You are on page 1of 8

Document Environment Management

Knit Bazaar (Pvt) Ltd. Title: Review Meeting


Issue Date: 19/01/2023
40/41, Vadam, Tongi, Gazipur Revision
18/01/2024
Date:

Review Meeting on the Environmental Management Strategy


& Internal Audit Issues.

Date/Time/Place: 19th January, 2023 at 3.00 PM. at Conference Room, KBPL.

Roles:
Chair : Sariful Islam – GM-HR & Compliance
Facilitator : Arif Miah– Manager-Admin, HR & Compliance
Minute Taker : Al-Amin Rahman – Manager-EMS & ECR
Documenter : Al-Amin Rahman – Manager-EMS & ECR
Other Participants : Md. Wahedun Nobi – Factory Manager
Abdul kader kajol-Manager (Maintenance)
Md. Azizul Houqe – Electric Engineer
Anwar Hossain-Sr. Executive-HR & Compliance
Md. Farhad Hossain – Safety Officer

Preparation:
 Documentation review and analysis
 Environmental objective performance analysis and review.

Materials to Bring:
 Environmental Management System documentation.
 All internal and external audit reports.
 Documents on water & energy consumption

Meeting Objectives:
An EMS Management Review Meeting has been arranged by Admin, HR & Compliance
Department at KBPL Conference Room on 19th January, 2023 at 3.00 PM. The meeting was
presided by Honorable GM-HR & Compliance of Spider Group. Current Environmental issues,
Scope of Development, Resource efficient practices, Environmental Action Plans are discussed
during the meeting and some decisions have been taken by the management to make them
implemented accordingly for the suitability, adequacy and effectiveness of the Environmental
Management System.
Head Office: House-29, Road-03, Sector-11, Uttara, Dhaka-1230
Tel: +88 02-55080271, 02-55080272
Web: www.spidergroupbd.com
Document Environment Management
Knit Bazaar (Pvt) Ltd. Title: Review Meeting
Issue Date: 19/01/2023
40/41, Vadam, Tongi, Gazipur Revision
18/01/2024
Date:

Meeting Agenda:
1. Environmental Policy Communication
2. Environmental Objectives and Targets Review.
3. Internal and other Audit Reports.
4. Discussion on limitation & obstacles to implement according to plan in the last year.
5. Required measures on achieve according to plan for the next year.
6. Discussion on target for 2022 & strategy to achieve.
7. Environmental Monitoring Plan and Frequency.
8. Chemical Management Issues.
9. Oeko-Tex (STeP) audit preparation.
10. Other (if have any).

Meeting Outcomes:

Next Steps: Owner


Need to review performance at least bi-annually/quarterly; GM
We have to implement issues as per the strategy for the year 2023

Discussion Will Effect on:


Vision 2030 has been set for Environmental Improvement in the following sections:
1. Energy Consumption.
2. Water Consumption.
3. Waste generation.
4. Air Emission
5. Wastewater generation.
6. Chemical Use

Discussion on our target for reduction of Waste Generations, Energy Consumptions,


Water uses for 2022
Our target for energy & water reduction for the year 2022 are -
 Water consumption will be reduced 5% within 2022 & total 30% in 2030/ per pcs of
production.
 Diesel consumption will be reduced by 5% within 2022 & total 30% in 2030/ per pcs of
production.
 Purchase Electricity will be reduced 5% within 2022 & total 30% in 2030/ per pcs of
production.
 GHG will be reduced 5% within 2022 & total 30% in 2030/ per pcs of production.
 Wastes will be reduced 5% within 2022 & total 30% in 2030/ per pcs of production.

Head Office: House-29, Road-03, Sector-11, Uttara, Dhaka-1230


Tel: +88 02-55080271, 02-55080272
Web: www.spidergroupbd.com
Document Environment Management
Knit Bazaar (Pvt) Ltd. Title: Review Meeting
Issue Date: 19/01/2023
40/41, Vadam, Tongi, Gazipur Revision
18/01/2024
Date:

Discussion on our target for reduction of Waste Generations, Energy Consumptions,


Water uses for 2022

Discussion on our achievement against target for the year 2022

Our achievements are-


 Water consumption reduced 8.15%
 Purchase Electricity consumption reduced 5.46%
 Diesel consumption reduced 4.41%
 GHG emissions reduced 5.43%
 Wastes generation reduced 4.76%

How We achieved Energy Saving Target


Plan/Strategy for 2022 Implementation Status
Gradually replaced. Already replaced about 95%
Installation of energy efficient LED lights
energy efficient light.
Gradually replaced. Already replaced about 86%
Clutch Motor to Servo Motor replacement.
energy efficient light.
Install Individual Switches. We installed 03switch/line switch from section wise.
Awareness training for energy saving to the We are conducting awareness training on energy saving
relevant employees. to employee.

