Contract No. Cnt/Enp/112310 Facilities Upgrade of Fire Water Pumping System at Jebel Ali Terminal Project
Contract No. Cnt/Enp/112310 Facilities Upgrade of Fire Water Pumping System at Jebel Ali Terminal Project
CNT/ENP/112310 FACILITIES
TERMINAL PROJECT
TABLE OF CONTENTS
Office: Dubai Order: AET00878-00 Document No. 4100001 Rev 1 Sheet 1 of: 8
CONTRACT NO. CNT/ENP/112310 : :
1 INTRODUCTION ............................................................................................ 3
1.1 Purpose of the Document .................................................................... 3
7 APPENDICIES ............................................................................................... 7
Appendix 1 – Electrical Load List .................................................................... 8
Office: Dubai Order: AET00878-00 Document No. 4100001 Rev 1 Sheet 2 of: 8
CONTRACT NO. CNT/ENP/112310 : :
1 INTRODUCTION
The Jebel Ali Terminal (JAT) of Emirates General Petroleum Corporation (EMARAT) for storage and
distribution of petroleum products is located at Petrochemical Zone of Plot No. EW103 of Jebel Ali
Free Zone (JAFZA).
Automotive fuels such as Gas Oil and Unleaded Gasoline and LPG are stored and handled at JAT,
for distributing petroleum products to the filling stations in the emirate of Dubai and Northern Emirates
from Jebel Ali Terminal (JAT) along with LPG cylinder filling and bulk supplies. The Terminal has been
in service for more than twenty years with refurbishment and add-on development over the years.
As a part of JAT2020 project an Adequacy Check for Fire Fighting Facility of JAT was carried out. In
line with EMARAT management directive, EMARAT HSE guidelines and considering future
developments, an improvement of the firefighting pumping system is initiated.
The objective of this project is to upgrade the firefighting system at Jebel Ali terminal by installing a
new firewater pump.
Emirates General Petroleum Corporation (EMARAT), the CLIENT, has appointed Bilfinger Tebodin
Middle East (BTME) the CONSULTANT, to provide consultancy services for the upgrade of firewater
pumping system at Jebel Ali Terminal, Dubai.
The purpose of the document is to summarize the electrical loads for the new additional diesel driven
pump envisaged in this project scope.
For the purpose of this document, the words and expressions listed below shall have the meanings
assigned as follows
2.1 Definitions
Office: Dubai Order: AET00878-00 Document No. 4100001 Rev 1 Sheet 3 of: 8
CONTRACT NO. CNT/ENP/112310 : :
SUB-CONTRACTOR Any person, firm, corporation or combination thereof to whom
any part of the project has been subcontracted.
2.2 Abbreviations
AC Alternating Current
DB Distribution Board
kV Kilo Volts
kW Kilo Watt
V Voltage
Office: Dubai Order: AET00878-00 Document No. 4100001 Rev 1 Sheet 4 of: 8
CONTRACT NO. CNT/ENP/112310 : :
3 ORDER OF PRECEDENCE
In case of conflict between various documents, codes or standards, the order of precedence that shall
be followed is:
Project Datasheets
Project Specifications
CLIENT Standards
In case of conflict between this specification and other specifications, codes or standards referred in
this document, the most stringent requirement as interpreted by CLIENT shall be entertained and
written CLIENT confirmation on the same shall be obtained before proceeding. CLIENT decision shall
be binding in this regard.
4 REFERENCE DOCUMENTS
5 DESIGN CRITERIA
Relevant definition, formulas, basis and assumptions which are used to form the design criteria for
this document are as follows:
5.1 Definitions
Absorbed Loads Loads that are absorbed by the driven equipment or the maximum
power taken during a given period of time as below:
Office: Dubai Order: AET00878-00 Document No. 4100001 Rev 1 Sheet 5 of: 8
CONTRACT NO. CNT/ENP/112310 : :
Consumed Load The ratio of the absorbed load to the efficiency at load factor. Consumed
load may be categorized as Continuous, Intermittent or Standby.
Continuous Loads All loads that may be required continuously for normal operation
or which may be reasonably expected to occur simultaneously.
Intermittent Loads All process and utility loads required for normal operation but neither
operating continuously nor simultaneously e.g. monorail hoists will
operate intermittently, coming on when they are required to lift
equipment.
Standby Loads All loads required during maintenance, change-over from duty to
standby or during abnormal circumstances e.g. for a 2x100% pump
installed, pump ‘A’ will run continuously while pump ‘B’ will be on
standby
Electrical load list has been prepared based on the following basis and assumptions:
Electrical Loads are divided into following three classes according to use:
b) Intermittent Load – Which draws power as per duty cycle for short duration
c) Stand-by Load – which is connected with power supply and ready to act as and when
required.
Electrical load list is prepared based on various Electrical and Process loads.
Load factor 1 for power feeders, Power factor(0.8) & Efficiency(0.85) considered for load
calculation are preliminary, to be updated the same based on final vendor data.
