DOCK REFURBISHMENT
BREVARD COUNTY, FL
LOCATION MAP CONSTRUCTION DRAWINGS
SITE GENERAL LOCATION - 100 VERSAILLES DRIVE
DRAWING INDEX
(PROVIDED BY ATKINS)
Prepared for SHEET NUMBER SHEET DESCRIPTION
LEGAL DESCRIPTION
A PARCEL OF SUBMERGED LAND LYING IN GOVERNMENT LOT 2, SECTION 20, TOWNSHIP 28 SOUTH, RANGE 38 EAST, BREVARD
COUNTY, FLORIDA, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT THE INTERSECTION OF THE SOUTH LINE OF THE NORTH 400 FEET OF THE SOUTH 700 FEET OF GOVERNMENT LOT
2, WITH THE SAFE UPLAND LINE OF THE INDIAN RIVER (1.0 FEET N.G.V.D. CONTOUR LINE): THENCE NORTH 22°26'24" WEST
ALONG THE SAID SAFE UPLAND LINE A DISTANCE OF 134.38 FEET; THENCE CONTINUE ALONG THE SAID SAFE UPLAND LINE
NORTH 20°31'02" WEST A DISTANCE OF 79.50 FEET TO THE POINT OF BEGINNING; THENCE SOUTH 83°49'30" WEST A DISTANCE OF
153.67 FEET; THENCE SOUH 06°10'31" EAST A DISTANCE OF 32.00 FEET; THEN SOUTH 83°49'30" WEST A DISTANCE OF 241.00 FEET;
THENCE SOUTH 06°10'31" EAST A DISTANCE OF 35.00 FEET; THENCE SOUTH 83°49'30" WEST A DISTANCE OF 85.00 FEET; THENCE
NORTH 06°10'31" WEST A DISTANCE OF 85.00 FEET; THENCE NORTH 06°10'31' WEST A DISTANCE OF 140.00 FEET; THENCE SOUTH
SEPTEMBER 2018
056°10'31" EAST A DISTANCE OF 35.00 FEET; THENCE NORTH 83°49'30' EAST A DISTANCE OF 241.00 FEET; THENCE SOUTH
06°10'31' EAST A DISTANCE OF 32.00 FEET; THENCE NORTH 89°49'30" EAST A DISTANCE OF 151.85 FEET; TO THE SAID SAFE
UPLAND LINE; THENCE ALONG SAID UPLAND LINE SOUTH 23°00'02" EAST A DISTANCE OF 6.27 FEET TO THE POINT OF BEGINNING.
OWNER CIVIL ENGINEER NOTE: HARBOR ISLAND BEACH CLUB PROJECT NAME IS
PHOENIX PARK FUND V, LP ATKINS ALSO KNOWN AS THE FORMER HAMPTONS APARTMENT
119 SIGNATURE DRIVE 7175 MURRELL ROAD SITE.
TAX PARCEL ID SHEET SIZE: 24'' X 36'' MELBOURNE BEACH, FL 32951 MELBOURNE, FL 32940 BID SET
NOT APPROVED FOR CONSTRUCTION UNLESS STAMPED APPROVED FOR CONSTRUCTION.
CONTRACTOR’S SUBMITTALS:
GENERAL NOTES:
THE FOLLOWING MINIMUM SUBMITTALS SHALL BE PREPARED BY THE CONTRACTOR AND SUBMITTED TO THE OWNER'S ENGINEER FOR REVIEW PRIOR TO
1. WORK SHALL BE IN ACCORDANCE WITH THE APPROPRIATE AUTHORITY HAVING JURISDICTION (AHJ) PRIMARILY FDEP AND ACOE RULES AND REGULATIONS. CONTRACTOR SHALL CONSTRUCTION ACTIVITY. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL SUBMITTAL REQUIREMENTS:
KEEP A COPY ONSITE OF ALL PROJECT PERMITS AND SIGNED AND SEALED DRAWINGS.
