KARIMUN 20 JUNI 2023

No : 0I.PNB- RUNH.20KV.IV-2023.

Subject : Notice of Commencement of 20 kV Distribution Works

Proyek : Soma Karimun 2 x 31 mw

To : PT. Runh Power Indonesia

Attn : Mr Jiang Xiang LIang

Address : Komp TMK , RT 001 RW 001 Sei Raya

MERAL- KARIMUN

Dear Sir,

Continuing Contract No: RUNH-ACS-068, regarding the 20 kV Transmission Network Project in Soma Karimun,
between RUNH POWER LTD and PT RUNH POWER INDONESIA with PT PROTON NUSANTARA BERKAH, dated
May 31, 2023, we would like to inform you as follows:

• Starting from the issuance date of this letter, the implementation process of the project as specified
in the aforementioned contract officially commences.
• The work schedule (Time Schedule) is attached herewith.

We hereby convey this notification and express our gratitude for your attention and cooperation.
SCHEDULE OF MATERIAL PROCUREMENT AND INSTALLATION OF 20 kV NETWORK PT. MAJOR POWER SOMA

TANJUNG BALAI KARIMUN

YEAR 2023
NO TYPES OF WORK VOL STN JUNE JULY AUGUST SEPTEMBER
Week I - IV Week I - IV Week I - IV Week I - IV

I II III IV I II III IV I II III IV I II III IV


SCHEDULE OF MATERIAL PROCUREMENT &
A 1 LS
ARRIVAL FOR 20 kV NETWORK
SCHEDULE OF INSTALLATION & NETWORK
B
INSTALLATION FOR 20 kV
Materials & Installation For Replacement of cracked
1 12 mtr 200 danN concrete pillars 30 Btg
2 Materials & Installation Iron pole 11 mtr 156 dan For
Druck schoper 22 Btg
3 Pole Servicing and Single Traves Installation 195 Set
4 Pole Servicing and Double Traves Installation 121 Set
Pole Servicing and Traves V (Pole Junction)
5 Installation 41 Set
6 Tensile Insulator 20 kv 120 Set
7 turnpu insulator 20 kv 1111 Set
8 Top ties 1111 Mtr
9 Cutout 20 kv 4 Set
10 Ligh - Inng Arrester 20 kv + Acescries 4 Set
11 Track school E1 21 Set
12 Track School ElD 5 Set
13 Cable AAACS lx 240mm 43000 Mtr
14 SKTM cable 3 x 240 rrn 1300 Mtr
15 Termination 20 kv 3 x 240 rrnri outdoor 7 Set
16 Tenrrination 20 kv 3 x 240 rnm indoor 6 Set
17 Jointing 20 kv 3 x 240 mm 1 Lots
18 240 mm AL schoen cable 45 Bh
19 CU AL 240 mm schoen cable 18 Bh
20 Fedeer Asphant pole accessories 3 Set
21 Danger sign plate 218 Bh
22 Anti climb 218 Bh
23 Druck School painting 22 units
24 Casting of pile foundations 218 units
25 Switchgear Panet 20 kV 4 Lots
26 20 kV PT Panel lncomblg 4 Lots
27 20 kV Panel Out oing 8 Lots
28 Making Transformer House. Parrel 2G kv 5x8 mtr
1 units
29 Making 20 kV Planted Cable Channels 1 Ls
30 20 kV Embedded Cable protectors accessories 1 Ls
31 Installation of SKTM 20 kV cable signs 1 Ls

- The schedule for ordering and arrival of 20kv network material is adjusted according to sea transportation from Jakarta to Karimun

Karimun, 19 June 2023