Total Plant Load = (100% of Continuous load) + (30% of Total Intermittent load or Largest
Intermittent load whichever is higher) + (10% of Total Standby load or Largest Standby load
whichever is higher)
All equipment tag numbers shown in this document is preliminary, it shall be updated in the next
revision in consult wi.
All equipment ratings shown in this document are preliminary, to be updated the same based on
final vendor data.
Office: Dubai Order: AET00878-00 Document No. 4100001 Rev 1 Sheet 6 of: 8
CONTRACT NO. CNT/ENP/112310 : :
Due to un-availability of native file of the original load list for the Auxilairy DB (Tag.No. DB-FPS)
at Pump house, this document has been prepared as a new document for the new loads
envisaged in this project scope. Refer Appendix-1 of this document.
6 LOAD SUMMARY
LOAD SUMMARY
New Load requirement under this project 5.71 6.71 5.71 6.71
scope (Refer Appendix – 1)
7 APPENDICIES
Office: Dubai Order: AET00878-00 Document No. 4100001 Rev 1 Sheet 7 of: 8
CONTRACT NO. CNT/ENP/112310 : :
Appendix 1 – Electrical Load List
Office: Dubai Order: AET00878-00 Document No. 4100001 Rev 1 Sheet 8 of: 8
CONTRACT NO. CNT/ENP/112310 : :
APPENDIX - 1 : ELECTRICAL LOAD LIST (NEW)
B
Description C
Tag Number B
C/I/S
A C D E F G
Page 1 of 1
CONTRACT NO. CNT/ENP/112310 FACILITIES
TERMINAL PROJECT
LIGHTING CALCULATION
Office: Dubai Order: AET00878-00 Document No. 4100008 Rev 0 Sheet 1 of: 8
CONTRACT NO. CNT/ENP/112310 : :
TABLE OF CONTENTS
1 INTRODUCTION ............................................................................................ 3
1.1 Purpose of the Document .................................................................... 3
2 DEFINITIONS AND ABBREVIATIONS .......................................................... 3
2.1 Definitions ........................................................................................... 3
2.2 Abbreviations ...................................................................................... 4
3 ORDER OF PRECEDENCE ........................................................................... 4
4 REFERENCE DOCUMENTS .......................................................................... 5
4.1 International Standards ....................................................................... 5
4.2 Project Documents .............................................................................. 5
5 BASIS AND ASSUMPTIONS ......................................................................... 5
6 RESULTS AND RECOMMENDATION ........................................................... 6
7 ATTACHMENTS............................................................................................. 6
APPENDIX – 1 : OUTDOOR LIGHTING CALCULATION ............................................ 7
APPENDIX – 2 : LIGHTING FIXTURE CATALOGUE .................................................. 8
Office: Dubai Order: AET00878-00 Document No. 4100008 Rev 0 Sheet 2 of: 8
CONTRACT NO. CNT/ENP/112310 : :
1 INTRODUCTION
The Jebel Ali Terminal (JAT) of Emirates General Petroleum Corporation (EMARAT) for storage and
distribution of petroleum products is located at Petrochemical Zone of Plot No. EW103 of Jebel Ali Free
Zone (JAFZA).
Automotive fuels such as Gas Oil and Unleaded Gasoline and LPG are stored and handled at JAT, for
distributing petroleum products to the filling stations in the emirate of Dubai and Northern Emirates from
Jebel Ali Terminal (JAT) along with LPG cylinder filling and bulk supplies. The Terminal has been in service
for more than twenty years with refurbishment and add-on development over the years.
As a part of JAT2020 project an Adequacy Check for Fire Fighting Facility of JAT was carried out. In line
with EMARAT management directive, EMARAT HSE guidelines and considering future developments, an
improvement of the firefighting pumping system is initiated.
The objective of this project is to upgrade the firefighting system at Jebel Ali terminal by installing a new
firewater pump.
Emirates General Petroleum Corporation (EMARAT), the CLIENT, has appointed Bilfinger Tebodin Middle
East (BTME) the CONSULTANT, to provide consultancy services for the upgrade of firewater pumping
system at Jebel Ali Terminal, Dubai.
For the purpose of this document, the words and expressions listed below shall have the meanings
assigned as follows:
2.1 Definitions
CLIENT Emirates General Petroleum Corporation (EMARAT)
Office: Dubai Order: AET00878-00 Document No. 4100008 Rev 0 Sheet 3 of: 8
CONTRACT NO. CNT/ENP/112310 : :
PROJECT Upgrading of Fire Water Pumping System at Jebel Ali
Terminal
2.2 Abbreviations
AC Alternating Current
DB Distribution Board
kW Kilo Watt
3 ORDER OF PRECEDENCE
In case of conflict between various documents, codes or standards, the order of precedence that shall be
followed is:
Office: Dubai Order: AET00878-00 Document No. 4100008 Rev 0 Sheet 4 of: 8
CONTRACT NO. CNT/ENP/112310 : :
In case of conflict between this specification and other specifications, codes or standards referred in this
document, the most stringent requirement as interpreted by CLIENT shall be entertained and written
CLIENT confirmation on the same shall be obtained before proceeding. CLIENT decision shall be binding
in this regard.