1. TIMBER PILING CERTIFICATIONS
2. THE ARRANGEMENT OF DRAWINGS AND/OR THE ORGANIZATION OF THE SPECIFICATIONS INTO DIVISIONS, SECTIONS, AND ARTICLES ARE FOR CLARITY ONLY AND SHALL NOT 2. MOORING CLEATS
3. METAL FABRICATIONS
CONTROL THE CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN ESTABLISHING THE EXTENT OF WORK TO BE PERFORMED BY ANY TRADE. THE
4. RUBBER DOCK FENDERS
CONTRACTOR MAY SUBCONTRACT THE WORK IN SUCH DIVISIONS AS HE/SHE SEES FIT AND IS ULTIMATELY RESPONSIBLE FOR FURNISHING ALL WORK SHOWN ON THE DRAWINGS
5. PILE DRIVING CRITERIA AND PROCEDURES
AND/OR IN THE SPECIFICATIONS. 6. HDPE WRAP
7. HARDWARE
3. IN THE EVENT OF INCONSISTENCIES BETWEEN PARTS OF THE CONTRACT DOCUMENTS OR BETWEEN THE CONTRACT DOCUMENTS AND APPLICABLE STANDARDS, CODES AND 8. SECURITY GATE
ORDINANCES, THE CONTRACTOR SHALL: (1) PROVIDE THE BETTER QUALITY AND/OR GREATER QUANTITY OF WORK; OR (2) COMPLY WITH THE MORE STRINGENT REQUIREMENT: 9. WATER PIPE AND APPURTENANCES
EITHER OR BOTH IN ACCORDANCE WITH THE ENGINEER'S INTERPRETATION. TECHNICAL SPECIFICATIONS TAKE PRIORITY OF GENERAL SPECIFICATION S AND DETAIL DRAWINGS 10.ELECTRICAL COMPONENTS
TAKE PRECEDENCE OVER GENERAL DRAWINGS. ANY WORK SHOWN ON ONE DRAWING SHALL BE CONSTRUED TO BE SHOWN IN ALL DRAWINGS AND THE CONTRACTOR WILL 11.DEMOLITION PLAN
COORDINATE THE WORK AND THE DRAWINGS. IF ANY PORTION OF THE CONTRACT DOCUMENTS SHALL BE IN CONFLICT WITH ANY OTHER PORTION, THE VARIOUS DOCUMENTS
COMPRISING THE CONTRACT SHALL GOVERN IN THE FOLLOWING ORDER OF PRECEDENCE: THE OWNER CONTRACTOR AGREEMENT; MODIFICATIONS; ADDENDA; AND
SUPPLEMENTARY CONDITIONS; THE GENERAL CONDITIONS; THE SPECIFICATIONS; THE DRAWINGS; AS BETWEEN SCHEDULES AND INFORMATION GIVEN ON DRAWINGS, THE WOOD PILES/ TIMBER:
SCHEDULES SHALL GOVERN;AS BETWEEN FIGURES GIVEN ON DRAWINGS AND THE SCALED MEASUREMENTS, THE FIGURES SHALL GOVERN, AS BETWEEN LARGE- SCALE
DRAWINGS AND SMALL SCALE DRAWINGS, THE LARGER SHALL GOVERN/ ANY SUCH CONFLICT OR INCONSISTENCY BETWEEN OR IN THE DRAWINGS SHALL BE SUBMITTED TO THE 1. ALL WOOD PILES SHALL BE DEMERARA GREENHEART (NECTANDRA RADIOSI). PILES SHALL BE DRIVEN TO 12
ENGINEER WHOSE DECISION THEREON SHALL BE FINAL AND CONCLUSIVE. (TWELVE) FEET EMBEDMENT (BELOW THE CHANNEL BOTTOM) IF THE WATER DEPTH IS 5 (FIVE) FEET OR LESS.
PILES SHALL BE DRIVEN TO 20 (TWENTY) FEET EMBEDMENT WHERE THE WATER DEPTH IS GREATER THAN 5
4. THE CONTRACTOR SHALL BE RESPONSIBLE TO FURNISH ALL MATERIAL AND LABOR (SURVEYING, ETC) TO CONSTRUCT THE FACILITY AS SHOWN. CONTRACTOR SHALL VISIT THE (FIVE) FEET. ALL PILES SHALL BE DRIVEN INTO FIRM SOILS AND TO A MINIMUM BEARING CAPACITY OF TEN (10)
SITE PRIOR TO BIDDING TO DETERMINE EXISTING CONDITIONS. ANY DISCREPANCY BETWEEN PLANS AND ACTUAL FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF TONS (SERVICE LOAD).
THE ENGINEER OF RECORD PRIOR TO COMMENCING ANY CONSTRUCTION WORK. 2. REFER TO PLANS FOR SPECIFICATIONS.
3. ALL LUMBER SHALL BE PRESSURED TREATED (PT). REFER TO STRUCTURAL NOTES FOR ADDITIONAL
5. PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL CHECK THE DRAWINGS AGAINST THE SITE AND THE WORK AND NOTIFY THE PROJECT REPRESENTATIVE IN INFORMATION.
WRITING OF ANY DISCREPANCIES IN EITHER DIMENSIONS AND/OR SITE CONDITIONS. THE CONTRACTOR SHALL NOT BEGIN CONSTRUCTION IN ANY SUCH AREA UNTIL THE 4. LOAD BEARING FRAMING SHALL BE #2 SOUTHERN YELLOW PINE (SYP) OR BETTER, 19 % MOISTURE CONTENT,
DISCREPANCY HAS BEEN RESOLVED BY THE CONTRACTOR AND APPROVED BY THE PROJECT REPRESENTATIVE. UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS
5. TIMBER FRAMING SHALL BE PRESSURE TREATED IN ACCORDANCE WITH AWPA STANDARDS U2 AND T1 AND
6. THE CONTRACTOR SHALL ANTICIPATE TIDAL FLUCTUATIONS DURING THE COURSE OF THE WORK. THE CONTRACTOR SHALL DETERMINE HIS WORK SCHEDULE FROM TIDE TABLES SHALL BE SUITABLE FOR MARINE USE, CATEGORY UC5C.
