0% found this document useful (0 votes)
166 views11 pages

PDA Test

Uploaded by

Georgeshua Zekon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
166 views11 pages

PDA Test

Uploaded by

Georgeshua Zekon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Project No.

01/ERG-RON/PDA-1/II/2023

 
LAPORAN PILE DRIVING ANALYZER (PDA)
TIANG BOR D-50 CM
(TIANG NO. BP-18 & BP-28)
PROYEK: YAMA HOUSE
BANDUNG, JAWA BARAT

Disiapkan untuk:
Bpk. Rony

15 Februari 2023

Disiapkan oleh:

Centennial Tower Lt. 29 Unit D-E


Jl. Jendral Gatot Subroto Kav. 24-25
Jakarta Selatan
PT EFEMKA REKAYASA GEOTEKNIK
Pile Driving Analyzer ® (PDA)
YAMA HOUSE BP-28

F@11.2 m (300 tn) A5,8


V@11.2 m (1.64 m/s) F6,7

TS: 100
TB: 0

WU@11.2 m (300 tn) A5,8


D@11.2 m (40 mm) F6,7

SET=1 mm
TS: 100
TB: 0

Project Information Quantity Results Sensors


PROJECT: YAMA HOUSE RMX 106 tn A5 (PR): [K11247] 435.698 mv/6.4v/5000g (1.25) VF6
PILE NAME: BP-28 RSU 93 tn F6 : [T196] 149.5 PDICAL (0.75) FF6
DESC: #BORED500 #250T #DH3T EMX 0.37 tn-m F7 : [T195] 150 PDICAL (0.75) FF6
STK
PDA OWNER: PT EFEMKA REKAYASA GEOTEKNIK 0.0 m A8 (PR): [K11248] 397.25 mv/6.4v/5000g (1.25) VF6
SERIAL NUMBER: 5097 LE CSX 7.3 MPa CLIP: OK
OPERATOR: AAK TSX 0.9 MPa
FILE: BP-28.pda FMX 146 tn
13Feb2023 11:22:37 DMX 3 mm
Blow number 1 DFN 1 mm
BTA 100.0 %
Pile Properties
LE 11.2 m
AR 1963.50 cm^2
EM 354 t/cm2
SP 2.40 t/m3
WS 3800.0 m/s
WC 3796.6 m/s
EA/C 182.8 tn-s/m
2L/C 5.90 ms
JC 0.60
LP 10.9 m

Version 2021.34
YAMA HOUSE; Pile: BP-28; #BORED500 #250T #DH3T; Blow: 1 (Test: 13-Feb-2023 11:22:) 14-Feb-2023
PT EFEMKA REKAYASA GEOTEKNIK CAPWAP(R) 2014-3

150 150
Force Msd Force Msd
tons tons
Force Cpt Velocity Msd

94 94

38 38

5 105 ms 5 105 ms

13 2L/c 13 2L/c
-19 -19

-75 -75

15
Shaft Resistance Length b. Sensors 11.2 m
Load (tons) Distribution Embedment 10.9 m
Pile Top
0 50 100 150 Top Area 1963.5 cm2
Bottom
0.000 End Bearing Area 1963.5 cm2
10
Top Perimeter 1.57 m

tons/m
Top E-Modulus 354 tons/cm2
Top Spec. Weight 2.4 tons/m3
2.000 RU = 119 tons Top Wave Spd. 3800 m/s
SF = 106 tons 5 Overall W.S. 3797 m/s
EB = 13 tons
Displacement (mm)

Dy = 4.626 mm Match Quality 3.17


Dx = 5.818 mm 0 Top Compr. Stress 0.1 tons/cm2
4.000
SET/Bl = 1.200 mm 0 EB Max Compr. Stress 0.1 tons/cm2
Max Tension Stress -0.00 tons/cm2
30
Avg. Shaft Quake 1.107 mm
6.000
Toe Quake 2.599 mm
60 Avg. Shaft Smith Dpg. 1.31 s/m
SF
tons

Toe Smith Damping 0.73 s/m


90
8.000

120
Pile Force
10.000 at Ru
150

CAPWAP(R) 2014-3 Licensed to PT EFEMKA REKAYASA GEOTEKNIK


YAMA HOUSE; Pile: BP-28 Test: 13-Feb-2023 11:22
#BORED500 #250T #DH3T; Blow: 1 CAPWAP(R) 2014-3
PT EFEMKA REKAYASA GEOTEKNIK OP: AAK
CAPWAP SUMMARY RESULTS
Total CAPWAP Capacity: 119.33; along Shaft 106.34; at Toe 12.99 tons
Soil Dist. Depth Ru Force Sum Unit Unit
Sgmnt Below Below in Pile of Resist. Resist.
No. Gages Grade Ru (Depth) (Area)
m m tons tons tons tons/m tons/m2

