OLD TIME BALANCE CODE LIST

Major code minor codes ActTyp Major codes name Minor codes name
C001 40 RIGWLC Initial Well Completion Initial Well Completion
C001 40A RIGWLC Initial Well Completion HT,Trips,Circn,C/O-etc
C001 40B RIGWLC Initial Well Completion Logging/Perf.Operations
C001 40C RIGWLC Initial Well Completion Completn String Related
C001 40D RIGWLC Initial Well Completion Well Stimulation
C001 40E RIGWLC Initial Well Completion Well Activation related
C001 40F RIGWLC Initial Well Completion Flow/build up study,BHS
C001 40G RIGWLC Initial Well Completion J/Pump/ESP/SRP related
C001 40H RIGWLC Initial Well Completion Gravel Pack related
C001 40I RIGWLC Initial Well Completion GL Related
C001 40J RIGWLC Initial Well Completion Well Completion- Misc.
C001 40K RIGWLC Initial Well Completion Cement related Operatn
C001 40L RIGWLC Initial Well Completion Fishing operations
C002 40M RIGWLC Well Completion-Time Loss Well Completn-Time Loss
C002 40N RIGWLC Well Completion-Time Loss Complication
C002 40O RIGWLC Well Completion-Time Loss Reservoir/ BHS
C002 40P RIGWLC Well Completion-Time Loss Down Hole & A/Lift
C002 40Q RIGWLC Well Completion-Time Loss Logging
C002 40R RIGWLC Well Completion-Time Loss WSS/ Cementing Unit
C002 40S RIGWLC Well Completion-Time Loss Waiting Tpt/EV/Material
C002 40T RIGWLC Well Completion-Time Loss Mechanical Repair
C002 40U RIGWLC Well Completion-Time Loss Electrical Repair
C002 40V RIGWLC Well Completion-Time Loss Civil Works
C002 40W RIGWLC Well Completion-Time Loss Auto Repair
C002 40X RIGWLC Well Completion-Time Loss Capital Repair- CWS
C002 40Y RIGWLC Well Completion-Time Loss Environment
C002 40Z RIGWLC Well Completion-Time Loss Misc
D001 1 RIGBLD Rig Move & Rig Building Rig Move & Rig Building
D001 1A RIGBLD Rig Move & Rig Building Rig Up /Anchor. /Rig Buld
D001 1B RIGBLD Rig Move & Rig Building Jack Down/De-Anch/Rig Dis
D001 1C RIGBLD Rig Move & Rig Building Rig Move / Sail
D002 2 RIGOPS Drilling and Coring Drilling Actual
D002 2A RIGOPS Drilling and Coring Piling
D002 2B RIGOPS Drilling and Coring Hole Enlarg/Under Reaming
D002 2C RIGOPS Drilling and Coring Reaming
D002 4 RIGCOR Drilling and Coring Coring
D003 6 RIGOPS Tripping Tripping
D003 6A RIGOPS Tripping M/Up or L/Dn D/C,D/P,Tbgs
D003 6B RIGOPS Tripping M/Up or L/Dn BHA
D004 12 RIGOPS Run Csg & Cementation Run Csg & Cementation
D004 12A RIGOPS Run Csg & Cementation Casing Lowering
D004 12B RIGOPS Run Csg & Cementation Cir Prior to Cementation
D004 12C RIGCEM Run Csg & Cementation Cementation
D004 13 RIGCEM Run Csg & Cementation W.O.C
D005 10 RIGOPS Auxiliary Operations Deviation Survey/TOTCO
D005 11 RIGLOG Auxiliary Operations Wire Line Logs
D005 14 RIGOPS Auxiliary Operations IWH-N/Up-N/Dn BOP
D005 15 RIGOPS Auxiliary Operations Test BOP/CSG/Hanger
D005 15A RIGOPS Auxiliary Operations LOT / PIT / SIT
D005 15B RIGOPS Auxiliary Operations Drill Cement-F/C-F/S
D005 16 RIGOPS Auxiliary Operations Drill Stem Test
D005 17 RIGCEM Auxiliary Operations Plug Back / Well Abonden