FOR THE PERIOD OF CONSTRUCTION. THE SITE IS SUBJECT TO VARIABLE WAVE AND SURGE CONDITIONS AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE 6. TIMBER CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE NATIONAL DESIGN SPECIFICATION FOR WOOD
TEMPORARY SUPPORT FOR MARINE STRUCTURES AND SHORELINE DURING CONSTRUCTION. CONSTRUCTION (NDS), 2005 EDITION WITH SUPPLEMENTS.
7. WOOD PILES SHALL BE OF MINIMUM DIAMETER STATED IN THE DRAWINGS AND SHALL BE PLACED LEVEL AND
7. THE CONTRACTOR SHALL COMPLY WITH ALL WATER QUALITY REQUIREMENTS AND REGULATORY PERMITS ISSUED BY LOCAL, STATE AND FEDERAL AUTHORITIES PRIOR TO AND AT PLUMB.
THE TIME OF CONSTRUCTION.
CONSTRUCTION ACTIVITIES:
8. THE CONTRACTOR SHALL PROVIDE ALL WARNING SIGNS, LIGHTS, SIGNALS AS REQUIRED BY THE PROJECT REPRESENTATIVE TO ADEQUATELY WARN THE PUBLIC AGAINST 1. BEST MANAGEMENT PRACTICES (PRIMARILY TURBIDITY SCREENS AND FLOATING TURBIDITY BARRIERS) FOR
DANGER AND TRESPASS WITHIN THE DESIGNATED CONSTRUCTION SITE. EROSION AND TURBIDITY CONTROL SHALL BE IMPLEMENTED AND MAINTAINED AT ALL TIMES DURING
CONSTRUCTION AND OPERATION OF THE PERMITTED ACTIVITY TO PREVENT SILTATION AND TURBID
DISCHARGES IN EXCESS OF STATE WATER STANDARDS PURSUANT TO CHAPTER 62-302, F.A.C. THE PERMITTEE
9. ALL WORK DONE ON THIS PROJECT IS MADE IN REFERENCE TO THE SURVEY CONDUCTED BY BRIEL AND ASSOCIATES. REFERENCE TO NATIONAL GEODETIC VERTICAL DATUM 1988 SHALL BE RESPONSIBLE FOR ENSURING THAT EROSION AND TURBIDITY CONTROL DEVICES AND PROCEDURES
(NAVD88) PER BRIEL AND ASSOCIATES, DATED 07/11/2018. MEAN HIGH WATER (MHW) = -0.91' NAVD88. ARE INSPECTED AND MAINTAINED DAILY DURING ALL PHASES OF CONSTRUCTION AUTHORIZED BY THIS PERMIT
UNTIL ALL AREAS THAT WERE DISTURBED DURING CONSTRUCTION ARE SUFFICIENTLY STABILIZED TO PREVENT
10. ALL WORK PERFORMED TO REFURBISH THE EXISTING DOCK SHOULD BE CONSISTENT WITH FDEP AND ARMY CORPS REQUIREMENTS. EROSION, SILTATION, AND TURBID DISCHARGES.
11. ALL HARDWARE INCLUDING BOLTS, CLIPS, STRAPS, SCREWS, ETC. SHALL BE AISI GRADE 316 STAINLESS STEEL. 2. UPON FINAL COMPLETION OF THE PROJECT AND UPON REASONABLE ASSURANCE THAT THE PROJECT IS NO
LONGER A POTENTIAL TURBIDITY SOURCE, THE PERMITTEE WILL BE RESPONSIBLE FOR THE REMOVAL OF THE
12. ALL SPECIFIED STEEL CONNECTION HARDWARE SHALL BE OF SUITABLE CORROSION RESISTANCE FOR SALT WATER CONDITIONS. TURBIDITY BARRIERS. THE TURBIDITY CONTROL DEVICES SHALL BE REMOVED NO LATER THAN ONE YEAR FROM
COMPLETION OF THE PROJECT. ALL TURBIDITY CONTROL DEVICES SHALL BE DISPOSED OF IN AN UPLAND
13. THE EXISTING DOCK IS CONSISTENT WITH BREVARD COUNTY MANATEE PROTECTION PLAN.
DISPOSAL AREA.
