PROJECT : GLORY LUMBER/JASMINE BANANA INC.

LOCATION : BACAO II, GENERAL TRIAS, CAVITE


SUBJECT : CONCRETE MONITORING
CONTRACTOR : WE ENTERPRISES AND CONTRACTORS INC.

ITEM LOCATION DATE

1. RC WALL FOOTING RIGHT SIDE JUNE 10, 2022


2. RC WALL FOOTING @ REAR SIDE 17.90 METERS JUNE 28, 2022
3. RC WALL @ RIGHT SIDE 26 METERS JUNE 30, 2022
4. RC WALL FOOTING @ RIGHT SIDE AND MANHOLE FOOTING JULY 4, 2022
5. RC WALL @ RIGHT SIDE 28 METERS JULY 7, 2022
6. RC WALL FOOTING @ RIGHT SIDE JULY 14, 2022
7. RC WALL @ RIGHT SIDE 34 METERS JULY 18, 2022
8. RC WALL FOOTING @RIGHT SIDE JULY 23, 2022
9. STIFFINER COLUMN AND LINTEL BEAM @RIGHT SIDE JULY 23, 2022
10. RC WALL @RIGHT SIDE JULY 28, 2022
11. DRAINAGE MANHOLE FOOTING & WALL AUGUST 2, 2022
12. RC WALL @RIGHT SIDE AUGUST 4, 2022
13. RC WALL @Rear SIDE 20-Aug-22
14.
15.

PREPARED BY:
VOLUME UNIT

17.50 m³
11.28 m³
8.50 m³
22.15 m³
9.50 m³
9.00 m³
11.50 m³
5.00 m³
5.00 m³
10.00 m³
10.00 m³
12.00 m³
22.50

153.93
PROJECT : TRANS OCEAN
LOCATION : DAGAT DAGATAN
SUBJECT : CONCRETE MONITORING
CONTRACTOR :

ITEM LOCATION

1. SOG
2. SOG
3. SOG
4. SOG
5. SOG
6. SOG
7. SOG
8. SOG
9. SOG
10. SOG
11. SOG
12. SOG
13. SOG
14. SOG
11. SOG
12.
13.
14.
11.
12.

15.

PREPARED BY:
DATE VOLUME UNIT

12-Jul-22 134.50 m³
14-Jul-22 103.50 m³
18-Jul-22 75.50 m³
19-Jul-22 140.50 m³
22-Jul-22 96.00 m³
27-Jul-22 105.50 m³
29-Jul-22 65.50 m³
3-Aug-22 128.50 m³
9-Aug-22 101.00 m³
10-Aug-22 74.00 m³
11-Aug-22 90.00 m³
12-Aug-22 91.00 m³
16-Aug-22 138.50 m³
19-Aug-22 98.00 m³
24-Aug-22 61.00 m³
25-Aug-22 57.00 m³



1560.00 m³