119.3
1 1.0 0.7 0.39 118.9 0.39 0.54 0.35
2 2.0 1.7 6.51 112.4 6.90 6.39 4.07
3 3.1 2.8 9.88 102.6 16.78 9.70 6.18
4 4.1 3.8 10.72 91.8 27.50 10.53 6.70
5 5.1 4.8 11.66 80.2 39.16 11.45 7.29
6 6.1 5.8 11.84 68.3 51.00 11.63 7.40
7 7.1 6.8 11.96 56.4 62.96 11.75 7.48
8 8.1 7.8 11.96 44.4 74.92 11.75 7.48
9 9.2 8.9 11.58 32.8 86.50 11.37 7.24
10 10.2 9.9 10.58 22.3 97.08 10.39 6.62
11 11.2 10.9 9.26 13.0 106.34 9.09 5.79
Avg. Shaft 9.67 9.76 6.21
Toe 12.99 66.16
Soil Model Parameters/Extensions Shaft Toe
Smith Damping Factor 1.31 0.73
Quake (mm) 1.107 2.599
Case Damping Factor 0.76 0.05
Damping Type Viscous Viscous
Unloading Quake (% of loading quake) 84 56
Reloading Level (% of Ru) 100 100
Unloading Level (% of Ru) 8
Soil Plug Weight (tons) 1.218

CAPWAP match quality = 3.17 (Wave Up Match) ; RSA = 0


Observed: Final Set = 1.200 mm; Blow Count = 833 b/m
Computed: Final Set = 1.278 mm; Blow Count = 782 b/m
Transducer F6 (T196) CAL: 149.5; RF: 0.75; F7 (T195) CAL: 150.0; RF: 0.75
A5 (K11247) CAL: 436; RF: 1.25; A8 (K11248) CAL: 397; RF: 1.25

max. Top Comp. Stress = 0.1 tons/cm2 (T= 26.3 ms, max= 1.000 x Top)
max. Comp. Stress = 0.1 tons/cm2 (Z= 1.0 m, T= 26.3 ms)
max. Tens. Stress = -0.00 tons/cm2 (Z= 6.1 m, T= 43.2 ms)
max. Energy (EMX) = 0.36 tons-m; max. Measured Top Displ. (DMX)= 3.347 mm

Analysis: 14-Feb-2023
YAMA HOUSE; Pile: BP-28 Test: 13-Feb-2023 11:22
#BORED500 #250T #DH3T; Blow: 1 CAPWAP(R) 2014-3
PT EFEMKA REKAYASA GEOTEKNIK OP: AAK
EXTREMA TABLE
Pile Dist. max. min. max. max. max. max. max.
Sgmnt Below Force Force Comp. Tens. Trnsfd. Veloc. Displ.
No. Gages Stress Stress Energy
m tons tons tons/cm2 tons/cm2 tons-m m/s mm
1 1.0 149.1 -3.1 0.1 -0.00 0.36 0.4 3.226
2 2.0 147.4 -4.2 0.1 -0.00 0.35 0.4 3.096
3 3.1 138.1 -5.5 0.1 -0.00 0.32 0.4 2.978
4 4.1 128.1 -6.4 0.1 -0.00 0.29 0.4 2.874
5 5.1 115.1 -6.9 0.1 -0.00 0.25 0.4 2.791
6 6.1 100.3 -7.3 0.1 -0.00 0.21 0.4 2.727
7 7.1 87.2 -6.5 0.0 -0.00 0.18 0.3 2.679
8 8.1 73.5 -4.8 0.0 -0.00 0.14 0.3 2.645
9 9.2 58.5 -3.9 0.0 -0.00 0.11 0.3 2.622
10 10.2 43.7 -3.3 0.0 -0.00 0.08 0.3 2.605
11 11.2 28.3 -1.8 0.0 -0.00 0.02 0.3 2.595

Absolute 1.0 0.1 (T = 26.3 ms)


6.1 -0.00 (T = 43.2 ms)

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 106 104 102 99 97 95 93 91 89 86
RX 145 137 130 122 116 111 106 101 98 95
RU 106 104 102 99 97 95 93 91 89 86
RAU = 55 (tons); RA2 = 113 (tons)
Current CAPWAP Ru = 119 (tons); Corresponding J(RP)= 0.00; J(RX) = 0.35

