SWR Railway - Hubballi Division

Rolling Block from 11.09.2023 to 08.10.2023


Date: 08.10.2023
BLOCK TYPE OF
BLOCK SEC/ TENTATIVE
BOARD DURATION TYPE OF QUANTUM OF BLOCK RESOURCE SUPERVISORS BLOCK AVAILED PROGRESS
STATION TIMINGS
DEPT (MINS) S. N. WORK WORK UP/DN LOCATION (KM) (LB/PB) REPERCUSSIONS REQUIREMENT STATUS BLOCK DURATION ACHIEVED
1 7 13 14
2 3 4 5 6 8 9 10 11 12 15 16 17
Isolator Movement not permitted in SIVARAMNANDH
BNP YARD 11:45-12:30
TRD 45 1 Maintenance 1 Yard 92-94 LB and PB BNP Yard-UP Tower Car (08310161863)

Isolator Movement not permitted in SIVARAMNANDH


BNP YARD Not permitted
TRD 45 2 Maintenance 1 Yard 92-94 LB and PB BNP Yard-UP Tower Car (08310161863)

Turnout Movement not permitted in SIVARAMNANDH


BNP YARD 13:15-14:00
TRD 45 3 Maintenance 1 Yard 92-94 LB and PB BNP Yard-UP Tower Car (08310161863)

Turnout Movement not permitted in SIVARAMNANDH


BNP YARD Not permitted
TRD 45 4 Maintenance 1 Yard 92-94 LB and PB BNP Yard-UP Tower Car (08310161863)

5 Isolator WUBL YARD Movement not permitted in B SOREN (7022029745) 15:45 - 16:30
TRD 45 1 Yard 475-477 LB and PB Tower Car
Maintenance WUBLYard UP
Isolator WUBL YARD Movement not permitted in B SOREN (7022029745) Not permitted
TRD 45 6 1 Yard 475-477 LB and PB Tower Car
Maintenance WUBLYard UP
7 Turnout WUBL YARD Movement not permitted in B SOREN (7022029745) 17:15 -18:00
TRD 45 1 Yard 475-477 LB and PB Tower Car
Maintenance WUBLYard UP
Turnout WUBL YARD Movement not permitted in B SOREN (7022029745) Not permitted
TRD 45 8 1 Yard 475-477 LB and PB Tower Car
Maintenance WUBLYard UP
ENGG
LB & Point DN line no train can be
150 min 2 GDG-HLAR DN Block required and signal SSE/JE P.Way 07:30 -09:00
ENGG disconnec on passed during Block me.
UNIMAT-8409 4 unit 0/000-48/000 staff required for
LB & Point UP line no train can be
150 min 3 HLAR-GDG UP disconnec on SSE/JE P.Way Not permitted
ENGG disconnec on passed during Block me.
DN line no train can be
150 min 4 UTV 30 rails SVNR-KNO DN 413/500-453/000 Block required and TRD SSE/JE P.Way 11:00 -13:00
ENGG passed during Block me.
KBL-DWR LB & PB staff required with
UP line no train can be
150 min 5 UTV 30rails KNO-SVNR UP 453/000-413/500 discharge rod SSE/JE P.Way Not permitted
ENGG passed during Block me.
DN line no train can be
150 min 6 16000m HLAR-BDM DN 48/000-68/000 SSE/JE P.Way 10:00-12:30
ENGG passed during Block me.
DTE-56850 LB Block required
UP line no train can be
150 min 7 16000m BDM-HLAR UP 68/000-48/000 SSE/JE P.Way Not permitted
ENGG passed during Block me.
UP & DN line no train can be
150min 8 Track a en on 1 EUBL yard UP 0/100-200, Pnt-52A LB Manually SSE/JE P.Way Not permitted
passed during Block me.
ENGG
40 minutes 1 point 51B point 51B up 45.48 disconnection up trains piloting ESM with 2 nos.staff
LKT NA 15:00 - 15:40
S&T maintanance maintanance
30 minutes 2 kug-hbs block kug-hbs block up/dn 45.48 disconnection up and dn trains on plct ESM with 1 nos.staff
instrument instrument LKT NA 15:30 - 16:00
S&T maintance maintance
45 3 maintanance of maintanance of both 115/400 discconnection all down trains need to be ESM with 1 nos.staff
KBL JE/S/KBL 10:00 - 10:45
S&T KBL-GIN Block KBL-GIN Block given PLCT
45 4 maintance of maintance of both 103/300 discconnection all trains need to be pilated ESM with 1 nos.staff
crank handles crank handles BNP JE/S/KBL 10:00 - 10:45
S&T ch1 to ch3 ch1 to ch3
60 5 maintanance of maintanance of both 92/500 discconnection all down trains need to be ESM with 1 nos.staff
BNA-TLKL BNA-TLKL BNA given PLCT JE/S/KBL 12:00 - 13:00
S&T Block Block
RE
PBC work
between CLR - CRZ 13:00-14:00
ENGG 120 minutes 1 CLR-CRZ PBC work SL 31/00 - 200 LB required
MPT Plain
LIM - QLM 14:00-15:00
ENGG 120 minutes 2 Track Tamping Track Tamping SL 44/900 - 45/300 LB required
BRM Machine CSM Yard road
00:00-01:30
ENGG 90 3 Working 500mtr 1 Loop Line yard 94/700 - 95/300 LB required
KM yard TWS Joint S&T work
KM Yard Not permitted
ENGG 90 minutes 4 Attention TWS Attention Yard 59/300 - 600 required
CTR work SVM - CNR (
09:15 - 12:15
ENGG 240 minutes 5 PQRS Block PQRS Block Up lIne) up Line 71/ 560 - 820 Line Block

2 x 90 Min 6 WRJ UP 72/100-200 SHADOW


SVM -CNR
ENGG LB required PQRS
60 min 7 UTV UP 70/10-200 SHADOW
SVM -CNR
ENGG LB required PQRS
60 min 8 MPT UP 70/100-200 SHADOW
SVM -CNR
ENGG LB required PQRS
60 Min 9 Manual Rd 3
LD-VSG Vsg Yard Not permitted
ENGG Packing LB required
60 Minutes 1 65AT/BT R/E 65AT/BT R/E UP 11.64 Disconnection 1. UP reception calling on ESM with 2 nos.staff
Disconnection two core lead two core lead 2. DN despatch by starter
TGT NA 12:00 -13:00
wire & TLD wire & TLD memo
S&T replacement replacement
30 Minutes 2 10ATR leadwire 10ATR leadwire Yard 31.699 Disconnection 1.CLR side piloting. ESM with 1 nos.staff
Disconnection replacement replacement CRZ NA Shadow Engg
S&T work. work.

Adjustment & MJO - VSG Shadow Engg


RE 4 1 SED Tower Car
Material shifting
& Mast erection CLR - DDS Not permitted
RE 3 2 in ghat section UTV + BRN
Material shifting
& Mast erection QLM - DDS Shadow Engg
RE 3 3 in ghat section UTV + BRN

S&T CN
Ajit Prasad
150 Min 1 Joint Packing 2 GED yard DN 80/400-500 Line block No DN train movement Fittings Manpower 10:00 - 11:30
ENGG SSE/P.Way/BGk
1 Machine
Santosh Chavan
150 Min 1 TWR 100 Mtrs MVD-JML UP 175/500-600 Line block No Up train movement 30 Labours, 10:00 -11:30
Tr.JE/P.way/BJP
ENGG Rail GR Pad & ERC
Tamping By Tamping By No Up & Down train Tamping Machine 08 Sachin Mane
180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block 11:00 -13:00
GDG-HG ENGG Machine Machine movement Nos Manpower SSE/P.way/IDR

DN line no train can be


240 min 1 TWR 12000m LKY-BDM DN 56/000-68/000 LB Block required SSE/JE P.Way 10:30 -12:30
ENGG passed during Block me.

TRD
30 MIN 1 IDR-NBL IDR-NBL UP/DN 240.6 DISCONNECTI UP & DN TRAIN PLCT ESM with 1 nos.staff
IDR-NBL JE/SIG/IDR 10:00 - 10:30
S&T UFSBI B/I UFSBI B/I ON TOWARDS HG SIDE

No train movement PQRS machine, Akhilesh KumarSingh


TNGL-RNJP BNHT-NDHI
ENGG 240 1 PQRS 260 mtr SL 10/060 to 320 LB BNHT-NDHI Agency labor, SSE/P.WAY/HPT/ML(IC)

Overlap Movement not permitted in Pavan Kumar


RDG Yard 13:00 - 13:45
TRD 45 1 Maintenance 1 Yard 52-53 LB and PB RDG yard Tower Car (08310163339)

Overlap Movement not permitted in Pavan Kumar


RDG Yard Not permitted
TRD 45 1 Maintenance 1 Yard 52-53 LB and PB RDG yard Tower Car (08310163339)
Turnout Movement not permitted in Pavan Kumar
RDG Yard 13:00 - 13:45
TRD 45 1 Maintenance 1 Yard 52-53 LB and PB RDG yard Tower Car (08310163339)
Turnout Movement not permitted in Pavan Kumar
RDG Yard Not permitted
TRD 45 1 Maintenance 1 Yard 52-53 LB and PB RDG yard Tower Car (08310163339)
Overlap Movement not permitted in S Ganesh
KDN YARD 11:00 - 11:45
TRD 45 1 Maintenance 1 Yard 187-189 LB and PB KDN yard UP Tower Car (08310162957)
Overlap Movement not permitted in S Ganesh
KDN YARD Not permitted
TRD 45 1 Maintenance 1 Yard 187-189 LB and PB KDN yard UP Tower Car (08310162957)
Turnout Movement not permitted in S Ganesh
KDN YARD 11:00 - 11:45
TRD 45 1 Maintenance 1 Yard 187-189 LB and PB KDN yard UP Tower Car (08310162957)

Turnout Movement not permitted in S Ganesh


KDN YARD Not permitted
TRD 45 1 Maintenance 1 Yard 187-189 LB and PB KDN yard UP Tower Car (08310162957)
30 mins x 3 1 LC-100, Point EKT & Key UP/DN 188.23 Disconnection LC-100- DN trains ESM with 2 nos.staff
No 15KL & Lock point reception piloting . Up as per train
16KL maintenance KDN trains dispatch starter NA
service
memo. 15 & 16 KL- Dn
S&T trains reception to Dn loop
30 mins 2 LC-97 EKT and EKT UP/DN 181.27 Disconnection Dn trains dispatch starter ESM with 2 nos.staff
Emergency maintenance memo. Up trains reception
EKT DAJ piloting NA 08:00 - 08:30
BAY-PKL
S&T
30 mins 3 LC 04 EKT and EKT UP/DN 1.658 Disconnection Caution order. Up/Dn ESM with 2 nos.staff
Emergency maintenance trains to observe PHS
EKT TNGL BP signal. NA 15:00 - 15:30

S&T
30 mins 4 8 KL point EKT & Key UP/DN 23.02 Disconnection Reception to BMM siding ESM with 2 nos.staff
maintenance Lock point piloting, Dispatch from
maintenance RNJP BMM line on starter memo. NA 15:00 - 15:30

S&T
Switch renewal LB & TNGL bypass train no AMC batch, S&T staff D.Amru Naik
90 Min 1 0.5 set TNGL byapss Byepass 174/100-200
point no 8A Disconnection movement and 2 B/s SSE/P.Way/TNGL
ENGG
Jt inspection No train movement
deficiency between Bay to Hdd Dn S&T staff and TM-4 Akash
90 min 1 1 point Bay yard Dn line 208/400 208/500 Not permitted
attention line and Hdd to Bay men and 2-B/s. JE/P.Way/Rdg
ENGG Pt.No.53/A Rd.No.6 to 8.
Jt inspection
No train movement
deficiency S&T staff and TM-4 Mukunda
90 min 2 1 point Bay yard Dn line 208/200 208/300 between Bay to Hdd from Not permitted
attention men and 2-B/s. SSE/P.Way/Spl works/Bay
Rd.No.7 & 8
ENGG Pt.No.57
Duomatic No Up train movement Agency labour -10 Akash
90 min 1 1 km Byc - Kdn UP line 201/000 202/000 11:30-13:00
ENGG working between Byc to Kdn men,Trd staff ,Machine JE/P.Way/Rdg
Joint
deficeancy KGW yard LB& S&T staff and TM-4 Akhilesh Kumar singh 07:00 - 08:30
ENGG 90 min 1 attention 1 point DN line 148/900-149/000 Disconnection DN train cannot recieve men and 2-B/s.

TRD
DN Reception PILOting ESM with 1 nos.staff
S&T 60" 1 CH No.1,2 1 PKL UP/DN 156.51 LB and Dispatchng Normal SSE/JE/S/HPT 07:00 - 08:00
UP reception 1,2 calling
LC-79 LC-79 Trains to be dealt through ESM with 2 nos.staff
S&T 45min 2 MRB both 138/100 to 138/200 discconnection JE/S/KBL 10:30 - 11:15
maintenance maintenance Slide boom

PKL-RLP ESM with 1 nos.staff


Maintenance of Maintenance of
S&T 30min 3 GIN UP and DN 126/600 Disconnection Both side PLCT JE/S/KBL 10:30 - 11:00
GIN-MRB B/I GIN-MRB B/I

ESM with 1 nos.staff


Maintenance of Maintenance of
S&T 20min 4 all crank all crank GIN UP and DN 126/600 Disconnection Both side piloting JE/S/KBL 11:00 - 11:20
handles handles

CON
UTV Machine 55/35 nos
2 blocks of 90 Shifting of Loading/unload LD-TVG SSE/Pway/SPL/LD 12:30 - 14:00
ENGG minutes each 1 Sleepers/Rails ing DN 558/000-534/000 LB & PB Contract Labours
Duomatic
tamping Plain track DEV-TVG SSE/Pway/LD 12:30 - 14:30
ENGG 2 x 120mins 2 Machine Tamping DN 539/600-538/400 LB Block required
2 blocks of 90 Manual
DUR-KNP JE/Pway/spl/BGM 11:15 - 12:45
ENGG minutes each 3 Attantion Curve No 06 DN 589/600-700 LB Block required
Slack packing
GPB-CKR SSE/P.W/GPB 09:00 - 11:00
ENGG 120mm 4 and alignment 1 DN 671/650-750 LB block required
30 Minutes 1 SUL-PCH SUL-PCH UP 637.756 Disconnection UP & DN train on PLCT ESM with 1 nos.staff
UFSBI Monthly UFSBI Monthly SUL JE/SIG/GPB 13:00 - 13:30
S&T Inspection Inspection
DWR-MRJ 40 Minutes 2 Pt no 61 Pt no 61 UP & DN 619.05 Disconnection 1. UP & DN reception ESM with 2 nos.staff
Disconnection maintenance maintenance SXB piloting to Rd 1 & 2 NA 12:20 - 13;00
S&T 2. UP despatch by starter
40 Minutes 3 Pt no 62 Pt no 62 UP & DN 619.05 Disconnection 1. UP & DN reception ESM with 2 nos.staff
Disconnection maintenance maintenance SXB piloting NA 12:20 - 13;00
S&T 2. UP despatch by starter

Tower Car Tower Car PCH-PRKH Mantu/Rishi 11:00-12:30


RE 240 4 Checking Checking UP/DN 648-652 LB Tower Car
LC319 LC319
Aproach Aproach LWR-KBI JE/PAY/LWARBL 08:00-09:00
ENGG 2 x 60mins 5 attention attention DN 518/800-900 LB No train movement 1+8 staff

