You are on page 1of 1

AS BUILT 22-2-2016

SCALE 1 : 200

ROAD 20 M
J

0.010%

0.010%
0.010%
-0.45

0.010%
-0.53 -0.30

6.00
-0.48 Asphalt

6.00
Asphalt Asphalt Asphalt
-0.49
Asphalt
K

6.30
0.010%

0.010%

WALK WAY
J

6.30
I

WALK WAY
6.30
H 0.010%

EXISTING PRODUCTION AREA

6.30

WALK WAY
G
0.010%

NEIGHBOUR
0.010%

6.30
EXISTING FACTORY

75.00
-0.30
F Asphalt

ROAD
6.30
E

PARKING AREA
0.010%

6.30

48 M
D
EXISTING PRODUCTION AREA

6.30
C 0.010% 0.010%

280 SQM

6.30
0.010%

WALK WAY
B
17.05

6.30
0.010% 0.010%
6.60
A

6.00

5.40

0.010%

0.010%

0.010%
0.010%

0.010%
0.010%
-0.23 -0.44
Asphalt -0.10 Asphalt -0.49
A' Asphalt Asphalt

NEIGHBOUR
5.60 45.40 1.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 6.05 6.05 8.40 9.50

150.00

17 16 13 14 12 11 10 9 8 7 6 5 4 3 2 1 0

KEY PLAN

SYMBOL DESCRIPTION

ROAD 20 M
J
-0.53 -0.45 +0.30 GUARD

-0.48 ROOM

WALKWAY
Asphalt
6.00

Asphalt

-0.15
Asphalt 4.66
10.57 -0.49
2.50 4.35 5.23 2.65 5.13 3.54 3.00 3.20 5.13
4.85 Asphalt WALK WAY 0.65
0.50
K

WALKWAY
-0.15
2.70
5.20
6.30

7.25

B
C

A
9300mm

3900mm 5400mm
FULLY LOUVERED DOOR
220cmX320cm

4
WALK WAY

700mm

WINDOW 240X100cm

FULLY LOUVERED DOOR


1.85

SEC SF6 ROOM

220cmX320cm
WALK WAY
J

600mm

AT THE BOTTOM OF
700mm

3300mm

1900mm
700mm

THE TENCH
+ 0.5 ABOVE ASPHALT
CHEQUERED PLATE ( 5mm )

EPOXY PAINTED
600mm

5200mm
1700mm

0.60

1
TRANSFORMER SUBSTUTION

EXHAUST FAN
50cm X 50cm
3.80 6.30 2.00

700mm
6.30

1050mm CHEQUERED PLATE ( 5mm ) TRENCH

500mm

700mm
850mm

200mm
3250mm

1850mm
2200mm

700mm
FT2

50cm X 50cm
EXHAUST FAN
TRENCH
25.30 20.00

700mm
CHEQUERED PLATE ( 5mm )

CHEQUERED PLATE ( 5mm )


I

700mm
1280mm

5200mm
CONSUMER'S CB ROOM
WINDOW 240X100cm
TRENCH
17.00 620mm

1850mm

FULLY LOUVERED DOOR


3250mm

220cmX320cm
CHEQUERED PLATE ( 5mm )
FT2
WALKWAY
-0.15

700mm
6.30

2
1000mm
WALK WAY

700mm
TRENCH CHEQUERED PLATE ( 5mm ) TRENCH

3900mm
2000mm
EXHAUST FAN
50cm X 50cm
H 220cmX320cm 220cmX320cm

200mm
FULLY LOUVERED DOOR

1
FULLY LOUVERED DOOR

-0.15 WALK WAY

WALK WAY
WALKWAY

EXISTING PRODUCTION AREA


6.30

WALK WAY

WALKWAY
0.50

-0.15
G 45.50
NEIGHBOUR

0.60
6.30

Asphalt
-0.17
EXISTING FACTORY
75.00

-0.17 WALKWAY
-0.30

WALK WAY
F Asphalt
Asphalt

WALKWAY
-0.15
6.30

7.80
4.20

10X4X3=1 20M
WATER TANK
PARKING AREA

U.G.F.F.
6.30

4.75
1.35

D EXISTING PRODUCTION AREA 3X4X3=36M

WALK WAY
ROOM
U.G. PUMP

LEGENDS
EXISTING BUILDING AREA
4.75
6.30

5X4X3= 60M
TANK
NEW EXTENSION AREA
U.G. WATER

WALK WAY
C
4.75
6.30

12.80

WALK WAY

WALKWAY
-0.15
4.75

B
0.60

WALK WAY
Khalid Fahad Al-Boayz Co.
6.30

4.05
4.05

TOILET TOILET
A
1.00

5.00

5.80
6.00

5.40

-0.23 7.50 -0.44


Asphalt -0.10 Asphalt
A' Asphalt
54.50
PLAST ELECTRO
PROJECT PLASTIC FACTORY
NEIGHBOUR
GROUND FLOOR - AS BUILT
5.60 45.40 1.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 6.05 6.05 8.40 9.50 TITLE
POWER LAYOUT PLAN
DRAWING NO.
150.00
DATE 19 - 03 - 2016
17 16 13 14 12 11 10 9 8 6 5 4 3 2 1 0
CHECKED BY ENG. AYAD

DRAWING BY S.KHAN

REVISION BY REV. 0000

You might also like