4 REFERENCE DOCUMENTS
The lighting calculation is based on the recommended illumination level as described below:
The type of fittings and lamps used for lighting calculation is based on Chalmit lighting catalogue. Contactor
can choose other types and manufacturer, provided that luminous flux of each fixture shall match as a
minimum with those selected for calculation.
Office: Dubai Order: AET00878-00 Document No. 4100008 Rev 0 Sheet 5 of: 8
CONTRACT NO. CNT/ENP/112310 : :
The luminaire and lamp type used in this calculation are summarized below:
6 Nos. Of ST3I/06L/LE
Fire water pump Sterling III LED Refer
75 129 4.9
house Shelter-1 Attachment-1
(LED Linear)
2 Nos. Of ST3I/06L/LE
Fire water pump Sterling III LED Refer
75 92 4.9
house Shelter-2 Attachment-1
(LED Linear)
The calculation result tabulated above and as shown in Attachment-1 is complying with the illumination
requirement. Hence, the selected number of lamp fixture and rating is adequate.
Lighting fixture herein shall be for the basis of calculation and minimum requirement only. Type of lighting
fixture to be used shall be from approved vendor list.
7 ATTACHMENTS
Office: Dubai Order: AET00878-00 Document No. 4100008 Rev 0 Sheet 6 of: 8
CONTRACT NO. CNT/ENP/112310 : :
APPENDIX – 1 : OUTDOOR LIGHTING CALCULATION
Office: Dubai Order: AET00878-00 Document No. 4100008 Rev 0 Sheet 7 of: 8
CONTRACT NO. CNT/ENP/112310 : :
APPENDIX – 2 : LIGHTING FIXTURE CATALOGUE
Office: Dubai Order: AET00878-00 Document No. 4100008 Rev 0 Sheet 8 of: 8
CONTRACT NO. CNT/ENP/112310 : :
CONTRACT NO. CNT/ENP/112310 FACILITIES
TERMINAL PROJECT
Office: Dubai Order: AET00878-00 Document No. 4132001 Rev 0 Sheet 1 of: 13
CONTRACT NO. CNT/ENP/112310 : :
TABLE OF CONTENTS
1 INTRODUCTION ............................................................................................ 3
1.1 Purpose of the Document .................................................................... 3
10 CONCLUSION ................................................................................................ 9
10.1 Cable Selection Chart.......................................................................... 9
11 APPENDICIES ............................................................................................... 9
Appendix 1 – Current Rating for LV Cables................................................... 10
Appendix 2 – Cable Derating Factor ............................................................. 11
Appendix 3 – Resistance and Reactance Table ............................................ 12
Appendix 4 – Electrical Cable Selection Chart .............................................. 13
Office: Dubai Order: AET00878-00 Document No. 4132001 Rev 0 Sheet 2 of: 13
CONTRACT NO. CNT/ENP/112310 : :
1 INTRODUCTION
The Jebel Ali Terminal (JAT) of Emirates General Petroleum Corporation (EMARAT) for storage and
distribution of petroleum products is located at Petrochemical Zone of Plot No. EW103 of Jebel Ali
Free Zone (JAFZA).
Automotive fuels such as Gas Oil and Unleaded Gasoline and LPG are stored and handled at JAT,
for distributing petroleum products to the filling stations in the emirate of Dubai and Northern Emirates
from Jebel Ali Terminal (JAT) along with LPG cylinder filling and bulk supplies. The Terminal has been
in service for more than twenty years with refurbishment and add-on development over the years.
As a part of JAT2020 project an Adequacy Check for Fire Fighting Facility of JAT was carried out. In
line with EMARAT management directive, EMARAT HSE guidelines and considering future
developments, an improvement of the firefighting pumping system is initiated.
The objective of this project is to upgrade the firefighting system at Jebel Ali terminal by installing a
new firewater pump.
Emirates General Petroleum Corporation (EMARAT), the CLIENT, has appointed Bilfinger Tebodin
Middle East (BTME) the CONSULTANT, to provide consultancy services for the upgrade of firewater
pumping system at Jebel Ali Terminal, Dubai.
The scope of this document is to define the technical basis, parameters and criteria used for the Cable
Sizing calculation for the project.
For the purpose of this document, the words and expressions listed below shall have the meanings
assigned as follows
2.1 Definitions
Office: Dubai Order: AET00878-00 Document No. 4132001 Rev 0 Sheet 3 of: 13
CONTRACT NO. CNT/ENP/112310 : :
SUB-CONTRACTOR Any person, firm, corporation or combination thereof to whom
any part of the project has been subcontracted.