UP TRAIN CAN'T
ENGG 240 BCM WORK 600 KRKP;MGD UP 497/400-498/00 LB+PB DISPATCH SSE/PWAY/DWR
Rekhya naik
VC-KTY Ballast Ballast profile & HBI-KTY 13:30 - 15:30
JE/PW/KTY
ENGG 120min 1 regulation sweeping Single line 44/0-45/0 Block required BRM-04
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 09.10.2023
BLOCK TYPE OF BLOCK
BOARD DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK REPERCUSSION RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
DEPT (MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) S REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
Isolator permitted in KGX SIVARAMNANDH 09.00 - 09.45
TRD 45 1 Maintenance 1 KGX YARD Yard 66-68 LB and PB Yard-DN Tower Car (08310161863)
Movement not
Isolator permitted in KGX SIVARAMNANDH 11.00-11.45
TRD 45 2 Maintenance 1 KGX YARD Yard 66-68 LB and PB Yard-DN Tower Car (08310161863)
Movement not
Turnout permitted in KGX SIVARAMNANDH 13.00-13.45
TRD 45 3 Maintenance 1 KGX YARD Yard 66-68 LB and PB Yard-DN Tower Car (08310161863)
Movement not
Turnout permitted in KGX SIVARAMNANDH 16.15-17.00
TRD 45 4 Maintenance 1 KGX YARD Yard 66-68 LB and PB Yard-DN Tower Car (08310161863)
Movement not
Isolator permitted in NVD B SOREN 08.30-09.15
TRD 45 5 Maintenance 1 NVD YARD Yard 35-37 LB and PB Yard-DN Tower Car (7022029745)
Movement not
Isolator permitted in NVD B SOREN 11.00-11.45
TRD 45 6 Maintenance 1 NVD YARD Yard 35-37 LB and PB Yard-DN Tower Car (7022029745)
Movement not
Turnout permitted in NVD B SOREN 13.00-13.45
TRD 45 7 Maintenance 1 NVD YARD Yard 35-37 LB and PB Yard-DN Tower Car (7022029745)
Movement not
Turnout permitted in NVD B SOREN 15.15-16.00
TRD 45 8 Maintenance 1 NVD YARD Yard 35-37 LB and PB Yard-DN Tower Car (7022029745)
SSE/JE P.Way 10:30-12.30(DN)
ENGG 120 min 4 BT-Unloading 20 Bobyn KJG-GDI UP & DN 400/100-433/0 LB Block required YLG 14:00-16:30(UP)
09:45-12:15(DN)
ENGG 150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
No movement on
150min 6 Track A en on 1 SUBL yard Road-1 0/100-500 LB Mannualy
ENGG Road-1 SSE/JE P.Way 09.00 - 11.00
ENGG
30 Minutes 1 Maintenance Maintenance SNH UP/DN 444.657 Disconnection All UP & DN trains ESM with 1 nos.staff JE/SIG/UBL
Disconnection and safety and safety to be dealt on
check of check of PLCT
SNH-KNO block SNH-KNO
for Monthly block for
KBL-DWR
Inspection Monthly
S&T Inspection 09.00 - 09.30
30 Minutes 2 Maintenance Maintenance SNH UP/DN 444.657 Disconnection All UP & DN trains ESM with 1 nos.staff JE/SIG/UBL
Disconnection and safety and safety to be dealt on
check of check of PLCT
SNH-GDI block SNH-GDI
for Monthly block for
Inspection Monthly
S&T Inspection 09.30 - 10.00
30 Minutes 3 IPS IPS SNH UP/DN 444.657 Disconnection All UP & DN trains ESM with 2 nos.staff JE/SIG/UBL
Disconnection Maintenance for Maintenance to be piloted and
Monthly for Monthly dispatched on
S&T Inspection Inspection Starter memo 10.00 - 10.30
30 Minutes 4 All Crank All Crank SNH UP/DN 444.657 Disconnection All UP & DN trains ESM with 2 nos.staff JE/SIG/UBL
Disconnection handle for handle for to be piloted and
Monthly Monthly dispatched on
S&T Inspection Inspection Starter memo 10.30 - 11.00
60 Minutes 5 Point 64B Point 64B UNK DN 472.6 Disconnection DN train reception ESM with 2 nos.staff JE/SIG/UBL
Disconnection Insulation Insulation on Piloting
replacement replacement
S&T work work 09.00 - 10.00
30 Minutes 6 nvd-ngr monthly nvd-ngr nvd-ngr up/dn 26.98 Disconnection All UP & DN trains ESM with 1 nos.staff JE/SIG/UBL
Disconnection block monthly block to be dealt on
S&T instrument instrument PLCT 11.00 - 11.30
30 Minutes 7 hbs -kug block hbs -kug hbs-kug up/dn 19.13 Disconnection All UP & DN trains ESM with 1 nos.staff NA
Disconnection maintance block to be dealt on
S&T maintance PLCT 111.00 - 11.30
45min 1 maintenance LC-30 GDGBP both 54/800 discconnectio Sliding boom will ESM with 2 nos.staff JE/S/GDG
S&T maintenance n be working 11.00 - 11.45
45min 2 Maintenace KL pont SOQ both 84/900 discconnectio Reception & ESM with 2 nos.staff JE/S/GDG
maintenae n Dispatch of Road
S&T 1 Not possible 11.00 - 11.45
60 3 LC 68 EKT LC 68 EKT KBL both 118/400 disconnection all trains delt on ESM with 2 nos.staff JE/S/KBL
S&T overhouling overhouling hand signals 12.00 - 13.00
45 4 maintance of maintance of BNP both 103/300 discconnectio all trains need to ESM with 1 nos.staff JE/S/KBL
crank handles crank handles n be pilated
S&T ch4 to ch6 ch4 to ch6 12.00 - 12.45
PBC Work Disconnection
between
ENGG 120min 1 DDS-LIM PBC Work DDS-LIM SL 42/000-300 LB Required 13.00 - 15.00
Material
ENGG 120min 2 BFR work shifting CRZ-DDS SL 33/500-37/000 LB Required SHADOW BLOCK
ENGG 180 min 3 PQRS SVM -CNR UP 72/600-8600 LB Required 09.00 - 12.00
O & E LC
ENGG 150 min 4 Night working CNR - MAO UP 80/500-600 LB Required SHADOW BLOCK
Attending M//L
LD-VSG
ENGG 75 min 5 point attention M/L LB Required SHADOW BLOCK
TRD
45 Minutes 2 Maintenance of Maintenance CLR Yard Disconnection 1.CRZ end, ESM with 1 nos.staff NA
Disconnection Crank handles of Crank reception on
CH12,13,14,15, handles calling on signals.
16 CH12,13,14,1 2.TGT
5,16 end,reception &
despatch on
S&T piloting. 13.00 - 13.45
ENGG
Point Packing No train Fittings and Siddalingeshwar
ENGG 120 Min 1 01 Nos WDL Yard SL 137/300-400 Line block
Point No.65B movement 12 Man power SSE/P.Way/LMT 11.00 - 13.00
1 Machine
No Up train M. M Munawar
150 Min 1 TWR 100 Mtrs MVD-JML UP 175/600-700 Line block 30 Labours,
movement JE/P.way/BSRX
ENGG Rail GR Pad & ERC 10.00 - 12.00
Tamping By Tamping By No Up & Down Tamping Machine Sachin Mane UP-10.00 - 11.15
180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block
ENGG Machine Machine train movement 08 Nos Manpower SSE/P.way/IDR DN- 12.00 -13.15
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 2 UTV GDG-BDM UP & DN 0/00-67/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 3 DTE -56850 2000m GDG-HLAR UP & DN 0/0-48/0 LB Block required SSE/JE P.Way 12:30-15:00(UP)
60MIN 1 Pt No. 7,13 Pt No. 7,13 MGH UP/DN 101.72 DISCONNEC UP/DN TRAINS ESM with 2 nos.staff JE/SSE
FOR FOR TION RECEIPTION ON
MAINTENANC MAINTENAN CALLING ON
11.00 - 12.00
E CE AND DISPATCH
ON STARTER
S&T MEMO
150MIN 2 Pt No. Pt No. BGK UP 93.29 DISCONNEC UP TRAINS ESM with 2 nos.staff JE/SSE
20,21,22,23,24 20,21,22,23,2 TION RECEIPTION ON
FOR 4 FOR CALLING ON
MAINTENANC MAINTENAN AND DISPATCH
E CE ON STARTER
MEMO DN 11.00 - 12.00
TRAINS
RECEIPTION BY
PILOTING AND
DISPATCH ON
S&T SIGNALS
120 MIN 1 100A&B END 100A&B END KDGI-MVD UP/DN 150.73 DISCONNEC UP TRAIN ESM with 3 nos.staff SSE/SIG/BSRX
HOSE PIPE HOSE PIPE TION RECEIVING ON
REPLACEMEN REPLACEME PILOTING AND
T WORK NT WORK CLAMPING AND
12.00 - 14.00
DN TRAIN
DISPATCH ON
STARTER MEMO
S&T AND CLAMPING
Movement not
Overlap permitted in TVL D. Kishore 10.30 - 11.15
TRD 45 1 Maintenance 1 TVL Yard Yard 279-281 LB and PB yard UP Tower Car (08310163796)
Movement not
Overlap permitted in TVL D. Kishore Not permitted
TRD 45 2 Maintenance 1 TVL Yard Yard 279-281 LB and PB yard UP Tower Car (08310163796)
Movement not
GDG-HG
Turnout permitted in TVL D. Kishore 13.00-13.45
TRD 45 3 Maintenance 1 TVL Yard Yard 279-281 LB and PB yard UP Tower Car (08310163796)
Movement not
Turnout permitted in TVL D. Kishore Not permitted
TRD 45 4 Maintenance 1 TVL Yard Yard 279-281 LB and PB yard UP Tower Car (08310163796)
Movement not
Overlap permitted in MNL G Mahadev 09.30 - 10.15
TRD 45 5 Maintenance 1 MNL YARD Yard 202-204 LB and PB yard UP Tower Car (08310162957)
Movement not
Overlap permitted in MNL G Mahadev Not permitted
TRD 45 6 Maintenance 1 MNL YARD Yard 202-204 LB and PB yard UP Tower Car (08310162957)
Movement not
Turnout permitted in MNL G Mahadev 10.15 - 11.00
TRD 45 7 Maintenance 1 MNL YARD Yard 202-204 LB and PB yard UP Tower Car (08310162957)
Movement not
Turnout permitted in MNL G Mahadev Not permitted
TRD 45 8 Maintenance 1 MNL YARD Yard 202-204 LB and PB yard UP Tower Car (08310162957)
Movement not
Overlap permitted in HBL D. Chinna 10.30 - 11.15
TRD 45 9 Maintenance 1 HBL Yard Yard 12-14 LB and PB yard UP Tower Car (08310162549)
Movement not
Overlap permitted in HBL D. Chinna Not permitted
TRD 45 10 Maintenance 1 HBL Yard Yard 12-14 LB and PB yard UP Tower Car (08310162549)
Movement not
Turnout permitted in HBL D. Chinna 11.15 - 12.00
TRD 45 11 Maintenance 1 HBL Yard Yard 12-14 LB and PB yard UP Tower Car (08310162549)
Movement not
Turnout permitted in HBL D. Chinna Not permitted
TRD 45 12 Maintenance 1 HBL Yard Yard 12-14 LB and PB yard UP Tower Car (08310162549)
Movement not
Overlap permitted in WDL G Mahadev 11.00 - 11.45
TRD 45 13 Maintenance 1 WDL Yard Yard 137-139 LB and PB yard UP Tower Car (08310162957)
Movement not
Overlap permitted in WDL G Mahadev Not permitted
TRD 45 14 Maintenance 1 WDL Yard Yard 137-139 LB and PB yard UP Tower Car (08310162957)
Movement not
Turnout permitted in WDL G Mahadev 11.45 - 12.30
TRD 45 15 Maintenance 1 WDL Yard Yard 137-139 LB and PB yard UP Tower Car (08310162957)
Movement not
Turnout permitted in WDL G Mahadev Not permitted
TRD 45 16 Maintenance 1 WDL Yard Yard 137-139 LB and PB yard UP Tower Car (08310162957)
S&T
CN
Switch renewal TNGL LB & JVSL line no train AMC batch, S&T staff and 2 Vicky Kumar
TNGL-RNJP 1 10.00 - 11.30
ENGG 90 min Point No 14B 0.5 set byepass JVSL line 1/800-900 Disconnection movement B/s JE/P.Way/SW/TNG
Movement not
1 Isolator permitted in BYC Pavan Kumar 08.30 - 09.15
TRD 45 Maintenance 1 BYC YARD Yard 200-202 LB and PB Yard-DN Tower Car (08310163339)
Movement not
2 Isolator permitted in BYC Pavan Kumar Not permitted
TRD 45 Maintenance 1 BYC YARD Yard 200-202 LB and PB Yard-DN Tower Car (08310163339)
Movement not
3 Turnout permitted in BYC Pavan Kumar 09.15 - 10.00
TRD 45 Maintenance 1 BYC YARD Yard 200-202 LB and PB Yard-DN Tower Car (08310163339)
Movement not
4 Turnout permitted in BYC Pavan Kumar Not permitted
TRD 45 Maintenance 1 BYC YARD Yard 200-202 LB and PB Yard-DN Tower Car (08310163339)
Movement not
5 Isolator permitted in GNR S Ganesh 09.45 - 10.30
TRD 45 Maintenance 1 GNR YARD Yard 168-170 LB and PB Yard-DN Tower Car (08310162957)
Movement not
6 Isolator permitted in GNR S Ganesh Not permitted
TRD 45 Maintenance 1 GNR YARD Yard 168-170 LB and PB Yard-DN Tower Car (08310162957)
Movement not
7 Turnout permitted in GNR S Ganesh 10.30 - 11.15
TRD 45 Maintenance 1 GNR YARD Yard 168-170 LB and PB Yard-DN Tower Car (08310162957)
Movement not
8 Turnout permitted in GNR S Ganesh Not permitted
TRD 45 Maintenance 1 GNR YARD Yard 168-170 LB and PB Yard-DN Tower Car (08310162957)
20 mins x 3 Crank Handle EKT BAY UP/DN 208.06 Disconnection CH1- GTL END ESM with 1 nos.staff NA
CH1, CH2, CH3 maintenance Reception/Dispatc
h piloting. CH2-
Up Trains :
Reception to Rd 2
& 3 piloting. CH3-
Up Trains :
Reception to Rd
5,6,7,8 piloting.
DN trains dispatch
: starter memo 10.00 - 10.20
from Rd 4,5,6,7 & 10.20 - 10.40
BAY-PKL
S&T 8. 10.40 - 11.00
30 mins BYC-KDN block Block BYC UP/DN 204.1 Disconnection Dn trains PLCT at ESM with 1 nos.staff NA
instrument Instrument KDN, Up trains
S&T Maintenance PLCT at BYC 11.00 - 11.30
20 mins x 3 Crank Handle EKT KDN UP/DN 188.23 Disconnection CH1- Dn trains ESM with 1 nos.staff NA
CH1, CH2, CH3 maintenance reception to CL1
& CL2 piloting. Up
trains dispatch
starter memo. Up
trains Reception
to CL 1 & Up M/L
on co-on. CH2-
DAJ END :
Reception
/Dispatch piloting.
CH3- Dn trains
reception piloting
all roads. Up
trains dispatch 11.00 - 11.20
from ACC Line on 11.20 - 11.40
S&T starter memo. 11.40 - 12.00
RE
Point No
13A-13B cross UPl line to DN S&T staff and TM-4 men and H.Anjanamurthy
90 min 1 10 mtr BYO yard UP/DN 162/400-500 LB
over rail cannot dispatch 2-B/s. JE/P.WAY/HPT/ML
ENGG renewal 10.00 -11.30
No train
Jt inspection
movement Mukunda
deficiency S&T staff and TM-4 men and
90 min 1 1 point Bay yard Dn line 208/200 208/300 between Bay to SSE/P.Way/Spl
attention 2-B/s.
Hdd from Rd.No.7 works/Bay
Pt.No.57
ENGG &8 10.00 - 11.00
No Up train
Duomatic movement Agency labour -10 men,Trd Akash
90 min 2 1 km Byc - Kdn UP line 202/000 203/000
working between Byc to staff ,Machine JE/P.Way/Rdg
ENGG Kdn 10.00 - 11.30
ENGG
Br No 252 app approach No train can be Ravi Teja
ENGG 120 min 1 packing packing GGVT-KTGG SL 52/00-100 LB dealt AMC BATCH (Je/P.Way/GGVT) 11.00 - 13.00
Rajavali,
ENGG 1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL Km 28/549-29/069 Block required Contract Labour JE/P.Way/YTG 11.00 - 14.00
1. AC and Diesel
TO and SI loco not permitted
60 1 1 SI, 1 TO KGW YARD UP 150-148 PB & LB Towercar JE/TRD/HPT 10.00 - 11.00
Maintenance in KGW yard UP
TRD line Rd-1,2,3,4
1. Ac and Diesel
UIOL and IOL not permitted in
60 2 2 UIOL KGW-PKL UP 155-150 PB & LB Towercar JE/TRD/HPT 10.00 - 11.00
Maintenance KGW-PKL UP
TRD section.
Movement not
Isolator permitted in KGW AANJAIAH 09.30 - 10.15
TRD 45 1 Maintenance 1 KGW YARD Yard 149-151 LB and PB Yard-DN Tower Car (08310162741)
Movement not
Isolator permitted in KGW AANJAIAH Not permitted
TRD 45 2 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-DN Tower Car (08310162741)
Movement not
Turnout permitted in KGW AANJAIAH 10.15 - 11.00
PKL-RLP 3
TRD 45 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-DN Tower Car (08310162741)
Movement not
Turnout permitted in KGW AANJAIAH Not permitted
TRD 45 4 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-DN Tower Car (08310162741)
30min 1 Maintenance of Maintenance GIN UP and DN 126/600 Disconnection Both side PLCT ESM with 1 nos.staff JE/S/KBL
GIN-JBGD B/I of GIN-JBGD
S&T B/I 09.30 - 10.00
30min 2 Maintenance of Maintenance GIN UP and DN 126/600 Disconnection Both side PLCT ESM with 1 nos.staff JE/S/KBL
GIN-KBL B/I of GIN-KBL
S&T B/I 10.00 - 10.30
60" 3 CH No.3,4 1 PKL UP/DN 156.51 LB DN Reception ESM with 1 nos.staff SSE/JE/S/HPT
RD1 2 5 calling
On and
Dispatchng
memeo UP
reception 1,2
callin ON
Dispatching
S&T memo 10.00 - 11.00
CON
Movement not
Isolator permitted in MGD HANUMANTH RAO 08.00 - 08.45
TRD 45 1 Maintenance 1 MGD YARD Yard 502-504 LB and PB Yard-DN Tower Car (08310162257)
Movement not
Isolator permitted in MGD HANUMANTH RAO Not permitted
TRD 45 2 Maintenance 1 MGD YARD Yard 502-504 LB and PB Yard-DN Tower Car (08310162257)
Movement not
Turnout permitted in MGD HANUMANTH RAO 08.45 - 09.30
TRD 45 3 Maintenance 1 MGD YARD Yard 502-504 LB and PB Yard-DN Tower Car (08310162257)
Movement not
Turnout permitted in MGD HANUMANTH RAO Not permitted
TRD 45 4 Maintenance 1 MGD YARD Yard 502-504 LB and PB Yard-DN Tower Car (08310162257)
TRD
TRD
30 Minutes 1 GKK-GPB GKK-GPB GKK UP 668.845 Disconnection UP & DN train on ESM with 1 nos.staff NA
UFSBI UFSBI PLCT
S&T Maintenance Maintenance 10.00 - 10.30
30 Minutes 2 GKK-PCH GKK-PCH GKK DN 668.845 Disconnection UP & DN train on ESM with 1 nos.staff NA
UFSBI UFSBI PLCT
S&T Maintenance Maintenance 10.30 - 11.00
40 Minutes 1 Pt no 65 Pt no 65 SXB UP & DN 619.05 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception piloting
2. UP despatch
S&T by starter memo 10.00 - 10.40
40 Minutes 2 Pt no 64 Pt no 64 SXB UP & DN 619.05 Disconnection 1. UP & DN ESM with 2 nos.staff NA
DWR-MRJ Disconnection maintenance maintenance reception piloting
2. UP despatch
S&T by starter memo 10.40 - 11.20
60 Minutes 3 8T two core 8T two core SVTN DN 554.62 Disconnection 2. DN despatch ESM with 1 nos.staff NA
S&T Disconnection lead wire lead wire by PLCT 12.00-13.00
60 Minutes 1 S1 HOME S1 HOME KRKP UP 495.07 Disconnection UP TRAIN ESM with 2 nos.staff NA
Disconnection SIGNAL SIGNAL RECEPTION ON
S&T REWIRING REWIRING CALLING ON 12.30-13.30
LC319
LC319 Aproach Aproach No train
ENGG 2 x 60mins 5 attention attention LWR-KBI UP 518/800-900 LB movement 1+8 staff JE/PAY/LWARBL 143.00-14.00
UTV Machine 55/35 nos
2 blocks of 90 Shifting of Loading/unloa
ENGG minutes each 1 Sleepers/Rails ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic
tamping Plain track
ENGG 2 x 120mins 2 Machine Tamping DEV-TVG DN 538/400-537/200 LB Block required SSE/Pway/LD 13.00 - 15.00
SEJ Packing
2 blocks of 90 and Greassing
ENGG minutes each 3 oiling SEJ No - 2 BGM-SXB UP/DN 618/100-200 LB LB required JE/p.way/KNP 10.00 - 11.30
SEJ Packing
and Greassing
ENGG 1 block 90 mnn 4 oiling 1 UGR Yard UP 721/000-100 LB block required SSE/PW/KUD 11.30 - 13.00
UP TRAIN CAN'T
ENGG 240 BCM WORK 600 KRKP;MGD UP 498/00-600 LB+PB DISPATCH SSE/PWAY/DWR 12.30 - 15.30
CON
Bridge no.121
Sharad Srivastava
approaches approach
SSE/PW/KTY
ENGG 120min 1 packing packing KTY-HBI singl line 48/900-49/100 Block required Manual 12.00 - 15.00
VC-KTY Ballast Ballast profile Rekhya naik
ENGG 120min 2 regulation & sweeping HBI-KTY Single line 45/0-46/0 Block required BRM-04 JE/PW/KTY 12.00 - 15.00
ENGG
RE
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 10.10.2023
BLOCK TYPE OF BLOCK
BOARD DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
DEPT (MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) REPERCUSSIONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
Isolator permitted in KGX SIVARAMNANDH 09.00 - 09.45
TRD 45 1 Maintenance 1 KGX YARD Yard 66-68 LB and PB Yard-DN Tower Car (08310161863)
Movement not
Isolator permitted in KGX SIVARAMNANDH 11.00-11.45
TRD 45 2 Maintenance 1 KGX YARD Yard 66-68 LB and PB Yard-DN Tower Car (08310161863)
Movement not
Turnout permitted in KGX SIVARAMNANDH 13.00-13.45
TRD 45 3 Maintenance 1 KGX YARD Yard 66-68 LB and PB Yard-DN Tower Car (08310161863)
Movement not
Turnout permitted in KGX SIVARAMNANDH 16.15-17.00
TRD 45 4 Maintenance 1 KGX YARD Yard 66-68 LB and PB Yard-DN Tower Car (08310161863)
Movement not
Isolator permitted in NVD B SOREN 08.30-09.15
TRD 45 5 Maintenance 1 NVD YARD Yard 35-37 LB and PB Yard-DN Tower Car (7022029745)
Movement not
Isolator permitted in NVD B SOREN 11.00-11.45
TRD 45 6 Maintenance 1 NVD YARD Yard 35-37 LB and PB Yard-DN Tower Car (7022029745)
Movement not
Turnout permitted in NVD B SOREN 13.00-13.45
TRD 45 7 Maintenance 1 NVD YARD Yard 35-37 LB and PB Yard-DN Tower Car (7022029745)
Movement not
Turnout permitted in NVD B SOREN 15.15-16.00
TRD 45 8 Maintenance 1 NVD YARD Yard 35-37 LB and PB Yard-DN Tower Car (7022029745)
09:45-12:15(DN)
ENGG 150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
DN line canoot be
150min 2 TWS attention 1 NVU yard Yard RD-3,DN, Pnt no-70B LB passed Road-3 & Mannualy
ENGG SSE/JE P.Way 10.00 - 12.30
4
ENGG
20 Minutes 1 UBL-UNK Block UBL-UNK UBL B cabin UP/DN 469 Disconnection All UP & DN trains ESM with 1 nos.staff NA
Disconnection Instrument for Block to be piloted
maintenance Instrument for
S&T maintenance 10.00 - 10.20
120 minutes 2 point 52b for point b for svnr dn 413.64 disconnection dn train reception ESM with 3 nos.staff JE/SIG/YLG
point machine point machine on calling on and
S&T replacement replacement dispatch piloting 10.00 - 12.00
KBL-DWR 30 minutes 3 ylg-gdi b/I ylg-gdi b/I ylg-gdi UP/DN 421.7 disconnection all trains to be ESM with 1 nos.staff NA
S&T maintance maintance piloted in block 09.30 - 10.00
31 minutes 4 ylg-svnr b/I ylg-svnr b/I ylg-svnr up/dn 421.7 disconnection all trains to be ESM with 1 nos.staff NA
S&T maintance maintance piloted in block 10.00 - 10.30
30 Minutes 5 GDI-SNH B/I GDI-SNH B/I GDI UP/DN 433.72 Disconnection All up and dn trains ESM with 1 nos.staff JE/SIG/YLG
Disconnection FOR MONTHLY FOR on plct
INSPECTION MONTHLY
S&T INSPECTION 09.30 - 10.00
30 Minutes 6 GDI-YLG B/I GDI-YLG B/I GDI UP/DN 433.72 Disconnection All up and dn trains ESM with 1 nos.staff JE/SIG/YLG
Disconnection FOR MONTHLY FOR on plct
INSPECTION MONTHLY
S&T INSPECTION 10.00 - 10.30
60 Minutes 7 02T TLD lifting 02T TLD BDKA DN 475.95 Disconnection DN trains to be ESM with 3 nos.staff NA
S&T Disconnection work lifting work dealt on calling ON 09.00 - 10.00
30 minute 8 EI EI ngr UP/DN 35.42 Disconnection up and dn trains ESM with 3 nos.staff NA
systemchangeov systemchang piloting
S&T er at ngr eover at ngr 11.30 - 12.00
31 minute 9 ngr-lkt block ngr-lkt block ngr UP/DN 35.42 Disconnection up and dn trains ESM with 1 nos.staff NA
S&T maintance maintance plct 12.00 - 12.30
30 Minutes 10 ECHR FOR ECHR FOR GDI UP/DN 433.72 Disconnection all trains on piloting ESM with 1 nos.staff JE/SIG/YLG
Disconnection TESTING DOR TESTING
MONTHLY DOR