14. THE GOVERNING BUILDING CODE IS THE FLORIDA BUILDING CODE (FBC), 2017 EDITION WITH LATEST SUPPLEMENTS.
3. THE LIMITS OF CONSTRUCTION SHALL BE DELINEATED BY SILT FENCING OR A FLOATING TURBIDITY BARRIER.
THE PERMITTEE SHALL BEAR THE RESPONSIBILITY OF NOTIFYING ALL CONSTRUCTION WORKERS THAT SILT
FENCING OR TURBIDITY BARRIER REPRESENTS THE LIMITS OF ALL CONSTRUCTION ACTIVITIES. THE PERMITTEE
COORDINATION: SHALL BEAR THE RESPONSIBILITY OF KEEPING ALL CONSTRUCTION WORKERS AND EQUIPMENT OUT OF THE
ADJACENT WETLANDS AND SURFACE WATERS WHERE WORK HAS NOT BEEN PERMITTED FOR IMPACTS.
1. DOCK ("C") DRAWINGS SHALL BE WORKED WITH DEMOLITION, ARCHITECTURAL/ BUILDING STRUCTURAL, (WHEN APPLICABLE) CIVIL AND ELECTRICAL DRAWINGS, ETC. TO
PROPERLY CONSTRUCT THE PROPOSED MARINE IMPROVEMENTS. DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE PROJECT REPRESENTATIVE IN A TIMELY 4. THERE SHALL BE NO STOCK PILING OF TOOLS, MATERIALS (I.E., LUMBER, PILINGS, RIPRAP, AND DEBRIS) WITHIN
MANNER, BEFORE PROCEEDING WITH THE WORK. WETLANDS, ALONG THE SHORELINE WITHIN THE LITTORAL ZONE, OR ELSEWHERE WITHIN WETLANDS/WATERS
OF THE STATE UNLESS SPECIFICALLY APPROVED IN THIS PERMIT. ANY AND ALL CONSTRUCTION DEBRIS SHALL
2. THE CONTRACTOR SHALL COORDINATE ALL HIS ON-SITE CONSTRUCTION ACTIVITIES WITH THE OWNER AND THE ENGINEER. BE REMOVED FROM WETLANDS/ WATERS OF THE STATE WITHIN 14 DAYS OF COMPLETION OF THE WORK
DOCK REFURBISHMENT
5. CONSTRUCTION EQUIPMENT SHALL NOT BE REPAIRED OR REFUELED IN WETLANDS OR ELSEWHERE WITHIN
WATERS OF THE STATE.
1. TIMBER PILE FOUNDATIONS FOR MARGINAL DOCKS AND TIMBER MOORING PILES ARE PER THE GEOTECHNICAL EXPLORATION REPORTS TITLED:
GENERAL NOTES
6. THE STANDARD MANATEE CONSTRUCTION CONDITIONS FOR IN-WATER WORK (2011) MUST BE FOLLOWED FOR
2. "SUBSURFACE SOIL EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION PROPOSED DOCK STRUCTURE, HARBOR BEACH CLUB - MELBOURNE BEACH, FLORIDA, DATED ALL IN-WATER ACTIVITY.
FEBRUARY 28, 2018."
7. CONTRACTOR SHALL SUPPLY THE AS-BUILT DRAWING OF THE DOCK REFURBISHMENT TO THE OWNER AND
3. THE REPORTS WERE PREPARED BY: ARDAMAN & ASSOCIATES, INC. 1300 N.COCOA BLVD., COCOA, FLORIDA 32922. ENGINEER AFTER PROJECT COMPLETION.
PHONE: 321-632-2503. REPORTS ARE AVAILABLE UPON WRITTEN REQUEST TO THE PROJECT REPRESENTATIVE.
C-2
Sep 26, 2018 - 4:16pm
\\FUSMBA1000\Civil$\PROJECTS\100056195 - Hampton Apt Redevelopment\10 CAD\11 - Dock Refurbishment - Con. Set\C-2 General Notes.
L
PL
'
80
50'
SU
EXISTING WOOD FINGER PIERS
W/ PILINGS TO BE REMOVED.
(TYP.)
RF
AC
SILT FENCE
EW
TO BE REMOVED (TYP.) W/ PILINGS TO BE REMOVED.
(TYP.)
AT
ER
AM
ER
PR
V
APPROX.
AR
RI
SHORELINE
OT
N
EC
W/PILINGS TO BE REMOVED
D I
(TYP.)
IN
TIO
EXISTING WOOD DOCK
W/ PILINGS TO BE
REMOVED (TYP.)
NB
UF
FE
R
PROJECT LIMITS
N
DOCK DEMOLITION PLAN NOTES:
SCALE: 1" = 30'
1. BACKGROUND AERIAL DEPICTS MORE OF THE DOCK IN PLACE THAN WHAT IS ACTUALLY THERE CURRENTLY.
LEGEND: 2. CONTRACTOR IS TO DEMOLISH THE ENTIRE EXISTING WOODEN BOAT DOCK AND WALKWAY, INCLUDING ALL
PILINGS, DECKING, AND ASSOCIATED APPURTENANCES.
