Section VI. Schedule of Requirements
The delivery schedule expressed as weeks/months stipulates hereafter a delivery
date which is the date of delivery to the project site.
| COMPUTER |
Item | Description Quantity | Total Delivered,
| No. | Weeks/Months
___|___(TIMELINE)
TLOT | SUPPLY AND Ti2units | 112units | One-time delivery of
DELIVERY OF the One Hundred |
LAPTOP Twelve (112) units of
Laptop Computer
within forty-five (45)
calendar days from)
receipt of the Notice to
| Proceed or staggered
| delivery — with the
following schedule:
a. 12 units on the
15" day
b. 50 units on the
30" day
c. 50 units on the
45" day
The end-user _ shall
conduct a pre-delivery
inspection of 12 units
within fifteen (15)
calendar days prior to
delivery of the entire
quantity of goods. This
shall be conducted at
the Supplier's
warehouse/outiet if
within Baguio City o
adjacent municipality,
or at the office address
of the procuring entity.
Inspection shall be
conducted for the
remaining units within
fifteen (18) days upon
| delivery
ACKNOWLEDGEMENT AND COMPLIANCE
WITH THE TERMS OF REFERENCE FOR THE
‘SUPPLY AND DELIVERY OF ONE HUNDRED TWELVE (112) UNITS OF LAPT(
‘SUPPLY AND DELIVERY OF ONE HUNDRED TWELVE (112)
UNITS OF LAPTOP COMPUTER
‘SIGNATURE OVER PRINTED NAME OF
AUTHORIZED REPRESENTATIVE,
DESIGNATION AND PRINTED NAME OF ane G
Page 1 of t