INSPECTION MONTHLY
S&T INSPECTION 09.30 - 10.00
30min 11 Monthly Monthly KGX both 66/600 disconnection both side piloting ESM with 1 nos.staff JE/S/GDG
inspection of inspection of and PLCT
BLOCK & Crank BLOCK &
S&T handle Crank handle 11.00 - 11.30
60 12 LC 66 EKT LC 66 EKT KBL both 117/600 disconnection all trains delt on ESM with 2 nos.staff JE/S/KBL
S&T overhouling overhouling hand signals 12.00 - 13.00
60 13 LC 51 LC 51 BNA both 93/00 discconnectio all down trains ESM with 1 nos.staff JE/S/KBL
Maintanance Maintanance n dispatch by starter
memo and up
trains reception by
S&T memo 11.30 - 12.30
RE
RE
ENGG 2 X 90 Min 1 UTV SVM-CNR UP 72/600-72/860 JE/PWay/QLM 10.00 - 11.30
ENGG 2 X 90 Min 2 MPT SVM - CNR UP 72/600-72/860 SHADOW BLOCK
ENGG 2 x 75 Min 3 WRJ SVM -CNR UP 72/860 SHADOW BLOCK
ENGG 120min 4 work between CLR PBC Work CLR-CRZ SL 25/400-800 connection requn not be recieved from CRZ end 13.00 - 15.00
ENGG 120 min 5 BFR work Material shiftinhg CLR-CRZ SL 26/900-30/000 LB required SHADOW BLOCK
TRD SHADOW BLOCK
60 Minutes 1 S8 rewiring S8 rewiring LD DN Disconnection PLCT ESM with 2 nos.staff NA
S&T Disconnection 559.45 12.00 - 13.00
30 Minutes 1 Maintenance of Maintenance LIM Yard 42.61 Disconnection All up and down ESM with 1 nos.staff NA
Disconnection LIM-QLM B/I of LIM-QLM trains towards QLM
LD-VSG S&T B/I through PLCT 13.00 - 13.30
30 Minutes 2 Maintenance of Maintenance DDS Yard 38.017 Disconnection 1. Despatch ESM with 1 nos.staff NA
Disconnection DDS-CRZ B/I of DDS-CRZ towards CRZ on
B/I PLCT. 2. PLCT for
S&T dn trains at CRZ. 13.00 - 13.30
30 Minutes 3 Maintenance of Maintenance DDS Yard 38.017 Disconnection 1. Despatch ESM with 1 nos.staff NA
Disconnection DDS-LIM B/I of DDS-LIM towards LIM on
B/I PLCT. 2. PLCT for
S&T up trains at LIM. 13.30 - 14.00
S&T
CN
Fittings and Siddalingeshwar
ENGG 120 Min 1 SEJ Packing 02 Nos WDL Yard UP&DN 137/400-500 Line block No train movement
12 Man power SSE/P.Way/LMT 11.00 - 13.00
1 Machine
No Up train M. M Munawar
ENGG 150 Min 1 TWR 100 Mtrs MVD-JML UP 175/700-800 Line block 30 Labours,
movement JE/P.way/BSRX
Rail GR Pad & ERC 10.00 - 12.00
Tamping By Tamping By No Up & Down Tamping Machine Sachin Mane UP-10.00 - 11.15
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block
Machine Machine train movement 08 Nos Manpower SSE/P.way/IDR DN- 12.00 -13.15
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 2 UTV GDG-BDM UP & DN 0/00-67/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 3 DTE -56850 2000m GDG-HLAR UP & DN 0/0-48/0 LB Block required SSE/JE P.Way 12:30-15:00(UP)
30 MIN 1 IDR-LHN UFSBI IDR-LHN IDR-LHN UP/DN 240.6 DISCONNEC UP & DN TRAIN ESM with 1 nos.staff JE/SIG/IDR
B/I UFSBI B/I TION PLCT TOWARDS
S&T 10.00 - 10.30
MAINTENANCE MAINTENAN HG SIDE
CE
30 MIN 2 DN SIDE DN SIDE IDR UP/DN 240.6 DISCONNEC UP SIDE TRAIN ESM with 1 nos.staff JE/SIG/IDR
CRANK CRANK TION PILOTING
HANDLE HANDLE DISPATCH ON
MAINTENANCE MAINTENAN STARTER MEMO .
S&T 10.30 - 11.00
CE 2) DN SIDE
CALLING ON &
DISPATCH ON
MEMO
RE
Movement not
TRD Overlap permitted in TVL D. Kishore 10.30 - 11.15
45 1 Maintenance 1 TVL Yard Yard 279-281 LB and PB yard UP Tower Car (08310163796)
Movement not
Overlap permitted in TVL D. Kishore Not permitted
TRD 45 2 Maintenance 1 TVL Yard Yard 279-281 LB and PB yard UP Tower Car (08310163796)
Movement not
Turnout permitted in TVL D. Kishore 13.00-13.45
TRD 45 3 Maintenance 1 TVL Yard Yard 279-281 LB and PB yard UP Tower Car (08310163796)
Movement not
Turnout permitted in TVL D. Kishore Not permitted
TRD 45 4 Maintenance 1 TVL Yard Yard 279-281 LB and PB yard UP Tower Car (08310163796)
Movement not
GDG-HG Overlap permitted in MNL G Mahadev 09.30 - 10.15
TRD 45 5 Maintenance 1 MNL YARD Yard 202-204 LB and PB yard UP Tower Car (08310162957)
Movement not
Overlap permitted in MNL G Mahadev Not permitted
TRD 45 6 Maintenance 1 MNL YARD Yard 202-204 LB and PB yard UP Tower Car (08310162957)
Movement not
Turnout permitted in MNL G Mahadev 10.15 - 11.00
TRD 45 7 Maintenance 1 MNL YARD Yard 202-204 LB and PB yard UP Tower Car (08310162957)
Movement not
Turnout permitted in MNL G Mahadev Not permitted
TRD 45 8 Maintenance 1 MNL YARD Yard 202-204 LB and PB yard UP Tower Car (08310162957)
Movement not
Overlap permitted in HBL D. Chinna 10.30 - 11.15
TRD 45 9 Maintenance 1 HBL Yard Yard 12-14 LB and PB yard UP Tower Car (08310162549)
Movement not
Overlap permitted in HBL D. Chinna Not permitted
TRD 45 10 Maintenance 1 HBL Yard Yard 12-14 LB and PB yard UP Tower Car (08310162549)
Movement not
Turnout permitted in HBL D. Chinna 11.15 - 12.00
TRD 45 11 Maintenance 1 HBL Yard Yard 12-14 LB and PB yard UP Tower Car (08310162549)
Movement not
Turnout permitted in HBL D. Chinna Not permitted
TRD 45 12 Maintenance 1 HBL Yard Yard 12-14 LB and PB yard UP Tower Car (08310162549)
Movement not
Overlap permitted in WDL G Mahadev 11.00 - 11.45
TRD 45 13 Maintenance 1 WDL Yard Yard 137-139 LB and PB yard UP Tower Car (08310162957)
Movement not
Overlap permitted in WDL G Mahadev Not permitted
TRD 45 14 Maintenance 1 WDL Yard Yard 137-139 LB and PB yard UP Tower Car (08310162957)
Movement not
Turnout permitted in WDL G Mahadev 11.45 - 12.30
TRD 45 15 Maintenance 1 WDL Yard Yard 137-139 LB and PB yard UP Tower Car (08310162957)
Movement not
Turnout permitted in WDL G Mahadev Not permitted
TRD 45 16 Maintenance 1 WDL Yard Yard 137-139 LB and PB yard UP Tower Car (08310162957)
S&T
CN
Point No 13A No train movement
and 13B joint TNGL LB& S&T staff , 1 B/s, 5 D. Amru Naik
TNGL-RNJP ENGG 120 min 1 2 point Sl 1/600-700 TNGL byepass to 10.00 - 11.30
inspection byepass Disconnection Tarck mans SSE/P.WAY/TNGL
BNHT, JVSL.
d fi Movement not
1 Isolator permitted in BYC Pavan Kumar 08.30 - 09.15
TRD 45 Maintenance 1 BYC YARD Yard 200-202 LB and PB Yard-DN Tower Car (08310163339)
Movement not
2 Isolator permitted in BYC Pavan Kumar Not permitted
TRD 45 Maintenance 1 BYC YARD Yard 200-202 LB and PB Yard-DN Tower Car (08310163339)
Movement not
3 Turnout permitted in BYC Pavan Kumar 09.15 - 10.00
TRD 45 Maintenance 1 BYC YARD Yard 200-202 LB and PB Yard-DN Tower Car (08310163339)
Movement not
4 Turnout permitted in BYC Pavan Kumar Not permitted
TRD 45 Maintenance 1 BYC YARD Yard 200-202 LB and PB Yard-DN Tower Car (08310163339)
Movement not
5 Isolator permitted in GNR S Ganesh 09.45 - 10.30
TRD 45 Maintenance 1 GNR YARD Yard 168-170 LB and PB Yard-DN Tower Car (08310162957)
Movement not
6 Isolator permitted in GNR S Ganesh Not permitted
TRD 45 Maintenance 1 GNR YARD Yard 168-170 LB and PB Yard-DN Tower Car (08310162957)
Movement not
7 Turnout permitted in GNR S Ganesh 10.30 - 11.15
TRD 45 Maintenance 1 GNR YARD Yard 168-170 LB and PB Yard-DN Tower Car (08310162957)
Movement not
8 Turnout permitted in GNR S Ganesh Not permitted
TRD 45 Maintenance 1 GNR YARD Yard 168-170 LB and PB Yard-DN Tower Car (08310162957)
20 mins x 4 1 Crank Handle EKT BAY UP/DN 208.06 Disconnection CH4- DN trains : ESM with 1 nos.staff NA
CH4, CH5, CH6 maintenance Reception to Rd 1
& CH7 piloting. Up trains:
Dispatch from Rd 1
starter memo.
CH5- Reception
from BYC to Rd 1
& 2 piloting.
Reception from
OBM piloting all
roads. Dispatch to
BYC & OBM starter
memo all roads.
CH6- HPT end
Reception /
Dispatch piloting .
CH7- Dn Trains :
Reception to Rd 4,
5, 6, 7, 8 piloting.
BAY-PKL
Up trains dispatch
from Rd 5,6 & 7
starter memo, Up 10.00 - 10.20
trains reception to 10.20 - 10.40
Rd 5,6,7 & 8 calling 10.40 - 11.00
S&T on. 11.00 - 11.20
30 mins 2 KDN-DAJ block Block KDN-DAJ UP/DN 188.23 Disconnection UP Trains PLCT at ESM with 1 nos.staff NA
instrument Instrument KDN , DN trains
S&T maintenance Maintenance PLCT at DAJ. 11.00 - 11.30
20 mins x 4 3 Crank Handle EKT KDN UP/DN 188.23 Disconnection CH4- Up trains ESM with 1 nos.staff NA
CH4, CH5, CH6 maintenance reception piloting.
& CH7 Up trains dispatch
from UP M/L, CL1
& CL2 by starter
memo. Dn trains
reception to CL1
piloting . CH5- UP
trains reception
piloting. Dn
dispatch from CL1
& CL2 starter
memo. CH6- Dn
trainsb dispatch on
starter memo. Up
trains reception to
ACC line piloting.
CH7- BAY END : 11.00 - 11.20
Reception 11.20 - 11.40
S&T /Dispatch piloting 11.40 - 12.00
20 mins x 2 4 Crank Handle EKT DAJ UP/DN 181.27 Disconnection Up trains ESM with 1 nos.staff NA
CH3, CH4 maintenance Reception Piloting.
Up trains dispatch 11.00 - 11.20
S&T starter memo 11.20 - 11..40
UPl line to DN S&T staff and TM-4 H.Anjanamurthy
90 min 1 WRJ 2 joints BYO yard UP/DN 162/400-500 LB
ENGG cannot dispatch men and 2-B/s. JE/P.WAY/HPT/ML 10.00 -11.30
Jt inspection
No train movement
deficiency LB & S&T staff and TM-4 Akash
90 min 1 1 point RDG yard SL 52/500-52/60 between Rdg to
attention Disconnection men and 2-B/s. Je/P.Way/Rdg
Slm
ENGG Pt.No.14/B 10.00 - 11.30
No train movement
Machine,TRD staff-3, Mukunda
90 min 2 UTV working 30 sleepers Bay -obm SL 1/500-5/000 LB & PB between Bay to
Dept-6 TM SE/P.Way/Spl works Ba
ENGG Obm 11.00 - 12.30
ENGG
Rajavali,
ENGG 1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL Km 29/069-29/589 Block required Contract Labour JE/P.Way/YTG 11.00 - 14.00
Sunil Kumar
Up trains cannot be (SSE/P.Way/GDG
ENGG 120 mins 1 Point packing 1 unit SOQ yard UP 84/300-400 LB received AMC labours ML) 11.00 - 13.00
Movement not
Isolator permitted in KGW AANJAIAH 09.30 - 10.15
TRD 45 1 Maintenance 1 KGW YARD Yard 149-151 LB and PB Yard-DN Tower Car (08310162741)
Movement not
Isolator permitted in KGW AANJAIAH Not permitted
TRD 45 2 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-DN Tower Car (08310162741)
Movement not
Turnout permitted in KGW AANJAIAH 10.15 - 11.00
TRD 45 3 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-DN Tower Car (08310162741)
Movement not
PKL-RLP Turnout permitted in KGW AANJAIAH
TRD 45 4 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-DN Tower Car (08310162741) Not permitted
30mins 1 Maintenance of Maintenance MRB UP and DN 137.29 Disconnection Both side PLCT ESM with 1 nos.staff JE/S/KBL
GIN-MRB of GIN-MRB
BLOCK BLOCK
S&T instrument instrument 09.00 - 09.30
30mins 2 Maintenance of Maintenance MRB UP and DN 137.29 Disconnection Both side PLCT ESM with 1 nos.staff JE/S/KBL
MRB-HPT of MRB-HPT
BLOCK BLOCK
S&T instrument instrument 09.30 - 10.00
60" 3 CH No.5 6 1 PKL UP/DN 156.51 LB DN Reception RD ESM with 1 nos.staff SSE/JE/S/HPT
3 4 5 calling On
and Dispatchng
memeo UP
S&T reception Piloting 10.00 - 11.00
CON
Movement not
Isolator permitted in MGD HANUMANTH RAO 08.00 - 08.45
TRD 45 1 Maintenance 1 MGD YARD Yard 502-504 LB and PB Yard-DN Tower Car (08310162257)
Movement not
Isolator permitted in MGD HANUMANTH RAO Not permitted
TRD 45 2 Maintenance 1 MGD YARD Yard 502-504 LB and PB Yard-DN Tower Car (08310162257)
Movement not
Turnout permitted in MGD HANUMANTH RAO 08.45 - 09.30
TRD 45 3 Maintenance 1 MGD YARD Yard 502-504 LB and PB Yard-DN Tower Car (08310162257)
Movement not
Turnout permitted in MGD HANUMANTH RAO Not permitted
ENGG 45 4 Maintenance 1 MGD YARD Yard 502-504 LB and PB Yard-DN Tower Car (08310162257)
TRD
TRD
30 Minutes 1 PCH-GKK PCH-GKK PCH DN 646.706 Disconnection UP & DN train on ESM with 1 nos.staff NA
UFSBI UFSBI PLCT
S&T Maintenance Maintenance 10.00 - 10.30
30 Minutes 2 PCH-SUL PCH-SUL PCH UP 646.706 Disconnection UP & DN train on ESM with 1 nos.staff NA
UFSBI UFSBI PLCT
S&T Maintenance Maintenance 10.30 - 11.00
40 Minutes 1 Pt no 65 Pt no 65 SUL UP & DN 637.756 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception piloting
2. UP despatch by
S&T starter memo 10.00 - 10.40
40 Minutes 2 Pt no 64 Pt no 64 SUL UP & DN 637.756 Disconnection 1. UP & DN ESM with 1 nos.staff NA
Disconnection maintenance maintenance reception piloting
2. UP despatch by
S&T starter memo 10.40 - 11.20
40 Minutes 3 Pt no 63 Pt no 63 SUL UP & DN 637.756 Disconnection 1. UP & DN ESM with 1 nos.staff NA
Disconnection maintenance maintenance reception piloting
2. UP despatch by
S&T starter memo 11.20 - 12.00
30 Minutes 4 SSBPAC B/I SSBPAC B/I SXB UP & DN 619.05 Disconnection 1. PLC ESM with 1 nos.staff JE/Sig/BGM
Disconnection Maintenance Maintenance
S&T SXB-BGM SXB-BGM 10.00 - 10.30
30 Minutes 5 SSBPAC B/I SSBPAC B/I SXB UP & DN 619.05 Disconnection 1. PLC ESM with 1 nos.staff JE/Sig/BGM
Disconnection Maintenance Maintenance
S&T SXB-SBH SXB-SBH 10.30 - 11.00
DWR-MRJ
DWR-MRJ
30 Minutes 6 All Crank handle All Crank SXB UP & DN 619.05 Disconnection 1. UP & DN ESM with 1 nos.staff JE/Sig/BGM
Disconnection Maintenance handle reception by
Maintenance piloting
2. UP & DN
despatch by starter
S&T memo 11.00 - 11.30
60 Minutes 7 S8 rewiring S8 rewiring LD DN 559.45 Disconnection PLCT ESM with 2 nos.staff NA
S&T Disconnection 12.00 - 13.00
60 Minutes 8 POINT N0-65B POINT TVG UP&DN 534.61 Disconnection NO UP TRAIN ESM with 2 nos.staff NA
Disconnection INSULATION N0-65B DISPATCH AND
REPLACEMENT INSULATION DN TRAIN
REPLACEME RECEPTION
S&T NT PILOTING 13.00 - 14.00
60 Minutes 9 POINT N0-64B POINT LWR UP&DN 525.8 Disconnection UP TRAIN DEALT ESM with 2 nos.staff NA
Disconnection GTP N0-64B GTP ON LOOP LINE and Engg. staff
INSULATION INSULATION ON SIGNAL AND
REPLACEMENT REPLACEME DN TRAIN
NT RECEPTION ON
S&T CALLING ON 13.00 - 14.00
RE
Trolleypath
attention DWR Trolleypath
ENGG 60 8 end attention LWR yd UP 525/5-6 LB No train movement 1+8 staff JE/PAY/LWARBL SHADOW BLOCK
UTV Machine 55/35 nos
2 blocks of 90 Shifting of Loading/unloa
ENGG minutes each 1 Sleepers/Rails ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
SEJ Packing
2 blocks of 90 and Greassing
ENGG minutes each 2 oiling SEJ-20 & 21 SUL-PCH UP 644/100-200 LB LB required SSE/p.way/BGM 10.00 - 11.30
Duomatic
tamping Plain track
ENGG 2 x 120mins 3 Machine Tamping DEV-TVG DN 537/200-536/000 LB Block required SSE/Pway/LD 13.00 - 15.00
SEJ Packing
1 block 90 and Greassing
ENGG mnn 4 oiling 1 UGR Yard UP 720/800-900 LB block required SSE/PW/KUD 11.00 - 12.30
UP TRAIN CAN'T
ENGG 240 BCM WORK 600 KRKP;MGD UP 498/600-499/200 LB+PB DISPATCH SSE/PWAY/DWR 12.00 - 15.00
CON
Ballast Ballast profile Rekhya naik
VC-KTY
ENGG 120min 1 regulation & sweeping HBI-KTY Single line 46/0-47/0 Block required BRM-04 JE/PW/KTY 12.00 - 15.00
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 11.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK REPERCUSS RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 KGX YARD Yard 66-68 LB and PB KGX Yard-DN Tower Car (08310161863) 10.00 - 10.45
Movement not
TRD Isolator permitted in SIVARAMNANDH NOT
45 2 Maintenance 1 KGX YARD Yard 66-68 LB and PB KGX Yard-DN Tower Car (08310161863) PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 KGX YARD Yard 66-68 LB and PB KGX Yard-DN Tower Car (08310161863) 11.00 - 11.45
Movement not
TRD Turnout permitted in SIVARAMNANDH NOT
45 4 Maintenance 1 KGX YARD Yard 66-68 LB and PB KGX Yard-DN Tower Car (08310161863) PERMITTED
Movement not
TRD Isolator permitted in B SOREN 08.30-09.15
45 5 Maintenance 1 NVD YARD Yard 35-37 LB and PB NVD Yard-DN Tower Car (7022029745)
Movement not
TRD Isolator permitted in B SOREN 11.00-11.45
45 6 Maintenance 1 NVD YARD Yard 35-37 LB and PB NVD Yard-DN Tower Car (7022029745)
Movement not
TRD Turnout permitted in B SOREN 13.00-13.45
45 7 Maintenance 1 NVD YARD Yard 35-37 LB and PB NVD Yard-DN Tower Car (7022029745)
Movement not
TRD Turnout permitted in B SOREN 15.15-16.00
45 8 Maintenance 1 NVD YARD Yard 35-37 LB and PB NVD Yard-DN Tower Car (7022029745)
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
09:45-12:15(DN)
ENGG
120 min 6 BT-Unloading 20 Bobyn HBS-NGR UP & DN 19/100-35/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
UP line no train
ENGG 7 Track a en on 1 BDKA yard UP 476/100-300 LB can be passed Mannually
150 min during Block SSE/JE P.Way 10.00 - 11.30
30 Minutes 1 EI System EI System UBL UP/DN 469 Disconnection TRAINS TO ESM with 3 nos.staff JE/SIG/UBL
Disconnection changeover changeover BE PILOTED
S&T
OF UBL B OF ubL B IN B CABIN
KBL-DWR CABIN CABIN 09.30 - 10.00
30 Minutes 2 Maintenance Maintenance UNK UP/DN 492.6 Disconnection All UP & DN ESM with 1 nos.staff JE/SIG/UBL
Disconnection and safety and safety trains to be
check of check of dealt on PLCT
S&T UNK-UBL UNK-UBL
block for block for
Monthly Monthly
Inspection Inspection 09.45 - 10.15
30 Minutes 3 IPS IPS UNK UP/DN 492.6 Disconnection All UP & DN ESM with 2 nos.staff JE/SIG/UBL
Disconnection Maintenance Maintenance trains to be
S&T for Monthly for Monthly piloted and
Inspection Inspection dispatched on
Starter memo 10.15 - 10.45
30 Minutes 4 All Crank All Crank UNK UP/DN 492.6 Disconnection All UP & DN ESM with 1 nos.staff JE/SIG/UBL
Disconnection handle for handle for trains to be
S&T Monthly Monthly piloted and
Inspection Inspection dispatched on
Starter memo 13.30 - 14.00
31 Minutes 5 kug-bmpa kug-bmpa kug up/dn 10.01 Disconnection all trains in ESM with 1 nos.staff NA
S&T Disconnection block block block plct
maintance maintance 11.00 - 11.30
32 Minutes 6 kug chkt kug chkt kug up/dn 10.01 Disconnection all trains ESM with 1 nos.staff NA
S&T
Disconnection maintance maintance piloting 11.30 - 12.00
30 7 Maintenance Maintenace of SOQ both 85/000 discconnectio Both side ESM with 1 nos.staff JE/S/GDG
BLOCK n PLCT
S&T
SOQ-RLP,SO
Q-BNA 11.00 - 11.30
20 8 monthly monthly BNP both 103/300 discconnectio all down trains ESM with 1 nos.staff JE/S/KBL
inspection of inspection of n need to be
S&T
BNP-KBL BNP-KBL given PLCT
Block Block 12.00 - 12.30
25 9 monthly monthly BNP both 103/300 discconnectio all trains need ESM with 1 nos.staff JE/S/KBL
S&T inspection of inspection of n to be pilated
crank handles crank handles 12.30 - 13.00
RE
PBC between PBC work at
ENGG
120 min 1 CLR-CRZ bridge no.69 CLR-CRZ SL 27/100-200 LB required 13.00 - 15.00
PBC work down trains
ENGG CRZ Yard PBC work at can't be SHADOW
120 min 2 point no.8B bridge no.69 CRZ Yard Yard 31/300-400 Joint work recieved from BLOCK
TRD
30 Minutes 1 Maintenance Maintenance CRZ Yard 31.699 Disconnection All up and ESM with 1 nos.staff NA
Disconnection of CRZ-CLR of CRZ-CLR down trains
S&T
B/I B/I towards CLR
through PLCT 13.00 - 13.30
30 Minutes 2 Maintenance Maintenance CRZ Yard 31.699 Disconnection All up and ESM with 1 nos.staff NA
Disconnection of CRZ-DDS of CRZ-DDS down trains
S&T
B/I B/I towards DDS
LD-VSG
through PLCT 13.30 - 14.00
30 Minutes 3 Maintenance Maintenance DDS Yard 38.017 Disconnection All trains ESM with 1 nos.staff NA
Disconnection of of through PLCT
S&T
CH1,CH2,CH CH1,CH2,CH and piloting.
3 3 13.00 - 13.30
30 Minutes 4 01 TF lead 01 TF lead svm Yard 75/500 Disconnection Reception DN ESM with 1 nos.staff NA
S&T Disconnection wire wire train on Co on
replacement replacement signal 10.30 - 11.00
30 Minutes 5 02 TF lead 02 TF lead svm Yard 75/500 Disconnection Reception DN ESM with 1 nos.staff NA
S&T Disconnection wire wire train on Co on
replacement replacement signal 11.00 - 11.30
S&T
CN
No train Fittings and Siddalingeshwar
ENGG 120 Min 1 SEJ Packing 02 Nos WDL Yard UP&DN 138/400-500 Line block
movement 12 Man power SSE/P.Way/LMT 11.00 - 13.00
1 Machine
No Up train M. M Munawar
ENGG 150 Min 1 TWR 100 Mtrs MVD-JML UP 175/800-900 Line block 30 Labours,
movement JE/P.way/BSRX
Rail GR Pad & ERC 10.00 - 12.00
No Up &
Tamping By Tamping By Tamping Machine 08 Sachin Mane UP-10.00 - 11.15
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block Down train
Machine Machine Nos Manpower SSE/P.way/IDR DN- 12.00 -13.15
movement
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 2 UTV GDG-BDM UP & DN 0/00-67/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 3 DTE -56850 2000m GDG-HLAR UP & DN 0/0-48/0 LB Block required SSE/JE P.Way 12:30-15:00(UP)
TRD
60MIN 1 SH KEYS SH KEYS MGH UP/DN 101.72 DISCONNEC UP/DN ESM with 1 nos.staff JE/SSE
FOR FOR TION TRAINS
MAINTENAN MAINTENAN RECEIPTION
CE CE ON SIGNALS
S&T
AND
DISPATCH
ON PLCT DN
TRAINS 11.30 - 12.30
Movement not
TRD Overlap permitted in D. Kishore 10.30 - 11.15
45 1 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car (08310163796)
Movement not
TRD Overlap permitted in D. Kishore Not permitted
45 2 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car (08310163796)
Movement not
TRD Turnout permitted in D. Kishore 13.00-13.45
45 3 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car (08310163796)