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS KEB
m/s ms tons tons tons mm mm mm tons-m tons tons/mm
0.4 25.75 60 67 146 3.347 1.313 1.200 0.37 163 5

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m cm2 tons/cm2 tons/m3 m
0.0 1963.5 353.8 2.403 1.57
11.2 1963.5 353.8 2.403 1.57
Toe Area 1963.5 cm2
Top Segment Length 1.02 m, Top Impedance 183 tons/m/s
Wave Speed: Pile Top 3800.0, Elastic 3800.0, Overall 3796.6 m/s
Pile Damping 2.00 %, Time Incr 0.268 ms, 2L/c 5.9 ms
Total volume: 2.199 m3; Volume ratio considering added impedance: 1.000

Page 2 Analysis: 14-Feb-2023


PT EFEMKA REKAYASA GEOTEKNIK
Pile Driving Analyzer ® (PDA)
YAMA HOUSE BP-28

F@11.2 m (500 tn) A5,8


V@11.2 m (2.74 m/s) F6,7

TS: 100
TB: 0

WU@11.2 m (500 tn) A5,8


D@11.2 m (40 mm) F6,7

SET=13 mm

TS: 100
TB: 0

Project Information Quantity Results Sensors


PROJECT: YAMA HOUSE RMX 81 tn A5 (PR): [K11247] 435.698 mv/6.4v/5000g (1.25) VF6
PILE NAME: BP-28 RSU 0 tn F6 : [T196] 149.5 PDICAL (0.75) FF6
DESC: #BORED500 #250T #DH3T EMX 1.75 tn-m F7 : [T195] 150 PDICAL (0.75) FF6
STK
PDA OWNER: PT EFEMKA REKAYASA GEOTEKNIK 0.0 m A8 (PR): [K11248] 397.25 mv/6.4v/5000g (1.2) VF6
SERIAL NUMBER: 5097 LE CSX 13.1 MPa CLIP: OK
OPERATOR: AAK TSX 1.0 MPa
FILE: BP-28.pda FMX 262 tn
13Feb2023 11:33:45 DMX 14 mm
Blow number 2 DFN 13 mm
BTA 100.0 %
Pile Properties
LE 11.2 m
AR 1963.50 cm^2
EM 354 t/cm2
SP 2.40 t/m3
WS 3800.0 m/s
WC 3796.6 m/s
EA/C 182.8 tn-s/m
2L/C 5.90 ms
JC 0.60
LP 10.9 m

Version 2021.34
PT EFEMKA REKAYASA GEOTEKNIK
Pile Driving Analyzer ® (PDA)
YAMA HOUSE BP-28

F@11.2 m (500 tn) A5,8


V@11.2 m (2.74 m/s) F6,7

TS: 100
TB: 0

WU@11.2 m (500 tn) A5,8


D@11.2 m (40 mm) F6,7

SET=18 mm

TS: 100
TB: 0

Project Information Quantity Results Sensors


PROJECT: YAMA HOUSE RMX 76 tn A5 (PR): [K11247] 435.698 mv/6.4v/5000g (1.28) VF6
PILE NAME: BP-28 RSU 0 tn F6 : [T196] 149.5 PDICAL (0.72) FF6
DESC: #BORED500 #250T #DH3T EMX 2.60 tn-m F7 : [T195] 150 PDICAL (0.72) FF6
STK
PDA OWNER: PT EFEMKA REKAYASA GEOTEKNIK 0.0 m A8 (PR): [K11248] 397.25 mv/6.4v/5000g (1.28) VF6
SERIAL NUMBER: 5097 LE CSX 15.2 MPa CLIP: OK
OPERATOR: AAK TSX 0.7 MPa
FILE: BP-28.pda FMX 305 tn
13Feb2023 11:53:34 DMX 20 mm
Blow number 3 DFN 18 mm
BTA 100.0 %
Pile Properties
LE 11.2 m
AR 1963.50 cm^2
EM 354 t/cm2
SP 2.40 t/m3
WS 3800.0 m/s
WC 3796.6 m/s
EA/C 182.8 tn-s/m
2L/C 5.90 ms
JC 0.60
LP 10.9 m

Version 2021.34
PT EFEMKA REKAYASA GEOTEKNIK
Pile Driving Analyzer ® (PDA)
YAMA HOUSE BP-28