D005 18 RIGCEM Auxiliary Operations Squeeze Cement
D005 20 RIGOPS Auxiliary Operations Dir Work(Jet-Buildup-etc)
D005 3 RIGOPS Auxiliary Operations Pipe Connection

Page 1 of 10
OLD TIME BALANCE CODE LIST
Major code minor codes ActTyp Major codes name Minor codes name
D005 5 RIGOPS Auxiliary Operations Circulate & Condition Mud
D005 7 RIGOPS Auxiliary Operations Lubricate Rig(Pre. Maint)
D005 7A RIGOPS Auxiliary Operations Lubricate Rig(Pre. Maint)
D005 7B RIGOPS Auxiliary Operations Rig Skidding
D005 7C RIGOPS Auxiliary Operations Other Misc. Operations
D005 9 RIGOPS Auxiliary Operations Shift-Cut Off Drill. Line
D006 22 RIGOPS Complications Complications
D006 22A RIGOPS Complications Activity /Kick /Blow Out
D006 22B RIGOPS Complications Mud Loss
D006 22C RIGOPS Complications H/Up - T/P - Back Ream
D006 22D RIGOPS Complications Side Tracking
D006 22E RIGOPS Complications Stuck Up
D006 22F RIGOPS Complications String Failure
D006 22G RIGOPS Complications Bit Failure
D006 22H RIGOPS Complications Directional Tool Failure
D006 22I RIGLOG Complications Logging Tool Failure
D006 22J RIGOPS Complications Other Complications
D006 22K RIGCEM Complications Secondary cementation
D006 22L RIGOPS Complications Casing Repairs
D007 19 RIGFIS Fishing Fishing
D007 19A RIGFIS Fishing Fishing Of Logging Tool
D007 19B RIGFIS Fishing Other Fishing Jobs
D008 8 RIGOPS Repairs Rig Repairs
D008 8A RIGOPS Repairs Drilling Repairs
D008 8B RIGOPS Repairs Mechanical Repairs
D008 8C RIGOPS Repairs Electrical Repairs
D008 8D RIGOPS Repairs Repairs During Rig Move
D008 8E RIGOPS Repairs Other Repairs
D008 8F RIGOPS Repairs Instru. Repairs
D009 21 RIGIDL Shutdown Shutdown
D009 21A RIGIDL Shutdown (During RM-RB) Waiting on Weather
D009 21B RIGIDL Shutdown (During RM-RB) Waiting on Location
D009 21C RIGBLD Shutdown (During RM-RB) Waiting for Logistics
D009 21D RIGIDL Shutdown (During RM-RB) Waiting for Ready Site
D009 21E RIGIDL Shutdown (During Drill) Waiting on Weather
D009 21F RIGOPS Shutdown (During Drill) Wait for Decision/Instruc
D009 21G RIGOPS Shutdown (During Drill) Wait for Men / Material
D009 21H RIGOPS Shutdown (During Drill) Wait for Logging
D009 21I RIGIDL Shutdown (During Drill) Local Agitation/Baricade
D009 21J RIGOPS Shutdown (During Drill) Waiting for Logistics
D009 21K RIGIDL Shutdown (During Drill) Other Shutdown
D009 21L RIGBLD Shutdown(During RM-RB) Other Shutdown(RM-RB)
D009 21M RIGIDL Shut Down (CR /REFUB) Capital Repairs / Refub.
D009 21N RIGIDL Shut Down (RM Out Cycle) R/M Inter Company O/Cycle
T001 23 RIGPRD Initial Well Testing Initial Prodn. Testing
T001 23A RIGPRD Initial Well Testing Tubing flex trip
T001 23B RIGPRD Initial Well Testing HT,Trips,Circln,Killing e
T001 23C RIGPRD Initial Well Testing Logging Operations
T001 23D RIGPRD Initial Well Testing Well Activation related
T001 23E RIGPRD Initial Well Testing Flow study,Sampling, BHS
T001 23F RIGPRD Initial Well Testing Well Stimulation
T001 23G RIGPRD Initial Well Testing Well Compln, A/Lift Inst.