Movement not
TRD Turnout permitted in D. Kishore Not permitted
45 4 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car (08310163796)
Movement not
TRD Overlap permitted in G Mahadev 09.30 - 10.15
GDG-HG 45 5 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in G Mahadev Not permitted
45 6 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in G Mahadev 10.15 - 11.00
45 7 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in G Mahadev Not permitted
45 8 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in D. Chinna 10.30 - 11.15
45 9 Maintenance 1 HBL Yard Yard 12-14 LB and PB HBL yard DN Tower Car (08310162549)
Movement not
TRD Overlap permitted in D. Chinna Not permitted
45 10 Maintenance 1 HBL Yard Yard 12-14 LB and PB HBL yard DN Tower Car (08310162549)
Movement not
TRD Turnout permitted in D. Chinna 11.15 - 12.00
45 11 Maintenance 1 HBL Yard Yard 12-14 LB and PB HBL yard DN Tower Car (08310162549)
Movement not
TRD Turnout permitted in D. Chinna Not permitted
45 12 Maintenance 1 HBL Yard Yard 12-14 LB and PB HBL yard DN Tower Car (08310162549)
Movement not
TRD Overlap permitted in G Mahadev 11.00 - 11.45
45 13 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in G Mahadev Not permitted
45 14 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car (08310162957)
Movement not
RE Turnout permitted in G Mahadev 11.45 - 12.30
45 15 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car (08310162957)
Movement not
CON Turnout permitted in G Mahadev Not permitted
45 16 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car (08310162957)
S&T
CN
Movement not
TRD 1 Isolator permitted in Pavan Kumar 08.30 - 09.15
45 Maintenance 1 BYC YARD Yard 200-202 LB and PB BYC Yard-DN Tower Car (08310163339)
Movement not
TRD 2 Isolator permitted in Pavan Kumar Not permitted
45 Maintenance 1 BYC YARD Yard 200-202 LB and PB BYC Yard-DN Tower Car (08310163339)
Movement not
TRD 3 Turnout permitted in Pavan Kumar 09.15 - 10.00
45 Maintenance 1 BYC YARD Yard 200-202 LB and PB BYC Yard-DN Tower Car (08310163339)
Movement not
TRD 4 Turnout permitted in Pavan Kumar Not permitted
45 Maintenance 1 BYC YARD Yard 200-202 LB and PB BYC Yard-DN Tower Car (08310163339)
Movement not
TRD 5 Isolator permitted in S Ganesh 09.45 - 10.30
45 Maintenance 1 GNR YARD Yard 168-170 LB and PB GNR Yard-UP Tower Car (08310162957)
Movement not
TRD 6 Isolator permitted in S Ganesh Not permitted
45 Maintenance 1 GNR YARD Yard 168-170 LB and PB GNR Yard-UP Tower Car (08310162957)
Movement not
TRD 7 Turnout permitted in S Ganesh 10.30 - 11.15
45 Maintenance 1 GNR YARD Yard 168-170 LB and PB GNR Yard-UP Tower Car (08310162957)
Movement not
Turnout S Ganesh
TRD 45 8 1 GNR YARD Yard 168-170 LB and PB permitted in Tower Car Not permitted
Maintenance (08310162957)
GNR Yard-UP
45 mins 1 44BTF TLD TLD and lead KDN DN 188.23 Disconnection Dn trains ESM with 1 nos.staff NA
and track lead wires dispatch
wires replacement starter memo.
S&T replacement Up trains
reception to
ACC line
piloting 11.00 - 11.45
20 mins x 3 2 Crank Handle EKT BNHT UP/DN 9.02 Disconnection CH1- ESM with 1 nos.staff NA
CH1, CH2, maintenance Reception
CH3 from Jindal,
NDHI and
TNGL -
Piloting.
Dispatch to
BAY-PKL JVSL, NDHI &
TNGL - starter
memo. CH2-
Reception
from Jindal,
NDHI and
TNGL to Rd 4
& 5 - Piloting.
S&T
Dispatch to
JVSL, NDHI &
TNGL from
Rd 4 & 5 -
starter memo.
CH3-
Reception
from Jindal,
NDHI and
TNGL -
Piloting.
Dispatch to
JVSL, NDHI & 11.00 - 11.20
TNGL - starter 11.20 - 11.40
memo. 11.40 - 12.00
30 mins 3 LC-08 EKT EKT BNHT UP/DN 9.02 Disconnection Reception / ESM with 2 nos.staff NA
maintenance maintenance Dispatch from
S&T
NDHI -
Piloting , 11.00 - 11.30
UP trains
S&T staff and TM-6
cannot H Anjanamurthy
ENGG 120min 1 WRJ 2 joints GNR yard UP 167/800-900 LB men and Welding
dispatch from JE/P.WAY/HPT/ML
batch.
GNR-to BYO 10.00 - 12.00
Jt inspection No train
deficiency LB & movement S&T staff and TM-4 Akash
ENGG 90 min 1 1 point RDG yard SL 52/500-52/60
attention Disconnection between Rdg men and 2-B/s. Je/P.Way/Rdg
Pt.No.13/B to Slm 12.00 - 13.30
No train
Mukunda
movement Machine,TRD staff-3,
ENGG 90 min 2 UTV working 30 sleepers Bay -obm SL 1/500-5/000 LB & PB SSE/P.Way/Spl
between Bay Dept-6 TM
works Bay
to Obm 12.00 - 13.30
ENGG
Up train
ENGG Br No 63 cannot be Hanumanthappa
120 min 1 packing 100 mtr KBL-BNA UP UP 114/000-100 LB dealt AMC Batch (SSE/P.WAY/KBL) 10.30 - 12.30
TTR Work, at Rajavali,
ENGG
1x180 mins 1 P No-15B 1 Point RMGD Yard Yard Km 10/900-11/000 Block required Contract Labour JE/P.Way/YTG 11.00 - 14.00
1. AC and
Diesel loco
not permitted
TRD 10.00 - 11.00
in KGW yard
TO and SI DN line
60 1 Maintenance 1 SI, 1 TO KGW YARD DN 150-148 LB & PB Rd-5,6,7,8 Towercar JE/TRD/HPT
1. Ac and
Diesel not
TRD permitted in 10.00 - 11.00
UIOL and IOL KGW-PKL DN
60 2 Maintenance 2 UIOL KGW-PKL DN 155-150 LB & PB section. Towercar JE/TRD/HPT
Movement not
permitted in
TRD 09.30 - 10.15
Isolator KGW AANJAIAH
45 1 Maintenance 1 KGW YARD Yard 149-151 LB and PB Yard-DN Tower Car (08310162741)
Movement not
PKL-RLP
permitted in
TRD Not permitted
Isolator KGW AANJAIAH
45 2 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-DN Tower Car (08310162741)
Movement not
permitted in
TRD 10.15 - 11.00
Turnout KGW AANJAIAH
45 3 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-DN Tower Car (08310162741)
Movement not
permitted in
TRD Not permitted
Turnout KGW AANJAIAH
45 4 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-DN Tower Car (08310162741)
30mins 1 Maintenance Maintenance MRB both 137.29 Disconnection BOTH side ESM with 1 nos.staff JE/S/KBL
S&T of crank of crank piloting
handle handle 10.00 - 10.30
60" 2 CH No.7 8 1 PKL UP/DN 156.51 LB DN Reception ESM with 1 nos.staff SSE/JE/S/HPT
calling On and
Dispatchng
S&T
memeo UP
reception
PIloting 10.00 - 11.00
CON
Movement not
TRD Isolator permitted in HANUMANTH RAO 08.00 - 08.45
45 1 Maintenance 1 MGD YARD Yard 502-504 LB and PB MGD Yard-UP Tower Car (08310162257)
Movement not
TRD Isolator permitted in HANUMANTH RAO Not permitted
45 2 Maintenance 1 MGD YARD Yard 502-504 LB and PB MGD Yard-UP Tower Car (08310162257)
Movement not
TRD Turnout permitted in HANUMANTH RAO 08.45 - 09.30
45 3 Maintenance 1 MGD YARD Yard 502-504 LB and PB MGD Yard-UP Tower Car (08310162257)
Movement not
TRD Turnout permitted in HANUMANTH RAO Not permitted
45 4 Maintenance 1 MGD YARD Yard 502-504 LB and PB MGD Yard-UP Tower Car (08310162257)
TRD
TRD
30 Minutes 1 SUL-PCH SUL-PCH SUL UP 637.756 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 10.00 - 10.30
30 Minutes 2 KUD-UGR KUD-UGR KUD UP 714.48 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 11.30 - 12.00
30 Minutes 3 KUD-CNCUF KUD-CNC KUD DN 714.48 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T SBI UFSBI on PLCT
Maintenance Maintenance 12.00 - 12.30
40 Minutes 4 Pt no 50 Pt no 50 SUL UP & DN 637.756 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. DN
despatch by
starter memo 10.00 - 10.40
40 Minutes 5 Pt no 51 Pt no 51 SUL UP & DN 637.756 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. DN
despatch by
starter memo 10.40 - 11.20
40 Minutes 6 Pt no 52 Pt no 52 SUL UP & DN 637.756 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
DWR-MRJ piloting
S&T
2. DN
despatch by
starter memo 11.20 - 12.00
60 Minutes 7 26T two core 26T two core LD DN 559.45 Disconnection 2. DN ESM with 1 nos.staff NA
S&T Disconnection lead wire lead wire despatch by
PLCT 12.00 - 13.00
60 Minutes 8 POINT N0-55 POINT N0-55 LWR UP 525.8 Disconnection UP TRAIN ESM with 2 nos.staff NA
Disconnection GTP GTP DEALT ON and Engg staff
S&T INSULATION INSULATION LOOP LINE
REPLACEME REPLACEME ON SIGNAL
NT NT 08.00 - 09.00
30 Minutes 9 DWR-KRKP DWR-KRKP DWR UP&DN 489.09 Disconnection PLCT at both ESM with 1 nos.staff NA
S&T Disconnection B/I FOR B/I FOR stations
Maintenance Maintenance 10.00 - 10.30
30 Minutes 10 DWR-NVU B/I DWR-NVU B/I DWR UP&DN 489.09 Disconnection PLCT AT ESM with 1 nos.staff NA
S&T Disconnection MAINTENAN MAINTENAN BOTH
CE CE STATION 10.30 - 141.00
Trolleypath
ENGG attention Trolleypath No train
60 8 DWR end attention LWR yd DN 525/5-6 LB movement 1+8 staff JE/PAY/LWARBL 08.00 - 09.00
UTV Machine 55/35 nos
ENGG 2 blocks of 90 1 Shifting of Loading/unloa
minutes each Sleepers/Rails ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Unimat Machine &
ENGG 2
1 block 240m PQRS work 0.52 SBH-SUL Up 627/730-628/250 LB & PB Signal staff SSE/p.way/BGM 10.00 - 11.30
Duomatic
ENGG 3 tamping Plain track
2 x 120mins Machine Tamping KNP-DUR DN 585/700-587/700 LB Block required JE/P.WAY/KNP 11.00 - 13.00
Duomatic
ENGG 4 tamping Plain track
2 x 120mins Machine Tamping PCH yard DN 646/000-647/000 LB Block required JE/P.way/SPL/BGM 10.00 - 12.00
Bridge.No.125
ENGG 5
1 block 90 mnn (Up) A en on Br.No.125 GKK-GPB Up 664/100-300 LB LB Required SSE/PWAY/GPB 10.30 - 12.00
UP TRAIN
ENGG CAN'T
240 BCM WORK 600 KRKP;MGD UP 499/200-499/800 LB+PB DISPATCH SSE/PWAY/DWR 12.00 - 15.00
CON
Ballast Ballast profile Rekhya naik
ENGG
120min 1 regulation & sweeping HBI-KTY Single line 47/0-48/0 Block required BRM-04 JE/PW/KTY 12.00 - 15.00
VC-KTY ENGG
TRD
RE
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 12.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK REPERCUSS RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 KGX YARD Yard 66-68 LB and PB KGX Yard-UP Tower Car (08310161863) 10.00 - 10.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 KGX YARD Yard 66-68 LB and PB KGX Yard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 KGX YARD Yard 66-68 LB and PB KGX Yard-UP Tower Car (08310161863) 11.00 - 11.45
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 KGX YARD Yard 66-68 LB and PB KGX Yard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in B SOREN 08.30-09.15
45 5 Maintenance 1 NVD YARD Yard 35-37 LB and PB NVD Yard-UP Tower Car (7022029745)
Movement not
TRD Isolator permitted in B SOREN 11.00-11.45
45 6 Maintenance 1 NVD YARD Yard 35-37 LB and PB NVD Yard-UP Tower Car (7022029745)
Movement not
TRD Turnout permitted in B SOREN 13.00-13.45
45 7 Maintenance 1 NVD YARD Yard 35-37 LB and PB NVD Yard-UP Tower Car (7022029745)
Movement not
TRD Turnout permitted in B SOREN 15.15-16.00
45 8 Maintenance 1 NVD YARD Yard 35-37 LB and PB NVD Yard-UP Tower Car (7022029745)
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
UP line no
Track
ENGG 150 min 6 1 BDKA Yard 476/300-600 train can be Mannually
attention
UP LB passed during SSE/JE P.Way 10.00 - 11.30
ENGG
30 Minutes 1 EI System EI System UBL UP/DN 469 Disconnection TRAINS TO ESM with 3 nos.staff JE/SIG/UBL
Disconnection changeover changeover BE PILOTED
S&T
OF UBL C OF ubL C IN C CABIN
CABIN CABIN 09.30 - 10.00
KBL-DWR 30 Minutes 2 YLG-SVNR YLG-SVNR YLG UP/DN 421.7 Disconnection ALL TRAINS ESM with 1 nos.staff JE/SIG/YLG
S&T Disconnection B/I FOR M/I B/I FOR M/I IN BLOCK
ON PLCT 09.30 - 10.00
30 Minutes 3 YLG-GDI B/I YLG-GDI B/I YLG UP/DN 421.7 Disconnection ALL TRAINS ESM with 1 nos.staff JE/SIG/YLG
S&T Disconnection FOR M/I FOR M/I IN BLOCK
ON PLCT 10.00 -10.30
20 Minutes 4 ECHR ECHR YLG UP/DN 421.7 Disconnection ALL TRAINS ESM with 1 nos.staff JE/SIG/YLG
S&T Disconnection TESTING TESTING PILOTING
FOR M/I FOR M/I 12.00 - 12.30
30 Minutes 5 Monthly Monthly BDKA UP/DN 475.95 Disconnection All UP & DN ESM with 2 nos.staff JE/SIG/UBL
Disconnection Inspection of Inspection of trains to be
S&T Interlocked Interlocked dealt on
LC gate LC gate Sliding boom
LC-287 LC-287 10.00-10.30
30 Minutes 6 Monthly Monthly BDKA UP/DN 475.95 Disconnection All UP & DN ESM with 2 nos.staff JE/SIG/UBL
Disconnection Inspection of Inspection of trains to be
S&T Interlocked Interlocked dealt on
LC gate LC gate Sliding boom
LC-289 LC-289 10.30-11.00
30 Minutes 7 lkt-bkit lkt-bkit LKT UP/DN 45.48 Disconnection ALL TRAINS ESM with 1 nos.staff JE/SIG/UBL
S&T Disconnection monthly monthly IN BLOCK
inspection inspection ON PLCT 12.00 - 12.30
30 Minutes 8 crank hanle crank hanle LKT UP/DN 45.48 Disconnection ALL TRAINS ESM with 1 nos.staff JE/SIG/UBL
S&T Disconnection monthly monthly PILOTING
inspection inspection 12.30 - 13.00
30min 9 Inspection Monthly RLP both 76/000 discconnectio Both side ESM with 1 nos.staff JE/S/GDG
inspection of n piloting and
S&T
BLOCK & PLCT
Crank handle 09.00 - 09.30
20 min 10 Maintenace Maintenace of SOQ both 85/000 discconnectio BOTH side ESM with 1 nos.staff JE/S/GDG
S&T CRANK n piloting
handle 11.00 - 11.20
20 11 monthly monthly BNP both 103/300 discconnectio all up trains ESM with 1 nos.staff JE/S/KBL
inspection of inspection of n need to be
S&T
BNP-TLKL BNP-TLKL given PLCT
Block Block 12.00 - 12.20
Manual
ENGG
60 Min 1 Packing CNR -MAO 80/500-600 JE/PWay/QLM 10.30 - 11.30
ENGG 180 Min 2 PQRS CNR -MAO 72/860-73/120 SSE/PWay/Qlm 11.30 - 12.30
Down trains
can not be
received and
ENGG
PBC work at up trains to be
CRZ point no Joint attention received by
120min 3 8A PBC work CRZ yard Yard 31/400-500 work piloting 13.00 - 15.00
Materiql
ENGG
120min 4 BFR work shifting work DDS-LIM SL 39/000-42/000 LB required 13.00 - 15.00
TRD
90 Minutes 1 Point 85A and Point 85A and CLR Yard 24.5 Disconnection 1.CRZ end, ESM with 2 nos.staff and NA
Disconnection 84B Gauge 84B Gauge reception on Engg. staff
Tie Plate Tie Plate calling on
Insulation Insulation signals for
renewal with renewal with Rd2,3,4,5.
LD-VSG S&T Pway staff Pway staff 2.TGT
end,reception
and despatch
on calling on
signals for
Rd1,Rd2. 13.00 - 14.30
30 Minutes 2 Maintenance Maintenance CRZ Yard 31.699 Disconnection Train ESM with 1 nos.staff NA
Disconnection of of movements
S&T
CH1,CH2,CH CH1,CH2,CH by piloting.
3 3 13.00 - 13.30
30 Minutes 3 Maintenance Maintenance CSM Yard 95.873 Disconnection All up and ESM with 1 nos.staff NA
Disconnection of CSM-MJO of CSM-MJO down trains
S&T
B/I B/I towards VSG
through PLCT. 11.00 - 11.30
30 Minutes 4 Maintenance Maintenance CSM Yard 95.873 Disconnection All up and ESM with 1 nos.staff NA
Disconnection of CSM-SKVL of CSM-SKVL down trains
S&T
B/I B/I towards SKVL
through PLCT. 11.30 - 12.00
ENGG
No train Ajit Prasad
ENGG 120 Min 1 Joint Packing 300 Mtrs MGH-JRKT SL 103/600-900 Line block Fittings & Manpower
movement SSE/P.Way/LMT 11.30 - 13.30
1 Machine
No Up train M. M Munawar
ENGG 150 Min 1 TWR 100 Mtrs MVD-JML UP 175/900-176/000 Line block 30 Labours,
movement JE/P.way/BSRX
Rail GR Pad & ERC 10.00 - 12.00
No Up &
Tamping By Tamping By Tamping Machine Sachin Mane UP-10.00 - 11.15
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block Down train
Machine Machine 08 Nos Manpower SSE/P.way/IDR DN- 12.00 -13.15
movement
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 2 UTV GDG-BDM UP & DN 0/00-67/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 3 DTE -56850 2000m GDG-HLAR UP & DN 0/0-48/0 LB Block required SSE/JE P.Way 12:30-15:00(UP)
TRD
60MI 1 Pt No. 7,8 Pt No. 7,8 LMT UP 128.29 DISCONNEC UP TRAINS ESM with 2 nos.staff JE/SSE
FOR FOR TION RECEIPTION
MAINTENAN MAINTENAN ON CALLING
CE CE ON AND
DISPATCH
ON STARTER
S&T MEMO DN
TRAINS
RECEIPTION
BY PILOTING
AND
DISPATCH
ON SIGNALS 11.00 - 12.00
120MIN 2 Pt No. Pt No. BGK UP 93.29 DISCONNEC UP TRAINS ESM with 2 nos.staff JE/SSE
15,16,17,18 15,16,17,18 TION RECEIPTION
FOR FOR ON CALLING
MAINTENAN MAINTENAN ON AND
CE CE DISPATCH
ON STARTER
S&T MEMO DN
TRAINS
RECEIPTION
BY PILOTING
AND
DISPATCH
ON SIGNALS 11.00 - 13.00
30 MIN 3 UP SIDE UP SIDE IDR UP/DN 240.6 DISCONNEC UP SIDE ESM with 1 nos.staff JE/SIG/IDR
CRANK CRANK TION TRAIN
HANDLE HANDLE PILOTING
MAINTENAN MAINTENAN DISPATCH
CE CE ON STARTER
S&T
MEMO . 2)
DN SIDE
CALLING ON
& DISPATCH
ON MEMO 10.00 - 11.00
Movement not
GDG-HG
TRD Overlap permitted in D. Kishore 10.30 - 11.15
45 1 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car (08310163796)
Movement not
TRD Overlap permitted in D. Kishore Not permitted
45 2 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car (08310163796)
Movement not
TRD Turnout permitted in D. Kishore 13.00-13.45
45 3 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car (08310163796)
Movement not
TRD Turnout permitted in D. Kishore Not permitted
45 4 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car (08310163796)
Movement not
TRD Overlap permitted in G Mahadev 09.30 - 10.15
45 5 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in G Mahadev Not permitted
45 6 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in G Mahadev 10.15 - 11.00
45 7 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in G Mahadev Not permitted
45 8 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in D. Chinna 10.30 - 11.15
45 9 Maintenance 1 HBL Yard Yard 12-14 LB and PB HBL yard DN Tower Car (08310162549)
Movement not
TRD Overlap permitted in D. Chinna Not permitted
45 10 Maintenance 1 HBL Yard Yard 12-14 LB and PB HBL yard DN Tower Car (08310162549)
Movement not
TRD Turnout permitted in D. Chinna 11.15 - 12.00
45 11 Maintenance 1 HBL Yard Yard 12-14 LB and PB HBL yard DN Tower Car (08310162549)
Movement not
TRD Turnout permitted in D. Chinna Not permitted
45 12 Maintenance 1 HBL Yard Yard 12-14 LB and PB HBL yard DN Tower Car (08310162549)
Movement not
TRD Overlap permitted in G Mahadev 11.00 - 11.45
45 13 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in G Mahadev Not permitted
45 14 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in G Mahadev 11.45 - 12.30
45 15 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in G Mahadev Not permitted
45 16 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car (08310162957)
CON
S&T
CN
Switch LB& Trains cannot S&T staff, AmC batch, 2 D.Amru Naik
TNGL-RNJP ENGG 90 Min 1 renewal Point 0.5 set BNHT yard Yard 8/500-600 11.00 - 12.30
Disconnection recieve from B/s SSE/P.Way/TNGL
No 19B TNGL BNHT
Movement not
TRD 1 Isolator permitted in Pavan Kumar 08.30 - 09.15
45 Maintenance 1 BYC YARD Yard 200-202 LB and PB BYC Yard-UP Tower Car (08310163339)
Movement not
TRD 2 Isolator permitted in Pavan Kumar Not permitted
45 Maintenance 1 BYC YARD Yard 200-202 LB and PB BYC Yard-UP Tower Car (08310163339)
Movement not
TRD 3 Turnout permitted in Pavan Kumar 09.15 - 10.00
45 Maintenance 1 BYC YARD Yard 200-202 LB and PB BYC Yard-UP Tower Car (08310163339)
Movement not
TRD 4 Turnout permitted in Pavan Kumar Not permitted
45 Maintenance 1 BYC YARD Yard 200-202 LB and PB BYC Yard-UP Tower Car (08310163339)
Movement not
TRD 5 Isolator permitted in S Ganesh 09.45 - 10.30
45 Maintenance 1 GNR YARD Yard 168-170 LB and PB GNR Yard-UP Tower Car (08310162957)
Movement not
TRD 6 Isolator permitted in S Ganesh Not permitted
45 Maintenance 1 GNR YARD Yard 168-170 LB and PB GNR Yard-UP Tower Car (08310162957)
Movement not
TRD 7 Turnout permitted in S Ganesh 10.30 - 11.15
45 Maintenance 1 GNR YARD Yard 168-170 LB and PB GNR Yard-UP Tower Car (08310162957)
Movement not
TRD 8 Turnout permitted in S Ganesh Not permitted
45 Maintenance 1 GNR YARD Yard 168-170 LB and PB GNR Yard-UP Tower Car (08310162957)
20 mins x 2 1 Crank Handle EKT BYC UP/DN 204.1 Disconnection CH3- Up ESM with 1 nos.staff NA
CH3, CH4 maintenance trains
reception
piloting to Rd
4 & Rd 5. Up
BAY-PKL trains
dispatch on
starter
memo.DN
trains
reception
S&T piloting to Rd
3, Rd 4 & Rd
5. DN trains
dispatch on
starter
memo.CH4-
Up trains
Dispatch on
starter memo.
Up trains 10.00 - 10.20
reception to 10.20 - 10.40
Rd 2 piloting.
UP trains
cannot S&T staff and TM-6 men H.Anjanamurthy
ENGG 150 min 1 WRJ 2 joints GNR yard UP 169/100-200 LB
recieve from welding batch JE/P.Way/HPT/ML
TNGL-GNR 09.40 - 11.40
Jt inspection No train
deficiency LB & movement S&T staff and TM-4 men Akash
ENGG 90 min 1 1 point RDG yard SL 53/200-300
attention Disconnection between Rdg and 2-B/s. Je/P.Way/Rdg
Pt.No.12/B to Kryp 12.00 - 13.30
No train
Mukunda
movement Machine,TRD staff-3,
ENGG 90 min 2 UTV working 30 sleepers Bay -obm SL 1/500-5/000 LB & PB SSE/P.Way/Spl
between Bay Dept-6 TM
works Bay
to Obm 11.00 - 12.30
ENGG
Km Rajavali,
ENGG
1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL 29/589--30/109 Block required Contract Labour JE/P.Way/YTG 11.00 - 14.00
Movement not
permitted in
TRD
Isolator KGW AANJAIAH
45 1 Maintenance 1 KGW YARD Yard 149-151 LB and PB Yard-UP Tower Car (08310162741) 10.00 - 10.45
