You are on page 1of 1

4 1 2 3 4

18.00
5.00 5.00 3.00 5.00 5.00

A
STO.
VAULT

OFFICE 2
4.30

DIRECTOR'S

4.70
OFFICE TREASURY
ENGINEER'S OFFICE

6.50
OFFICE
2.30

1.60
L W A Y FIRE EXIT
FIRE EXIT

17.00
17.00
CLERK'S
3.50

17.00

ROOM ARCHITECT'S ACCOUNTING/

5.20
5.00 OFFICE STAFF ROOM FINANCE OFFICE

RECEPTION
2.00

AREA
C

PRESIDENT/

5.50
5.50

CONFERENCE
5.00

LOBBY OFFICE LONGUE AREA VICE PRES. OFFICE

5.30 5.30 7.40 5.30


18.00

OR PLAN SECOND FLOOR PLAN


SCALE: 1:100 MTS
1:100 MTS

SCHOOL/DEPARTMENT: NAME/YEAR&SEC.: PROJECT TITLE: INSTRUCTOR/SUBJECT: SHEET NO.:

UNIVERSITY OF THE ASSUMPTION NABONG, MA. PAULINE M. PRESTRESSED CONCRETE AR. JOSEPH EDWARD DELA CRUZ
COLLEGE OF ENGINEERING &ARCHITECTURE BS - ARCHITECTURE 4-A
March 18, 2023
BUILDING TECHNOLOGY 04 1

You might also like