- BORING LOCATION; SEE SPECS
3. ALL EXISTING WOOD PILING SHALL BE COMPLETELY REMOVED, THIS INCLUDES DEBRIS THAT IS FOUND ON
- FLOATING TURBIDITY BARRIER THE BOTTOM OF THE RIVER, ALONG WITH ANY DEBRIS OR PARTIAL PIECES THAT MAY BE GENERATED
- PROJECT LIMITS DURING REMOVAL.
- SEDIMENT CONTROL FENCE 4. ALL DEBRIS SHALL BE DISPOSED OF OFF-SITE AT AN APPROVED UPLAND DISPOSAL FACILITY IN A LEGAL
MANNER.
5. ALL DEMOLITION WORK SHALL BE PERFORMED IN ACCORDANCE WITH CONTRACTOR'S DEMOLITION PLAN,
WHICH SHALL BE SUBMITTED TO OWNER'S ENGINEER FOR REVIEW AND APPROVAL PRIOR TO START OF
SITE DEVELOPMENT DATA: WORK.
THE SITE IS LOCATED WITHIN SECTIONS 20, TOWNSHIP 28 6. DEMOLITION ACTIVITIES SHALL ENSURE PROTECTION OF FACILITIES. CONTRACTOR SHALL EXERCISE
SOUTH, RANGE 38 EAST OF BREVARD COUNTY, FLORIDA EXTREME CAUTION WHILE PERFORMING WORK AROUND EXISTING UTILITIES TO REMAIN. SUBMIT
DEMOLITION PLAN OUTLINING ALL PROTECTIVE MEASURES.
GRAPHIC SCALE:
TAX ACCOUNT #2849283 ; PARCEL ID: 28-38-20-00-00005.0-0000.00
0 30 60 90
C-3
Sep 26, 2018 - 12:57pm
G:\PROJECTS\100056195 - Hampton Apt Redevelopment\10 CAD\11 - Dock Refurbishment - Con. Set\C-3 Demolition Plan.dwg
PL
APPROXIMATE
EXISTING SHORELINE
PROJECT LIMITS
(2.7 ACRES)
SILT FENCE
CRUSHED COQUINA
(PROVIDED BY OTHERS)
20.0'
12"Ø WOODEN GUIDE PILES (TYP.)
FLOATING TURBIDITY BARRIER
30.0'
37.3'
20.0'
30.0'
U.N.O.
32.0'
TYP.
ER
6.0'
U.N.O.
20.0'
TYP.
RI V
37.3'
32.0'
120.0'
N
2.0'
I
TYP.
IND
28.0'
37.3'
TYP.
2.0'
6.0'
40.0' 183.0'
TO SHORE
WALKWAY
270.0' SLIPS
A T P IER AREA - 36
ORY B O
SID ENT IA L ACCESS
MAIN RE
46.0' 499.0'
CTION
ADDITION
AL
VE RA LL CONSTRU
O
DOCK REFURBISHMENT
PL
- EXISTING CONTOURS
C-4
Sep 26, 2018 - 12:57pm
G:\PROJECTS\100056195 - Hampton Apt Redevelopment\10 CAD\11 - Dock Refurbishment - Con. Set\C-4 New Dock Site Plan.dwg
HANDRAIL
37.3'
POST (TYP.)
15.0' 30.0'
12.5'
FINGER PIER (TYP.)
-6 C
C-5 C-6
32.0'
2.0'
30.0'
-4
DECK EL. +7.10 DECK EL. +6.30 6' WIDE A DECK EL. +6.30
A WALKWAY C-5 C-6
C-5 C-6
120.0'
37.3'
20.0'
-6
LEGEND:
DOCK REFURBISHMENT
C-5
Sep 26, 2018 - 12:58pm
G:\PROJECTS\100056195 - Hampton Apt Redevelopment\10 CAD\11 - Dock Refurbishment - Con. Set\C-5 New Dock Detail Plan.dwg
10'-0"
2"x8" STRINGERS
2"x8" COLLAR, TYP.
10'-0"
CL PILE CL PILE
8"Ø TIMBER PILE AT
10'-0" O.C. (TYP.)
4"x6" POST
DECK PLATE
DOCK REFURBISHMENT
5'-0"
2"
SIMPSON STRONG-TIE GUARDRAIL POST
GIRDER CONNECTIONS (DTT2Z) - FASTEN PER
MANUFACTURER'S RECOMMENDATIONS
TYPICAL PILE AND GIRDER PLAN TYPICAL HANDRAIL POST CONNECTION DETAIL
SCALE: 1/2' = 1'-0" SCALE: 1' = 1'-0"
C-6
Sep 26, 2018 - 12:58pm
G:\PROJECTS\100056195 - Hampton Apt Redevelopment\10 CAD\11 - Dock Refurbishment - Con. Set\C-6 Dock Plans and Detail.dwg
6'-0"
2"x6" HANDRAIL (TYP.)
3'-6"
6'-0" W/ 1/2" SPACING PRESSURE TREATED
RAIL (TYP.)