Movement not
permitted in
TRD
Isolator KGW AANJAIAH
45 2 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-UP Tower Car (08310162741) NOT PERMITTED
Movement not
permitted in
TRD
Turnout KGW AANJAIAH
45 3 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-UP Tower Car (08310162741) 12.30 - 13.15
PKL-RLP TRD
TRD
30mins 1 M/I of M/I of GGVT both 38.5 Disconnection Both side ESM with 1 nos.staff JE/S/KBL
JBGD-GGVT JBGD-GGVT PLCT/piloting
S&T
BLOCK BLOCK
instrument instrument 10.00 - 10.30
30 min 2 M/I of CRANK M/I of CRANK GGVT both 38/500 Disconnection BOTH side ESM with 1 nos.staff JE/S/KBL
S&T
handle handle piloting 10.30 - 11.00
60" 3 CH No.1,2 1 BYO UP/DN LB DN Reception ESM with 1 nos.staff SSE/JE/S/HPT
calling ON
S&T and
Dispatchng
starter memo 10.00 - 11.00
CON
Movement not
TRD Isolator permitted in HANUMANTH RAO 08.00 - 08.45
45 1 Maintenance 1 MGD YARD Yard 502-504 LB and PB MGD Yard-UP Tower Car (08310162257)
Movement not
TRD Isolator permitted in HANUMANTH RAO Not permitted
45 2 Maintenance 1 MGD YARD Yard 502-504 LB and PB MGD Yard-UP Tower Car (08310162257)
Movement not
TRD Turnout permitted in HANUMANTH RAO 08.45 - 09.30
45 3 Maintenance 1 MGD YARD Yard 502-504 LB and PB MGD Yard-UP Tower Car (08310162257)
Movement not
TRD Turnout permitted in HANUMANTH RAO Not permitted
45 4 Maintenance 1 MGD YARD Yard 502-504 LB and PB MGD Yard-UP Tower Car (08310162257)
TRD
TRD
30 Minutes 1 CNC-KUD CNC-KUD CNC UP 708.15 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 11.00 - 11.30
30 Minutes 2 CNC-RBG CNC-RBG CNC DN 708.15 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 11.30 - 12.00
60 Minutes 3 Pt no 65 & 64 Pt no 65 & 64 BGM DN 610.39 Disconnection 1. DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. UP
despatch by
starter memo 10.00 - 11.00
60 Minutes 4 Pt no 63 & 62 Pt no 63 & 62 BGM DN 610.39 Disconnection 1. DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. UP
despatch by
starter memo 11.00 - 12.00
DWR-MRJ 40 Minutes 5 01T two core 01T two core DUR DN & DN 599.637 Disconnection 1. DN ESM with 1 nos.staff NA
Disconnection lead wire lead wire reception
calling on
S&T
2. UP
despatch by
starter memo 12.00 - 12.40
40 Minutes 6 S1C Calling S1C Calling DEV UP 546.55 Disconnection NIL ESM with 2 nos.staff NA
S&T
Disconnection ON rewiring ON rewiring 11.00 - 11.40
30 Minutes 7 CH1-CH10 CH1-CH10 DWR UP&DN 489.09 Disconnection both UP and ESM with 1 nos.staff NA
Disconnection FOR FOR DN trains
S&T maintenance maintenance reception and
dispatch by
pilotting 14.00 -14.30
20 Minutes 8 03AT LEAD 03AT LEAD MGD UP 502.56 Disconnection UP TRAIN ESM with 1 nos.staff NA
Disconnection WIRE WIRE RECEPTION
S&T
REPLACEME REPLACEME ON CALLING
NT NT ON 14.00 - 14.20
UTV Machine
Shifting of 55/35 nos
ENGG 1
2 blocks of 90 Sleepers/Rail Loading/unloa
minutes each s ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic
ENGG 2 tamping Plain track
2 x 120mins Machine Tamping KNP-DUR DN 587/700-589/700 LB Block required JE/P.WAY/KNP 11.00 - 13.00
Duomatic
ENGG 3 tamping Plain track
2 x 120mins Machine Tamping PCH-GKK DN 649/000-651/000 LB Block required JE/P.way/SPL/BGM 10.00 - 11.30
1 block 90 Bridge.No.125
ENGG 4
mnn (Up) Attention Br.No.125 GKK-GPB Up 664/300-600 LB LB Required SSE/PWAY/GPB 10.00 - 11.30
UP TRAIN
ENGG CAN'T
240 BCM WORK 600 KRKP;MGD UP 499/800-500/400 LB+PB DISPATCH SSE/PWAY/DWR 12.00 - 15.00
CON
Ballast Ballast profile Rekhya naik
ENGG
120min 1 regulation & sweeping HBI-KTY Single line 48/0-49/0 Block required BRM-04 JE/PW/KTY 12.00 - 15.00
VC-KTY ENGG
TRD
RE
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 13.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) REPERCUSSIONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in KGX SIVARAMNANDH
45 1 Maintenance 1 KGX YARD Yard 66-68 LB and PB Yard-UP Tower Car (08310161863) 10.00 - 10.45
Movement not
TRD Isolator permitted in KGX SIVARAMNANDH NOT
45 2 Maintenance 1 KGX YARD Yard 66-68 LB and PB Yard-UP Tower Car (08310161863) PERMITTED
Movement not
TRD Turnout permitted in KGX SIVARAMNANDH
45 3 Maintenance 1 KGX YARD Yard 66-68 LB and PB Yard-UP Tower Car (08310161863) 11.00 - 11.45
Movement not
TRD Turnout permitted in KGX SIVARAMNANDH NOT
45 4 Maintenance 1 KGX YARD Yard 66-68 LB and PB Yard-UP Tower Car (08310161863) PERMITTED
Movement not
TRD Isolator permitted in NVD 08.30-09.15
45 5 Maintenance 1 NVD YARD Yard 35-37 LB and PB Yard-UP Tower Car B SOREN (7022029745)
Movement not
TRD Isolator permitted in NVD 11.00-11.45
45 6 Maintenance 1 NVD YARD Yard 35-37 LB and PB Yard-UP Tower Car B SOREN (7022029745)
Movement not
TRD Turnout permitted in NVD 13.00-13.45
45 7 Maintenance 1 NVD YARD Yard 35-37 LB and PB Yard-UP Tower Car B SOREN (7022029745)
Movement not
TRD Turnout permitted in NVD 15.15-16.00
45 8 Maintenance 1 NVD YARD Yard 35-37 LB and PB Yard-UP Tower Car B SOREN (7022029745)
10:30-12.30(DN)
ENGG SSE/JE P.Way
120 min 4 BT-Unloading 20 Bobyn KJG-GDI UP & DN 400/100-433/0 LB Block required YLG 14:00-16:30(UP)
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
Crossing 483/100-200, Pnt UP & DN line no train
ENGG 150min 6 1 NVU yard UP can be passed during Mannually
Renewal work no-94B LB and PB SSE/JE P.Way 10.00 - 11.30
Block time
30 minutes 1 lc 267 lc 267 gdi UP/DN 433.72 Disconnection up and dn trains dealt ESM with 2 JE/SIG/YLG
S&T maintance for maintance for with slinding boom nos.staff
m/i m/i 09.30 - 10.00
KBL-DWR 30 minutes 2 lc 286 lc 286 gdi UP/DN 433.72 Disconnection up and dn trains dealt ESM with 2 JE/SIG/YLG
S&T maintance for maintance for with slinding boom nos.staff
m/i m/i 10.00 - 10.30
30 Minutes 3 Monthly Monthly KNO UP/DN 453.17 Disconnection All UP & DN trains to ESM with 1 JE/SIG/UBL
Disconnection Inspection of Inspection of be dealt on Sliding nos.staff
S&T Interlocked Interlocked boom
LC gate LC gate
LC-276 LC-276 09.30 - 10.00
30 minutes 4 MONTHLY MONTHLY KUG UP/DN 10.01 Disconnection ALL UP AND DN ESM with 1 JE/SIG/UBL
INSPECTION INSPECTION TRAINS ON PLCT nos.staff
S&T
OF KUG-HBS OF KUG-HBS
BLOCK BLOCK 11.30 - 12.00
30 minutes 5 MONTHLY MONTHLY KUG UP/DN 10.01 Disconnection ALL TRAINS ESM with 1 JE/SIG/UBL
INSPECTION INSPECTION PILOTING nos.staff
S&T
OF CRANK OF CRANK
HANDLE HANDLE 12.00 - 12.30
30 minutes 6 NVD-NGR NVD-NGR NVD UP/DN 26.98 Disconnection ALL UP AND DN ESM with 1 JE/SIG/UBL
BLOCK BLOCK TRAINS ON PLCT nos.staff
S&T INSTRUMEN INSTRUMEN
T T
MAINTANCE MAINTANCE 11.30 - 12.00
30 minutes 7 MONTHLY MONTHLY NVD UP/DN 26.98 Disconnection ALL TRAINS ESM with 1 JE/SIG/UBL
INSPECTION INSPECTION PILOTING nos.staff
S&T
OF CRANK OF CRANK
HANDLE HANDLE 12.00 - 12.30
45 8 maintanance maintanance KBL both 115/400 discconnectio all up trains need to be ESM with 1 JE/S/KBL
S&T of KBL-BNP of KBL-BNP n given PLCT nos.staff
Block Block 12.00 - 12.45
45 9 maintanance maintanance BNA both 92/500 discconnectio all up trains need to be ESM with 1 JE/S/KBL
S&T of BNA-SOQ of BNA-SOQ n given PLCT nos.staff
Block Block 08.30 - 09.15
90 10 Pt 65A Pt 65A BNA both 91/300-200 discconnectio dn trains reception ESM with 2 JE/S/KBL
Gaugetie Gaugetie n pilated and up trains nos.staff and Engg
plate plate dispatch pilated staff
S&T
insulation insulation
replacement replacement
work work 11.30 - 13.00
ENGG 2 x 90 MIN 1 MPT SVM - CNR UP 71/860-72/120 JE/PwAY /QLM 10.30 - 12.00
SHADOW
ENGG
2 X 75 miN 2 UTV/WRJ SVM -CNR UP 71/860-72/120 BLOCK
Attending PT.
ENGG
60 Min 3 no 75 QLM Yard SSE/PWay/Svm 09.30 - 10.45
CRZ yard UP up trains can not be
ENGG
120 min 4 line PBC work PBC work CRZ yard Yard 31/500-800 disconnection received 13.00 - 15.00
PBC work
ENGG between SHADOW
LD-VSG
120 min 5 CRZ-DDS PBC work CRZ-DDS SL 34/200-500 LB required BLOCK
TRD
30 Minutes 1 KL 101/102 KL 101/102 VSG Yard 108.458 Disconnection Shunting movement ESM with 2 NA
S&T Disconnection EKT EKT from Rd2 to Rd1& VIP nos.staff
Maintenance Maintenance siding on piloting. 10.00 - 10.30
40 Minutes 2 55T TLD BOX 55T TLD BOX svm Yard 75/500 Disconnection Reception from Rd ESM with 2 NA
S&T
Disconnection lifting work lifting work 4,5&6 Co on signal nos.staff 11.00 - 11.40
S&T
CN
Fittings & Ajit Prasad
ENGG 120 Min 1 Joint Packing 300 Mtrs MGH-JRKT SL 103/900-104/200 Line block No train movement
Manpower SSE/P.Way/LMT 11.30 - 13.30
1 Machine
30 Labours, M. M Munawar
ENGG 150 Min 1 TWR 100 Mtrs MVD-JML UP 176/000-100 Line block No Up train movement
Rail GR Pad & JE/P.way/BSRX
ERC 10.00 - 12.00
UP-10.00 - 11.15
Tamping By Tamping By No Up & Down train Tamping Machine Sachin Mane
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block DN- 12.00
Machine Machine movement 08 Nos Manpower SSE/P.way/IDR
-13.15
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 2 UTV GDG-BDM UP & DN 0/00-67/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 3 DTE -56850 2000m GDG-HLAR UP & DN 0/0-48/0 LB Block required SSE/JE P.Way 12:30-15:00(UP)
Movement not
TRD Overlap permitted in LHN yard D. Kishore
45 1 Maintenance 1 LHN Yard Yard 251-253 LB and PB DN Tower Car (08310163796) 09.30 - 10.15
Movement not
TRD Overlap permitted in LHN yard D. Kishore NOT
45 2 Maintenance 1 LHN Yard Yard 251-253 LB and PB DN Tower Car (08310163796) PERMITTED
Movement not
TRD Turnout permitted in LHN yard D. Kishore
45 3 Maintenance 1 LHN Yard Yard 251-253 LB and PB DN Tower Car (08310163796) 10.15 - 11.00
Movement not
TRD Turnout permitted in LHN yard D. Kishore NOT
45 4 Maintenance 1 LHN Yard Yard 251-253 LB and PB DN Tower Car (08310163796) PERMITTED
Movement not
TRD Overlap permitted in BJP yard G Mahadev
45 5 Maintenance 1 BJP YARD Yard 190-192 LB and PB DN Tower Car (08310162957) 09.30 - 10.15
Movement not
TRD Overlap permitted in BJP yard G Mahadev NOT
45 6 Maintenance 1 BJP YARD Yard 190-192 LB and PB DN Tower Car (08310162957) PERMITTED
Movement not
TRD Turnout permitted in BJP yard G Mahadev
GDG-HG 45 7 Maintenance 1 BJP YARD Yard 190-192 LB and PB DN Tower Car (08310162957) 10.15 - 11.00
Movement not
TRD Turnout permitted in BJP yard G Mahadev NOT
45 8 Maintenance 1 BJP YARD Yard 190-192 LB and PB DN Tower Car (08310162957) PERMITTED
Movement not
TRD Overlap permitted in BLR yard
45 9 Maintenance 1 BLR Yard Yard 21-23 LB and PB DN Tower Car D. Chinna (08310162549) 10.30 - 11.15
Movement not
TRD Overlap permitted in BLR yard NOT
45 10 Maintenance 1 BLR Yard Yard 21-23 LB and PB DN Tower Car D. Chinna (08310162549) PERMITTED
Movement not
TRD Turnout permitted in BLR yard
45 11 Maintenance 1 BLR Yard Yard 21-23 LB and PB DN Tower Car D. Chinna (08310162549) 11.15 - 12.00
Movement not
TRD Turnout permitted in BLR yard NOT
45 12 Maintenance 1 BLR Yard Yard 21-23 LB and PB DN Tower Car D. Chinna (08310162549) PERMITTED
Movement not
TRD Overlap permitted in BSRX yard G Mahadev
45 13 Maintenance 1 BSRX Yard Yard 137-139 LB and PB DN Tower Car (08310162957) 11.00 - 11.45
Movement not
TRD Overlap permitted in BSRX yard G Mahadev NOT
45 14 Maintenance 1 BSRX Yard Yard 137-139 LB and PB DN Tower Car (08310162957) PERMITTED
Movement not
TRD Turnout permitted in BSRX yard G Mahadev
45 15 Maintenance 1 BSRX Yard Yard 137-139 LB and PB DN Tower Car (08310162957) 11.45 - 12.30
Movement not
TRD Turnout permitted in BSRX yard G Mahadev NOT
45 16 Maintenance 1 BSRX Yard Yard 137-139 LB and PB DN Tower Car (08310162957) PERMITTED
30MIN FOR 1 BGK SIDE BGK SIDE GED UP/DN 80.37 DISCONNEC WILL BE GIVEN WITH ESM with 2 NA
S&T EACH POINT POINTS POINTS TION DISCONNECTION OF nos.staff
CONCERNED POINT 10.00 - 10.30
S&T
CN
TNGL-RNJP ENGG No trains movement PQRS machine, Akhilesh Kumar Singh
240 1 PQRS work 260 mtr BNHT-NDHI SL 10/320 to 580 LB BNHT--NDHi Agency labor, SSE/P.WAY/HPT/ML (IC) 11.00 - 15.00
Movement not
TRD Isolator permitted in BYC Pavan Kumar 08.30 - 09.15
45 1 Maintenance 1 BYC YARD Yard 200-202 LB and PB Yard-UP Tower Car (08310163339)
Movement not
TRD Isolator permitted in BYC Pavan Kumar Not permitted
45 2 Maintenance 1 BYC YARD Yard 200-202 LB and PB Yard-UP Tower Car (08310163339)
Movement not
TRD Turnout permitted in BYC Pavan Kumar 09.15 - 10.00
45 3 Maintenance 1 BYC YARD Yard 200-202 LB and PB Yard-UP Tower Car (08310163339)
Movement not
Turnout Pavan Kumar
TRD 45 1 BYC YARD Yard 200-202 LB and PB permitted in BYC Tower Car Not permitted
Maintenance (08310163339)
4 Yard-UP
Movement not
TRD Isolator permitted in BYO
45 5 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-UP Tower Car S Ganesh (08310162957) 10.00 - 10.45
Movement not
TRD Isolator permitted in BYO
45 6 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-UP Tower Car S Ganesh (08310162957) Not permitted
Movement not
TRD Turnout permitted in BYO
45 7 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-UP Tower Car S Ganesh (08310162957) 10.45 - 11.15
Movement not
TRD Turnout permitted in BYO
45 8 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-UP Tower Car S Ganesh (08310162957) Not permitted
60" 1 CH No.3,4 1 BYO UP/DN 161.53 LB DN/UP Reception ESM with 1 SSE/JE/S/HPT
calling ON and nos.staff
S&T
BAY-PKL Dispatchng starter
memo 10.00 - 11.00
30 mins x 2 2 LC-112A & EKT & Key BAY UP/DN Disconnection LC-112A- Reception to ESM with 2 NA
100 KL point Lock point Rd 6,7 & 8 piloting. nos.staff
manitenance maintenance Dispatch from Rd 6, 7 &
S&T 8 starter memo. KL100-
Reception to Rd 1
piloting. Dispatch from 09.00 - 09.30
208.06 Rd 1 starter memo. 09.30 - 10.00
30 mins 3 LC -05 EKT & EKT BNHT-TNGL UP/DN Disconnection Caution order. Up/Dn ESM with 2 NA
S&T Emergency maintenance BP trains to observe PHS nos.staff
EKT 9.02 signal. 10.00 - 10.30
RE
Switch UP trains cannot
LB & 12 TM , 2 B/s, and Vicky Kumar
ENGG 90 min 1 renewal point 0.5 set TNGL UP 175/100-200 dispatch and recieve
Disconnection S&T staff JE/P.WAY/SW/TNGL
No 97B From TNGL to JVSL, 10.00 - 11.30
Rail renewal Bypass trains no Akhuilesh Kumar singh
ENGG 90 min 1 13 mtr HPT bypass Bypass 0/300-400-400-500 LB 10 TM & B/S 2
work movement SSE/P.WAY/HPT/ML 15.00 - 16.30
Jt inspection
deficiency LB & No train movement S&T staff and TM-4 Akash
ENGG 90 min 1 1 point RDG yard SL 52/500-52/60
attention Disconnection between Rdg to Slm men and 2-B/s. Je/P.Way/Rdg
Pt.No.14/B 08.00 - 09.30
Mukunda
No train movement Machine,TRD
ENGG 90 min 2 UTV working 30 sleepers Bay -obm SL 1/500-5/000 LB & PB SSE/P.Way/Spl works
between Bay to Obm staff-3, Dept-6 TM
Bay 11.00 - 12.30
Point packing LB & No train movement Agency-15 R.V.Naik
ENGG 60 min 3 1 Pt Slm yard SL 30/600-700
Pt.No13/B disconnection between Obm to Slm labour,S&T staff SSE/P.Way/Obm 12.00 - 13.00
UP train cannot be
ENGG Track dispatched but can be Hanumanthappa
120min 1 attention 100mtr GIn Yard UP UP 125/500-600 LB received AMC Batch (SSE/P.Way/KBL) 10.00 - 12.00
ENGG 1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL Km 30/109-30/629 Block required Contract Labour Rajavali, JE/P.Way/YTG 11.00 - 14.00
1. AC and Diesel loco
TRD TO and SI 1 SI + 1 TO + not permitted in KGW
60 1 Maintenance 4 CA KGW YARD UP 150-148 LB & PB yard UP line Rd-1,2,3,4 Towercar JE/TRD/HPT 10.00 - 11.00
1. Ac and Diesel not
TRD UIOL and IOL permitted in KGW-HPT
60 2 Maintenance 2 UIOL KGW-HPT UP 148-144 LB&PB UP section. Towercar JE/TRD/HPT 11.30 - 12.30
Movement not
TRD Isolator permitted in KGW AANJAIAH
45 1 Maintenance 1 KGW YARD Yard 149-151 LB and PB Yard-UP Tower Car (08310162741) 10.00 - 10.45
Movement not
TRD Isolator permitted in KGW AANJAIAH
45 2 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-UP Tower Car (08310162741) 11.30 - 12.15
Movement not
PKL-RLP TRD Turnout permitted in KGW AANJAIAH NOT
45 3 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-UP Tower Car (08310162741) PERMITTED
Movement not
TRD Turnout permitted in KGW AANJAIAH
45 4 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-UP Tower Car (08310162741) 12.30 - 13.15
45mins 1 63ATF Lead 63ATF Lead GIN UP and DN 125/900 to 125/800 LB Trains cannot be dealt ESM with 1 SSE/JE/ESM
wire wire through Road4 nos.staff
S&T
Replacement Replacement
work work 10.00 - 10.45
30mins 2 Maintenance Maintenance GGVT both 38/500 Disconnection Both side PLCT/piloting ESM with 1 JE/S/KBL
of of nos.staff
S&T JBGD-GGVT JBGD-GGVT
BLOCK BLOCK
instrument instrument 11.00 - 11.30
30 min 3 Maintenace of Maintenace of GGVT both 38/500 Disconnection BOTH side piloting ESM with 1 JE/S/KBL
S&T CRANK CRANK nos.staff
handle handle 11.30 - 12.00
CON
Movement not
TRD Isolator permitted in KBI HANUMANTH RAO
45 1 Maintenance 1 KBI YARD Yard 514-516 LB and PB Yard-UP Tower Car (08310162257) 08.00 - 08.45
Movement not
TRD Isolator permitted in KBI HANUMANTH RAO NOT
45 2 Maintenance 1 KBI YARD Yard 514-516 LB and PB Yard-UP Tower Car (08310162257) PERMITTED
Movement not
TRD Turnout permitted in KBI HANUMANTH RAO
45 3 Maintenance 1 KBI YARD Yard 514-516 LB and PB Yard-UP Tower Car (08310162257) 08.45 - 09.15
Movement not
TRD Turnout permitted in KBI HANUMANTH RAO NOT
45 4 Maintenance 1 KBI YARD Yard 514-516 LB and PB Yard-UP Tower Car (08310162257) PERMITTED
TRD
TRD
30 Minutes 1 GKK-GPB GKK-GPB GKK UP 662.845 Disconnection UP & DN train on PLCT ESM with 1 JE/SIG/GPB
UFSBI UFSBI nos.staff
S&T
Monthly Monthly
Inspection Inspection 10.00 - 10.30
30 Minutes 2 GKK-PCH GKK-PCH GKK DN 662.845 Disconnection UP & DN train on PLCT ESM with 1 JE/SIG/GPB
UFSBI UFSBI nos.staff
S&T
Monthly Monthly
Inspection Inspection 10.30 - 11.00
30 Minutes 3 SED-VJR SED-VJR SED UP 730.858 Disconnection UP & DN train on PLCT ESM with 1 NA
S&T UFSBI UFSBI nos.staff
Maintenance Maintenance 09.00 - 09.30
30 Minutes 4 SED-UGR SED-UGR SED DN 730.858 Disconnection UP & DN train on PLCT ESM with 1 NA
S&T UFSBI UFSBI nos.staff
DWR-MRJ Maintenance Maintenance 09.30 - 10.00
40 Minutes 5 Pt no 62 Pt no 62 DUR UP & DN Disconnection 1. DN reception piloting ESM with 2 NA
S&T Disconnection maintenance maintenance 2. UP despatch by nos.staff
599.637 starter memo 12.00 - 12.40
40 Minutes 6 Pt no 61 Pt no 61 DUR UP & DN Disconnection 1. DN reception piloting ESM with 2 NA
S&T Disconnection maintenance maintenance 2. UP despatch by nos.staff
599.637 starter memo 12.40 - 13.20
60 Minutes 7 POINT POINT LWR UP&DN 525.8 Disconnection DN TRAIN CAN BE ESM with 2 NA
Disconnection N0-54A GTP N0-54A GTP RECEIVED ON nos.staff and Engg
INSULATION INSULATION CALLING ON UP staff
S&T
REPLACEME REPLACEME TRAIN CANNOT BE
NT NT DEALT ON LOOP LINE
ON SIGNAL 14.00 - 15.00
UTV Machine
Shifting of 55/35 nos
ENGG 1
2 blocks of 90 Sleepers/Rail Loading/unloa
minutes each s ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic
ENGG 2 tamping Plain track
2 x 120mins Machine Tamping KNP-DUR DN 589/700-591/700 LB Block required JE/P.WAY/KNP 11.00 - 13.00
Duomatic
ENGG 3 tamping Plain track
2 x 120mins Machine Tamping PCH-GKK DN 647/000-649/000 LB Block required JE/P.way/SPL/BGM 10.00 - 11.30
1 block 90 Bridge.No.125
ENGG 4
mnn (Dn) Attention Br.No.125 GKK-GPB Dn 664/100-300 LB LB Required SSE/PWAY/GPB 10.00 - 11.30
UP TRAIN CAN'T
ENGG
240 BCM WORK 600 KRKP;MGD UP 500/400-501/00 LB+PB DISPATCH SSE/PWAY/DWR 12.00 - 15.00
CON
Bridge no.133
approach Sharad Srivastava
ENGG 120min 2 approaches KTY-HBI singl line 57/900-58/000 Block required Manual
packing SSE/PW/KTY
packing 12.00 - 15.00
VC-KTY Ballast Ballast profile Rekhya naik
ENGG
120min 1 regulation & sweeping HBI-KTY Single line 49/0-50/0 Block required BRM-04 JE/PW/KTY 12.00 - 15.00
TRD
RE
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 14.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK REPERCUSS RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 KGX YARD Yard 66-68 LB and PB KGX Yard-UP Tower Car (08310161863) 10.00 - 10.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 KGX YARD Yard 66-68 LB and PB KGX Yard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 KGX YARD Yard 66-68 LB and PB KGX Yard-UP Tower Car (08310161863) 11.00 - 11.45
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 KGX YARD Yard 66-68 LB and PB KGX Yard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in B SOREN 08.30-09.15
45 5 Maintenance 1 NVD YARD Yard 35-37 LB and PB NVD Yard-UP Tower Car (7022029745)
Movement not
TRD Isolator permitted in B SOREN 11.00-11.45
45 6 Maintenance 1 NVD YARD Yard 35-37 LB and PB NVD Yard-UP Tower Car (7022029745)
Movement not