T001 23H RIGPRD Initial Well Testing CSQ for Cmt Bond repair
T001 23I RIGPRD Initial Well Testing Fishing operations
T002 23J RIGPRD Well Testing- Time Loss Well Testing-Time Loss

Page 2 of 10
OLD TIME BALANCE CODE LIST
Major code minor codes ActTyp Major codes name Minor codes name
T002 23K RIGPRD Well Testing- Time Loss Complication
T002 23L RIGPRD Well Testing- Time Loss Reservoir/ BHS
T002 23M RIGPRD Well Testing- Time Loss Down Hole & A/Lift
T002 23N RIGPRD Well Testing- Time Loss Logging
T002 23O RIGPRD Well Testing- Time Loss WSS/ Cementing Unit
T002 23P RIGPRD Well Testing- Time Loss Waiting Tpt/EV/Material
T002 23Q RIGPRD Well Testing- Time Loss Mechanical Repair
T002 23R RIGPRD Well Testing- Time Loss Electrical Repair
T002 23S RIGPRD Well Testing- Time Loss Civil Works
T002 23T RIGPRD Well Testing- Time Loss Auto Repair
T002 23U RIGPRD Well Testing- Time Loss Capital Repair- CWS
T002 23V RIGPRD Well Testing- Time Loss Environment
T002 23W RIGPRD Well Testing- Time Loss Misc(D light/Decision etc
T002 23X RIGPRD Well Testing CMT / BP-Zone Isolation
T002 23Y RIGPRD Well Testing CSQ/GEL for G/WSO
T002 23Z RIGPRD Well Testing BOP/X-mas Tree handling
W001 26 WOWLKL WO Well Killing WO Well Killing
W001 26A WOWLKL WO Well Killing Bulldoze
W001 26B WOWLKL WO Well Killing Tubing Puncture/Cutting
W001 26C WOWLKL WO Well Killing Circuln,Kill & Loss Ctrl
W002 27 WOWLPR WO Well Preparation WO Well Preparation
W002 27A WOWLPR WO Well Preparation X-mas tree handle/Test
W002 27B WOWLPR WO Well Preparation BOP Handling /Testing
W003 28 WOOTOP WO Other Operation WO Other Operation
W003 28A WOOTOP WO Other Operation POOH/ RI Compln String
W003 28B WOOTOP WO Other Operation Well Head Related
W003 28C WOOTOP WO Other Operation Release / Retrieve Packer
W003 28D WOOTOP WO Other Operation Trips(D.P/Tbg)-spacing
W003 28E WOOTOP WO Other Operation Injectivity Testing
W003 28F WOOTOP WO Other Operation Flow back & Stabilisation
W003 28G WOOTOP WO Other Operation Milling of CR/ BP/ PP
W003 28H WOOTOP WO Other Operation Sand / Bottom Clearing
W003 28I WOOTOP WO Other Operation Release Stuck up
W003 28J WOOTOP WO Other Operation Misc. Routine/ Repair job
W003 28K WOOTOP WO Other Operation Mud/LCM Preparation WO
W003 28L WOOTOP WO Other Operation Third Party Insp.(CH Rig)
W004 29 WOLGOP WO Logging Ops WO Logging Ops
W004 29A WOLGOP WO Logging Ops PLT
W004 29B WOLGOP WO Logging Ops CBL-VDL/ USIT/ CIT-etc
W004 29C WOLGOP WO Logging Ops Perforation
W004 29D WOLGOP WO Logging Ops Setting of BP/ CR/ PP
W004 29E WOLGOP WO Logging Ops Dummy Run
W004 29F WOLGOP WO Logging Ops Logging- Others Ops
W005 30 WOWLOP WO Wire Line Ops WO Wire Line Ops
W005 30A WOWLOP WO Wire Line Ops SSSV Related
W005 30B WOWLOP WO Wire Line Ops GLV Related
W005 30C WOWLOP WO Wire Line Ops SV/B Plug/S-Plug/ SS
W005 30D WOWLOP WO Wire Line Ops Wire Line Others