WOOD DECKING 2''X6''
2'-0" W/ 1/2" SPACING
1'-9"
2"x4" DECK PLATE (TYP.) 2"x4" DECK PLATE (TYP.) PRESSURE TREATED
WOOD DECKING 2''X6'' EL. VARIES +6.30 TO +7.10 2"x10" RUB RAIL (TYP.)
EL. VARIES +6.30 TO +7.10 EL. VARIES +6.30 TO +7.10
W/ 1/2" SPACING
1'-6"
1'-6"
1'-6"
2"x8" STRINGER (TYP.)
3'-6"
2"x8" STRINGER (TYP.) 2"x8" STRINGER (TYP.)
2"x8" GIRDER
2'-0"
5'-6"
5'-6"
2"x8" GIRDER 2"x8" GIRDER 2"x8" BRACES INSTALLED
7'-3'' TO 8'-0''
4'-0"
7'-7 1/2"
6'-4''
2"x8" BRACES INSTALLED 2"x8" BRACES INSTALLED ALL PILINGS
ACROSS WALKWAY AT ACROSS WALKWAY AT
ALL PILINGS ALL PILINGS 3/4" BOLT (TYP.)
8'' DIA TIMBER PILING (TYP.) 8'' DIA TIMBER PILING (TYP.) 8'' DIA TIMBER PILING (TYP.)
1'-4"
CL PILE CL PILE CL PILE CL PILE CL PILE
CL PILE
5'-0" 5'-0"
4"x6" POST
3'-6"
PRESSURE TREATED WOOD
1'-9"
DECKING 2''x6'' W/ 1/2" 2"x4" DECK PLATE (TYP.)
EL. VARIES +6.30 TO +7.10 SPACING
EL. VARIES +6.30 TO +7.10
7'-0"
PRESSURE TREATED WOOD
DECKING 2''X6'' W/ 1/2"
SPACING
8" DIAMETER 8" DIAMETER WINGS
PILING (TYP.) PILING (TYP.)
6'-0"
NOTE:
1. ALL WOOD TO BE PRESSURE TREATED.
WALKWAY ELEVATION WALKWAY ELEVATION WITH HANDRAILS 2. SCREEN TO BE 12 MESH BLACK POLY STAINLESS - 0.028 DIAMETER.
SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0" 3. CONTRACTOR TO SUBMIT SHOP DRAWING FOR GATE ASSEMBLY AND
DOOR HARDWARE FOR APPROVAL.
4. SUPPLY ELECTRONIC KEYPAD LOCK.
5. ALTERNATE GATE VARIETY MAY BE PROPOSED BY THE CONTRACTOR
AS APPROVED BY THE OWNER.
NOTE:
C-7
Sep 26, 2018 - 12:58pm
G:\PROJECTS\100056195 - Hampton Apt Redevelopment\10 CAD\11 - Dock Refurbishment - Con. Set\C-7 Sections and Details.dwg
NOTES:
2. FINAL ELECTRIC AND WATER DESIGN WILL BE PROVIDED BY OTHERS, EITHER THE INSTALLER'S ENGINEER OR
THEIR PROCUREMENT OF ELECTRICAL ENGINEERING CONSULTANT, PLUMBER, COMPETENT ELECTRIC OR
PLUMBING SKILLED INSTALLATION SERVICES TO CURRENT NEC ELECTRIC CODE AND PLUMBING CODE.
3. ANTICIPATED ELECTRIC LOAD TO DOCK: BOAT DOCK WILL BE SERVED AT 120/208V THREE PHASE AND WILL
REQUIRE A PAD MOUNTED UTILITY TRANSFORMER TO BE LOCATED WITHIN THE BOAT DOCK SERVICE ENTRANCE.
E
42 SLIPS @ 4KVA PER SLIP (DEMAND) = 168 KVA -- USE 600 AMP SERVICE ENTRANCE MAIN. THIS SERVICE WILL
SERVE THE BOAT DOCK SYSTEM VIA A CT METER SYSTEM. FEEDER SHALL BE (2) SETS OF (4) # 500KCMIL AL.
E
E
W
FINGER PIER (TYP.)
NEW 6' WIDE
WALKWAY
E
W
1.5" CPVC POTABLE WATER TIGHT
WATER SERVICE. ROUTE JUNCTION BOX
3/4" HOSE (TYP.)
AT OUTSIDE STRINGER 6' WIDE WALKWAY
BIBB (TYP.)
E
(TYP.)
A B
W
C-7 C-8 C-7 C-8
E
W W W W W W W W W W W W W W W W W W W W W W W W W W W
E E E E E E E E E E E E E E E E E E E E E E E E
W
E
W
LEGEND
WATER W W
ELECTRICAL E E
DOCK REFURBISHMENT
FINGER PIER (TYP.)
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
MATCH LINE: A-A
CRUSHED COQUINA
APPROX. EXIST.