TRD Turnout permitted in B SOREN 13.00-13.45
45 7 Maintenance 1 NVD YARD Yard 35-37 LB and PB NVD Yard-UP Tower Car (7022029745)
Movement not
TRD Turnout permitted in B SOREN 15.15-16.00
45 8 Maintenance 1 NVD YARD Yard 35-37 LB and PB NVD Yard-UP Tower Car (7022029745)
09:45-12:15(DN)
ENGG
150 min *2 1 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
PBC work
ENGG 120 min 2 between PBC work DDS-LIM SL 42/000-300 disconnection
DDS-LIM Block required 13.00 - 15.00
KBL-DWR Point PBC
ENGG 120 min 3 between PBC work CLR-CRZ SL 27/700-28/000 LB required
CLR-CRZ SHADOW BLOCK
UP line no
Reconditionin
468/900-469/00, train can be
ENGG 150min 4 g of Tounge 1 UBL yard UP LB
Pnt no-133A passed during
Rails
Block time. Mannually SSE/JE P.Way ----
60 Minutes 1 02AT TLD 02AT TLD BDKA DN 475.95 Disconnection DN trains to ESM with 2 nos.staff NA
S&T Disconnection lifting work lifting work be dealt on
Calling ON 08.30 - 09.30
30 MINUTES 2 NGR-NVD NGR-NVD NGR-NVD UP/DN 35.42 Disconnection ALL TRAINS ESM with 1 nos.staff NA
BLOCK BLOCK IN BLOCK
S&T
INSTRUMEN INSTRUMEN ON PLCT
T T 11.30 - 12.00
30 MINUTES 3 NGR CRANK NGR CRANK NGR DN 35.42 Disconnection ALL CRANK ESM with 1 nos.staff NA
MONTH MONTH HANDLES
S&T
INSTRUMEN INSTRUMEN FOR
T T MAINTANCE 12.00 - 12.30
30min 4 Quaterly Quaterly KBL both 115/400 discconnectio Both side ESM with 1 nos.staff SSE/S/GDG
Inspection of Inspection of n PLCT &
S&T BLOCK & BLOCK & PILOTING
CRANK CRANK
handle handle 12.00 - 12.30
60 5 maintance of maintance of TLKL both 97/600 discconnectio all trains need ESM with 1 nos.staff JE/S/KBL
S&T
crank handles crank handles n to be pilated 12.00 - 12.30
90 6 Pt 63B Pt 63B BNA dn 92/500 discconnectio DN trains ESM with 2 nos.staff JE/S/KBL
Gaugetie Gaugetie n recepotion and Engg staff
plate plate pilated
S&T
insulation insulation
replacement replacement
work work 12.00 - 13.30
ENGG 180 Min 1 PQRS SVM -CNR 72/120-72/380 SSE/PWAY QLM 10.00 - 13.00
Attending PT
ENGG no. 65B KM
60 Min 2 Yard KM Yard 10.00 - 11.00
SEJ no 20
ENGG
90 Min 3 Renewal SSE/PWAY /VSG 10.00 - 11.30
TRD
30 Minutes 1 SSBPAC B/I SSBPAC B/I LD UP & DN Disconnection 1. PLC ESM with 1 nos.staff NA
S&T Disconnection maintenance maintenance
LD-SVTN LD-SVTN 559.45 12.00 - 12.30
30 Minutes 2 SSBPAC B/I SSBPAC B/I LD UP & DN Disconnection 1. PLC ESM with 1 nos.staff NA
S&T Disconnection maintenance maintenance
LD-GNJ LD-GNJ 559.45 12.30 - 13.00
30 Minutes 3 SSBPAC B/I SSBPAC B/I LD UP & DN Disconnection 1. PLC ESM with 1 nos.staff NA
S&T Disconnection maintenance maintenance
LD-TGT LD-TGT 559.45 13.00 - 13.30
30 Minutes 4 Crank handle Crank handle LD UP & DN Disconnection 1. UP & DN ESM with 1 nos.staff NA
Disconnection CH 1 to 6 for CH 1 to 6 for reception by
maintenance maintenance piloting
S&T
2. UP & DN
LD-VSG
despatch by
559.45 starter memo 17.00 - 17.30
30 Minutes 5 Crank handle Crank handle LD UP & DN Disconnection 1. UP & DN ESM with 1 nos.staff NA
Disconnection CH 7 to 11 for CH 7 to 11 for reception by
maintenance maintenance piloting
S&T
2. UP & DN
despatch by
559.45 starter memo 17.30 - 18.00
30 Minutes 6 Maintenance Maintenance CSM Yard 95.873 Disconnection All trains ESM with 1 nos.staff NA
S&T Disconnection All crank All crank movement on
handles handles piloting 10.00 - 10.30
30 Minutes 7 M/I of M/I of MJO Yard 435.73 Disconnection All up and ESM with 1 nos.staff JE/VSG
Disconnection MJO-CSM B/I MJO-CSM B/I down trains
S&T
towards VSG
through PLCT. 10.00 - 10.30
CON
S&T
PROJ
S&T
CN
No train Ajit Prasad
ENGG 120 Min 1 Joint Packing 400 Mtrs MGH-JRKT SL 104/200-600 Line block Fittings & Manpower
movement SSE/P.Way/LMT 11.30 - 13.30
1 Machine
No Up train M. M Munawar
ENGG 150 Min 1 TWR 100 Mtrs MVD-JML UP 176/100-200 Line block 30 Labours,
movement JE/P.way/BSRX
Rail GR Pad & ERC 10.00 - 12.00
No train BT Rake B C Pradhan
ENGG 120 Min 2 BT 900 Cum MNL-NBL UP 211/000-209/000 Line block
movement Manpower SSE/P.Way/BJP 10.00 - 12.00
No Up &
Tamping By Tamping By Tamping Machine 08 Sachin Mane UP-10.00 - 11.15
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block Down train
Machine Machine Nos Manpower SSE/P.way/IDR DN- 12.00 -13.15
movement
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 2 UTV GDG-BDM UP & DN 0/00-67/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 3 DTE -56850 2000m GDG-HLAR UP & DN 0/0-48/0 LB Block required SSE/JE P.Way 12:30-15:00(UP)
Movement not
TRD Overlap permitted in D. Kishore
45 1 Maintenance 1 LHN Yard Yard 251-253 LB and PB LHN yard DN Tower Car (08310163796) 09.30 - 10.15
Movement not
TRD Overlap permitted in D. Kishore
45 2 Maintenance 1 LHN Yard Yard 251-253 LB and PB LHN yard DN Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Turnout permitted in D. Kishore
45 3 Maintenance 1 LHN Yard Yard 251-253 LB and PB LHN yard DN Tower Car (08310163796) 10.15 - 11.00
Movement not
TRD Turnout permitted in D. Kishore
45 4 Maintenance 1 LHN Yard Yard 251-253 LB and PB LHN yard DN Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 5 Maintenance 1 BJP YARD Yard 190-192 LB and PB BJP yard DN Tower Car (08310162957) 09.30 - 10.15
Movement not
TRD Overlap permitted in G Mahadev
45 6 Maintenance 1 BJP YARD Yard 190-192 LB and PB BJP yard DN Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 7 Maintenance 1 BJP YARD Yard 190-192 LB and PB BJP yard DN Tower Car (08310162957) 10.15 - 11.00
Movement not
TRD Turnout permitted in G Mahadev
45 8 Maintenance 1 BJP YARD Yard 190-192 LB and PB BJP yard DN Tower Car (08310162957) NOT PERMITTED
GDG-HG Movement not
TRD Overlap permitted in D. Chinna
45 9 Maintenance 1 BLR Yard Yard 21-23 LB and PB BLR yard DN Tower Car (08310162549) 10.30 - 11.15
Movement not
TRD Overlap permitted in D. Chinna
45 10 Maintenance 1 BLR Yard Yard 21-23 LB and PB BLR yard DN Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Turnout permitted in D. Chinna
45 11 Maintenance 1 BLR Yard Yard 21-23 LB and PB BLR yard DN Tower Car (08310162549) 11.15 - 12.00
Movement not
TRD Turnout permitted in D. Chinna
45 12 Maintenance 1 BLR Yard Yard 21-23 LB and PB BLR yard DN Tower Car (08310162549) NOT PERMITTED
Movement not
permitted in
TRD
Overlap BSRX yard G Mahadev
45 13 Maintenance 1 BSRX Yard Yard 137-139 LB and PB DN Tower Car (08310162957) 11.00 - 11.45
Movement not
permitted in
TRD
Overlap BSRX yard G Mahadev
45 14 Maintenance 1 BSRX Yard Yard 137-139 LB and PB DN Tower Car (08310162957) NOT PERMITTED
Movement not
permitted in
TRD
Turnout BSRX yard G Mahadev
45 15 Maintenance 1 BSRX Yard Yard 137-139 LB and PB DN Tower Car (08310162957) 11.45 - 12.30
Movement not
permitted in
TRD
Turnout BSRX yard G Mahadev
45 16 Maintenance 1 BSRX Yard Yard 137-139 LB and PB DN Tower Car (08310162957) NOT PERMITTED
60MIN 1 SH KEYS SH KEYS JRKT UP/DN 113 DISCONNEC UP/DN ESM with 1 nos.staff JE/SSE
FOR FOR TION TRAINS
MAINTENAN MAINTENAN RECEIPTION
CE CE ON SIGNALS
S&T
AND
DISPATCH
ON PLCT DN
TRAINS 1.30 - 12.30
S&T
CN
Movement not
permitted in
TRD
Overlap BAY yard RD Pavan Kumar
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 1, 2 & 3 Tower Car (08310163339) 09.00 - 09.45
Movement not
permitted in
TRD
Overlap BAY yard RD Pavan Kumar
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 1, 2 & 3 Tower Car (08310163339) Not permitted
Movement not
permitted in
TRD
Turnout BAY yard RD Pavan Kumar
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 1, 2 & 3 Tower Car (08310163339) 10.30 - 11.15
Movement not
permitted in
TRD
Turnout BAY yard RD Pavan Kumar
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 1, 2 & 3 Tower Car (08310163339) Not permitted
Movement not
TRD 5 Isolator permitted in S Ganesh
45 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-UP Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD 6 Isolator permitted in S Ganesh
45 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-UP Tower Car (08310162957) Not permitted
Movement not
TRD 7 Turnout permitted in S Ganesh
45 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-UP Tower Car (08310162957) 10.45 - 11.15
Movement not
TRD 8 Turnout permitted in S Ganesh
45 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-UP Tower Car (08310162957) Not permitted
BAY-PKL 60" 1 CH No.5 6 1 BYO UP/DN 161.53 LB DN/UP ESM with 1 nos.staff SSE/JE/S/HPT
Reception
S&T piloting and
Dispatchng
starter memo 10.00 - 11.00
30 mins 2 LC-06 EKT EKT BNHT-TNGL UP/DN Disconnection Caution order. ESM with 2 nos.staff NA
maintenance maintenance BP Up/Dn trains
S&T & Emergency to observe
EKT PHS signal.
maintenance 9.02 11.00 - 11.30
Switch Road No 6 No
LB & S&T staff, AMC batch D> Amru Naik
ENGG 90 min 1 renewal point 0.5 set TNGL yard Road No-6 175/500-600 train
Disconnection , 2 B/s SSE/P.WAY/TNGL
no 94A movement 10.00 - 11.30
Trains cannot
recieve and S&T staff and TM-4 H.Anjanamurthy
ENGG 150 1 WRJ 4 joints MRB-HPT DN/UP 141/900-142/000 LB
dispatch men and 2-B/s. Je/P.Way/HPT/ML UP - 10.00 - 12.00
UP/DN DN - 07.00 - 09.00
Jt inspection No train
deficiency LB & movement S&T staff and TM-4 Akash
ENGG 90 min 1 1 point RDG yard SL 53/300-400
attention Disconnection between Rdg men and 2-B/s. Je/P.Way/Rdg
Pt.No.8 to MOMU 12.00 - 13.30
No train
movement Machine,TRD staff-3, Mukunda
ENGG 90 min 2 UTV working 30 sleepers Bay -obm SL 1/500-5/000 LB & PB
between Bay Dept-6 TM SE/P.Way/Spl works B
to Obm 11.00 - 12.30
No train
Point packing LB & movement Agency-15 R.V.Naik
ENGG 60 min 3 1 Pt Slm yard SL 30/300-400
Pt.No.13/A disconnection between Slm labour,S&T staff SSE/P.Way/Obm
to Obm 11.30 - 12.30
Point attention DN trains Sunil Kumar
S&T staff , blacksmith
ENGG 65A, 65B and cannot (SSE/P.Way/GDG
and AMC labours
2x120 mins 1 64B 3 point RLP yard DN 75/300-600 LB dispatch ML) 11.30 - 13.30
Movement not
permitted in
TRD
Isolator KGW AANJAIAH
45 1 Maintenance 1 KGW YARD Yard 149-151 LB and PB Yard-UP Tower Car (08310162741) 10.00 - 11.00
Movement not
permitted in
TRD
Isolator KGW AANJAIAH
45 2 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-UP Tower Car (08310162741) 11.30 - 12.30
Movement not
permitted in
TRD
Turnout KGW AANJAIAH
45 3 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-UP Tower Car (08310162741) 10.00 - 10.45
PKL RLP
PKL-RLP
Movement not
permitted in
TRD
Turnout KGW AANJAIAH
45 4 Maintenance 1 KGX YARD Yard 149-151 LB and PB Yard-UP Tower Car (08310162741) 11.30 - 12.15
TRD
45min 1 LC-76 M/I LC-76 M/I MRB Both 133/800 to discconnectio Trains to be ESM with 2 nos.staff JE/S/KBL
S&T 133/900 n dealt through
Slide boom 10.00 - 10.45
45min 2 LC-77 M/I LC-77 M/I MRB both 134/700 to discconnectio Trains to be ESM with 2 nos.staff JE/S/KBL
S&T 134/800 n dealt through
Slide boom 12.00 - 12.45
45min 3 LC-79 M/I LC-79 M/I MRB both 138/100 to discconnectio Trains to be ESM with 2 nos.staff JE/S/KBL
S&T 138/200 n dealt through
Slide boom 12.45 - 13.15
CON
Movement not
TRD Isolator permitted in HANUMANTH RAO
45 1 Maintenance 1 KBI YARD Yard 514-516 LB and PB KBI Yard-UP Tower Car (08310162257) 08.00 - 08.45
Movement not
TRD Isolator permitted in HANUMANTH RAO
45 2 Maintenance 1 KBI YARD Yard 514-516 LB and PB KBI Yard-UP Tower Car (08310162257) NOT PERMITTED
Movement not
TRD Turnout permitted in HANUMANTH RAO
45 3 Maintenance 1 KBI YARD Yard 514-516 LB and PB KBI Yard-UP Tower Car (08310162257) 08.45 - 09.15
Movement not
TRD Turnout permitted in HANUMANTH RAO
45 4 Maintenance 1 KBI YARD Yard 514-516 LB and PB KBI Yard-UP Tower Car (08310162257) NOT PERMITTED
TRD
TRD
30 Minutes 1 RBG-CNC RBG-CNC RBG UP 697.55 Disconnection UP & DN train ESM with 1 nos.staff JE/SIG/GPB
UFSBI UFSBI on PLCT
S&T
Monthly Monthly
Inspection Inspection 11.00 - 11.30
30 Minutes 2 RBG-CKR RBG-CKR RBG DN 697.55 Disconnection UP & DN train ESM with 1 nos.staff JE/SIG/GPB
UFSBI UFSBI on PLCT
S&T
Monthly Monthly
Inspection Inspection 11.30 - 12.00
30 Minutes 3 UGR-SED UGR-SED UGR UP 721.235 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 14.00 - 14.30
30 Minutes 4 UGR-KUD UGR-KUD UGR DN 721.235 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 14.30 - 15.00
30 Minutes 5 Track 62 ATR Track 62 ATR KUD UP 721.235 Disconnection UP train ESM with 1 nos.staff NA
two core two core reception on
cable cable Calling ON &
replaced replaced Despatch on
S&T
Starter memo,
DN Train
reception on
Calling ON 11.30 - 12.00
30 Minutes 6 Track 62 BTR Track 62 BTR KUD UP 721.235 Disconnection UP train ESM with 1 nos.staff NA
two core two core reception on
cable cable Calling ON &
replaced replaced Despatch on
S&T
Starter memo,
DN Train
reception on
Calling ON 12.00 - 12.30
30 Minutes 7 SSBPAC B/I SSBPAC B/I BGM UP & DN Disconnection 1. PLC ESM with 1 nos.staff JE/Sig/BGM
S&T Disconnection Monthly Insp Monthly Insp
BGM-SXB BGM-SXB 610.39 10.00 - 10.30
30 Minutes 8 SSBPAC B/I SSBPAC B/I BGM UP & DN Disconnection 1. PLC ESM with 1 nos.staff JE/Sig/BGM
S&T Disconnection Monthly Insp Monthly Insp
BGM-DUR BGM-DUR 610.39 10.30 - 11.00
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 15.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK REPERCUSS RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-UP Tower Car (08310161863) 09.00 - 09.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-UP Tower Car (08310161863) 11.30 - 12.15
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in B SOREN
45 5 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-UP Tower Car (7022029745) 11.30 - 12.15
Movement not
TRD Isolator permitted in B SOREN
45 6 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-UP Tower Car (7022029745) NOT PERMITTED
Movement not
TRD Turnout permitted in B SOREN
45 7 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-UP Tower Car (7022029745) 12.15 - 13.00
Movement not
TRD Turnout permitted in B SOREN
45 8 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-UP Tower Car (7022029745) NOT PERMITTED
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
09:45-12:15(DN)
ENGG
120 min 6 BT-Unloading 20 Bobyn HBS-NGR UP & DN 19/100-35/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
Reconditionin 468/900-469/00, Pnt DN line no
ENGG 150min 7 g of Tounge 1 UBL yard UP LB train can be
no-133B Mannually SSE/JE P.Way ----
Rails passed during
30 Minutes 1 Maintenance Maintenance BDKA UP/DN 475.98 Disconnection All UP & DN ESM with 1 nos.staff NA
Disconnection and safety and safety trains to be
KBL-DWR
check of check of dealt on PLCT
S&T
BDKA-NVUL BDKA-NVUL
block for block for
maintenance maintenance 09.00 - 09.30
30 Minutes 2 Maintenance Maintenance BDKA UP/DN 475.98 Disconnection All UP & DN ESM with 1 nos.staff NA
Disconnection and safety and safety trains to be
check of check of dealt on PLCT
S&T
BDKA-BMAP BDKA-BMAP
block for block for
maintenance maintenance 10.00 - 10.30
30 Minutes 3 IPS IPS LKT UP/DN 45.48 Disconnection ALL UP AND ESM with 2 nos.staff NA
S&T Disconnection MAINTANCE MAINTANCE DN TRAINS
PILOTING 12.00 - 12.30
30 Minutes 4 LKT-NGR LKT-NGR LKT-NGR UP/DN 45.48 Disconnection ALL TRAINS ESM with 1 nos.staff NA
S&T Disconnection BLOCK BLOCK ON PLCT
MAINTANCE MAINTANCE 12.30 - 13.00
20 min 5 Inspection M.I inspection GDGBP both 55/700 disconnection Both side ESM with 1 nos.staff JE/S/GDG
S&T of CRANK piloting
handle 12.00 - 12.20
20 6 monthly monthly KBL both 115/400 Diconnection all up trains ESM with 1 nos.staff JE/S/KBL
inspection of inspection of need to be
S&T
KBL-BNP KBL-BNP given PLCT
Block Block 08.30 - 08.50
60 7 LC 56 LC 56 BNP both 103/300 discconnectio dn trains ESM with 2 nos.staff JE/S/KBL
Maintanance Maintanance n reception
through
colling on and
dispatch
S&T
through
memo up
trains
reception by
memo 12.00 - 13.00
ENGG 2 X 75 min 1 WRJ SVM -CNR UP 72/120-380 10.00 - 11.15
ENGG 2 x 90 Min 2 UTV SVM -CNR UP 72/120-380 10.00 - 11.30
ENGG 2 x 90 min 3 MPT SVM -CNR UP 72/180-380 SHADOW BLOCK
PBC work at
ENGG
120min 4 DDS-LIM PBC work DDS-LIM SL 39/500-800 LB required 13.00 - 15.00
Material
ENGG
120min 5 BFR work shifting CLR-CRZ SL 26/000-31/000 LB required SHADOW BLOCK
TRD
30 Minutes 1 SSBPAC B/I SSBPAC B/I GNJ UP & DN Disconnection 1. PLC ESM with 1 nos.staff NA
S&T Disconnection maintenance maintenance
GNJ-LD GNJ-LD 572.99 11.30 - 12.00
30 Minutes 2 SSBPAC B/I SSBPAC B/I GNJ UP & DN Disconnection 1. PLC ESM with 1 nos.staff NA
S&T Disconnection maintenance maintenance
GNJ-KNP GNJ-KNP 572.99 12.00 -12.30
30 Minutes 3 Crank handle Crank handle GNJ UP & DN Disconnection 1. UP & DN ESM with 1 nos.staff NA
Disconnection CH 1 to 8 for CH 1 to 8 for reception by
maintenance maintenance piloting
S&T
LD-VSG 2. UP & DN
despatch by
572.99 starter memo 12.30 - 13.00
30 Minutes 4 Maintenance Maintenance LIM Yard 42.61 Disconnection All up and ESM with 1 nos.staff NA
Disconnection of LIM-DDS of LIM-DDS down trains
S&T
B/I B/I towards DDS
through PLCT 14.00 - 14.30
30 Minutes 5 Maintenance Maintenance SKVL Yard 100.434 Disconnection All up and ESM with 1 nos.staff NA
S&T Disconnection of SKVL-VSG of SKVL-VSG down trains
B/I B/I through PLCT. 10.00 - 10.30
30 Minutes 6 Maintenance Maintenance SKVL Yard 100.434 Disconnection 1. All down ESM with 1 nos.staff NA
Disconnection of SKVL-CSM of SKVL-CSM trains through
B/I B/I PLCT at
S&T CSM. 2. All up
trains through
PLCT at
SKVL. 10.30 - 11.00
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 2 UTV GDG-BDM UP & DN 0/00-67/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 3 DTE -56850 2000m GDG-HLAR UP & DN 0/0-48/0 LB Block required SSE/JE P.Way 12:30-15:00(UP)
No train Fittings and Ajit Prasad
ENGG 120 Min 1 SEJ Packing 02 Nos BGK Yard SL 93/100-200 Line block
movement 12 Man power SSE/P.Way/BGK 11.00 - 13.00
1 Machine
No Up train M. M Munawar
ENGG 150 Min 1 TWR 100 Mtrs MVD-JML UP 176/200-300 Line block 30 Labours,
movement JE/P.way/BSRX
Rail GR Pad & ERC 10.00 - 12.00
No Up &
Tamping By Tamping By Tamping Machine 08 Sachin Mane
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block Down train UP-10.00 - 11.15
Machine Machine Nos Manpower SSE/P.way/IDR
movement DN- 12.00 -13.15
Movement not
TRD Overlap permitted in D. Kishore
45 1 Maintenance 1 LHN Yard Yard 251-253 LB and PB LHN yard UP Tower Car (08310163796) 09.30 - 10.15
Movement not
TRD Overlap permitted in D. Kishore
45 2 Maintenance 1 LHN Yard Yard 251-253 LB and PB LHN yard UP Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Turnout permitted in D. Kishore
45 3 Maintenance 1 LHN Yard Yard 251-253 LB and PB LHN yard UP Tower Car (08310163796) 10.15 - 11.00
Movement not
TRD Turnout permitted in D. Kishore
45 4 Maintenance 1 LHN Yard Yard 251-253 LB and PB LHN yard UP Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 5 Maintenance 1 BJP YARD Yard 190-192 LB and PB BJP yard UP Tower Car (08310162957) 09.30 - 10.15
Movement not
TRD Overlap permitted in G Mahadev
45 6 Maintenance 1 BJP YARD Yard 190-192 LB and PB BJP yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 7 Maintenance 1 BJP YARD Yard 190-192 LB and PB BJP yard UP Tower Car (08310162957) 10.15 - 11.00
Movement not
TRD Turnout permitted in G Mahadev
45 8 Maintenance 1 BJP YARD Yard 190-192 LB and PB BJP yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Overlap permitted in D. Chinna
GDG-HG 45 9 Maintenance 1 BLR Yard Yard 21-23 LB and PB BLR yard UP Tower Car (08310162549) 10.30 - 11.15
Movement not
TRD Overlap permitted in D. Chinna
45 10 Maintenance 1 BLR Yard Yard 21-23 LB and PB BLR yard UP Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Turnout permitted in D. Chinna
45 11 Maintenance 1 BLR Yard Yard 21-23 LB and PB BLR yard UP Tower Car (08310162549) 11.15 - 12.00
Movement not
TRD Turnout permitted in D. Chinna
45 12 Maintenance 1 BLR Yard Yard 21-23 LB and PB BLR yard UP Tower Car (08310162549) NOT PERMITTED
Movement not
permitted in
TRD
Overlap BSRX yard G Mahadev
45 13 Maintenance 1 BSRX Yard Yard 137-139 LB and PB UP Tower Car (08310162957) 11.00 - 11.45
Movement not
permitted in
TRD
Overlap BSRX yard G Mahadev
45 14 Maintenance 1 BSRX Yard Yard 137-139 LB and PB UP Tower Car (08310162957) NOT PERMITTED
Movement not
permitted in
TRD
Turnout BSRX yard G Mahadev
45 15 Maintenance 1 BSRX Yard Yard 137-139 LB and PB UP Tower Car (08310162957) 11.45 - 12.30
Movement not
permitted in
TRD
Turnout BSRX yard G Mahadev
45 16 Maintenance 1 BSRX Yard Yard 137-139 LB and PB UP Tower Car (08310162957) NOT PERMITTED