2.2 Abbreviations
AC Alternating Current
DB Distribution Board
kV Kilo Volts
kW Kilo Watt
V Voltage
Office: Dubai Order: AET00878-00 Document No. 4132001 Rev 0 Sheet 4 of: 13
CONTRACT NO. CNT/ENP/112310 : :
3 ORDER OF PRECEDENCE
In case of conflict between various documents, codes or standards, the order of precedence that shall
be followed is:
Project Datasheets
Project Specifications
CLIENT Standards
In case of conflict between this specification and other specifications, codes or standards referred in
this document, the most stringent requirement as interpreted by CLIENT shall be entertained and
written CLIENT confirmation on the same shall be obtained before proceeding. CLIENT decision shall
be binding in this regard.
4 REFERENCE DOCUMENTS
Codes and Standards referred to herein, form part of the requirements of this Specification and unless
otherwise specified the date of edition or revision of such codes/standards shall be the latest.
Office: Dubai Order: AET00878-00 Document No. 4132001 Rev 0 Sheet 5 of: 13
CONTRACT NO. CNT/ENP/112310 : :
The VENDOR shall be familiar with the requirements of these documents and shall make them readily
available to all persons concerned with carrying out the scope of work specified in this Specification.
IEC 60183 Guidance for the selection of high-voltage A.C. cable systems
Cables for Rated Voltages from 6kV (Um = 7.2kV) upto 30kV (Um
IEC 60502-2
= 36kV)
ERA REPORT 69-30 Part III Sustained Current Ratings for PVC Insulated Cables to BS 6346
Office: Dubai Order: AET00878-00 Document No. 4132001 Rev 0 Sheet 6 of: 13
CONTRACT NO. CNT/ENP/112310 : :
6 SERVICE CONDITIONS
: Maximum 100%
84 Deg C
recommended by DM.
The following Steady state cable voltage drop limits are considered for the cable sizing calculation.
Office: Dubai Order: AET00878-00 Document No. 4132001 Rev 0 Sheet 7 of: 13
CONTRACT NO. CNT/ENP/112310 : :
Motor branch circuits - 5%
Power and control cables shall be of annealed stranded copper conductors, XLPE insulated,
steel wire armoured, and overall PVC sheathed. Lead sheath cables or equivalent eco-friendly
sheathing shall be used for outdoor cables.
Where,
Iflc = Full Load current
TDF = Total De-rating factor for the cables laid in ground
9 DERATING FACTORS
De-rating factors for variation in thermal resistivity of soil (2.5°C m/W) = 0.75
(Table 3 of Ducab cable catalogue)
De-rating factors considered for cables laid in Air / Metallic cable trays:
Office: Dubai Order: AET00878-00 Document No. 4132001 Rev 0 Sheet 8 of: 13
CONTRACT NO. CNT/ENP/112310 : :
Grouping factor for 4 touching circuits on a metal tray = 0.77
(Table 12 of Ducab cable catalogue)
Total De-rating factor (T.D.F.) for cable tray installation (0.82 x 0.77) = 0.63
10 CONCLUSION
The selected cables are suitable to carry the full load current within temperature limits and acceptable
voltage drops at operating conditions.
LV cable sizes are calculated and Electrical Cable Selection Chart is prepared in Attachment-4 ready
for selection of cables for all voltage level applied in this PROJECT.
11 APPENDICIES
Office: Dubai Order: AET00878-00 Document No. 4132001 Rev 0 Sheet 9 of: 13
CONTRACT NO. CNT/ENP/112310 : :
Appendix 1 – Current Rating for LV Cables
Office: Dubai Order: AET00878-00 Document No. 4132001 Rev 0 Sheet 10 of: 13
CONTRACT NO. CNT/ENP/112310 : :
Appendix 1 - Doc. No. 112310-ELEC-CAL-3001
14 BICC
Appendix 1 - Doc. No. 112310-ELEC-CAL-3001
BICC 25
Appendix 1 - Doc. No. 112310-ELEC-CAL-3001
BICC 27
Appendix 2 – Cable Derating Factor
Office: Dubai Order: AET00878-00 Document No. 4132001 Rev 0 Sheet 11 of: 13
CONTRACT NO. CNT/ENP/112310 : :
Appendix 2 - Doc. No. 112310-ELEC-CAL-3001
RATING FACTORS
Where the conditions of installation differ from those defined in the current rating tables, the following rating factors may be used
for cables size selection.
In ERA Report 69-30 Part III, the types of load are classified under three headings, viz:
With knowledge of the type of load to be imposed on the cable it is then possible to determine the soil thermal resistivity along the
cable route in accordance with recommendations in ERA Report 69-30.
BICC 11
Appendix 2 - Doc. No. 112310-ELEC-CAL-3001
SPACING
SPACING
Touching +
* This spacing will not be possible for some of the larger diameter cables.
+ For high current carrying cables (i.e. large size) it is advisable to allow spacing between circuits. Alternatively the most
appropriate group rating factor must be applied when determining the cable size and required number of cables in parallel.
12 BICC
Appendix 2 - Doc. No. 112310-ELEC-CAL-3001
SPACING
+ For high current carrying cables (i.e. large size) it is advisable to allow spacing between circuits. Alternatively the most
appropriate group rating factor must be applied when determining the cable size and required number of cables in parallel.