SHORELINE
N
GRAPHIC SCALE:
DOCK UTILITY PLAN 0 10 20 30
SCALE: 1" = 10'
SCALE: 1" = 10'
C-8
Sep 26, 2018 - 12:59pm
G:\PROJECTS\100056195 - Hampton Apt Redevelopment\10 CAD\11 - Dock Refurbishment - Con. Set\C-8 Utility Plan.dwg
3/4" THREADED WATER
UTILITY NOTES: HAMMER ARRESTOR (TYP.)
IN GENERAL, PLUMBING AND ELECTRICAL PLANS ARE SCHEMATIC ONLY AND SHOULD NOT BE SCALED. CONTRACTOR SHALL 3/4" NIBCO C56-VB HEAVY
COORDINATE AT SITE ALL PLUMBING AND ELECTRICAL WORK SO AS NOT TO CONFLICT IN LOCATION WITH OTHER WORKS UNDER PATTERN HOSE BIBB (MPT) W/
THE CONTRACT. VACUUM BREAKER 3/4" CPVC
SOCKET-TO-FPT ADAPTER (TYP.)
6'-0"
PLUMBING
3/4" CPVC POTABLE WATER
2'-0"
SERVICE (TYP.)
1. COORDINATE ALL PIPING ROUTING WITH ALL OTHER TRADES PRIOR TO INSTALLATION. ROUTE ALL PIPING TO AVOID
ELECTRICAL RACEWAYS AND STRUCTURE. NO PENETRATION THROUGH STRUCTURAL MEMBERS ARE ALLOWED FOR
6"
EL. VARIES 3/4" SHUT-OFF VALVE (TYP.)
PLUMBING INSTALLATION WITHOUT WRITTEN APPROVAL FROM THE ENGINEER PRIOR TO INSTALLATION.
2. THE CONTRACTOR SHALL BASE HIS PROPOSAL UPON THE FIXTURES AND FAUCETS AS SCHEDULED OR SPECIFIED USING THE 2"x8" STRINGER (TYP.)
MANUFACTURER'S AND MODEL NUMBERS AS CALLED FOR IN THE CONSTRUCTION DOCUMENTS.
3/4" CPVC ELBOW (TYP.)
3. THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS IN SUFFICIENT TIME TO AVOID DELAYING THE COMPLETION OF
THE PROJECT. DELAY IN DELIVERIES WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR SUBMISSION OF SUBSTITUTE
MATERIALS/FIXTURES/FAUCETS, ETC.
1.5" CPVC TEE (SxS) W/ 1.5" x 3/4"
REDUCER BUSHING (SPGxS)
4'-0"
4. PIPING ROUTING IS SCHEMATIC AND INTENDED TO INDICATE GENERAL ROUTING. CONTRACTOR SHALL PROVIDE ANY
ADDITIONAL OFFSETS AND FITTINGS REQUIRED FOR PROPER INSTALLATION AND TO MAINTAIN CLEARANCES AS
ENCOUNTERED IN THE FIELD.
3/4" CPVC TEE (SxS)
5. ALL PLUMBING INSTALLATION AND MATERIALS SHALL BE IN STRICT COMPLIANCE WITH ALL LOCAL, STATE, AND FEDERAL 2"x8" BRACES
CODES AND APPLICABLE STANDARDS, REGULATIONS, AND AUTHORITIES HAVING JURISDICTION OVER THIS PROJECT.
6. ROUGH-IN ALL SUPPLIES IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND MAKE FINAL 3/4" BOLT (TYP.)
CONNECTIONS. ALL SUPPLIES SHALL BE VALVED. INSTALL VACUUM BREAKERS WHERE REQUIRED BY CODE.
EL. -0.0' NAVD 88
7. SUBMIT SHOP DRAWINGS INCLUDING PIPE ROUTING AND EQUIPMENT LOCATION TO THE ENGINEER FOR REVIEW PRIOR TO
THE INSTALLATION OR PURCHASING OF ANY PIPING EQUIPMENT. EL. -0.91' MHW
8. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF HIS STORED MATERIALS AND EQUIPMENT FOR THE DURATION
OF THE PROJECT. PROVIDE PROTECTION COVER OVER EQUIPMENT TO ENSURE AGAINST WATER AND DUST DAMAGE AND
PROVIDE SUITABLE PALLETS BETWEEN EQUIPMENT AND MATERIALS STORED ON GROUND.
1. THE WORK PRACTICES EMPLOYED ON THIS PROJECT SHALL AT ALL TIMES COMPLY WITH OR EXCEED THE LATEST ADOPTED
EDITION OF THE NEC (NATIONAL ELECTRIC CODE). CONTRACTOR SHALL PROVIDE OR OBTAIN ALL REQUIRED LABOR, A TYPICAL WATER SUPPLY SECTION
MATERIAL, EQUIPMENT, INSURANCE, TOOLS, PERMITS, INSPECTIONS, ETC. TO PERFORM THE PROJECT ELECTRICAL WORK AS C-7 C-8 SCALE: 1/2" = 1'-0"
PER NEC, LOCAL AGENCIES AND OWNER REQUIREMENTS.