W005 30E WOWLOP WO Wire Line Ops. Reservoir / BH Studies
W006 31 WOCMOP WO Cementation Ops WO Cementation Ops
W006 31A WOCMOP WO Cementation Ops CSQ Opern. incl Inj, WOC
W006 31B WOCMOP WO Cementation Ops Cement Drilling
W007 32 WOSHOF WO Shut Off Ops WO Shut Off Ops
W007 32A WOSHOF WO Shut Off Ops WSO/ GSO by Chemicals
W008 33 WOWCOP WO Well Completion WO Well Completion

Page 3 of 10
OLD TIME BALANCE CODE LIST
Major code minor codes ActTyp Major codes name Minor codes name
W008 33A WOWCOP WO Well Completion Packer Set and Test
W008 33B WOWCOP WO Well Completion Jet/ESP/SRP related
W008 33C WOWCOP WO Well Completion A/Bolt & T/H Related
W008 33D WOWCOP WO Well Completion Gravel Pack related
W008 33E WOWCOP WO Well Completion GL Related
W008 33F WOWCOP WO Well Completion Well Completion- Others
W009 34 WOSTML WO Well Stimulation WO Well Stimulation
W009 34A WOSTML WO Well Stimulation Acidisation
W009 34B WOSTML WO Well Stimulation Fracturing
W009 34C WOSTML WO Well Stimulation CTU related
W009 34D WOSTML WO Well Stimulation Stimulation- Others
W010 35 WODROP WO Drilling Ops WO Drilling Ops
W010 35A WODROP WO Drilling Ops Casing Cut & Retrieve
W010 35B WODROP WO Drilling Ops Section Mill/ Window Cutt
W010 35C WODROP WO Drilling Ops Formn Drilling (17½"-6")
W010 35D WODROP WO Drilling Ops Casing/Liner & Cementn
W010 35E WODROP WO Drilling Ops Hermetical Testing
W010 35F WODROP WO Drilling Ops Cement Repair Job
W011 36 WOTMLS WO Time Loss WO Time Loss
W011 36A WOTMLS WO Time Loss Complication
W011 36B WOTMLS WO Time Loss Reservoir/ BHS
W011 36C WOTMLS WO Time Loss Mud Chemical /WI
W011 36D WOTMLS WO Time Loss Down Hole & A/Lift
W011 36E WOTMLS WO Time Loss Logging
W011 36F WOTMLS WO Time Loss WSS Unit
W011 36G WOTMLS WO Time Loss Waiting for Crane
W011 36H WOTMLS WO Time Loss Waiting Tpt/ EV/ Material
W011 36I WOTMLS WO Time Loss Mechanical Repair
W011 36J WOTMLS WO Time Loss Electrical Repair
W011 36K WOTMLS WO Time Loss Civil Works
W011 36L WOTMLS WO Time Loss Auto Repair
W011 36M WOTMLS WO Time Loss Capital Repair- CWS/ SITE
W011 36N WOTMLS WO Time Loss Environment
W011 36O WOTMLS WO Time Loss Misc
W011 36P WOTMLS WO Time Loss Cementing Unit
W011 36Q WOTMLS WO Time Loss Weekly off, Closed days
W011 36R WOTMLS WO Time Loss Absence of Shift, No Plan
W011 36S WOTMLS WO RM-RB Time Loss Waiting for Location
W011 36T WOTMLS WO RM-RB Time Loss Waiting for Logistics
W011 36U WOTMLS WO RM-RB Time Loss Waiting for Ready Site
W011 36V WOTMLS WO RM-RB Time Loss Waiting on Weather
W012 37 WOFISH WO Fishing WO Fishing
W012 37A WOFISH WO Fishing String / Packer Fishing
W012 37B WOFISH WO Fishing Fishing - Others
W013 38 WOWLAT WO Well Activation WO Well Activation
W013 38A WOWLAT WO Well Activation N2/Air Compressor Appl.
W013 38B WOWLAT WO Well Activation W/Actn (incl Displ)-etc
W013 38C WOWLAT WO Well Activation Well Under Obsn.