Head Office: House-29, Road-03, Sector-11, Uttara, Dhaka-1230


Tel: +88 02-55080271, 02-55080272
Web: www.spidergroupbd.com
Document Environment Management
Knit Bazaar (Pvt) Ltd. Title: Review Meeting
Issue Date: 19/01/2023
40/41, Vadam, Tongi, Gazipur Revision
18/01/2024
Date:

How We achieved Water Saving Target

Plan/Strategy for 2022 Implementation Status


Proper maintenance of water valves, fitting, leakage etc. It is regular/continuous practice
Leak detection, preventive maintenance & improved
cleaning (water taps/ Valves/ Pipe joints/ Nozzles/ It is regular/continuous practice
Cisterns/ Overflow/ Steam taps etc.)
Prohibit extravagance uses of water by placing more
It is regular/continuous practice
awareness program to worker.
Awareness training for water saving to the relevant
It is regular/continuous practice
employees.
Install water trigger nozzle in hose pipes. It is regular/continuous practice
Proper maintenance of water valves, fitting, leakage etc. It is regular/continuous practice

Discussion On Our Target For Reduction Of Energy & Water Uses For 2023
Our target for energy & water reduction for the year 2023 are -
 Water consumption will be reduced 3% by 2023.
 Purchase Electricity will be reduced 3% by 2023.
 Diesel will be reduced 3% by 2023.
 GHG will be reduced 3% by 2023.
 Wastes will be reduced 3% by 2023.

Head Office: House-29, Road-03, Sector-11, Uttara, Dhaka-1230


Tel: +88 02-55080271, 02-55080272
Web: www.spidergroupbd.com
Document Environment Management
Knit Bazaar (Pvt) Ltd. Title: Review Meeting
Issue Date: 19/01/2023
40/41, Vadam, Tongi, Gazipur Revision
18/01/2024
Date:

Our Plan to for 2023 to achieve Reduction of Energy Consumption

Plan/Strategy for 2023 Implementation Status


Installation of energy efficient LED lights
Clutch Motor to Servo Motor replacement.
Install Individual Switches.
Awareness training for energy saving to the
relevant employees.

Minimizing heat loss by proper insulation of


valves & pipes

Setting the compressor pressure at 4 to 5 bar will


save significant amount of electrical energy

Our Plan to for 2023 to achieve Reduction of Wastes Generation

As per Implementation plan.

Head Office: House-29, Road-03, Sector-11, Uttara, Dhaka-1230


Tel: +88 02-55080271, 02-55080272
Web: www.spidergroupbd.com
Document Environment Management
Knit Bazaar (Pvt) Ltd. Title: Review Meeting
Issue Date: 19/01/2023
40/41, Vadam, Tongi, Gazipur Revision
18/01/2024
Date:

Our Plan to for 2023 to achieve Reduction of Water Consumption

Plan/Strategy for 2023


Proper maintenance of water valves, fitting,
leakage etc.
Leak detection, preventive maintenance &
improved cleaning (water taps/ Valves/ Pipe joints/
Nozzles/ Cisterns/ Overflow/ Steam taps etc.)
Prohibit extravagance uses of water by placing
more awareness program to worker.

Awareness training for water saving to the relevant


employees.
Install water trigger nozzle in hose pipes.

Use smart flash system in toilets.

Install sensor system at water taps.

Next Meeting: Updates will be checked in 24th July, 2023 at 10.30 AM. at Conference Room,
KBPL.

Signature:

Sariful Islam
GM-HR & Compliance

Head Office: House-29, Road-03, Sector-11, Uttara, Dhaka-1230


Tel: +88 02-55080271, 02-55080272
Web: www.spidergroupbd.com
Document Environment Management
Knit Bazaar (Pvt) Ltd. Title: Review Meeting
Issue Date: 19/01/2023
40/41, Vadam, Tongi, Gazipur Revision
18/01/2024
Date:

Pictures of Management Review Meeting

Attendance Sheet:

Head Office: House-29, Road-03, Sector-11, Uttara, Dhaka-1230


Tel: +88 02-55080271, 02-55080272
Web: www.spidergroupbd.com
Document Environment Management
Knit Bazaar (Pvt) Ltd. Title: Review Meeting
Issue Date: 19/01/2023
40/41, Vadam, Tongi, Gazipur Revision
18/01/2024
Date:

SL No Name Designation Signature


01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20

Head Office: House-29, Road-03, Sector-11, Uttara, Dhaka-1230


Tel: +88 02-55080271, 02-55080272
Web: www.spidergroupbd.com

You might also like