F@11.2 m (600 tn) A5,8


V@11.2 m (3.28 m/s) F6,7

TS: 100
TB: 0

TOE Beta @ 8.7 m

WU@11.2 m (600 tn) A5,8


D@11.2 m (100 mm) F6,7

SET=22 mm

TS: 100
TB: 0

TOE Beta @ 8.7 m

Project Information Quantity Results Sensors


PROJECT: YAMA HOUSE RMX 85 tn A5 (PR): [K11247] 435.698 mv/6.4v/5000g (1.25) VF6
PILE NAME: BP-28 RSU 0 tn F6 : [T196] 149.5 PDICAL (0.75) FF6
DESC: #BORED500 #250T #DH3T EMX 3.70 tn-m F7 : [T195] 150 PDICAL (0.75) FF6
STK
PDA OWNER: PT EFEMKA REKAYASA GEOTEKNIK 0.0 m A8 (PR): [K11248] 397.25 mv/6.4v/5000g (1.25) VF6
SERIAL NUMBER: 5097 LE CSX 18.6 MPa CLIP: OK
OPERATOR: AAK TSX 0.3 MPa
FILE: BP-28_1.pda FMX 373 tn
13Feb2023 01:24:03 DMX 24 mm
Blow number 1 DFN 22 mm
BTA 100.0 %
Pile Properties
LE 11.2 m
AR 1963.50 cm^2
EM 354 t/cm2
SP 2.40 t/m3
WS 3800.0 m/s
WC 3796.6 m/s
EA/C 182.8 tn-s/m
2L/C 5.90 ms
JC 0.60
LP 10.9 m

Version 2021.34
YAMA HOUSE; Pile: BP-28; #BORED500 #250T #DH3T; Blow: 1 (Test: 13-Feb-2023 13:24:) 14-Feb-2023
PT EFEMKA REKAYASA GEOTEKNIK CAPWAP(R) 2014-3

375 375
Force Msd Force Msd
tons tons
Force Cpt Velocity Msd

234 234

94 94

5 105 ms 5 105 ms

13 2L/c 13 2L/c
-47 -47

-188 -188

15
Shaft Resistance Length b. Sensors 11.2 m
Load (tons) Distribution Embedment 10.9 m
Pile Top
0 50 100 150 Top Area 1963.5 cm2
Bottom
0.000 End Bearing Area 1963.5 cm2
10
Top Perimeter 1.57 m

tons/m
Top E-Modulus 354 tons/cm2
Top Spec. Weight 2.4 tons/m3
10.000 RU = 110 tons Top Wave Spd. 3800 m/s
SF = 57 tons 5 Overall W.S. 3797 m/s
EB = 53 tons
Displacement (mm)

20.000 Dy = 28.026 mm Match Quality 3.54


Dx = 49.940 mm 0 Top Compr. Stress 0.2 tons/cm2
SET/Bl = 22.000 mm 0 Max Compr. Stress 0.2 tons/cm2
30.000 Max Tension Stress -0.00 tons/cm2
30 EB
Avg. Shaft Quake 1.000 mm
Toe Quake 20.326 mm
40.000 60 Avg. Shaft Smith Dpg. 0.34 s/m
tons

SF Toe Smith Damping 0.48 s/m


90
50.000
120
Pile Force
60.000 at Ru
150

CAPWAP(R) 2014-3 Licensed to PT EFEMKA REKAYASA GEOTEKNIK


YAMA HOUSE; Pile: BP-28 Test: 13-Feb-2023 13:24
#BORED500 #250T #DH3T; Blow: 1 CAPWAP(R) 2014-3
PT EFEMKA REKAYASA GEOTEKNIK OP: AAK
CAPWAP SUMMARY RESULTS
Total CAPWAP Capacity: 109.99; along Shaft 57.07; at Toe 52.92 tons
Soil Dist. Depth Ru Force Sum Unit Unit
Sgmnt Below Below in Pile of Resist. Resist.
No. Gages Grade Ru (Depth) (Area)
m m tons tons tons tons/m tons/m2