Ratings for cables installed in single way ducts, underground, have been based on values of soil temperature and soil thermal
resistivity which are generally representative of conditions in the United Kingdom. Rating factors to take account of variations in
ground temperatures are given in Table 3. Where conditions of operation can be fairly accurately estimated, and knowledge of the
soil along the route is available, it is possible to determine the ratings more precisely by the use of estimated maximum ground
temperature, the soil thermal resistivity factors, grouping factors, and factors for the depths of laying given in Tables 8 to 11.
BICC 13
Appendix 2 - Doc. No. 112310-ELEC-CAL-3001
Ratings based on Ambient air temp 30˚C Ratings based on Ambient air temp 30˚C
Laid directly in ground, run in single-way ducts Table 8 Laid directly in ground, run in single-way ducts Table 10
Two core Three and Four core Two core Three and Four core
Nominal Nominal
area of Current rating Volt drop Current rating Volt drop area of Current rating Volt drop Current rating Volt drop
Conductor In In duct per amp In In duct per amp Conductor In In duct per amp In In duct per amp
ground per metre ground per metre ground per metre ground per metre
mm2 amp amp mV amp amp mV mm2 amp amp mV amp amp mV
1.5 38 31 31 32 26 27 1. 5 32 26 29 27 22 25
2. 5 49 41 19 42 34 16 2. 5 41 34 18 35 29 15
4 65 53 12 55 45 10 4 55 45 11 47 38 9.5
6 81 67 7.9 69 56 6.8 6 69 57 7.3 59 48 6.4
10 109 89 4.7 92 75 4.0 10 92 76 4.4 78 64 3.8
Ratings based on Ground temp 15˚C, Soil thermal resistivity 1.2˚Cm/W. Ratings based on Ground temp 15˚C, Soil thermal resistivity 1.2˚Cm/W.
Depth of laying 0.5m. All circuits thermally independent. 100mm diameter Depth of laying 0.5m. All circuits thermally independent. 100mm diameter
single-way ducts. single-way ducts.
Current Ratings for cables having more than four cores are available on request. Current Ratings for cables having more than four cores are available on request.
RATING FACTORS
Rating factors for variation in thermal
Rating factors for ambient air temperature Table 11 resistivity of soil (average values) Table 14
Ambient air temperature 25˚C 30˚C 35˚C 40˚C 45˚C 50˚C 55˚C Soil thermal resistivity in ˚Cm/W
Cable type Rating factor Type of installation 0.8 0.9 1.0 1.5 2.0 2.5
Multicore cables laid directly
XLPE and LSF cable 1.02 1.00 0.96 0.91 0.87 0.82 0.76
in ground 1.09 1.06 1.04 0.93 0.84 0.77
PVC cable 1.03 1.00 0.94 0.87 0.79 0.71 0.61 Multicore cables installed
in single way ducts 1.03 1.02 1.02 0.97 0.91 0.87
Correction factors for Groups of Cables, installed in air Table 12 Rating factors for ground temperature
(cables laid direct or in ducts) Table 15
Arrangement of Number of circuits or multicore cables
cables 2 3 4 5 6 7 8 9 10 Ground temperature 15˚C 20˚C 25˚C 30˚C 35˚C 40˚C 45˚C
In conduit, XLPE insulated 1.0 0.97 0.93 0.89 0.86 0.82 0.76
trunking or
bunched and PVC insulated 1.0 0.95 0.90 0.85 0.80 0.74 0.67
clipped directly 0.8 0.7 0.65 0.6 0.57 0.54 0.52 0.5 0.48 Group rating factors for multicore cables
in horizontal formation (average values) Table 16
On metal tray and
Number Spacing between cable centres
cables touching 0.86 0.81 0.77 0.75 0.74 0.73 0.73 0.72 0.71
of cables Touch- 0.15m 0.3m 0.45m 0.6m
in group ing
Rating factors for depth of laying 2 0.81 0.87 0.91 0.93 0.94
(to centre of cable or to centre of duct) Table 13 Cables direct 3 0.70 0.78 0.84 0.87 0.90
in ground 4 0.63 0.74 0.81 0.86 0.89
Depth of laying Multicore Cables 5 0.59 0.70 0.78 0.83 0.87
m Direct in ground In single way ducts 6 0.55 0.67 0.76 0.82 0.86
0.50 1.00 1.00 2 0.90 0.93 0.95 0.96
0.60 0.99 0.99 Cables in single 3 0.82 0.87 0.90 0.93
0.80 0.97 0.97 way ducts 4 0.78 0.85 0.89 0.91
1.00 0.95 0.96 5 0.76 0.82 0.87 0.90
1.25 0.94 0.95 6 0.72 0.81 0.86 0.90
8 ")##
Appendix 3 – Resistance and Reactance Table
Office: Dubai Order: AET00878-00 Document No. 4132001 Rev 0 Sheet 12 of: 13
CONTRACT NO. CNT/ENP/112310 : :
Atatchment-3 OF CLIENT DOC.NO.
