Problem Solving 1
Problem Solving 1
Solution
Table 1
Cj 400 360 0 0 0
Prod Qty X1 X2 S1 S2 S3
0 S1 640 4 8 1 0 0
0 S2 360 6 2 0 1 0
0 S3 200 5 0 0 0 1
Zj
Cj - Zj
0 x (640 4 8 0 0 0) = 0 0 0 0 0 0
0 x (360 6 2 0 0 0) = 0 0 0 0 0 0
0 x (200 5 0 0 0 0) = 0 0 0 0 0 0
Zj = 0 0 0 0 0 0
Cj 400 360 0 0 0
Prod Qty X1 X2 S1 S2 S3
0 S1 640 4 8 1 0 0 640/4 =
0 S2 360 6 2 0 1 0 350/6 =
0 S3 200 5 0 0 0 1 200/5 =
Zj 0 0 0 0 0 0
Cj - Zj 400 360 0 0 0
Table 2
Cj 400 360 0 0 0
Prod Qty X1 X2 S1 S2 S3
0 S1 480 0 8 1 0 -0.8
0 S2 120 0 2 0 1 -1.2
400 X1 40 1 0 0 0 0.2
Zj 16000 400 0 0 0 80
Cj - Zj 0 360 0 0 -80
Solution
NR3 = OR3/5 = 200 5 0 0 0 1
5
NR3 = 40 1 0 0 0 1/5
Zj = 400 x 40 1 0 0 0 1/5
Zj = 16000 400 0 0 0 80
Cj 400 360 0 0 0
Prod Qty X1 X2 S1 S2 S3
0 S1 480 0 8 1 0 - 4/5 480/8 =
0 S2 120 0 2 0 1 -1 1/5 120/2 =
400 X1 40 1 0 0 0 0.2 40/0 =
Zj 16000 400 0 0 0 80
Cj - Zj 0 360 0 0 -80
Table 3
Cj 400 360 0 0 0
Prod Qty X1 X2 S1 S2 S3
360 X2 60 0 1 1/8 0 - 1/9
0 S2 0 0 0 -0.25 1 -1
400 X1 40 1 0 0 0 0.2
Zj 37600 400 360 45 0 44
Cj - Zj 0 0 -45 0 -44
Cj 400 360 0 0 0
Prod Qty X1 X2 S1 S2 S3
360 X2 60 0 1 1/8 0 - 1/9
0 S2 0 0 0 - 1/4 1 -1
400 X1 40 1 0 0 0 1/5
Zj 37600 400 360 45 0 44
Cj - Zj 0 0 -45 0 -44
4x + 8y = 640 Find V2
x - intercept y - intercept
Let y = 0 Let x = 0
4x + 8y = 640 4x + 8y = 640
4x + 8(0) = 640 4(0) + 8y = 640
4x = 640 8y = 640
4x = 640/4 8y = 640/8
x = 160 y = 80
6x + 2y = 360
x - intercept y - intercept
Let y = 0 Let x = 0
6x + 2y = 360 6x + 2y = 360
6x + 2(0) = 360 6(0) + 2y = 360
6x = 360 2y = 360
6x = 360/6 2y = 360/2
x = 60 y = 180
. Each special lamp
oduction period, the
of milling time in the
e company's machines
es 5 light bulbs that
nits. The contribution
units of the special
maximize the profit?
y = 60
4 x + 8 y = 640
4 x + 8 (60) = 640
4 x + 480 = 640
4 x = 640 - 480
4 x = 160
4 x = 160
4
x = 40
(40,60)
400x + 360y Profit
400(0) + 360(80) ₱ 28,800.00
400(40)+360(60) ₱ 37,600.00
400(40)+360(0) ₱ 16,000.00