W014 39 WORBLD WO Rig Move/Building WO Rig Move/ Building
W014 39A WORBLD WO Rig Move/Building Tpt/ R-B/Jack up/down
W014 39B WORBLD WO Rig Move/Building Skidding

Page 4 of 10
Pcode Cde Rrigmode IADC ActTyp Short name Short name
COUC 24F C 24 Out cycle Capital Repairs / Refub a
OUC 24A O 24 Out cycle Waiting on Weather/Natura
OUC 24B O 24 Out cycle Waiting on Location
OUC 24C O 24 Out cycle Waiting for Logistics
OUC 24D O 24 Out cycle Waiting for Ready Site
OUC 24E O 24 Out cycle Local Agitation/Baricade
OUC 24F O 24 Out cycle Capital Repairs / Refub a
OUC 24G O 24 Out cycle R/M Inter Company O/Cycle
OUC 24H O 24 Out cycle Third Party Insp /NDT/
OUC 24I O 24 Out cycle Weekly off, Closed days,
OUC 24J O 24 Out cycle Other Wait With Approval
PCMP 12C P 12 Run Csg & Cementation Drill Cement,F/C,F/S
PCMP 13A P 13 W.O.C W.O.C
PCMP 17A P 17 Plug Back Plug Back Zone Isolation
PCMP 17B P 17 Plug Back ABDN Plug Back/CSG Retriv
PCMP 18A P 18 Squeeze Jobs Squeeze Cement (for Cmt B
PCMP 18B P 18 Squeeze Jobs Gel/Polymer/Injectivity/
PCON 22A P 22 Complications Activity /Kick /Blow Out
PCON 22B P 22 Complications Mud Loss / Loss Control
PCON 22C P 22 Complications H/Up - T/P - Back Ream /
PCON 22D P 22 Complications Side Tracking
PCON 22E P 22 Complications Stuck Up
PCON 22F P 22 Complications String Failure
PCON 22G P 22 Complications Down Hole Tool / Bit Fail
PCON 22H P 22 Complications Cement Bond Improvement
PCON 22I P 22 Complications Casing Repairs
PCON 22J P 22 Complications Complication due to Loggi
PFIN 19A P 19 Fishing Fishing- Unplanned
POUC 24A P 24 Out cycle Waiting on Weather/Natura
POUC 24B P 24 Out cycle Waiting on Location
POUC 24C P 24 Out cycle Waiting for Logistics
POUC 24D P 24 Out cycle Waiting for Ready Site
POUC 24E P 24 Out cycle Local Agitation/Baricade
POUC 24F P 24 Out cycle Capital Repairs / Refub a
POUC 24G P 24 Out cycle R/M Inter Company O/Cycle
POUC 24H P 24 Out cycle Third Party Insp /NDT/
POUC 24I P 24 Out cycle Weekly off, Closed days,
POUC 24J P 24 Out cycle Other Wait With Approval
PPTP 11A P 11 RIGPRD Logging operations Logging operations
PPTP 14A P 14 N/Up-N/Dn WH / BOP/X-Tree N/Up-N/Dn WH / BOP / X-Ma
PPTP 15A P 15 Test BOP/CSG/Hanger SIT/LOT / PIT / Test CSG
PPTP 15B P 15 Test BOP/CSG/Hanger TEST WH / BOP / X TREE
PPTP 16A P 16 RIGOPS Drill Stem Test Drill Stem Test
PPTP 23A P 23 RIGPRD Production Testing Activation, N2/Air Compre
PPTP 23B P 23 RIGPRD Production Testing Well Stimulation ,Coil Tu
PPTP 23C P 23 RIGPRD Production Testing Release / Retrieve Packer
PPTP 23D P 23 RIGPRD Production Testing Milling of CR/ BP/ PP/Cem
PPTP 23E P 23 RIGPRD Production Testing Prod Wire Line Operations
PPTP 23F P 23 RIGPRD Production Testing A.Lift (Jet/ESP/SRP/GL) T
PPTP 23G P 23 RIGPRD Production Testing Gravel Pack/Sand Control
PPTP 23H P 23 RIGPRD Production Testing Fracturing
PPTP 23I P 23 RIGPRD Production Testing Planned Fishing
PPTP 3A P 3 RIGPRD Reaming Reaming-Hole Enlarg/Under
PPTP 5A P 5 RIGPRD Circulation & Condition Circulation & Condition
PPTP 7A P 7 RIGPRD Lubricate Rig Lubricate Rig(Pre. Maint)
PPTP 7B P 7 RIGPRD Lubricate Rig(Pre. Maint) Safety / Fire Drills
PPTP 9A P 9 RIGPRD Shift-Cut-Ch Drill. Line Shift-Cut-Cha Drill line
PREN 8A P 8 RIGPRD Repairs Drilling / Production Eqp
PREN 8B P 8 RIGPRD Repairs Mechanical Repairs, Auto
PREN 8C P 8 RIGPRD Repairs Electrical Repairs
PREN 8D P 8 RIGPRD Repairs Instru. Repairs
PSHN 21A P 21 Shutdown (In Cycle) Waiting on Weather
PSHN 21B P 21 Shutdown (In Cycle) Waiting for Logistics
PSHN 21C P 21 Shutdown (In Cycle) Waiting For Civil Wrk/ Se
PSHN 21D P 21 Shutdown (In Cycle) Wait for Decision/Instruc
PSHN 21E P 21 Shutdown (In Cycle) Wait for Material / Men /
PSHN 21F P 21 Shutdown (In Cycle) Waiting for Day light
PSHN 21G P 21 Shutdown (In Cycle) Waiting for Logging
PSHN 21H P 21 Shutdown (In Cycle) Waiting for Cementing
PSHN 21I P 21 Shutdown (In Cycle) Waiting for WSS.