112310-ELEC-CAL-3001
RESISTANCE
NOMINAL
(REF. TABLE II, COLUMN 8 OF IEC Reactance at 50 Hz
AREA OF
SR.NO. 60228)
CONDUCT
OR (mm2) R in ohm / km mH/kM Ohm/kM
20°C 90°C 'L' 'X'
1 2.5 7.41 9.50 0.297 0.0932
Office: Dubai Order: AET00878-00 Document No. 4132001 Rev 0 Sheet 13 of: 13
CONTRACT NO. CNT/ENP/112310 : :
240V CABLE SELECTION CHART (POWER FEEDER)
(LAID IN GROUND)
CABLES HAVING COPPER CONDUCTORS
MAXIMUM PERMISSIBLE VOLT DROP = 2% AT FEEDER F.L.C.
DERATlNG FACTOR = 0.44
VOLTAGE = 240 V
CABLE CSA IN mm2 2.5 mm2 4 mm2 6 mm2 10 mm2 16 mm2 25 mm2 35 mm2 50 mm2 70 mm2 95 mm2 120 mm2 150 mm2 185 mm2 240 mm2
STANDARD CABLE RATING (Refer
42 55 69 92 140 180 215 255 315 381 410 472 539 632
Appendix-A)
SITE CABLE RATING 18.5 24.2 30.4 40.5 61.6 79.2 94.6 112.2 138.6 167.6 180.4 207.7 237.2 278.1
CABLE RESIST. IN OHM / km (20˚ C) 7.410 4.610 3.080 1.830 1.150 0.727 0.524 0.387 0.268 0.193 0.153 0.124 0.099 0.075
CABLE RESIST. IN OHM / km (90˚ C) 9.500 5.910 3.950 2.350 1.470 0.930 0.670 0.500 0.340 0.250 0.200 0.160 0.130 0.100
CABLE INDUCTANCE IN mH / km 0.297 0.279 0.266 0.250 0.242 0.244 0.237 0.235 0.231 0.225 0.224 0.226 0.227 0.224
CABLE REACTANCE IN OHM / km 0.093 0.088 0.084 0.079 0.076 0.077 0.074 0.074 0.073 0.071 0.071 0.071 0.071 0.070
FEEDER FEEDER
COS SIN MAXIMUM PERMISSIBLE ROUTE LENGTH IN METER
RATING F.L.C.
PHI PHI
kW AMPS
0.25 1.23 0.85 0.60 241 386 575 958 1512 2341 3189 4173 5889 7681 9225 10969 12782 15399
1 4.90 0.85 0.60 60 96 144 239 378 585 797 1043 1472 1920 2306 2742 3195 3850
2.5 12.25 0.85 0.60 24 39 57 96 151 234 319 417 589 768 922 1097 1278 1540
0.13 0.64 0.85 0.60 463 742 1105 1842 2908 4502 6133 8024 11325 14770 17740 21094 24580 29613
0.13 0.64 0.85 0.60 463 742 1105 1842 2908 4502 6133 8024 11325 14770 17740 21094 24580 29613
0.08 0.39 0.85 0.60 753 1206 1796 2993 4725 7315 9966 13040 18403 24002 28827 34278 39943 48121
1.00 4.90 0.85 0.60 60 96 144 239 378 585 797 1043 1472 1920 2306 2742 3195 3850
3.00 14.71 0.85 0.60 20 32 48 80 126 195 266 348 491 640 769 914 1065 1283
3.70 18.14 0.85 0.60 16 26 39 65 102 158 215 282 398 519 623 741 864 1040
4.00 19.61 0.85 0.60 - 24 36 60 95 146 199 261 368 480 577 686 799 962
5.50 26.96 0.85 0.60 - - 26 44 69 106 145 190 268 349 419 499 581 700
7.50 36.76 0.85 0.60 - - - 32 50 78 106 139 196 256 307 366 426 513
11.00 53.92 0.85 0.60 - - - - 34 53 72 95 134 175 210 249 290 350
15.00 73.53 0.85 0.57 - - - - - 39 53 70 99 129 155 185 216 261
18.50 90.69 0.85 0.57 - - - - - - 43 57 80 105 126 150 175 212
22.00 107.84 0.85 0.57 - - - - - - - 48 67 88 106 126 147 178
30.00 147.06 0.85 0.57 - - - - - - - - - 65 78 93 108 130
37.00 181.37 0.85 0.57 - - - - - - - - - - - 75 88 106
45.00 220.59 0.85 0.57 - - - - - - - - - - - - 72 87
55.00 269.61 0.85 0.54 - - - - - - - - - - - - - 72
75.00 367.65 0.85 0.54 - - - - - - - - - - - - - -
90.00 441.18 0.85 0.54 - - - - - - - - - - - - - -
110.00 539.22 0.85 0.54 - - - - - - - - - - - - - -
132.00 647.06 0.85 0.54 - - - - - - - - - - - - - -
150.00 735.29 0.85 0.53 - - - - - - - - - - - - - -
Project No. 112310
Doc. No. ATTCHMENT 4 of Doc. No. 112310-ELEC-CAL-3001
ATTCHMENT 4: CABLE SELECTION CHART Rev 0
Date 15/11/2022
\\10.161.14.4\Projtech\PROJECTS 2022\aeT00878 EMARAT-Upgrading of Fire Water\9 TME DOCS-DWGS\341 Elect\1 CURRENT\4. Cable Sizing\112310-ELEC-CAL-3001-A- Appendix 4.xlsx 1 of 2
240V CABLE SELECTION CHART (POWER FEEDER)
(LAID IN AIR)
CABLES HAVING COPPER CONDUCTORS
MAXIMUM PERMISSIBLE VOLT DROP = 2% AT FEEDER F.L.C.
