Udc CCTV PPM February 2023
Udc CCTV PPM February 2023
Project Name: UDC Tower Project Location: The Pearl Client: UDC
1- Device Checklist
Task # Task Completed?
T001 ☒YES
Inspect for general condition, wear, rust, cracks, loose connections,
☐NO
frayed cables, and damage
☐N/A
T002 ☒YES
Inspect mounting hardware (anchor bolts, pole attachment) ☐NO
☐N/A
T003 ☒YES
Inspect enclosure window and lens. Clean glass with suitable glass
☐NO
cleaning
☐N/A
T004
☒YES
Operate PTZ for all function to their extreme limits to ensure full
☐NO
operation and proper focus.
☐N/A
T005 ☒YES
Inspect all wiring harness and interconnecting cables
☐NO
assemblies/connectors for tightness, wear, and corrosion
☐N/A
T006 ☒YES
Visually inspect general condition of UPS for corrosion, wear, and any
☐NO
other damage
☐N/A
T007
☒YES
Verify functionality of UPS by disconnecting power at breaker. Verify
☐NO
that UPS maintains operation
☐N/A
T008 ☒YES
Inspection of all cables (power and data) in the MDF and IDF for the
☐NO
patch panels/switches/storages/servers
☐N/A
T009 ☒YES
Inspection of the cooling system and reporting any malfunction.
☐NO
☐N/A
T010 ☒YES
Check disk usage/hardware/OS/SQL of all the servers ☐NO
☐N/A
T011 ☒YES
Check the recording on the storage ☐NO
☐N/A
T012 ☒YES
Check the hard disks and all the hardware of the storages ☐NO
☐N/A
T013 ☒YES
Inspection of all cables (power and VGA) for the monitors ☐NO
☐N/A
T014 Check the VMS for camera physical setup and camera view setup ☒YES
☐NO
☐N/A
T015 Inspect all the workstation (cables/network/OS/hardware) ☒YES
☐NO
☐N/A
2- Details:
UPS:
Ground Floor electrical room Device Model Battery model Battery Remarks
32KVA UPS to UDB – 1T GF-01 UPS Emerson network Liebert NXC AC Power N/A N/A Operational
Power System
15KVA UPS for CCTV Rack UPS Emerson network Liebert NXC AC Power HAZE-AGM HZB12-33 40nos Operational
Power System
5KVA UPS for CCTV UPS Emerson network Liebert GXT3 Power System Emerson network 4 pack Operational
Workstation Power 5000VA power
5KVA UPS for ACS and PMS UPS Emerson network Liebert GXT3 Power System Emerson network 4 pack Operational
Power 5000VA power
Camera Details:
IDF RACK
location Device Model Qty Remarks
39th Floor POE Switch panel 24 ports AT-FS970M24PS 2 Operational
Patch panels Actasis N\A 2 Operational
fiber patch panels N\A 1 Operational
CCTV Workstation: 02
location Device Model Qty Remarks
monitor LG 23MP65HQ-P 1 Operational
GF Server Room keyboard HP HP-KU0316 1 Operational
mouse HP M-UAE96 1 Operational
CPU Intel Core 8 TH GEN HP2420 1 Operational
CCTV Workstation: 03
location Device Model Qty Remarks
monitor Dell SE2219H 1 Operational
GF Server Room keyboard HP PR-1101 1 Operational
mouse HP M-U0032 1 Operational
CPU Intel Core 8 TH GEN HP2420 1 Operational
CCTV Workstation: 04
location Device Model Qty Remarks
monitor LG 23MP65HQ-P 1 Operational
GF Server Room keyboard HP HP-KU0316 1 Operational
mouse HP M-U0032 1 Operational
CPU Intel Core 8 TH GEN HP2420 1 Operational
CCTV Workstation: 05
location Device Model Qty Remarks
monitor LG 23MP65HQ-P 1 Operational
GF Server Room keyboard HP HPKU0316 1 Operational
mouse HP MOD-GUO 1 Operational
CPU Intel Core 8 TH GEN HP2420 1 Operational
CCTV Workstation:06
location Device Model Qty Remarks
monitor LG 23MP65HQ-P 1 Operational
GF Server Room keyboard HP HPKU0316 1 Operational
mouse HP M-U0032-0 1 Operational
CPU Intel Core 8 TH GEN HP2420 1 Operational
Servers Details:
Server Name Connected Camera Qty
ABQ1-CCTV-SRVR1 Connected Camera 54 no’s
ABQ1-CCTV-SRVR2 Connected Camera 53 no’s
ABQ1-CCTV-SRVR3 Connected Camera 61 no’s
ABQ1-CCTV-SRVR4 Connected Camera 60 no’s
ABQ1-CCTV-SRVR5 Connected Camera 60 no’s
ABQ1-CCTV-SRVR6 Connected Camera 60 no’s
ABQ1-CCTV-SRVR7 backup
Storage Details:
The CCTV system was tested and checked, and it is working properly
7 Cameras are damaged (ICR Submitted)
L01/P4-CAM10
LM/P3-CAM01
L36-CAM01
L03/P6-CAM14
LG/P1-CAM30
L43-CAM 01
LG/P1-CAM 39
Defective Media Converter in Lift C and Level 43 (ICR Submitted)
5- By signing below, the signees confirm that all four preventative maintenance checklists (General, Device,
Cabinet, and Communications) and the ITS Structures Preventative Maintenance Guide have been
completed, and that all item issues have been reported above.