PSHN 21J P 21 Shutdown (In Cycle) Waiting for Art. Lift
PSHN 21K P 21 Shutdown (In Cycle) Waiting for Reservoir / B
PSHN 21L P 21 Shutdown (In Cycle) Waiting for Other Service
PTRP 6A P 6 RIGPRD Tripping Tripping, M/U, B/U, L/D S
WACP 23A W 23 WOWLAT Production Testing Activation, N2/Air Compre
WACP 23F W 23 WOWCOP Production Testing A.Lift (Jet/ESP/SRP/GL) T
WCMP 12C W 12 WOCMOP Run Csg & Cementation Drill Cement,F/C,F/S
WCMP 13A W 13 WOCMOP W.O.C W.O.C
WCMP 17A W 17 WOCMOP Plug Back Plug Back Zone Isolation
WCMP 17B W 17 WOCMOP Plug Back Plug Back/CSG Retriv/ABDN
WCMP 18A W 18 WOCMOP Squeeze Jobs Squeeze Cement (for Cmt B
WCMP 18B W 18 WOCMOP Squeeze Jobs Gel/Polymer/Injectivity/
WCON 22A W 22 Complications Activity /Kick /Blow Out
WCON 22B W 22 Complications Mud Loss / Loss Control
WCON 22C W 22 Complications H/Up - T/P - Back Ream /
WCON 22D W 22 Complications Side Tracking
WCON 22E W 22 Complications Stuck Up
WCON 22F W 22 Complications String Failure
WCON 22G W 22 Complications Down Hole Tool / Bit Fail
WCON 22H W 22 Complications Cement Bond Improvement
WCON 22I W 22 Complications Casing Repairs
WCON 22J W 22 Complications Complication due to Loggi
WFIN 19A W 19 WOFISH Fishing Fishing- Unplanned
WFIP 23I W 23 WOFISH Production Testing Planned Fishing
WKLP 5A W 5 WOWLKL Circulation & Condition Circulation & Condition
WLGP 11A W 11 WOWLOP Logging operations Logging operations
WLGP 11B W 11 WOWLOP Logging operations PLT
WOTP 23C W 23 WOOTOP Production Testing Release / Retrieve Packer
WOTP 23D W 23 WOOTOP Production Testing Milling of CR/ BP/ PP/Cem
WOTP 23G W 23 WOWCOP Production Testing Gravel Pack/Sand Control
WOTP 3A W 3 WOOTOP Reaming Reaming-Hole Enlarg/Under
WOTP 7A W 7 WOOTOP Lubricate Rig Lubricate Rig(Pre. Maint)
WOTP 7B W 7 WOOTOP Lubricate Rig Safety / Fire Drills
WOTP 9A W 9 WOOTOP Shift-Cut-Ch Drill. Line Shift-Cut-Cha Drill line
WOUC 24A W 24 Out Cycle Waiting on Weather/Natura
WOUC 24B W 24 Out Cycle Waiting on Location
WOUC 24C W 24 Out Cycle Waiting for Logistics
WOUC 24D W 24 Out Cycle Waiting for Ready Site
WOUC 24E W 24 Out Cycle Local Agitation/Baricade
WOUC 24F W 24 Out Cycle Capital Repairs / Refub a
WOUC 24G W 24 Out Cycle R/M Inter Company O/Cycle
WOUC 24H W 24 Out Cycle Third Party Insp /NDT/
WOUC 24I W 24 Out Cycle Weekly off, Closed days,
WOUC 24J W 24 Out Cycle Other Wait With Approval
WPRP 14A W 14 WOWLPR N/Up-N/Dn WH / BOP/X-Tree N/Up-N/Dn WH / BOP / X-Ma
WPRP 15A W 15 WOWLPR Test BOP/CSG/Hanger SIT/LOT / PIT / Test CSG
WPRP 15B W 15 WOWLPR Test BOP/CSG/Hanger TEST WH / BOP / X TREE
WREN 8A W 8 WOOTOP Repairs Drilling / Production Eqp
WREN 8B W 8 WOOTOP Repairs Mechanical Repairs, Auto
WREN 8C W 8 WOOTOP Repairs Electrical Repairs
WREN 8D W 8 WOOTOP Repairs Instru. Repairs
WSHN 21A W 21 WOTMLS Shutdown (In Cycle) Waiting on Weather
WSHN 21B W 21 WOTMLS Shutdown (In Cycle) Waiting for Logistics
WSHN 21C W 21 WOTMLS Shutdown (In Cycle) Waiting For Civil Wrk/ Se
WSHN 21D W 21 WOTMLS Shutdown (In Cycle) Wait for Decision/Instruc
WSHN 21E W 21 WOTMLS Shutdown (In Cycle) Wait for Material / Men /
WSHN 21F W 21 WOTMLS Shutdown (In Cycle) Waiting for Day light
WSHN 21G W 21 WOTMLS Shutdown (In Cycle) Waiting for Logging
WSHN 21H W 21 WOTMLS Shutdown (In Cycle) Waiting for Cementing
WSHN 21I W 21 WOTMLS Shutdown (In Cycle) Waiting for WSS.
