perbaikan backhand
Masalah stuck inner berulang kali
Trouble Machine, Material Soft-Hard
Standby waiting spare part fan radiator
Kendala saat moving, engine over heat (moving from E0163 to E0164
Waiting water supply 2 hours
Hard Material
Hard Material
Standby waiting spare part fan radiator nyari sumber mata air untuk rignya
Stuck inner
-
Pulang lebih awal karena solar habis
08.20 s/d 13.30 Moving Rig to E0131, geser 4 meter ke arah timur laut karena posisi curam. Material Soft-Gravel
Material gravel, maintenance radiator fan, stuck inner
Moving to E0165
Moving E0155
Moving rig from E0154 to E0155, titik geser ke Utara 2 meter
Pulang lebih awal karena solar habis
10.00 s/d 17.00 standby dikarenakan kipas radiator trouble
Material Soft
Seling nyangkut dirantai (done), shaft gear box leak, stock habis (diganti sementara dengan Shaft PQ, Hose sleeding leak, Mate
gravel, stock polymer habis
Perbaikan Sleeding (Done), Hard Material, Gravel, Stock Polymer Habis, Stuck core barrel (Done)
-
Overshoot patah diakhir shift
Moving to E0167 (Spasi 100 m), Material gravel, water loss 18 m, stuck rods 3x, stuck inner tube 1x
Moving to E0143 sampai pukul 14.00 WIT, material hardrock & gravel, mata bit habis di akhir shift
Cutting tidak bisa naik karena polymer kurang baik
Material Soft, Maintenance backhand inner tube, Flushing
Stuck Rood
maintance Radiator ,Material Hardrock Dan Gravel
Moving Rig Sampai Jam 13:00 Wit
Material Gravel Dan Las Knalpot
Stuck Rood
maintance Radiator ,Material Hardrock Dan Gravel
Moving Rig Sampai Jam 13:00 Wit
Material Gravel Dan Las Knalpot
Moving To E0157
Titik Geser 6 Meter arah barat dikarenakan titik awal lereng Terjal
Hardrock Dan Gravel
Moving to E0134
Material gravel
Rig 01 (Apdoni)
TOTAL PRODUKSI RIG-01
5
12
20
16,6
3
3
0
0
14
2
22
18
10
14
18
5
*
10
13
4
0
0
173
9
17
9
0
16
15
3
8
0
0
4
6
6
1
11
6
10
6
10
2
7
8
5
5
164
8
15
13
26
17
11
0
17
25
11
6
1
2
24
12
6
16
10
13
1
0.3
20
254.3
17
7
12
2
6
16
0
14
11
6
6
18
16
14
20
18
12
25
6
7
7
5
245
0
0
3
10
11
2
2
10
15
13
10
20
16
3
25
32
6
9
3
9
0
0
0
0
11
210
1046.3
REMARKS
Perbaikan backhand
Waiting water supply 2 hours
-
Moving E0155
Moving rig from E0154 to E0155, titik geser ke Utara 2 meter
Formasi gravel
Finish batuan Gravel
Formasi gravel
finish
Finish
Material Hard
Redrill Dan Peraikan Spearhead Point