120 MIN 1 117A&B END 117A&B END KDGI-BSRX UP/DN 150.73 DISCONNEC UP TRAIN ESM with 3 nos.staff SSE/SIG/BSRX
HOSE PIPE HOSE PIPE TION RECEIVING
REPLACEME REPLACEME ON CALLING
NT WORK NT WORK ON
DISPATCH
S&T ON MEMO
AND DN
TRAIN
PILOTING
AND
CLAMPING . 13.00 - 15.00
RE
Movement not
permitted in
TRD
Isolator BAY yard RD Pavan Kumar
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 1, 2 & 3 Tower Car (08310163339) 09.00 - 09.45
Movement not
permitted in
TRD
Isolator BAY yard RD Pavan Kumar
45 2 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 1, 2 & 3 Tower Car (08310163339) Not permitted
Movement not
permitted in
TRD
Turnout BAY yard RD Pavan Kumar
45 3 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 1, 2 & 3 Tower Car (08310163339) 10.30 - 11.15
Movement not
permitted in
TRD
Turnout BAY yard RD Pavan Kumar
45 4 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 1, 2 & 3 Tower Car (08310163339) Not permitted
Movement not
TRD Isolator permitted in S Ganesh
45 5 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-UP Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Isolator permitted in S Ganesh
45 6 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-UP Tower Car (08310162957) Not permitted
Movement not
TRD Turnout permitted in S Ganesh
45 7 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-UP Tower Car (08310162957) 10.45 - 11.15
Movement not
BAY-PKL TRD Turnout permitted in S Ganesh
45 8 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-UP Tower Car (08310162957) Not permitted
60" 1 CH No.1 2 1 GNR UP/DN 168.47 LB DN Reception ESM with 1 nos.staff SSE/JE/S/HPT
calling ON
and
S&T
Dispatchng
starter memo
UP PILoting 10.00 - 11.00
30 mins 2 LC- 33 EKT & EKT RDG-SLM UP/DN Disconnection UP & DN ESM with 1 nos.staff NA
Emergency maintenance trains on PHS
S&T
EKT and Caution
47/100-200 order 12.00 - 12.30
RE
RE
Trains cannot
recieve and S&T staff and TM-4 H.Anjanamurthy
ENGG 150 1 WRJ 4 joints MRB-HPT DN/UP 141/900-142/000 LB
dispatch men and 2-B/s. Je/P.Way/HPT/ML UP - 10.00 - 12.00
UP/DN DN - 07.00 - 09.00
No train
30 movement Machine,TRD staff-3, Mukunda
ENGG 90 min 1 UTV working Bay -obm SL 5/000-10/000 LB & PB
sleepers/Rails between Bay Dept-6 TM SE/P.Way/Spl works B
to Obm 11.00 - 12.30
Rail renewal
Bypess train D.Amru Naik
ENGG 2x90 1 & Check rail 26 mtr TNGL byepass Byepass 0/200-300 LB 2 B/s 15 Track mans
no movement SSE/P.WAY/TNGL
renewal 10.00 - 11.30
ENGG
UP trains Sunil Kumar
S&T staff , blacksmith
ENGG cannot (SSE/P.Way/GDG
and AMC labours
120 mins 1 Point packing 1 point RLP yard UP 76/900-77/00 LB dispatch ML) 11.30 - 13.30
ENGG
Movement not
TRD Isolator permitted in AANJAIAH
45 1 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-UP Tower Car (08310162741) 10.00 - 10.45
Movement not
PKL-RLP TRD Isolator permitted in AANJAIAH
45 2 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-UP Tower Car (08310162741) NOT PERMITTED
Movement not
TRD Turnout permitted in AANJAIAH
45 3 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-UP Tower Car (08310162741) 10.45 - 11.30
Movement not
TRD Turnout permitted in AANJAIAH
45 4 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-UP Tower Car (08310162741) NOT PERMITTED
CON
Movement not
TRD Isolator permitted in HANUMANTH RAO
45 1 Maintenance 1 KBI YARD Yard 514-516 LB and PB KBI Yard-DN Tower Car (08310162257) 08.00 - 08.45
Movement not
TRD Isolator permitted in HANUMANTH RAO
45 2 Maintenance 1 KBI YARD Yard 514-516 LB and PB KBI Yard-DN Tower Car (08310162257) NOT PERMITTED
Movement not
TRD Turnout permitted in HANUMANTH RAO
45 3 Maintenance 1 KBI YARD Yard 514-516 LB and PB KBI Yard-DN Tower Car (08310162257) 08.45 - 09.15
Movement not
TRD Turnout permitted in HANUMANTH RAO
45 4 Maintenance 1 KBI YARD Yard 514-516 LB and PB KBI Yard-DN Tower Car (08310162257) NOT PERMITTED
TRD
TRD
30 Minutes 1 VJR-MRJ VJR-MRJ VJR UP 739.587 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 10.00 - 10.30
30 Minutes 2 VJR-SED VJR-SED VJR UP 739.587 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 10.30 - 11.00
40 Minutes 3 Pt no 50 Pt no 50 DUR UP & DN Disconnection 1. UP ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. DN
despatch by
599.637 starter memo 11.30 - 12.15
60 Minutes 4 Pt no 52 & 53 Pt no 52 & 53 DUR UP & DN Disconnection 1. UP ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. DN
DWR-MRJ
despatch by
599.637 starter memo 12.15 - 13.15
20 Minutes 5 DEV-TVG B/I DEV-TVG B/I DEV UP&DN 546.55 Disconnection PLCT at both ESM with 1 nos.staff NA
S&T Disconnection FOR FOR stations
Maintenance Maintenance 08.00 - 08.20
20 Minutes 6 CH1-CH8 CH1-CH8 DEV UP&DN 546.55 Disconnection both UP and ESM with 1 nos.staff NA
Disconnection FOR FOR DN trains
S&T maintenance maintenance reception and
dispatch by
pilotting 08.20 - 08.40
30 Minutes 7 TVG-DEV B/I TVG-DEV B/I TVG UP&DN 534.61 Disconnection PLCT AT ESM with 1 nos.staff NA
S&T Disconnection MAINTENAN MAINTENAN BOTH
CE CE STATION 08.00 - 08.30
UTV Machine
Shifting of 55/35 nos
ENGG
2 blocks of 90 Sleepers/Rail Loading/unloa
minutes each 1 s ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic
ENGG tamping Plain track
2 x 120mins 2 Machine Tamping KNP-DUR DN 593/700-595/700 LB Block required JE/P.WAY/KNP 11.00 - 13.00
Unimat Machine &
ENGG
1 block 240m 3 PQRS work 0.52 SBH-SUL Up 628/250-770 LB & PB Signal staff SSE/p.way/BGM 10.00 - 12.00
Duomatic
ENGG tamping Plain track
2 x 120mins 4 Machine Tamping PCH-GKK DN 651/000-653/000 LB Block required JE/P.way/SPL/BGM 10.00 - 11.30
ENGG 1 block 90 mnn 5 ge.No.184 atten Br.No.184 KUD-UGR SL 716/000-200 LB LB Required SSE/PWAY/KUD
UP TRAIN
ENGG CAN'T
240 BCM WORK 550 KRKP;MGD UP 501/600-502/250 LB+PB DISPATCH SSE/PWAY/DWR 12.00 - 15.00
CON
Ballast Ballast profile Rekhya naik
ENGG
120min 1 regulation & sweeping HBI-KTY Single line 51/0-52/0 Block required BRM-04 JE/PW/KTY 12.00 - 15.00
VC-KTY ENGG
TRD
RE
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 16.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION QUANTUM BLOCK SEC/ LOCATION BLOCK REPERCUSS RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. TYPE OF WORK OF WORK STATION UP/DN (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-UP Tower Car (08310161863) 09.00 - 09.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-UP Tower Car (08310161863) 11.30 - 12.15
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in
45 5 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-UP Tower Car B SOREN (7022029745) 11.30 - 12.15
Movement not
TRD Isolator permitted in
45 6 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-UP Tower Car B SOREN (7022029745) NOT PERMITTED
Movement not
TRD Turnout permitted in
45 7 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-UP Tower Car B SOREN (7022029745) 12.15 - 13.00
Movement not
TRD Turnout permitted in
45 8 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-UP Tower Car B SOREN (7022029745) NOT PERMITTED
SSE/JE P.Way 10:30-12.30(DN)
ENGG
120 min 4 BT-Unloading 20 Bobyn KJG-GDI UP & DN 400/100-433/0 LB Block required YLG 14:00-16:30(UP)
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
Reconditioning 0/00-100, Pnt Road-8 &9 No
KBL-DWR ENGG 150min 6 1 UBL yard Road-8 LB train can be
of Tounge Rails no- 137A Mannually SSE/JE P.Way 11.00 - 13.30
passed during
30 Minutes 1 Maintenance and Maintenance KNO UP/DN 453.17 Disconnection All UP & DN ESM with 1 nos.staff NA
Disconnection safety check of and safety trains to be
KNO-SUBL check of dealt on PLCT
S&T
block for KNO-SUBL
maintenance block for
maintenance 15.00 - 15.30
30 Minutes 2 Maintenance and Maintenance KNO UP/DN 453.17 Disconnection All UP & DN ESM with 1 nos.staff NA
Disconnection safety check of and safety trains to be
KNO-SNH block check of dealt on PLCT
S&T
for maintenance KNO-SNH
block for
maintenance 15.30 - 16.00
30 3 Inspection M.I inspection GDGBP both 55.7 discconnectio Both side ESM with 1 nos.staff JE/S/GDG
S&T of Block n PLCT
GDGBP-HBL 12.00 - 12.30
20 4 monthly monthly KBL both 115/400 discconnectio all down trains ESM with 1 nos.staff JE/S/KBL
inspection of inspection of n need to be
S&T
KBL-GIN Block KBL-GIN given PLCT
Block 12.00 - 12.20
25 5 monthly monthly KBL both 115/400 discconnectio all trains need ESM with 1 nos.staff JE/S/KBL
S&T inspection of inspection of n to be pilated
crank handles crank handles 12.20 - 12.40
45 6 51ATF bond wire 51ATF bond BNA both 92/800 discconnectio trains can not ESM with 1 nos.staff JE/S/KBL
S&T replacement wire n delt on Road
replacement 4&5 11.30 - 12.15
45 7 52 ATF bond 52 ATF bond BNA both 92/800 discconnectio trains can not ESM with 1 nos.staff JE/S/KBL
S&T wire replacement wire n delt on Road
replacement 1&2 12.15 - 13.00
ENGG 180 Min 1 PQRS SVM-CNR UP 72/380-640 SSE/Pway/SVM 10.00 - 12.00
ENGG 150 Min 2 Lc 43 Night Working MJO - CSM UP SSE/Pway/QLM 10.00 - 11.30
PBC work
ENGG between
120MIN 3 DDS-LIM PBC work DDS-LIM SL 39/200-500 LB Required 13.00 - 15.00
Up train can't
be received
and down
ENGG
Switch renewal train can be
point no.4B LIM Switch received by
120 min 4 yard renewal LIM yard Yard 43/400-500 Joint work piloting SHADOW BLOCK
TRD
60 Minutes 1 Pt no 61&62 Pt no 61&62 LD UP & DN Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. DN
despatch by
559.45 starter memo 12.00 - 13.00
60 Minutes 2 Pt no 63&65 Pt no 63&65 LD UP & DN Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. DN
despatch by
559.45 starter memo 14.30 - 15.30
30 Minutes 3 VSG-SKVL B/I VSG-SKVL VSG Yard 108/000 Disconnection All up and ESM with 2 nos.staff JE/SIG/VSG
Disconnection checking work B/I checking down trains
S&T for Monthly work for through PLCT
Inspection Monthly
Inspection 10.00 - 10.30
30 Minutes 4 CH1,CH2,CH3,C CH1,CH2,CH VSG Yard 108/000 Disconnection MPT side all ESM with 1 nos.staff JE/SIG/VSG
Disconnection H4,CH5 & CH6 3,CH4,CH5 & trains piloting.
checking work CH6 checking
S&T
for Monthly work for
Inspection Monthly
Inspection 10.30 - 11.00
30 Minutes 5 CH7,CH8,CH9,C CH7,CH8,CH VSG Yard 108/000 Disconnection SKVL side,all ESM with 1 nos.staff JE/SIG/VSG
Disconnection H10,CH11 & 9,CH10,CH11 up and down
CH12 checking & CH12 trains piloting.
S&T
work for Monthly checking work
Inspection for Monthly
Inspection 11.00 - 11.30
30 Minutes 6 Maintenance of Maintenance SKVL Yard 100.434 Disconnection 1.Despatching ESM with 1 nos.staff NA
Disconnection All crank handles of All crank towards VSG
handles on PLCT and
starter memo.
2. Reception
from VSG on
piloting. 3.
S&T
Despatching
towards CSM
on PLCT and
starter memo.
4.. Reception
from CSM on
piloting. 10.00 - 10.30
30 Minutes 7 Q/I of SVM-CNR Q/I of SVM Yard 69/199 Disconnection 1. PLCT for ESM with 1 nos.staff SSE/SIG/SVM
Disconnection B/I SVM-CNR B/I down trains at
S&T SVM. 2. PLCT
for up trains at
CNR. 10.00 - 10.30
30 Minutes 8 Q/I of SVM-KM Q/I of SVM Yard 69/200 Disconnection 1. PLCT for ESM with 1 nos.staff SSE/SIG/SVM
Disconnection B/I SVM-KM B/I down trains at
S&T KM. 2. PLCT
for up trains at
SVM. 10.30 - 11.00
30 Minutes 9 Q/I of Q/I of SVM Yard 69/201 Disconnection 1.Reception ESM with 1 nos.staff SSE/SIG/SVM
Disconnection CH1,CH2,CH3,C CH1,CH2,CH from CNR
H4,CH5 & CH6 3,CH4,CH5 & side piloting.
CH6 2.Reception
from KM side
S&T
on calling on
signals.
3.Despatch
towards CNR
on piloting. 11.00 - 11.30
30 Minutes 10 Q/I of Q/I of SVM Yard 69/202 Disconnection 1.Reception ESM with 1 nos.staff SSE/SIG/SVM
Disconnection CH7,CH8,CH9,C CH7,CH8,CH from KM side
H10,CH11 & 9,CH10,CH11 piloting.
CH12 & CH12 2.Reception
from CNR
S&T
side on calling
on signals.
3.Despatch
towards KM
on piloting. 11.30 - 12.00
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 2 UTV GDG-BDM UP & DN 0/00-67/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 3 DTE -56850 2000m GDG-HLAR UP & DN 0/0-48/0 LB Block required SSE/JE P.Way 12:30-15:00(UP)
Point Packing No train Fittings and Chaturanan Chandan
ENGG 120 Min 1 01 Nos BGK Yard SL 93/000-100 Line block
Point No.24 movement 12 Man power SSE/P.Way/BGK 11.00 - 13.00
1 Machine
No Up train B C Pradhan
ENGG 150 Min 1 TWR 100 Mtrs MVD-JML UP 176/300-400 Line block 30 Labours,
movement SSE/P.way/BJP
Rail GR Pad & ERC 10.00 - 12.00
No Up &
Tamping By Tamping By 250/000-281/ Tamping Machine 08 Sachin Mane
ENGG 180 Min 1 LHN-HG UP/DN Line block Down train UP-10.00 - 11.15
Machine Machine 900 Nos Manpower SSE/P.way/IDR
movement DN- 12.00 -13.15
Movement not
TRD Overlap permitted in
45 1 Maintenance 1 LHN Yard Yard 251-253 LB and PB LHN yard UP Tower Car D. Kishore (08310163796) 09.30 - 10.15
Movement not
TRD Overlap permitted in
45 2 Maintenance 1 LHN Yard Yard 251-253 LB and PB LHN yard UP Tower Car D. Kishore (08310163796) NOT PERMITTED
Movement not
TRD Turnout permitted in
45 3 Maintenance 1 LHN Yard Yard 251-253 LB and PB LHN yard UP Tower Car D. Kishore (08310163796) 10.15 - 11.00
Movement not
TRD Turnout permitted in
45 4 Maintenance 1 LHN Yard Yard 251-253 LB and PB LHN yard UP Tower Car D. Kishore (08310163796) NOT PERMITTED
Movement not
TRD Overlap permitted in
45 5 Maintenance 1 BJP YARD Yard 190-192 LB and PB BJP yard UP Tower Car G Mahadev (08310162957) 09.30 - 10.15
Movement not
TRD Overlap permitted in
45 6 Maintenance 1 BJP YARD Yard 190-192 LB and PB BJP yard UP Tower Car G Mahadev (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in
45 7 Maintenance 1 BJP YARD Yard 190-192 LB and PB BJP yard UP Tower Car G Mahadev (08310162957) 10.15 - 11.00
Movement not
TRD Turnout permitted in
GDG-HG 45 8 Maintenance 1 BJP YARD Yard 190-192 LB and PB BJP yard UP Tower Car G Mahadev (08310162957) NOT PERMITTED
Movement not
TRD Overlap permitted in
45 9 Maintenance 1 BLR Yard Yard 21-23 LB and PB BLR yard UP Tower Car D. Chinna (08310162549) 10.30 - 11.15
Movement not
TRD Overlap permitted in
45 10 Maintenance 1 BLR Yard Yard 21-23 LB and PB BLR yard UP Tower Car D. Chinna (08310162549) NOT PERMITTED
Movement not
TRD Turnout permitted in
45 11 Maintenance 1 BLR Yard Yard 21-23 LB and PB BLR yard UP Tower Car D. Chinna (08310162549) 11.15 - 12.00
Movement not
TRD Turnout permitted in
45 12 Maintenance 1 BLR Yard Yard 21-23 LB and PB BLR yard UP Tower Car D. Chinna (08310162549) NOT PERMITTED
Movement not
permitted in
TRD
Overlap BSRX yard
45 13 Maintenance 1 BSRX Yard Yard 137-139 LB and PB UP Tower Car G Mahadev (08310162957) 11.00 - 11.45
Movement not
permitted in
TRD
Overlap BSRX yard
45 14 Maintenance 1 BSRX Yard Yard 137-139 LB and PB UP Tower Car G Mahadev (08310162957) NOT PERMITTED
Movement not
permitted in
TRD
Turnout BSRX yard
45 15 Maintenance 1 BSRX Yard Yard 137-139 LB and PB UP Tower Car G Mahadev (08310162957) 11.45 - 12.30
Movement not
permitted in
TRD
Turnout BSRX yard
45 16 Maintenance 1 BSRX Yard Yard 137-139 LB and PB UP Tower Car G Mahadev (08310162957) NOT PERMITTED
30 MIN 1 LHN-TVL UFSBI LHN-TVL LHN-TVL UP/DN 251 DISCONNEC UP & DN SIGNAL STAFF JE/SIG/IDR
B/I UFSBI B/I TION TRAIN PLCT
S&T
MAINTENANCE MAINTENAN TOWARDS
CE LHN SIDE 10.00 - 10.30
S&T
CN
Movement not
permitted in
TRD
Isolator BAY yard RD Pavan Kumar
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 1, 2 & 3 Tower Car (08310163339) 09.00 - 09.45
Movement not
permitted in
TRD
Isolator BAY yard RD Pavan Kumar
45 2 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 1, 2 & 3 Tower Car (08310163339) Not permitted
Movement not
permitted in
TRD
Turnout BAY yard RD Pavan Kumar
45 3 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 1, 2 & 3 Tower Car (08310163339) 10.30 - 11.15
Movement not
permitted in
TRD
Turnout BAY yard RD Pavan Kumar
45 4 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 1, 2 & 3 Tower Car (08310163339) Not permitted
Movement not
TRD Isolator permitted in
45 5 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-UP Tower Car S Ganesh (08310162957) 10.00 - 10.45
Movement not
TRD Isolator permitted in
45 6 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-UP Tower Car S Ganesh (08310162957) Not permitted
Movement not
TRD Turnout permitted in
45 7 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-UP Tower Car S Ganesh (08310162957) 10.45 - 11.15
Movement not
TRD Turnout permitted in
45 8 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-UP Tower Car S Ganesh (08310162957) Not permitted
60" 1 CH No.3 4 1 GNR UP/DN 168.47 LB DN Reception ESM and Staff SSE/JE/S/HPT
calling ON
and
S&T
Dispatchng
starter memo
UP PILoting 10.00 - 11.00
15 MINS X4 2 Crank handle EKT RDG UP/DN 53.77 NA CH1- UP ESM WITH STAFF NA
EKT maintenance Trains
maintenance. reception
CH1, CH2, CH3, Piloting, Dn
CH4 trains
dispatch
starter memo.
CH2-Dn trains
reception
Piloting, Up
trains
dispatch
starter memo.
S&T CH3-UP
Trains
reception
Piloting, Dn
trains
dispatch
starter memo.
CH4-Trains to
KRYP:
dispatch on
starter memo, 12.00 - 12.15
Reception 12.15 - 12.30
from KRYP - 12.30 - 12.45
Piloting. 12.45 - 13.00
20 mins x 2 3 Crank handle EKT BYC UP/DN Disconnection CH1-UP/DN ESM WITH STAFF NA
EKT maintenance trains piloting
maintenance. . CH2- Up
BAY-PKL
CH1 & CH2 trains
reception
S&T
piloting to Rd
1 & 2 . Up
trains
dispatch on 09.00 - 09.20
204.1 starter memo. 09.20 - 09.40
20 mins x 2 4 Crank handle EKT DAJ UP/DN Disconnection CH1-Dn trains ESM WITH STAFF NA
EKT maintenance reception
maintenance, piloting, Up
CH1, CH2 trains
S&T dispatch
starter memo.
CH2- Up/Dn
trains Piloting/ 10.00 - 10.20
181.27 starter memo 10.20 - 10.40
30 MINS 5 DAJ-TNGL block Block DAJ UP/DN Disconnection Dn trains ESM WITH STAFF NA
Instrument Instrument PLCT at
S&T Maintenance Maintenance TNGL, Up
trains PLCT at
181.27 DAJ 10.40 - 11.10
20 mins x 3 6 Crank handle EKT TNGL UP/DN Disconnection CH1-Up ESM WITH STAFF NA
EKT maintenance Trains
maintenance. reception
CH1, CH2, CH3 Piloting. Dn
trains
dispatch
starter memo.
CH2- Up
trains
reception to
Rd 1 & 2
piloting. Dn
S&T
trains
dispatch from
Rd 1 & 2
starter memo.
CH3- Dn
trains
dispatch
starter memo.
Dn trains
reception to 10.00 - 10.20
Rd 4 & Rd 5 10.20 - 10.40
175.7 calling on. 10.40 - 11.00
UP trains no H.Anjanamurthy
ENGG 90 min 1 Rail renewal 13 mtr BYO-GNR UP 165/300-400 LB B/s 2 & 8 TM
movement Je/P.WAY/HPT/ML 10.00 - 11.30
No train
Jt inspection
movement
deficiency LB & S&T staff and TM-4 men Akash
ENGG 90 min 1 1 point Slm yard SL 31/200-300 between SLm
attention Disconnection and 2-B/s. Je/P.Way/Rdg
Rd.No.2 to
Pt.No.7/A
Rdg 11.30 - 13.00
No train
30 movement Machine,TRD staff-3, R.V.Naik
ENGG 90 min 2 UTV working Bay -obm SL 5/000-10/000 LB & PB
sleepers/Rails between Bay Dept-6 TM SSE/P.Way/Obm
to Obm 11.00 - 12.30
No train
movement
Point packing LB & Agency-15 labour,S&T Mukunda
ENGG 60 min 3 1 Pt Slm yard SL 31/300-400 between Slm
Pt.No.8/A disconnection staff SSE/P.Way/Spl works Bay
Rd.No.3 to
Rdg SHADOW BLOCK
Rail renewal &
Bypess train D.Amru Naik
ENGG 2x90 1 Check rail 26 mtr TNGL byepass Byepass 0/200-300 LB 2 B/s 15 Track mans
no movement SSE/P.WAY/TNGL
renewal 10.00 - 11.30
DN train
ENGG SEJ cannot be AMC Batch Hanumanthappa
120 min 1 maintainance 1 unit GIN-MRB DN 131/000-100 LB dealt Blacksmith team (SSE/P.Way/KBL) 09.00 - 11.00
TTR Work at P Km Prasad,
ENGG
1x180 mins 1 No-14A 1 Point VYS Yard VYS Yard 9/900-10/000 Block required Contract Labour Asst.SSE/P.Way/HPT(BL) 11.00 - 14.00
Movement not
TRD Isolator permitted in AANJAIAH
45 1 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-UP Tower Car (08310162741) 10.00 - 10.45
PKL-RLP Movement not
TRD Isolator permitted in AANJAIAH
45 2 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-UP Tower Car (08310162741) NOT PERMITTED
Movement not
TRD Turnout permitted in AANJAIAH
45 3 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-UP Tower Car (08310162741) 10.45 - 11.30
Movement not
TRD Turnout permitted in AANJAIAH
45 4 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-UP Tower Car (08310162741) NOT PERMITTED
Movement not
TRD Isolator permitted in HANUMANTH RAO
45 1 Maintenance 1 KBI YARD Yard 514-516 LB and PB KBI Yard-DN Tower Car (08310162257) 08.00 - 08.45
Movement not
TRD Isolator permitted in HANUMANTH RAO
45 2 Maintenance 1 KBI YARD Yard 514-516 LB and PB KBI Yard-DN Tower Car (08310162257) NOT PERMITTED
Movement not
TRD Turnout permitted in HANUMANTH RAO
45 3 Maintenance 1 KBI YARD Yard 514-516 LB and PB KBI Yard-DN Tower Car (08310162257) 08.45 - 09.15
Movement not
TRD Turnout permitted in HANUMANTH RAO
45 4 Maintenance 1 KBI YARD Yard 514-516 LB and PB KBI Yard-DN Tower Car (08310162257) NOT PERMITTED
30 Minutes 1 SED-VJR UFSBI SED-VJR SED UP 730.858 Disconnection UP & DN train ESM & STAFF SSE/SIG/MRJ
Monthly UFSBI on PLCT
S&T
Inspection Monthly
Inspection 14.00 - 14.30
30 Minutes 2 SED-UGR SED-UGR SED DN 730.858 Disconnection UP & DN train ESM & STAFF SSE/SIG/MRJ
UFSBI Monthly UFSBI on PLCT
S&T
Inspection Monthly
Inspection 14.30 - 15.00
30 Minutes 3 MRJ-VJR UFSBI MRJ-VJR MRJ DN 747.74 Disconnection UP & DN train ESM & STAFF ESM & STAFF
S&T Maintenance UFSBI on PLCT
Maintenance 09.00 - 09.30
30 Minutes 4 RBG-CNC RBG-CNC RBG UP 697.55 Disconnection UP & DN train ESM & STAFF ESM & STAFF
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 11.00 - 11.30
30 Minutes 5 RBG-CKR RBG-CKR RBG DN 697.55 Disconnection UP & DN train ESM & STAFF ESM & STAFF
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 11.30 - 12.00
40 Minutes 6 Pt no 50 Pt no 50 BGM UP & DN Disconnection 1. UP ESM & Staff ESM & Staff
Disconnection maintenance maintenance reception
piloting
S&T
2. DN
despatch by
610.39 starter memo 10.00 - 10.40
DWR-MRJ 60 Minutes 7 Pt no 52 & 54 Pt no 52 & 54 BGM DN Disconnection 1. DN ESM & Staff ESM & Staff
S&T Disconnection maintenance maintenance despatch by
610.39 starter memo 10.40 - 11.40
30 Minutes 8 CH1-CH8 CH1-CH8 TVG UP&DN 534.61 Disconnection UP&DN ESM&STAFF ESM&STAFF
Disconnection MAINTENANCE MAINTENAN RECEPTION
S&T CE AND
DISPATCH
PILOTING 14.00 - 14.30
30 Minutes 9 LWR-KBI B/I LWR-KBI B/I LWR UP&DN 525.8 Disconnection PLCT at both ESM&STAFF ESM&STAFF
Disconnection FOR FOR stations
S&T
MAINTENANCE MAINTENAN
CE 14.30 - 15.00
20 Minutes 10 KBI-LWR B/I KBI-LWR B/I KBI UP&DN 514.23 Disconnection PLCT at both ESM&STAFF ESM&STAFF
S&T Disconnection FOR FOR stations
maintenance maintenance 08.00 - 08.20
20 Minutes 11 KBI- MGDB/I KBI- MGDB/I KBI UP&DN 514.23 Disconnection PLCT at both ESM&STAFF ESM&STAFF
S&T Disconnection FOR FOR stations
maintenance maintenance 08.20 - 08.40
20 Minutes 12 CH1-CH6 CH1-CH6 KBI UP&DN 514.23 Disconnection UP&DN ESM&STAFF ESM&STAFF
Disconnection MAINTENANCE MAINTENAN RECEPTION
S&T CE AND
DISPATCH
PILOTING 08.40 - 09.00
UTV Machine 55/35 nos
ENGG 2 blocks of 90 Shifting of Loading/unloa 558/000-534/
minutes each 1 Sleepers/Rails ding LD-TVG DN 000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic Plain track 595/700-597/
ENGG
2 x 120mins 2 tamping Machine Tamping KNP-DUR DN 700 LB Block required JE/P.WAY/KNP 11.00 - 13.00
627/730-770
ENGG Duomatic Plain track (PQRS
2 x 120mins 3 tamping Machine Tamping SBH-SUL Up Location) LB Block required JE/P.way/SPL/BGM 10.00 - 12.00
ENGG 1 block 90 mnn 4 dge.No.184 attenti Br.No.184 KUD-UGR SL 716/200-400 LB LB Required SSE/PWAY/KUD 14.00 - 15.30
UP TRAIN
ENGG CAN'T
240 BCM WORK 600 MGD YARD UP 502/250-850 LB+PB DISPATCH SSE/PWAY/DWR 01.00 - 04.00
CON
Ballast profile Rekhya naik
ENGG
120min 1 Ballast regulation & sweeping HBI-KTY Single line 52/0-53/0 Block required BRM-04 JE/PW/KTY 12.00 - 14.00
VC-KTY ENGG
TRD
RE
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 17.10.2023
BLOCK TYPE OF RESOURCE BLOCK
BOARD DEPT DURATION QUANTUM BLOCK SEC/ LOCATION BLOCK REPERCUSS REQUIREMEN TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. TYPE OF WORK OF WORK STATION UP/DN (KM) (LB/PB) IONS T SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-UP Tower Car (08310161863) 09.00 - 09.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-UP Tower Car (08310161863) 11.30 - 12.15
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in B SOREN
45 5 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-UP Tower Car (7022029745) 11.30 - 12.15
Movement not
TRD Isolator permitted in B SOREN
45 6 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-UP Tower Car (7022029745) NOT PERMITTED
Movement not
TRD Turnout permitted in B SOREN
45 7 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-UP Tower Car (7022029745) 12.15 - 13.00
Movement not
TRD Turnout permitted in B SOREN
45 8 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-UP Tower Car (7022029745) NOT PERMITTED
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
UP line no
train can be
ENGG 150 min 6 Track attention 1 BDKA yard UP BYPASS 9/600-700 LB Mannually
passed during
Block time. SSE/JE P.Way -----
ENGG
20 Minutes 1 NVU-BDKA B/I NVU-BDKA NVU UP&DN 482.2 Disconnection PLCT at both ESM with 1 NA
S&T Disconnection FOR maintenance B/I FOR stations nos.staff
maintenance 10.30 - 10.50
20 Minutes 2 NVU-DWR B/I NVU-DWR B/I NVU UP&DN 482.2 Disconnection PLCT at both ESM with 1 NA
S&T Disconnection FOR maintenance FOR stations nos.staff
KBL-DWR maintenance 10.50 - 11.10
30 Minutes 3 subl-kno b/I for m/i subl-kno b/I subl-kno up/dn 465.12 Disconnection All trains on ESM with 1 JE/SIG/UBL
S&T Disconnection for m/i block section nos.staff
on PLCT 15.30 - 16.00
120 minutes 4 point 64 a point 64 a svnr up 413.64 Disconnection up trains ESM with 3 JE/SIG/YLG
S&T replacement work replacement piloting nos.staff
work 14.00 - 16.00
30 Minutes 5 Maintenance and Maintenance UNK UP/DN 472.6 Disconnection All UP & DN ESM with 1 NA
Disconnection safety check of and safety trains to be nos.staff
UNK-UBL block check of dealt on PLCT
S&T
for maintenance UNK-UBL
block for
maintenance 10.30 - 11.00
30 Minutes 6 MONTHLY MONTHLY NVD-HBS UP/DN 26.98 Disconnection All trains on ESM with 1 JE/SIG/UBL
S&T Disconnection INSPECTION OF INSPECTION block section nos.staff
NVD-HBS OF NVD-HBS on PLCT 12.00 - 12.30
30 Minutes 7 MONTHLY MONTHLY NVD UP/DN 26.98 Disconnection ALL TRAINS ESM with 2 JE/SIG/UBL
S&T Disconnection INSPECTION OF INSPECTION PILOTING nos.staff
IPS OF IPS 12.30 - 13.00
60 8 maintance of maintance of KBL both 115/400 discconnectio all trains need ESM with 1 JE/S/KBL
S&T crank handles ch5 crank handles n to be pilated nos.staff
to ch8 ch5 to ch8 12.00 - 13.00
45 9 50AT TLD 50AT TLD BNA dn 93/900 discconnectio DN trains ESM with 2 JE/S/KBL
S&T replacement work replacement n dispatch by nos.staff
work memo 12.00 - 13.00
30mins 10 Quaterly Maintenance JBGD Both 18/100 disconnection Both side ESM with 1 SSE/S/GDG
InspectionJBGD- of PLCT nos.staff
S&T
GGVT B/I JBGD-GGVT
B/I 11.00 - 11.30
30mins 11 Quaterly Maintenance JBGD Both 18/100 disconnection Both side ESM with 1 SSE/S/GDG
Inspection of GIN-JBGD PLCT nos.staff
S&T GIN-JBGD BLOCK
BLOCK instrument
instrument 11.30 - 12.00
30mins 12 Quaterly Maintenance JBGD Both 18/100 disconnection Both side ESM with 1 SSE/S/GDG
S&T Inspection of of Crank piloting nos.staff
Crank handles handles 12.00 - 12.30
ENGG 2 X 75 Min 1 WRJ SVM -CNR UP 72/380-640 JE/Pway QLM 10.00 - 11.15
ENGG 2 x 90 Min 2 UTV SVM -CNR UP 72/380-640 10.00 - 11.30
ENGG 2X 90 Min 3 MPT SVM -CNR UP 72/380-640 SHADOW BLOCK
PBC work
ENGG between
120min 4 CRZ-DDS PBC work CRZ-DDS SL 33/000-300 LB required 13.00 - 15.00
material
ENGG
120min 5 BFR work shifting CRZ-DDS SL 33/000-37/000 LB required SHADOW BLOCK
TRD
25 Minutes 1 Checking of Checking of CLR Yard 24.5 Disconnection All up and ESM with 1 SSE/S/CLR
Disconnection CLR-CRZ B/I for CLR-CRZ B/I down trains nos.staff
S&T
Quarterly for Quarterly towards CRZ
Inspection Inspection through PLCT 13.00 - 13.25
25 Minutes 2 Checking of Checking of CLR Yard 24.5 Disconnection All up and ESM with 1 SSE/S/CLR
Disconnection CLR-TGT B/I for CLR-TGT B/I down trains nos.staff
S&T
Quarterly for Quarterly towards TGT
Inspection Inspection through PLCT 13.25 - 13.50
45 Minutes 3 Maintenance of Maintenance LIM Yard 42.61 Disconnection Train ESM with 1 NA
Disconnection CH1,CH2,CH3 of movements nos.staff
S&T
CH1,CH2,CH by piloting.
3 13.00 - 13.45
30 Minutes 4 CSM-MJO B/I CSM-MJO B/I CSM Yard 95.873 Disconnection All up and ESM with 1 JE/S/VSG
Disconnection checking work for checking work down trains nos.staff
S&T
monthly for monthly towards VSG
Inspection Inspection through PLCT. 10.00 - 10.30
30 Minutes 5 CSM-SKVL B/I CSM-SKVL CSM Yard 95.873 Disconnection All up and ESM with 1 JE/S/VSG
Disconnection checking work for B/I checking down trains nos.staff
S&T monthly work for towards SKVL
Inspection monthly through PLCT.
Inspection 10.30 - 11.00
30 Minutes 6 All crank handles All crank CSM Yard 95.873 Disconnection All trains ESM with 1 JE/S/VSG
Disconnection checking work for handles movement on nos.staff
S&T monthly checking work piloting
Inspection for monthly
Inspection 11.00 - 11.30
30 Minutes 7 Q/I of CNR-MAO Q/I of CNR Yard 75/500 Disconnection 1. Despatch ESM with 1 SSE/SIG/SVM
Disconnection B/I CNR-MAO B/I towards MAO nos.staff
S&T on PLCT. 2.
PLCT for up
trains at MAO. 11.00 - 11.30
30 Minutes 8 Q/I of CNR-SVM Q/I of CNR Yard 75/500 Disconnection 1. Despatch ESM with 1 SSE/SIG/SVM
Disconnection B/I CNR-SVM B/I towards SVM nos.staff
on PLCT. 2.
S&T
PLCT for
down trains at
SVM. 11.30 - 12.00
30 Minutes 9 Q/I of Q/I of CNR Yard 75/500 Disconnection Both side ESM with 1 SSE/SIG/SVM
Disconnection CH1,CH2,CH3,C CH1,CH2,CH reception and nos.staff
S&T
H4,CH5,CH6 3,CH4,CH5,C despatch on