WSHN 21J W 21 WOTMLS Shutdown (In Cycle) Waiting for Art. Lift
WSHN 21K W 21 WOTMLS Shutdown (In Cycle) Waiting for Reservoir / B
WSHN 21L W 21 WOTMLS Shutdown (In Cycle) Waiting for Other Service
WSTP 23B W 23 WOSTML Production Testing Well Stimulation ,Coil Tu
WSTP 23H W 23 WOSTML Production Testing Fracturing
WTRP 6A W 6 WOOTOP Tripping Tripping, M/U, B/U, L/D S
WWLP 23E W 23 WOWLOP Production Testing Prod Wire Line Operations
XOUC 24A X 24 Out Cycle Waiting on Weather/Natura
XOUC 24B X 24 Out Cycle Waiting on Location
XOUC 24C X 24 Out Cycle Waiting for Logistics
XOUC 24D X 24 Out Cycle Waiting for Ready Site
XOUC 24E X 24 Out Cycle Local Agitation/Baricade
XOUC 24F X 24 Out Cycle Capital Repairs / Refub a
XOUC 24G X 24 Out Cycle R/M Inter Company O/Cycle
XOUC 24H X 24 Out Cycle Third Party Insp /NDT/
XOUC 24I X 24 Out Cycle Weekly off, Closed days,
XOUC 24J X 24 Out Cycle Other Wait With Approval
XWON 21A X 21 Shutdown (In Cycle) Waiting on Weather
XWON 21B X 21 Shutdown (In Cycle) Waiting for Logistics
XWON 21C X 21 Shutdown (In Cycle) Waiting For Civil Wrk/ Se
XWON 21D X 21 Shutdown (In Cycle) Wait for Decision/Instruc
XWON 21E X 21 Shutdown (In Cycle) Wait for Material / Men /
XWON 21F X 21 Shutdown (In Cycle) Waiting for Day light
XWON 21G X 21 Shutdown (In Cycle) Waiting for Logging
XWON 21H X 21 Shutdown (In Cycle) Waiting for Cementing
XWON 21I X 21 Shutdown (In Cycle) Waiting for WSS.
XWON 21J X 21 Shutdown (In Cycle) Waiting for Art. Lift
XWON 21K X 21 Shutdown (In Cycle) Waiting for Reservoir / B
XWON 21L X 21 Shutdown (In Cycle) Waiting for Other Service
XWON 8A X 8 Repairs Drilling / Production Eqp
XWON 8B X 8 Repairs Mechanical Repairs, Auto
XWON 8C X 8 Repairs Electrical Repairs
XWON 8D X 8 Repairs Instru. Repairs
XWOP 1A X 1 WORBLD Rig Move & Rig Building Rig Move & Rig Building
XWOP 1B X 1 WORBLD Rig Move & Rig Building Prepration For Rig Move,
XWOP 1C X 1 WORBLD Rig Move & Rig Building Rig TPT / Sail / Tow / Po
XWOP 1D X 1 WORBLD Rig Move & Rig Building Skidding/Dragging
New time balance code w.e.f. 01.04.2006
MINOR CODE MINOR CODE DESCRIPTION
1 Rig Move & Rig Building CODES W.E.F 01.04.06
1A Rig Move & Rig Building Major Codes
1B Prepration For Rig Move, Rig/Jack Up-Down-Rig Buld Minor Codes
1C Rig TPT / Sail / Tow / Position
1D Skidding/Dragging
2 Drilling Actual
2A Drilling Actual (Drilling, LDST/SDST/Drain Hole, etc)
2B Piling
2C Section Mill/ Window Cutt Side Track (WO)
3 Reaming-Hole Enlarg/Under Reaming
3A Reaming-Hole Enlarg/Under Reaming
4 Coring
4A Coring
5 C & C / Subdue Well
Drlling-C & C , WELL SERVICES- C & C, Bulldoze, Changeover, Well
5A
Killing, Loss Ctrl, Sand / Bottom Clearing.
