ROO BROWNFIELD OPERATIONS PROJECT
TAAM
ENGINEERING
“Contact #: 102444
REQUEST FOR INSPECTION
102444TA-C-GO-GO00-QA-PRO-0023
A
dLio sll w
JPROJECT No: R-039 0 Part
contractor: TAAM Engineering Co
pate of inspection: 12/08/2021
Discipline: Mechanical [RFI No: 102444TA-QA-RFL-00332
[Area/Location: NIDS ‘Sub System No: N/A
Invervention|_ contractor ‘ceme
‘Time of Inspection: 07:00 AIM event
nt TAM ‘SNC LAVALIN
ire No: wa
ITP teem No: N/A
TRIACS No: N/A
linspaction Aetivity/Deseription: Re-instaternent
Drawing @ Rev Wo:
‘CHECKED @ READY FOR INSPECTION
Submitted by Contractor - Construction GCMC Construction
Name ‘Alaa Resheed
Contac Mabie No (07834417750
Signature
Date & Tine 12/05/2021
FOR QUALITY CONTROL DEPARTMENT USE ONLY
eceved and Chacha by LERRRATOF OE ‘GONE OAT OE
RECENED BY ‘CHECKED BY Qet RECEIVED BY RECEIVED BY
Name All awed
Contact Hable No 07834896104
Signature
Date BTime 12/05/2021
Fon HOLD Report: YES] NOL] Date:
‘action: YEs NOD Date:
INSPECTION RESULTS (Tik 5 appiable)
ACCEPTABLE (A)
CANCELLED (C)
NOT READY FOR INSPECTION (NE)
REASON FOR CANCELLATION / NOT READY FOR INSPECTION/REJECTION
‘incomplete Werk
insufficent documents attached
& Repested/unnecessary RFI
“4-No action for RF on Hold
5-No Power Supply available at site
PTW not available
7 safety issues
5 Test Crew not available
9 Test Equipment not available
10- Material aot as per data sheet drawing
‘THUnscceptable Test Procedure /Result
$2.Violation of ITP
12-Poer Workmanship
14 Spec. Vilation
‘S:nstallation not as per drawing
16: Other Comments/Remarks
Punch List Number (any)
Inspected By
Contractor QA/QC
GCMC QA/QC
Name
Signature
RFI Closed on