DERATlNG FACTOR = 0.63
VOLTAGE = 240 V
CABLE CSA IN mm2 2.5 mm2 4 mm2 6 mm2 10 mm2 16 mm2 25 mm2 35 mm2 50 mm2 70 mm2 95 mm2 120 mm2 150 mm2 185 mm2 240 mm2
STANDARD CABLE RATING (Refer
42 55 69 92 115 152 188 228 291 354 430 480 540 636
Appendix-A)
SITE CABLE RATING 26.5 34.7 43.5 58.0 72.5 95.8 118.4 143.6 183.3 223.0 270.9 302.4 340.2 400.7
CABLE RESIST. IN OHM / km (20˚ C) 7.410 4.610 3.080 1.830 1.150 0.727 0.524 0.387 0.268 0.193 0.153 0.124 0.099 0.075
CABLE RESIST. IN OHM / km (90˚ C) 9.500 5.910 3.950 2.350 1.470 0.930 0.670 0.500 0.340 0.250 0.200 0.160 0.130 0.100
CABLE INDUCTANCE IN mH / km 0.297 0.279 0.266 0.250 0.242 0.244 0.237 0.235 0.231 0.225 0.224 0.226 0.227 0.224
CABLE REACTANCE IN OHM / km 0.093 0.088 0.084 0.079 0.076 0.077 0.074 0.074 0.073 0.071 0.071 0.071 0.071 0.070
FEEDER FEEDER
COS SIN MAXIMUM PERMISSIBLE ROUTE LENGTH IN METER
RATING F.L.C.
PHI PHI
kW AMPS
0.25 1.23 0.85 0.60 241 386 575 958 1512 2341 3189 4173 5889 7681 9225 10969 12782 15399
0.37 1.81 0.85 0.60 163 261 388 647 1022 1582 2155 2819 3979 5190 6233 7411 8636 10404
0.55 2.70 0.85 0.60 109 175 261 435 687 1064 1450 1897 2677 3491 4193 4986 5810 6999
0.75 3.68 0.85 0.60 80 129 192 319 504 780 1063 1391 1963 2560 3075 3656 4261 5133
1.10 5.39 0.85 0.60 55 88 131 218 344 532 725 948 1338 1746 2097 2493 2905 3500
1.50 7.35 0.85 0.60 40 64 96 160 252 390 532 695 981 1280 1537 1828 2130 2566
2.20 10.78 0.85 0.60 27 44 65 109 172 266 362 474 669 873 1048 1246 1452 1750
3.00 14.71 0.85 0.60 20 32 48 80 126 195 266 348 491 640 769 914 1065 1283
3.70 18.14 0.85 0.60 16 26 39 65 102 158 215 282 398 519 623 741 864 1040
4.00 19.61 0.85 0.60 15 24 36 60 95 146 199 261 368 480 577 686 799 962
5.50 26.96 0.85 0.60 - 18 26 44 69 106 145 190 268 349 419 499 581 700
7.50 36.76 0.85 0.60 - - 19 32 50 78 106 139 196 256 307 366 426 513
11.00 53.92 0.85 0.60 - - - 22 34 53 72 95 134 175 210 249 290 350
15.00 73.53 0.85 0.57 - - - - - 39 53 70 99 129 155 185 216 261
18.50 90.69 0.85 0.57 - - - - - 32 43 57 80 105 126 150 175 212
22.00 107.84 0.85 0.57 - - - - - - 36 48 67 88 106 126 147 178
30.00 147.06 0.85 0.57 - - - - - - - - 49 65 78 93 108 130
37.00 181.37 0.85 0.57 - - - - - - - - 40 52 63 75 88 106
45.00 220.59 0.85 0.57 - - - - - - - - - 43 52 62 72 87
55.00 269.61 0.85 0.54 - - - - - - - - - - 43 51 60 72
75.00 367.65 0.85 0.54 - - - - - - - - - - - - - 53
90.00 441.18 0.85 0.54 - - - - - - - - - - - - - -
110.00 539.22 0.85 0.54 - - - - - - - - - - - - - -
132.00 647.06 0.85 0.54 - - - - - - - - - - - - - -
150.00 735.29 0.85 0.53 - - - - - - - - - - - - - -
Project No. 112310
Doc. No. ATTCHMENT 4 of Doc. No. 112310-ELEC-CAL-3001
ATTCHMENT 4: CABLE SELECTION CHART Rev 0
Date 15/11/2022
\\10.161.14.4\Projtech\PROJECTS 2022\aeT00878 EMARAT-Upgrading of Fire Water\9 TME DOCS-DWGS\341 Elect\1 CURRENT\4. Cable Sizing\112310-ELEC-CAL-3001-A- Appendix 4.xlsx 2 of 2
CONTRACT NO. CNT/ENP/112310 FACILITIES
TERMINAL PROJECT
CABLE SCHEDULE
Office: Dubai Order: AET00878-00 Document No. 4143001 Rev 0 Sheet 1 of: 1
CONTRACT NO. CNT/ENP/112310 : :
FROM TO
Sr. Voltage NO. OF LENGTH