2. THE CONTRACTOR SHALL FIELD VERIFY LOCATION AND POWER FEEDS OF EQUIPMENT WITH OWNER'S REPRESENTATIVE
(REVISE BRANCH CIRCUITS AS REQUIRED).
3. THE CONTRACTOR SHALL PROVIDE OUTLET AND JUNCTION BOXES PER NEC REQUIREMENT ACCORDING TO THEIR LOCATION.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CUTTING AND PATCHING REQUIRED TO PERFORM THE ELECTRICAL
WORK. OWNER SHALL BE NOTIFIED BEFORE STARTING ANY CUTTING AND PATCHING, AND WORK SHALL BE DONE IN SUCH A
MANNER THAT WILL NOT AFFECT THE ADJACENT LAND AREA OR DOCK STRUCTURE. CONTRACTOR SHALL BE RESPONSIBLE
FOR ANY DAMAGE AS A RESULT OF CUTTING AND PATCHING AND SHALL PROVIDE A CODE COMPLIANT SOLUTION TO RESTORE
THE AFFECTED SYSTEMS AT NO EXTRA CHARGE.
5. THE CONTRACTOR SHALL FOLLOW OWNER, NATIONAL AND LOCAL AGENCIES, ETC. SAFETY REGULATIONS PROCEDURES.
CONTRACTOR SHALL PROVIDE ADEQUATE EQUIPMENT AND WORKING AREA PROTECTION TO PREVENT INJURIES TO PEOPLE
AND DAMAGE TO PROPERTY.
6. THE CONTRACTOR SHALL FULLY TEST ALL ELECTRICAL SYSTEMS UPON COMPLETION OF WORK.
DOCK REFURBISHMENT
JUNCTION BOX (TYP.)
8. THE CONTRACTOR SHALL LABEL EACH SWITCH, RECEPTACLE, PANEL, AND JUNCTION BOXES WITH SOURCE PANEL AND EL. VARIES 2"x8" STRINGER (TYP.)
CIRCUIT NUMBER.
1" SCH. 80 PVC CONDUIT (TYP.)
9. THE CONTRACTOR SHALL VERIFY PHASE ROTATION ON ALL THREE-PHASE EQUIPMENT (DISCONNECTS, RECEPTACLES, ETC. 1" SCH. 80 PVC CONDUIT (TYP.)
1" SCH. 80 PVC 90° ELBOW (TYP.)
10. ALL CIRCUIT BREAKERS SHALL BE BOLT-ON TYPE.
1" SCH. 80 PVC CONDUIT (TYP.)
11.NO SPLICES SHALL BE PERMITTED ON ELECTRICAL WIRING HOME RUNS FROM PANEL.
4'-0"
2"x8" BRACES
CL PILE CL PILE
C-9
Sep 26, 2018 - 12:59pm
G:\PROJECTS\100056195 - Hampton Apt Redevelopment\10 CAD\11 - Dock Refurbishment - Con. Set\C-9 Utility Sections and Notes.dwg
FOLDS FOR COMPACT STORAGE
DEPTH ACCORDING TO NEED
TIDAL WATERS AND/OR HEAVY WIND AND WAVE ACTION
OR ANCHOR IF IN ROCK
EMBED POSTS 18" MIN.
FILTER FABRIC 2"
3' MIN. WIDTH
BACKFILL &
HAND TAMP ECONOMY FABRICS AVAILABLE WORK AREA FLOOD
18 OZ. 300 LB/IN. STANDARD
EBB
90
FLOW °
1/4" CHAIN
NYLON REINFORCED VINYL ALL SEAMS HEAT SEALED
1 SECTION FLOATING TURBIDITY BARRIER TYPE 1 TYPICAL INSTALLATION LAYOUT OF FLOATING TURBIDITY BARRIERS
- - NTS NTS NTS
1. SET POSTS AND EXCAVATE A 4"x4" TRENCH 2. STAPLE WIRE FENCING TO THE POSTS.
UPSLOPE ALONG THE LINE OF POSTS.
CONTROL DETAILS
3. ATTACH THE FILTER FABRIC TO THE WIRE 4 . BACKFILL AND COMPACT THE EXCAVATED SOIL.
FENCE AND EXTEND IT INTO THE TRENCH.
C-10
Sep 26, 2018 - 12:59pm
G:\PROJECTS\100056195 - Hampton Apt Redevelopment\10 CAD\11 - Dock Refurbishment - Con. Set\C-10 SWPPP Details.dwg
DISTRICT'S REQUIREMENTS
CONTRACTOR'S REQUIREMENTS
GENERAL CONTRACTOR
SUB-CONTRACTOR
SUB-CONTRACTOR
SUB-CONTRACTOR
SUB-CONTRACTOR
Sep 26, 2018 - 1:00pm