6 Tripping
Tripping, M/U, B/U, L/D Str/ BHA/ Flex trip, Trips with Well Compln, A/Lift
6A
Instruments, Packer Set.
7 Lubricate Rig(Pre. Maint)
7A Lubricate Rig(Pre. Maint)
7B Safety / Fire Drills
8 Repairs
8A Drilling / Production Eqpt. Repairs
8B Mechanical Repairs, Auto Repair
8C Electrical Repairs
8D Instru. Repairs
9 Shift-Cut-Ch Off Drill. Line
9A Shift-Cut-Change Off Drill. Line
10 Deviation Survey/TOTCO
10A Deviation Survey/TOTCO
11 Wire Line Logs (Electro Logs)
Logging operations CBL-VDL/ USIT/ CIT-etc), Perf.Operations, Tubing
11A
Puncture/Cutting, Setting of BP/ CR/ PP, Dummy Run, VSP.
11B PLT
12 Run Csg & Cementation
12A Casing / Liner Lowering
12B Cir Prior to Cementation & Cementation
12C Drill Cement,F/C,F/S
13 W.O.C
13A W.O.C
14 N/Up-N/Dn WH / BOP / X-Mas Tree
14A N/Up-N/Dn WH / BOP / X-Mas Tree
15 Test BOP/CSG/Hanger
15B SIT/LOT / PIT / Test CSG / HT
15A TEST WH / BOP / X TREE
16 Drill Stem Test
16A Drill Stem Test
17 Plug Back
17A Plug Back Zone Isolation
17B Plug Back/CSG Retrival/ABDN
18 Cement Squeeze / WO Shut Off Ops
18A Squeeze Cement (for Cmt Bond repair)
18B Gel / Polymer Squeeze / Injectivity Testing / WO Shut Off Ops
19 Fishing

Page 8 of 10
New time balance code w.e.f. 01.04.2006
MINOR CODE MINOR CODE DESCRIPTION
19A Fishing
21 Shutdown (In Cycle)
21A Waiting on Weather
21B Waiting for Logistics
21C Waiting For Civil Wrk/ Sea Bed / Soil Survey
21D Wait for Decision/Instruction
21E Wait for Material / Men / Mud / Chemical
21F Waiting for Day light
21G Waiting for Logging
21H Waiting for Cementing
21I Waiting for WS.
21J Waiting for Art. Lift
21K Waiting for Reservoir / BHS
21L Waiting for Other Services (MWD, Wire Line Job. etc)
22 Complications
22A Activity /Kick /Blow Out
22B Mud Loss / Loss Control
22C H/Up - T/P - Back Ream / Ream
22D Side Tracking
22E Stuck Up
22F String Failure
22G Down Hole Tool / Bit Failure
22H Cement Bond Improvement
22I Casing Repairs
22J Logging
23 Prodn. Testing / Work Over
23A Activation, N2/Air Compressor Appl, Flow study,Sampling, BHS, WUO.
23B Well Stimulation ,Coil Tubing operations, etc
23C Release / Retrieve Packer/String
23D Milling of CR/ BP/ PP/Cement Drilling
Prod Wire Line Operations = SSSV Related, GLV Related, SV/B Plug/S-
23E
Plug.
23F A.Lift (Jet/ESP/SRP/GL) Trial runs/Surface jobs
23G Gravel Pack/Sand Control
23H Fracturing
23I Planned Fishing
24 OUT CYCLE
24A Waiting on Weather/Natural Calamity, Environment
24B Waiting on Location
24C Waiting for Logistics
24D Waiting for Ready Site
24E Local Agitation/Baricade
24F Capital Repairs / Refub at Site or CWS
24G R/M Inter Company O/Cycle
24H Third Party Insp /NDT/
24I Weekly off, Closed days, Shift not Planned
24J Any Other Waiting With Approval of CA