CABLE TAG NO. CABLE CONSTRUCTION CABLE SIZE REMARKS
No. grade (kV) RUNS (m)
EQUIPMENT TAG NO. DESCRIPTION GLAND EQUIPMENT TAG NO. DESCRIPTION GALND
5 XX-XXXX-003 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 4 sq.mm DB-FPS 240V AUXILAIRY DB M20 FACP-01 FACP Panel M20 10.00
6 XX-XXXX-PE003 CU/PVC 0.45/0.75 1 1C X 4 sq.mm DB-FPS 240V AUXILAIRY DB FACP-01 FACP Panel 10.00
7 XX-XXXX-004 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 4 sq.mm DB-FPS 240V AUXILAIRY DB M20 JBL-01 1Ph Lighting JB - 01 M20 12.00
8 XX-XXXX-005 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-01 1Ph Lighting JB - 01 M20 LF-01 Light Fixture - 01 M20 2.00
9 XX-XXXX-006 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-01 1Ph Lighting JB - 01 M20 JBL-02 1Ph Lighting JB - 02 M20 8.00
10 XX-XXXX-007 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-02 1Ph Lighting JB - 02 M20 LF-02 Light Fixture - 02 M20 2.00
11 XX-XXXX-008 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-02 1Ph Lighting JB - 02 M20 JBL-03 1Ph Lighting JB - 03 M20 8.00
12 XX-XXXX-009 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-03 1Ph Lighting JB - 03 M20 LF-03 Light Fixture - 03 M20 2.00
Page 1 of 2
FROM TO
Sr. Voltage NO. OF LENGTH
CABLE TAG NO. CABLE CONSTRUCTION CABLE SIZE REMARKS
No. grade (kV) RUNS (m)
EQUIPMENT TAG NO. DESCRIPTION GLAND EQUIPMENT TAG NO. DESCRIPTION GALND
13 XX-XXXX-010 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 4 sq.mm DB-FPS 240V AUXILAIRY DB M20 JBL-04 1Ph Lighting JB - 01 M20 12.00
14 XX-XXXX-011 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-04 1Ph Lighting JB - 01 M20 LF-04 Light Fixture - 01 M20 2.00
15 XX-XXXX-012 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-04 1Ph Lighting JB - 01 M20 JBL-05 1Ph Lighting JB - 02 M20 8.00
16 XX-XXXX-013 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-05 1Ph Lighting JB - 02 M20 LF-05 Light Fixture - 02 M20 2.00
17 XX-XXXX-014 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-05 1Ph Lighting JB - 02 M20 JBL-06 1Ph Lighting JB - 03 M20 8.00
18 XX-XXXX-015 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-06 1Ph Lighting JB - 03 M20 LF-06 Light Fixture - 03 M20 2.00
19 XX-XXXX-016 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 4 sq.mm DB-FPS 240V AUXILAIRY DB M20 JBL-07 1Ph Lighting JB - 01 M20 12.00
20 XX-XXXX-017 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-07 1Ph Lighting JB - 01 M20 LF-07 Light Fixture - 01 M20 2.00
21 XX-XXXX-018 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-07 1Ph Lighting JB - 01 M20 JBL-08 1Ph Lighting JB - 02 M20 8.00
22 XX-XXXX-019 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-08 1Ph Lighting JB - 02 M20 LF-08 Light Fixture - 02 M20 2.00
23 XX-XXXX-020 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-08 1Ph Lighting JB - 02 M20 JBL-09 1Ph Lighting JB - 03 M20 8.00
24 XX-XXXX-021 CU/XLPE/PVC/GSWA/PVC 0.6/1 1 3C X 2.5 sq.mm JBL-09 1Ph Lighting JB - 03 M20 LF-09 Light Fixture - 03 M20 2.00
Client EMARAT
Project UPGRADE OF FIRE WATER PUMPING SYSTEM AT JEBEL ALI TERMINAL PROJECT
Title CABLE SCHEDULE
DOC. NO. 112310-ELEC-SCH-3002
Page 2 of 2