> >i 98
Stans
VERSION.
EMAAR) mirage
DONA) Ve Adasen GeLeL Lu
i "Arabian Ranches lll Development, . ev
Project aaa evcentre- Mainworks | EMBlover + M/s. Emaar Development PISC
‘ Contactor: M/s. Parkway International LLC
i (M/s. Mirage Leisure and
jineer je Contactor M/s. Conversion Electromachanical
Enginee’ eestcomere ce M/s. Conversion Elect LLC
recipline |S | ARC | mec | ete cer sey) | Submittal ARDS-PICAAMEC: | pe,
amar Reference No. | MAS-070 Rev.00
Location _ | Allarea Unifier Record No.
(soecv Phase) Date (08-07-2023
) [ISTOF SUBMITTED ITEMS
Ta Pee ieee fs
‘3 Hard & 1 Soft Yes
ir & Dirt Separator
o
Copy
‘Manufacturer | M/zFLANICO (Netherland)
——— sample: C] No
Supper ‘ifs Metalic Bulding Materials LLC male
(UAE) fer
TEE ECE TET BRACE
COMPLIANCE The Contractor hereby confirms that the submitted ems hay
STATEMENT __ cogrect and in strict conformance with the Contract DocuriéAt
‘MEP Ehgirjeer, Technical Manager|. I
Mipfiance statement)
5 / Project Manager
ao p&e cO 00 &O
Ae Mecken Bire Dial Sepercfor ple Ferre. Netbeylnd.
2) Faslertpu Shatt be. Bs, intachc €f0 er wet i tag
LR - be retsasp apprevek..
Reviewer's Name: ABO S7hhn..
iL AG
Ae
sprotrgandoate: BABA |
~ ey
2 a vw
aor aoe
_Comments Sheet Attached: Yes ()_No
ao eo co ODO
Dat
Galan NE Slg in iaeraConvee Te ContSCEMIBENOSy
é sand Document 9s perCauses 53 and 174 ofthe Canoe
zh
iforepjon ond Record
Rites Sed Gewlomen
Form: Mater Aprox Sob