110.0
1 1.0 0.7 0.26 109.7 0.26 0.36 0.23
2 2.0 1.7 1.41 108.3 1.67 1.38 0.88
3 3.1 2.8 1.54 106.8 3.21 1.51 0.96
4 4.1 3.8 2.55 104.2 5.76 2.50 1.59
5 5.1 4.8 5.00 99.2 10.76 4.91 3.13
6 6.1 5.8 5.15 94.1 15.91 5.06 3.22
7 7.1 6.8 5.74 88.3 21.65 5.64 3.59
8 8.1 7.8 6.83 81.5 28.48 6.71 4.27
9 9.2 8.9 8.52 73.0 37.00 8.37 5.33
10 10.2 9.9 9.93 63.1 46.93 9.75 6.21
11 11.2 10.9 10.14 52.9 57.07 9.96 6.34
Avg. Shaft 5.19 5.24 3.33
Toe 52.92 269.52
Soil Model Parameters/Extensions Shaft Toe
Smith Damping Factor 0.34 0.48
Quake (mm) 1.000 20.326
Case Damping Factor 0.11 0.14
Damping Type Viscous Viscous
Unloading Quake (% of loading quake) 93 62
Reloading Level (% of Ru) 100 100
Unloading Level (% of Ru) 58
Resistance Gap (included in Toe Quake) (mm) 7.348
Soil Plug Weight (tons) 0.555

CAPWAP match quality = 3.54 (Wave Up Match) ; RSA = 0


Observed: Final Set = 22.000 mm; Blow Count = 45 b/m
Computed: Final Set = 21.466 mm; Blow Count = 47 b/m
Transducer F6 (T196) CAL: 149.5; RF: 0.75; F7 (T195) CAL: 150.0; RF: 0.75
A5 (K11247) CAL: 436; RF: 1.25; A8 (K11248) CAL: 397; RF: 1.25

max. Top Comp. Stress = 0.2 tons/cm2 (T= 25.2 ms, max= 1.011 x Top)
max. Comp. Stress = 0.2 tons/cm2 (Z= 2.0 m, T= 25.2 ms)
max. Tens. Stress = -0.00 tons/cm2 (Z= 6.1 m, T= 30.0 ms)
max. Energy (EMX) = 3.80 tons-m; max. Measured Top Displ. (DMX)=24.206 mm

Analysis: 14-Feb-2023
YAMA HOUSE; Pile: BP-28 Test: 13-Feb-2023 13:24
#BORED500 #250T #DH3T; Blow: 1 CAPWAP(R) 2014-3
PT EFEMKA REKAYASA GEOTEKNIK OP: AAK
EXTREMA TABLE
Pile Dist. max. min. max. max. max. max. max.
Sgmnt Below Force Force Comp. Tens. Trnsfd. Veloc. Displ.
No. Gages Stress Stress Energy
m tons tons tons/cm2 tons/cm2 tons-m m/s mm
1 1.0 361.3 -3.6 0.2 -0.00 3.80 1.9 24.372
2 2.0 365.3 -0.1 0.2 -0.00 3.79 1.9 24.333
3 3.1 363.9 -0.1 0.2 -0.00 3.74 2.1 24.290
4 4.1 350.9 -0.1 0.2 -0.00 3.68 2.3 24.242
5 5.1 335.4 -1.7 0.2 -0.00 3.59 2.4 24.188
6 6.1 311.6 -5.6 0.2 -0.00 3.40 2.5 24.133
7 7.1 291.4 -2.3 0.1 -0.00 3.21 2.6 24.078
8 8.1 265.7 -0.1 0.1 -0.00 3.00 2.6 24.021
9 9.2 224.4 -0.1 0.1 -0.00 2.74 2.7 23.964
10 10.2 173.0 -0.1 0.1 -0.00 2.42 2.7 23.902
11 11.2 118.2 -0.1 0.1 -0.00 1.65 2.8 23.840

Absolute 2.0 0.2 (T = 25.2 ms)


6.1 -0.00 (T = 30.0 ms)

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 194 153 113 72 31 0 0 0 0 0
RX 194 172 154 137 120 102 85 81 81 81
RU 194 153 113 72 31 0 0 0 0 0
RAU = 81 (tons); RA2 = 79 (tons)
Current CAPWAP Ru = 110 (tons); Corresponding J(RP)= 0.21; J(RX) = 0.46

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS KEB
m/s ms tons tons tons mm mm mm tons-m tons tons/mm
1.9 22.80 305 295 373 24.206 21.999 22.000 3.70 160 4

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m cm2 tons/cm2 tons/m3 m
0.0 1963.5 353.8 2.403 1.57
11.2 1963.5 353.8 2.403 1.57
Toe Area 1963.5 cm2
Top Segment Length 1.02 m, Top Impedance 183 tons/m/s
Wave Speed: Pile Top 3800.0, Elastic 3800.0, Overall 3796.6 m/s
Pile Damping 2.00 %, Time Incr 0.268 ms, 2L/c 5.9 ms
Total volume: 2.199 m3; Volume ratio considering added impedance: 1.000

Page 2 Analysis: 14-Feb-2023

You might also like