You are on page 1of 4
HOANG LONG JOINT OPERATING COMPANY TE GIAC TRANG FIELD DEVELOPMENT PROVISION OF ENGINEERING SERVICES OF TGT NEW FLOWLINES PROJECT Document Title: INSTRUMENT DATASHEET FOR GAS LIFT VORTEX FLOW METER Document No.: TGT-I-H05-DS-0023 TSSUED FOR PURCHASE TSSUED FOR APPROVAL 70 TSSUED FOR REVEW i |Hoang Long Joint Operating Company ‘CLIENT FEF JconreactoR: PetroVietnam Engineering Consultancy JSC oe J 08 oso ee fe eae “awe 2 Hos: fFevir-| 1030 3 |Hos: [Fern | |:390 1 [Oe FEIT | [0830 [ear ] ] CASO VORTEX ALGN ASTER [pooment nor —vernieebewns jeans sone Ane ae ae] M: SES lnenbirnaaenmiaanaemcnneMeniee, pearl oe [NO. WORKING: [For No. OFF: [Fac No: SRR NOTEE 10 " NOTES - GENERAL Documentation Reauite: 2) Hazardous Aves Cocficate as per IEC 60070-10, ») Ingress Protection Certfcate 2s per IEC 60528 ©) Hycrotest Cerfcate 9) Callration Certcate €) Material Certiteate,1SO-EN 10204 Type 31 (8) for pressure retaining pants 4) Operating & Maintenance Instrucons 9) NACE MR.0176 /IS0 15156 Cerificate for al wetted parte 1 Installation & Commissioning Spere Pers List and Two Years Opereional Spares List |) General arrangement Drawing with Dimensional deta, 1). Ceniicate of Comptance/ Conformance 4) Test Cerificate |) NDT (Dye Penetration Test) Certicato ‘m) Calculation Sheet 'n) Recommended Installaton Practice and Dimensional Details ‘Al intruments 1o be provided wih a SS 316 nameplate wit ag no. and model no. permanently engraved. ‘All intruments o be painted in accordance with supplers paint system sutabe fora hostile offshore environment. ‘The euppbe inerument hal be immune to vibration ané suitable for ofehore applications, Vendor shal ave the recommended mounting deta. {Al low meter and accessories shal be able to sustain process design pressure, temperature, service Mud ‘Al Flow Meter should mee! the folowing specications 2) General insruments Specification, GEN-XXx-SP-0002 1) Speciieation for Piping and Valve Materials, GEN-L-20X-SP.0001, ©) Specification for Painting And Protective Coating, GEN-M20X-SP-0014 8) Spacication for Electrical ad Instrument Cables, GEN-E XXX SP-008 Flange Surface Finish: Roughness of groove for RTJ flange maximum 63pin Re, Roughness for RF Flange += 125-250 pin Ra. Flange bore shall be suitable for pipe scheduie. ‘Vendor to ensure that elastomers used in he Instrument accessories are compatble withthe service Mulé specified design conditions. ‘Morcury, Asbestos and PTFE tapes shal not be used for any application, PTFE based pastes shal be used 2s these sealants based on design tomporatuo and pressure valves. ‘All unused cable ents shall be supped with 816 Stainless steel Exd Plug “GAS URT VORTEX FLOW WETER INSTRUMENT DATASHEET "TECGIAG TRANG FIELD DEVELOPUENT JpRovisow OF NONEERNG SERVICES FOR TOT NEW FLOORNES PROVEC [pocoment No: saeer Tereneosa0% 4 oF 4 Tae TTT ; Hane em oe + aus aes A a a cae - TET] + SO CTRE on SS a f — oe at ee paren To Saee Sree ae wm (eee aa or Race eran fo a oe A a Hoss stees BESS t ea Seem mara Soe Na ROS Be Sanco a, i 2 seen ey aero oceans SORTER ie 2 ee 2 a = z= = Se a 7 Sl ir aoe — a ST aS Sa rere ae = eee Gacy | Senepere sour etre Ee Roe ae 7 = Shere ra oe ee moe Ae aM] oe us aT eoredobyas Wiel cue aos be ra aces ante Meccan metadan a pec emiemeenaiennin consis inet sins [E-REFER TO INDEX PAGEISHEET 2 FOR TAG NO, DETAILS Vendor rvew pros Temper aig of SESTs forthe delgn prevaue ampere GESTS snot autalavendarTo = Dupln S a

You might also like