You are on page 1of 1
ROO BROWNFIELD OPERATIONS PROJECT TAAM ENGINEERING “Contact #: 102444 REQUEST FOR INSPECTION 102444TA-C-GO-GO00-QA-PRO-0023 A dLio sll w JPROJECT No: R-039 0 Part contractor: TAAM Engineering Co pate of inspection: 12/08/2021 Discipline: Mechanical [RFI No: 102444TA-QA-RFL-00332 [Area/Location: NIDS ‘Sub System No: N/A Invervention|_ contractor ‘ceme ‘Time of Inspection: 07:00 AIM event nt TAM ‘SNC LAVALIN ire No: wa ITP teem No: N/A TRIACS No: N/A linspaction Aetivity/Deseription: Re-instaternent Drawing @ Rev Wo: ‘CHECKED @ READY FOR INSPECTION Submitted by Contractor - Construction GCMC Construction Name ‘Alaa Resheed Contac Mabie No (07834417750 Signature Date & Tine 12/05/2021 FOR QUALITY CONTROL DEPARTMENT USE ONLY eceved and Chacha by LERRRATOF OE ‘GONE OAT OE RECENED BY ‘CHECKED BY Qet RECEIVED BY RECEIVED BY Name All awed Contact Hable No 07834896104 Signature Date BTime 12/05/2021 Fon HOLD Report: YES] NOL] Date: ‘action: YEs NOD Date: INSPECTION RESULTS (Tik 5 appiable) ACCEPTABLE (A) CANCELLED (C) NOT READY FOR INSPECTION (NE) REASON FOR CANCELLATION / NOT READY FOR INSPECTION/REJECTION ‘incomplete Werk insufficent documents attached & Repested/unnecessary RFI “4-No action for RF on Hold 5-No Power Supply available at site PTW not available 7 safety issues 5 Test Crew not available 9 Test Equipment not available 10- Material aot as per data sheet drawing ‘THUnscceptable Test Procedure /Result $2.Violation of ITP 12-Poer Workmanship 14 Spec. Vilation ‘S:nstallation not as per drawing 16: Other Comments/Remarks Punch List Number (any) Inspected By Contractor QA/QC GCMC QA/QC Name Signature RFI Closed on

You might also like