H6 piloting 12.30 - 13.00
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 2 UTV GDG-BDM UP & DN 0/00-67/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 3 DTE -56850 2000m GDG-HLAR UP & DN 0/0-48/0 LB Block required SSE/JE P.Way 12:30-15:00(UP)
Point Packing No train Fittings and Chaturanan Chandan
ENGG 120 Min 1 01 Nos BGK Yard SL 93/100-200 Line block
Point No.23B movement 12 Man power SSE/P.Way/BGK 11.00 - 13.00
1 Machine
No Up train 30 Labours, B.C Pradhan
ENGG 150 Min 1 TWR 100 Mtrs MVD-JML UP 176/400-500 Line block
movement Rail GR Pad & SSE/P.way/BJP
ERC 10.00 - 12.00
No Up & Tamping
Tamping By Tamping By 250/000-281/9 Sachin Mane
ENGG 180 Min 1 LHN-HG UP/DN Line block Down train Machine 08 UP-10.00 - 11.15
Machine Machine 00 SSE/P.way/IDR
movement Nos Manpower DN- 12.00 -13.15
Movement not
TRD Overlap permitted in D. Kishore
45 1 Maintenance 1 IDR Yard Yard 240-242 LB and PB IDR yard UP Tower Car (08310163796) 10.00 - 10.45
Movement not
TRD Overlap permitted in D. Kishore
45 2 Maintenance 1 IDR Yard Yard 240-242 LB and PB IDR yard UP Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Turnout permitted in D. Kishore
45 3 Maintenance 1 IDR Yard Yard 240-242 LB and PB IDR yard UP Tower Car (08310163796) 10.45 - 11.15
Movement not
TRD Turnout permitted in D. Kishore
45 4 Maintenance 1 IDR Yard Yard 240-242 LB and PB IDR yard UP Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 5 Maintenance 1 JML YARD Yard 176-178 LB and PB JML yard UP Tower Car (08310162957) 12.30 - 13.15
Movement not
TRD Overlap permitted in G Mahadev
45 6 Maintenance 1 JML YARD Yard 176-178 LB and PB JML yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
GDG-HG 45 7 Maintenance 1 JML YARD Yard 176-178 LB and PB JML yard UP Tower Car (08310162957) 13.15 - 14.00
Movement not
TRD Turnout permitted in G Mahadev
45 8 Maintenance 1 JML YARD Yard 176-178 LB and PB JML yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Overlap permitted in D. Chinna
45 9 Maintenance 1 MVD Yard Yard 164-166 LB and PB MVD yard UP Tower Car (08310162549) 12.30 - 13.15
Movement not
TRD Overlap permitted in D. Chinna
45 10 Maintenance 1 MVD Yard Yard 164-166 LB and PB MVD yard UP Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Turnout permitted in D. Chinna
45 11 Maintenance 1 MVD Yard Yard 164-166 LB and PB MVD yard UP Tower Car (08310162549) 13.15 - 14.00
Movement not
TRD Turnout permitted in D. Chinna
45 12 Maintenance 1 MVD Yard Yard 164-166 LB and PB MVD yard UP Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 13 Maintenance 1 MLP Yard Yard 30-33 LB and PB MLP yard UP Tower Car (08310162957) 10.30 - 11.15
Movement not
TRD Overlap permitted in G Mahadev
45 14 Maintenance 1 MLP Yard Yard 30-33 LB and PB MLP yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 15 Maintenance 1 MLP Yard Yard 30-33 LB and PB MLP yard UP Tower Car (08310162957) 11.15 - 12.00
Movement not
TRD Turnout permitted in G Mahadev
45 16 Maintenance 1 MLP Yard Yard 30-33 LB and PB MLP yard UP Tower Car (08310162957) NOT PERMITTED
30 MIN 1 LHN-IDR UFSBI LHN-IDR LHN-IDR UP/DN 251 DISCONNEC UP & DN ESM with 1 JE/SIG/IDR
B/I UFSBI B/I TION TRAIN PLCT nos.staff
S&T
MAINTENANCE MAINTENAN TOWARDS
CE LHN SIDE 10.00 - 10.30
S&T
CN
Movement not
Isolator permitted in Pavan Kumar
TRD 45 1 1 BAY YARD Yard 207-209 LB and PB Tower Car
Maintenance BAY yard RD (08310163339)
- 1, 2 & 3 09.00 - 09.45
Movement not
Isolator permitted in Pavan Kumar
TRD 45 2 1 BAY YARD Yard 207-209 LB and PB Tower Car
Maintenance BAY yard RD (08310163339)
- 1, 2 & 3 Not permitted
Movement not
Turnout permitted in Pavan Kumar
TRD 45 3 1 BAY YARD Yard 207-209 LB and PB Tower Car
Maintenance BAY yard RD (08310163339)
- 1, 2 & 3 10.30 - 11.15
Movement not
Turnout permitted in Pavan Kumar
TRD 45 4 1 BAY YARD Yard 207-209 LB and PB Tower Car
Maintenance BAY yard RD (08310163339)
- 1, 2 & 3 Not permitted
Movement not
Isolator S Ganesh
TRD 45 5 1 BYO YARD Yard 161-163 LB and PB permitted in Tower Car
Maintenance (08310162957)
BYO Yard-UP 10.00 - 10.45
Movement not
Isolator S Ganesh
TRD 45 6 1 BYO YARD Yard 161-163 LB and PB permitted in Tower Car
Maintenance (08310162957)
BYO Yard-UP Not permitted
Movement not
Turnout S Ganesh
TRD 45 7 1 BYO YARD Yard 161-163 LB and PB permitted in Tower Car
Maintenance (08310162957)
BYO Yard-UP 10.45 - 11.15
Movement not
Turnout S Ganesh
TRD 45 8 1 BYO YARD Yard 161-163 LB and PB permitted in Tower Car
Maintenance (08310162957)
BYO Yard-UP Not permitted
60" 1 CH No.5 6 1 GNR UP/DN LB DN Reception ESM with 1 SSE/JE/S/HPT
piloting and nos.staff
Dispatchng
starter memo
S&T
UP reception
caling ON RD
1 5 dispatch
Memo 10.00 - 11.00
30 MINS 2 RDG-SLM Block EKT RDG UP/DN Disconnection UP/DN trains ESM with 1 NA
S&T Instrument maintenance PLCT nos.staff
Maintenance 53.77 12.00 - 12.30
30 mins 3 LC-35 EKT & EKT RDG UP/DN Disconnection UP Trains ESM with 2 NA
Emergency EKT maintenance reception nos.staff
Piloting, Dn
S&T
trains
dispatch
53.77 starter memo. 12.30 - 13.00
30 mins 4 LC-02 EKT & EKT BYB UP/DN Disconnection Caution order. ESM with 2 NA
Emergency EKT maintenance Up/Dn trains nos.staff
S&T
to observe
208.06 PHS signal. 11.00 - 11.30
20 mins X 4 5 Crank Handle EKT TNGL UP/DN Disconnection CH4- Up ESM with 1 NA
EKT. CH4, CH5, maintenance trains nos.staff
CH6, CH7 reception to
Rd 6 to 10
Piloting. Dn
trains
BAY-PKL reception to
Rd 6 to 10 on
co-on. Dn
trains
dispatch from
Rd 6 to 10 on
starter
memo.CH5-
Dn trains
reception to
Rd 6 to 10
Piloting. Up
trains
reception to
Rd 6 to 10 on
co-on. Up
trains
S&T dispatch from
Rd 6 to 10 on
starter memo.
CH6- Up
trains
reception to
Rd 1, 2 & 3
co-on. Up
trains
dispatch from
Rd 1 , 2 & 3
on starter
memo. Dn
trains
reception to
Rd 1 , 2 & 3
piloting. CH7-
Dn trains
reception
piloting. Up
trains 10.00 - 10.20
dispatch from 10.20 - 10.40
Rd 4 to 10 10.40 - 11.00
175.7 starter memo. 11.00 - 11.20
30 mins 6 TNGL-GNR Block Block TNGL BP UP/DN Disconnection Up trains ESM with 2 NA
Instrument Instrument PLCT at nos.staff
S&T Maintenance Maintenance TNGL BP, DN
trains PLCT at
1.658 GNR 11.20 - 11.50
UP trains no H.Anjanamurthy
ENGG 150 1 WRJ 2 joints BYO-GNR` UP 165/300-400 LB B/s 2 & 8 TM
movement Je/P.WAY/HPT/ML 10.00 - 11.30
Jt inspection No train
S&T staff and
deficiency LB & movement R.V.Naik
ENGG 90 min 1 1 point Obm yard SL 15/600-700 TM-4 men and
attention Disconnection between Obm SSE/P.Way/Obm
2-B/s.
Pt.No.7/A to Slm 11.00 - 12.30
No train
Machine,TRD
30 movement Akash
ENGG 90 min 2 UTV working Bay -obm SL 10/000-15/000 LB & PB staff-3, Dept-6
sleepers/Rails between Bay Je/P.Way/Rdg
TM
to Obm SHADOW BLOCK
ENGG
Km Rajavali,
ENGG
1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL 30/629-31/149 Block required Contract Labour JE/P.Way/YTG 11.00 - 14.00
DN train AMC Batch
ENGG 136/400-137/3 cannot be Blacksmith Hanumanthappa
2x 120 min 1 SEJ maintainance 2 unit MRB-HPT DN 00 LB dealt team (SSE/P.Way/KBL) 09.00 - 11.00
TRD
45min 1 LC-76 LC-76 MRB Both 133/800 to disconnection Trains to be ESM with 2 JE/S/KBL
S&T maintenance maintenance 133/900 dealt through nos.staff
Slide boom 08.30 - 09.15
30mins 2 M/I of M/I of JBGD Both 18/100 disconnection Both side ESM with 1 JE/S/KBL
S&T JBGD-GGVT B/I JBGD-GGVT PLCT nos.staff
B/I 11.00 - 11.30
30mins 3 M/I of GIN-JBGD M/I of JBGD Both 18/100 disconnection Both side ESM with 1 JE/S/KBL
BLOCK GIN-JBGD PLCT nos.staff
S&T
instrument BLOCK
PKL-RLP instrument 11.30 - 12.00
30mins 4 M/I of Crank M/I of Crank JBGD Both 18/100 disconnection Both side ESM with 1 JE/S/KBL
S&T
handles handles piloting nos.staff 12.00 - 12.30
Movement not
TRD Isolator permitted in AANJAIAH
45 1 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-UP Tower Car (08310162741) 10.00 - 10.45
Movement not
TRD Isolator permitted in AANJAIAH
45 2 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-UP Tower Car (08310162741) NOT PERMITTED
Movement not
TRD Turnout permitted in AANJAIAH
45 3 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-UP Tower Car (08310162741) 10.45 - 11.30
Movement not
TRD Turnout permitted in AANJAIAH
45 4 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-UP Tower Car (08310162741) NOT PERMITTED
CON
Movement not
TRD Isolator permitted in HANUMANTH RAO
45 1 Maintenance 1 LWR YARD Yard 525-527 LB and PB LWR Yard-DN Tower Car (08310162257) 14.00 - 14.45
Movement not
TRD Isolator permitted in HANUMANTH RAO
45 2 Maintenance 1 KBI YARD Yard 525-527 LB and PB LWR Yard-DN Tower Car (08310162257) 08.00 - 08.45
Movement not
TRD Turnout permitted in HANUMANTH RAO
45 3 Maintenance 1 KBI YARD Yard 525-527 LB and PB LWR Yard-DN Tower Car (08310162257) NOT PERMITTED
Movement not
TRD Turnout permitted in HANUMANTH RAO
45 4 Maintenance 1 KBI YARD Yard 525-527 LB and PB LWR Yard-DN Tower Car (08310162257) 08.45 - 09.15
30 Minutes 1 VJR-MRJ UFSBI VJR-MRJ VJR UP 739.587 Disconnection UP & DN train ESM with 1 SSE/SIG/MRJ
Monthly UFSBI on PLCT nos.staff
S&T
Inspection Monthly
Inspection 09.30 - 10.00
30 Minutes 2 VJR-SED UFSBI VJR-SED VJR UP 739.587 Disconnection UP & DN train ESM with 1 SSE/SIG/MRJ
Monthly UFSBI on PLCT nos.staff
S&T
Inspection Monthly
Inspection 10.00 - 10.30
30 Minutes 3 Both side Crank Both side UGR UP/DN 721.235 Disconnection UP & DN ESM with 1 NA
handle Crank handle Train nos.staff
Maintenance Maintenance Reception ON
S&T
Piloting &
Despatch on
Starter memo. 09.30 - 10.00
30 Minutes 4 CKR-RBG UFSBI CKR-RBG CKR UP 683.282 Disconnection UP & DN train ESM with 1 NA
S&T Maintenance UFSBI on PLCT nos.staff
Maintenance 11.00 - 11.30
30 Minutes 5 CKR-GPB UFSBI CKR-GPB CKR DN 683.282 Disconnection UP & DN train ESM with 1 NA
S&T Maintenance UFSBI on PLCT nos.staff
Maintenance 11.30 - 12.00
40 Minutes 6 Pt no 55 Pt no 55 SXB UP & DN Disconnection 1. UP ESM with 2 NA
Disconnection maintenance maintenance reception nos.staff
piloting
S&T
2. DN
despatch by
619.05 starter memo 10.00 - 10.40
40 Minutes 7 Pt no 56 Pt no 56 SXB UP & DN Disconnection 1. UP ESM with 2 NA
DWR-MRJ Disconnection maintenance maintenance reception nos.staff
piloting
S&T
2. DN
despatch by
619.05 starter memo 10.40 - 11.20
60 Minutes 8 LC 356 LC 356 KNP UP & DN Disconnection Sliding boom ESM with 2 NA
S&T
Disconnection maintenance maintenance 584.86 working nos.staff 11.30 - 12.30
30 Minutes 9 SSBPAC B/I SSBPAC B/I TGT UP & DN Disconnection 1. PLC ESM with 1 NA
S&T Disconnection maintenance maintenance nos.staff
TGT-LD TGT-LD 11.64 13.00 - 13.30
30 Minutes 10 SSBPAC B/I SSBPAC B/I TGT UP & DN Disconnection 1. PLC ESM with 1 NA
S&T Disconnection maintenance maintenance nos.staff
TGT-CLR TGT-CLR 11.64 13.30 - 14.00
30 Minutes 11 Crank handle for Crank handle TGT UP & DN Disconnection 1. UP & DN ESM with 1 NA
Disconnection maintenance CH 1 to 6 for reception by nos.staff
maintenance piloting
S&T
2. UP & DN
despatch by
11.64 starter memo 14.00 - 14.30
30 Minutes 12 TVG-LWR B/I TVG-LWR B/I TVG UP&DN 534.61 Disconnection PLCT AT ESM with 1 NA
Disconnection FOR FOR BOTH nos.staff
S&T
MAINTENANCE MAINTENAN STATION
CE 08.00 - 08.30
30 Minutes 13 LWR-TVG B/I LWR-TVG B/I LWR UP&DN 525.8 Disconnection PLCT at both ESM with 1 NA
Disconnection FOR FOR stations nos.staff
S&T
MAINTENANCE MAINTENAN
CE 08.30 - 09.00
UTV Machine 55/35 nos
ENGG 2 blocks of 90 Shifting of Loading/unloa 558/000-534/0 Contract
minutes each 1 Sleepers/Rails ding LD-TVG DN 00 LB & PB Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic tamping Plain track 597/700-599/7
ENGG
2 x 120mins 2 Machine Tamping KNP-DUR DN 00 LB Block required JE/P.WAY/KNP 11.00 - 13.00
Duomatic tamping Plain track 653/000-655/0
ENGG
2 x 120mins 3 Machine Tamping PCH-GKK DN 00 LB Block required JE/P.way/SPL/BGM 10.00 - 12.00
ENGG 1 block 90 mnn 4 ridge.No.184 attentio Br.No.184 KUD-UGR SL 716/400-600 LB LB Required SSE/PWAY/KUD 14.00 - 15.30
UP TRAIN
ENGG 502/900-503/4 CAN'T
240 BCM WORK 550 MGD YARD UP 50 LB+PB DISPATCH SSE/PWAY/DWR 01.00 - 04.00
CON
Ballast profile Rekhya naik
ENGG
120min 1 Ballast regulation & sweeping HBI-KTY Single line 53/0-54/0 Block required BRM-04 JE/PW/KTY 12.00 - 14.00
VC-KTY ENGG
TRD
RE
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 18.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM OF BLOCK SEC/ BLOCK REPERCUSS RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK WORK STATION UP/DN LOCATION (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-DN Tower Car (08310161863) 09.00 - 09.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-DN Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-DN Tower Car (08310161863) 11.30 - 12.15
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-DN Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in B SOREN
45 5 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-DN Tower Car (7022029745) 11.30 - 12.15
Movement not
TRD Isolator permitted in B SOREN
45 6 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-DN Tower Car (7022029745) NOT PERMITTED
Movement not
TRD Turnout permitted in B SOREN
45 7 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-DN Tower Car (7022029745) 12.15 - 13.00
Movement not
TRD Turnout permitted in B SOREN
45 8 Maintenance 1 HBS YARD Yard 18-20 LB and PB HBS Yard-DN Tower Car (7022029745) NOT PERMITTED
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
09:45-12:15(DN)
ENGG
120 min 6 BT-Unloading 20 Bobyn HBS-NGR UP & DN 19/100-35/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
Reconditioning 0/00-100, Pnt no- Road-8 &9 No
ENGG 150min 7 1 UBL yard Road-8 LB train can be
of Tounge Rails 139B Mannually SSE/JE P.Way ----
passed during
30 minutes 1 Subl-kno B/I Subl-kno B/I subl-kno up/dn 465.12 disconnection All up and dn ESM with 1 nos.staff NA
KBL-DWR S&T
maintance maintance trains piloting 15.30 - 16.00
30 Minutes 2 Maintenance Maintenance SNH UP/DN 444.657 Disconnection All UP & DN ESM with 1 nos.staff NA
Disconnection and safety and safety trains to be
check of check of dealt on PLCT
S&T
SNH-GDI block SNH-GDI block
for for
maintenance maintenance 15.00 - 15.30
30 Minutes 3 Maintenance Maintenance SNH UP/DN 444.657 Disconnection All UP & DN ESM with 1 nos.staff NA
Disconnection and safety and safety trains to be
check of check of dealt on PLCT
S&T
SNH-KNO SNH-KNO
block for block for
maintenance maintenance 15.30 - 16.00
60 Minutes 4 54BT TLD 54BT TLD BDKA UP 475.95 Disconnection All UP trains ESM with 3 nos.staff NA
S&T Disconnection lifting work lifting work reception on
Calling ON 11.00 - 12.00
30 minutes 5 HBS IPS HBS IPS HBS UP/DN 19.13 Disconnection ALL TRAINS ESM with 1 nos.staff JE/SIG/UBL
S&T
MAINTANCE MAINTANCE PILOTING 12.00 - 12.30
30 minutes 6 HBS-KUG HBS-KUG HBS UP/DN 19.13 Disconnection ALL TRAINS ESM with 1 nos.staff JE/SIG/UBL
S&T MONTHLY MONTHLY ON BLOCK
INSPECTION INSPECTION ON PLCT 12.30 - 13.00
30min 7 Quaterly Quaterly BNP both 103/300 discconnectio Both side ESM with 1 nos.staff JE/S/KBL
Inspection of Inspection of n PLCT &
S&T
BLOCK & BLOCK & PILOTING
CRANK handle CRANK handle 12.00 - 12.30
20 8 monthly monthly TLKL both 97/600 discconnectio all down trains ESM with 1 nos.staff JE/S/KBL
inspection of inspection of n need to be
S&T
TLKL-BNP TLKL-BNP given PLCT
Block Block 12.00 - 12.20
25 9 monthly monthly TLKL both 92/500 discconnectio all trains need ESM with 1 nos.staff JE/S/KBL
S&T inspection of inspection of n to be pilated
crank handles crank handles 12.20 - 12.40
ENGG 180 Min 1 PQRS SVM -CNR UP 72/640-72/900 SSE/Pway /QLM 10.30 - 12.30
ENGG 75 Min 2 Manual Packing SVM -CNR UP 72/640-900 SSE/Pway /svm SHADOW BLOCK
PBC work
ENGG between
120min 3 DDS-LIM PBC work DDS-LIM SL 41/500-42/000 LB required 13.00 - 15.00
down trains
can't be
received and
ENGG
PBC work at up trains can
DDS point no Joint attention be received
120min 4 8B PBC work DDS yard Yard 37/200-300 work by piloting SHADOW BLOCK
TRD
60 Minutes 1 Pt no 50&51 Pt no 50&51 GNJ UP & DN Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. DN
despatch by
572.99 starter memo 11.30 - 12.30
40 Minutes 2 Pt no 51 Pt no 51 GNJ UP & DN Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. DN
despatch by
572.99 starter memo 12.30 - 13.10
90 Minutes 3 At Point 4, At Point 4, CRZ Yard 31.699 Disconnection Train ESM with 2 nos.staff NA
Disconnection sulphation sulphation movements
S&T
cleaning work. cleaning work. dealt through
piloting. 13.00 - 14.30
30 Minutes 4 SPI-23 EKT SPI-23 EKT VSG Yard 108.458 Disconnection Shunting ESM with 1 nos.staff NA
Disconnection Maintenance Maintenance movement
towards MPT
S&T
side through
SPI not
possible. 10.00 - 10.30
30 Minutes 5 SKVL-VSG B/I SKVL-VSG B/I SKVL Yard 100.434 Disconnection All up and ESM with 1 nos.staff JE/S/VSG
Disconnection Checking work Checking work down trains
S&T
for monthly for monthly through PLCT.
Inspection Inspection 10.30 - 11.00
LD-VSG 30 Minutes 6 SKVL-CSM B/I SKVL-CSM B/I SKVL Yard 100.434 Disconnection 1. All down ESM with 1 nos.staff JE/S/VSG
Disconnection Checking work Checking work trains through
for monthly for monthly PLCT at
S&T Inspection Inspection CSM. 2. All up
trains through
PLCT at
SKVL. 11.00 - 11.30
30 Minutes 7 All crank All crank SKVL Yard 100.434 Disconnection 1.Despatching ESM with 1 nos.staff JE/S/VSG
Disconnection handles handles towards VSG
Checking work Checking work on PLCT and
for monthly for monthly starter memo.
Inspection Inspection 2. Reception
from VSG on
piloting. 3.
S&T
Despatching
towards CSM
on PLCT and
starter memo.
2. Reception
from CSM on
piloting. 11.30 - 12.00
30 Minutes 8 Q/I of KM-QLM Q/I of KM-QLM KM Yard 57.07 Disconnection 1. Despatch ESM with 1 nos.staff SSE/SIG/SVM
Disconnection B/I for Monthly B/I for Monthly towards QLM
Inspection Inspection on PLCT. 2.
S&T
PLCT for
down trains at
QLM. 10.30 - 11.00
30 Minutes 9 Q/I of KM-SVM Q/I of KM-SVM KM Yard 57.07 Disconnection 1. Despatch ESM with 1 nos.staff SSE/SIG/SVM
Disconnection B/I for Monthly B/I for Monthly towards SVM
S&T Inspection Inspection on PLCT. 2.
PLCT for up
trains at SVM. 11.00 - 11.30
40 Minutes 10 Q/I of Q/I of KM Yard 57.07 Disconnection Both side ESM with 1 nos.staff SSE/SIG/SVM
Disconnection CH1,CH2,CH3, CH1,CH2,CH3, reception and
CH4,CH5,CH6, CH4,CH5,CH6, despatching
S&T
CH7 for CH7 for on piloting
Monthly Monthly
Inspection Inspection 11.30 - 12.10
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 2 UTV GDG-BDM UP & DN 0/00-67/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 3 DTE -56850 2000m GDG-HLAR UP & DN 0/0-48/0 LB Block required SSE/JE P.Way 12:30-15:00(UP)
Point Packing No train Fittings and Chaturanan Chandan
ENGG 120 Min 1 01 Nos BGK Yard SL 93/800-900 Line block
Point No.16 movement 12 Man power SSE/P.Way/BGK 11.00 - 13.00
1 Machine
No Up train B C Pradhan
ENGG 150 Min 1 TWR 100 Mtrs MVD-JML UP 176/500-600 Line block 30 Labours,
movement SSE/P.way/BJP
Rail GR Pad & ERC 10.00 - 12.30
No Up &
Tamping By Tamping By Tamping Machine 08 Sachin Mane
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block Down train UP-10.00 - 11.15
Machine Machine Nos Manpower SSE/P.way/IDR
movement DN- 12.00 -13.15
Movement not
TRD Overlap permitted in D. Kishore
45 1 Maintenance 1 IDR Yard Yard 240-242 LB and PB IDR yard UP Tower Car (08310163796) 10.00 - 10.45
Movement not
TRD Overlap permitted in D. Kishore
45 2 Maintenance 1 IDR Yard Yard 240-242 LB and PB IDR yard UP Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Turnout permitted in D. Kishore
45 3 Maintenance 1 IDR Yard Yard 240-242 LB and PB IDR yard UP Tower Car (08310163796) 10.45 - 11.15
Movement not
TRD Turnout permitted in D. Kishore
45 4 Maintenance 1 IDR Yard Yard 240-242 LB and PB IDR yard UP Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 5 Maintenance 1 JML YARD Yard 176-178 LB and PB JML yard UP Tower Car (08310162957) 12.30 - 13.15
Movement not
TRD Overlap permitted in G Mahadev
45 6 Maintenance 1 JML YARD Yard 176-178 LB and PB JML yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 7 Maintenance 1 JML YARD Yard 176-178 LB and PB JML yard UP Tower Car (08310162957) 13.15 - 14.00
Movement not
TRD Turnout permitted in G Mahadev
45 8 Maintenance 1 JML YARD Yard 176-178 LB and PB JML yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Overlap permitted in D. Chinna
45 9 Maintenance 1 MVD Yard Yard 164-166 LB and PB MVD yard UP Tower Car (08310162549) 12.30 - 13.15
Movement not
GDG-HG TRD Overlap permitted in D. Chinna
45 10 Maintenance 1 MVD Yard Yard 164-166 LB and PB MVD yard UP Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Turnout permitted in D. Chinna
45 11 Maintenance 1 MVD Yard Yard 164-166 LB and PB MVD yard UP Tower Car (08310162549) 13.15 - 14.00
Movement not
TRD Turnout permitted in D. Chinna
45 12 Maintenance 1 MVD Yard Yard 164-166 LB and PB MVD yard UP Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 13 Maintenance 1 MLP Yard Yard 30-33 LB and PB MLP yard UP Tower Car (08310162957) 10.30 - 11.15
Movement not
TRD Overlap permitted in G Mahadev
45 14 Maintenance 1 MLP Yard Yard 30-33 LB and PB MLP yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 15 Maintenance 1 MLP Yard Yard 30-33 LB and PB MLP yard UP Tower Car (08310162957) 11.15 - 12.00
Movement not
TRD Turnout permitted in G Mahadev
45 16 Maintenance 1 MLP Yard Yard 30-33 LB and PB MLP yard UP Tower Car (08310162957) NOT PERMITTED
TRD
60MIN 1 SH KEYS FOR SH KEYS FOR BGK UP/DN 93.29 DISCONNEC UP/DN ESM with 1 nos.staff ESM/JE/SSE
MAINTENANC MAINTENANC TION TRAINS
E E RECEIPTION
ON SIGNALS
S&T
AND
DISPATCH
ON PLCT DN
TRAINS 11.00 - 13.00
60 MIN 2 65A HOSE 65A HOSE MNL-AYB UP/DN 208.48 DISCONNEC UP TRAIN ESM with 3 nos.staff JE/SIG/BJP
PIPEREPLACE PIPEREPLACE TION DEALT ON
MENT MENT STARTER
MEMO/CLAM
PING & DN
S&T
TRAIN
DEALTN AT
PILOTING
AND
CLAMPING 10.00 - 11.00
S&T
CN
No train PQRS machine, Agency Akhilesh Kumar
TNGL-RNJP ENGG 240 1 PQRS work 1 BNHT-NDHI SL 10/580 to 840 LB movement Singh 11.00 - 15.00
labor
BNHT NDHI SSE/P WAY/HPT/M
Movement not
permitted in
TRD
Isolator BAY yard RD Pavan Kumar
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 4, 5 & 6 Tower Car (08310163339) 09.00 - 09.45
Movement not
permitted in
TRD
Isolator BAY yard RD Pavan Kumar
45 2 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 4, 5 & 6 Tower Car (08310163339) Not permitted
Movement not
permitted in
TRD
Turnout BAY yard RD Pavan Kumar
45 3 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 4, 5 & 6 Tower Car (08310163339) 10.30 - 11.15
Movement not
permitted in
TRD
Turnout BAY yard RD Pavan Kumar
45 4 Maintenance 1 BAY YARD Yard 207-209 LB and PB - 4, 5 & 6 Tower Car (08310163339) Not permitted
Movement not
TRD Isolator permitted in S Ganesh
45 5 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-DN Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Isolator permitted in S Ganesh
45 6 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-DN Tower Car (08310162957) Not permitted
Movement not
TRD Turnout permitted in S Ganesh
45 7 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-DN Tower Car (08310162957) 10.45 - 11.15
Movement not
TRD Turnout permitted in S Ganesh
45 8 Maintenance 1 BYO YARD Yard 161-163 LB and PB BYO Yard-DN Tower Car (08310162957) Not permitted
60" 1 31 TR two core 1 KGW UP/DN 149.605 LB UP PLCT for ESM with 1 nos.staff SSE/JE/S/HPT
S&T lead wire KGW-HPT
replacement 10.00 - 11.00
30 mins 2 LC 111 EKT EKT BYB UP/DN Disconnection Up trains ESM with 1 nos.staff NA
maintenance maintenance piloting, Dn
S&T
trains starter
208.06 memo 11.00 - 11.30
20 mins x 4 3 Crank handle EKT TNGL UP/DN Disconnection CH8- Up ESM with 1 nos.staff NA
EKT. CH8, maintenance trains
CH9, CH10, dispatch on
CH11 starter memo.
Dn trains
reception
BAY-PKL piloting. CH9 -
Up trains
dispatch on
starter memo.
Up train
reception to
Rd 3 piloting.
S&T CH10- Up
trains
dispatch on
starter memo.
Up train
reception to
Rd 3 piloting.
CH11- Up
trains
dispatch on
starter memo. 10.00 - 10.20
Up train 10.20 - 10.40
reception to 10.40 - 11.00
175.7 Rd 3 piloting. 11.00 - 11.20
30 mins 4 LC 109 EKT & EKT BYC UP/DN Disconnection Dn trains ESM with 2 nos.staff NA
Emergency maintenance PLCT and
EKT caution order
S&T maintenance for both Up
and DN trains
for observing
204.1 PHS. 11.30 - 12.00
30 mins 5 TNGL-BNHT Block TNGL BP UP/DN Disconnection UP/DN trains ESM with 1 nos.staff NA
block Instrument PLCT
S&T
instrument Maintenance
maintenance 1.647 10.00 - 10.30
RE
DN trains
X-Over rail S&T staff and 6 TM & 2 H.Anjanamurhy
ENGG 90 1 13 mtr PKL X-over 156/800-900 LB cannot
renewal B/s JE/P.WAY/HPT/ML
dispatch 10.00 - 11.30
ENGG
No train
30 movement Machine,TRD staff-3, Mukunda
ENGG 90 min 1 UTV working Bay -obm SL 16/000-20/000 LB & PB
sleepers/Rails between Dept-6 TM SE/P.Way/Spl works B
Obm to slm 11.00 - 12.30
ENGG
NO train can Hanumanthappa
ENGG
120 min 1 TRack attention 100 mtr MRB_GIN UP 136/000-100 LB be dealt AMC labour (SSE/P.Way/KBL) 10.00 - 12.00
Rajavali,
ENGG
1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL Km 31/149-31/669 Block required Contract Labour JE/P.Way/YTG 11.00 - 14.00
TRD
45mins 1 50ATF Bond 50ATF Bond GGVT UP and DN 37/400 to 37/500 LB JBGD side ESM with 1 nos.staff SSE/JE/ESM
wire wire trains to be
Replacement Replacement received by
S&T work work piloting and
despatch
through
starter memo 11.00 - 11.45
30min 2 Monthly Monthly MRB UP and DN 137/500 to 137/600 Disconnection Both side ESM with 1 nos.staff JE/S/KBL
S&T Inspection of Inspection of PLCT
MRB-GIN B/I MRB-GIN B/I 11.00 - 11.30
30min 3 Monthly Monthly MRB UP and DN 137/500 to 137/600 Disconnection Both side ESM with 1 nos.staff JE/S/KBL
S&T Inspection of Inspection of PLCT
PKL-RLP
MRB-HPT B/I MRB-HPT B/I 11.30 - 12.00
30min 4 Monthly Monthly MRB UP and DN 137/500 to 137/600 Disconnection Both side ESM with 1 nos.staff JE/S/KBL
S&T Inspection of Inspection of Piloting
crank handles crank handles 12.00 - 12.30
Movement not
TRD Isolator permitted in AANJAIAH
45 1 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-DN Tower Car (08310162741) 10.00 - 10.45
Movement not
TRD Isolator permitted in AANJAIAH
45 2 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-DN Tower Car (08310162741) NOT PERMITTED
Movement not
TRD Turnout permitted in AANJAIAH
45 3 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-DN Tower Car (08310162741) 10.45 - 11.30
Movement not
TRD Turnout permitted in AANJAIAH
45 4 Maintenance 1 HPT YARD Yard 143-145 LB and PB HPT Yard-DN Tower Car (08310162741) NOT PERMITTED
CON
Movement not
TRD Isolator permitted in HANUMANTH RAO
45 1 Maintenance 1 LWR YARD Yard 525-527 LB and PB LWR Yard-DN Tower Car (08310162257) 14.00 - 14.45
Movement not
TRD Isolator permitted in HANUMANTH RAO
45 2 Maintenance 1 KBI YARD Yard 525-527 LB and PB LWR Yard-DN Tower Car (08310162257) 08.00 - 08.45
Movement not
TRD Turnout permitted in HANUMANTH RAO
45 3 Maintenance 1 KBI YARD Yard 525-527 LB and PB LWR Yard-DN Tower Car (08310162257) NOT PERMITTED
Movement not
TRD Turnout permitted in HANUMANTH RAO
45 4 Maintenance 1 KBI YARD Yard 525-527 LB and PB LWR Yard-DN Tower Car (08310162257) 08.45 - 09.15
TRD
TRD
30 Minutes 1 UGR-SED UGR-SED UGR UP 721.235 Disconnection UP & DN train ESM with 1 nos.staff SSE/SIG/MRJ
S&T UFSBI Monthly UFSBI Monthly on PLCT
Inspection Inspection 11.30 - 12.00
30 Minutes 2 UGR-KUD UGR-KUD UGR DN 721.235 Disconnection UP & DN train ESM with 1 nos.staff SSE/SIG/MRJ
S&T UFSBI Monthly UFSBI Monthly on PLCT
Inspection Inspection 12.00 - 12.30
30 Minutes 3 LC 448 gate LC 448 gate KUD UP 714.48 Disconnection UP Train ESM with 2 nos.staff NA
EKT EKT reception on
Maintenace Maintenace Calling ON &
Desaptch on
S&T
starter memo,
DN Train
Reception on
Piloting 11.30 - 12.00
30 Minutes 4 GPB-CKR GPB-CKR GPB UP 688.466 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 11.00 - 11.30
30 Minutes 5 GPB-GKK GPB-GKK GPB DN 688.466 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 11.30 - 12.00
40 Minutes 6 Pt no 50 Pt no 50 SBH UP & DN Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. DN
despatch by
626.144 starter memo 10.00 - 10.40
40 Minutes 7 Pt no 51 Pt no 51 SBH UP & DN Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
DWR-MRJ 2. DN
despatch by
626.144 starter memo 10.40 - 11.20
30 Minutes 8 CH1-CH6 CH1-CH6 KRKP UP&DN 695.07 Disconnection UP&DN ESM with 1 nos.staff NA
Disconnection MAINTENANC MAINTENANC RECEPTION
S&T E E AND
DISPATCH
PILOTING 14.00 - 14.30
30 Minutes 9 KRKP-DWR B/I KRKP-DWR B/I KRKP UP&DN 695.07 Disconnection PLCT AT ESM with 1 nos.staff NA
S&T Disconnection MAINTENANC MAINTENANC BOTH
E E STATION 14.30 - 15.00
30 Minutes 10 KRKP-MGD B/I KRKP-MGD B/I KRKP UP&DN 695.07 Disconnection PLCT AT ESM with 1 nos.staff NA
S&T Disconnection MAINTENANC MAINTENANC BOTH
E E STATION 15.30 - 16.00
30 Minutes 11 TVG-DEV B/I TVG-DEV B/I TVG UP&DN 534.61 Disconnection PLCT AT ESM with 1 nos.staff SSE/SIG/LWR
S&T Disconnection FOR M/I FOR M/I BOTH
STATION 08.00 - 08.30
30 Minutes 12 CH1-CH8 FOR CH1-CH8 FOR TVG UP&DN 534.61 Disconnection UP&DN ESM with 1 nos.staff SSE/SIG/LWR
Disconnection M/I M/I RECEPTION
S&T AND
DISPATCH
PILOTING 08.30 - 09.00
30 Minutes 13 TVG-LWR B/I TVG-LWR B/I TVG UP&DN 534.61 Disconnection PLCT AT ESM with 1 nos.staff SSE/SIG/LWR
S&T FOR M/I FOR M/I BOTH
STATION 14.00 - 14.30
120 Minutes 14 LC-321 LC-321 LWR UP&DN 525.8 Disconnection TARIN CAN ESM with 3 nos.staff NA
Disconnection ROPEWIRE ROPEWIRE BE DEALT
S&T
REPLACEMEN REPLACEMEN USING SLIDE
T T BOOM 08.00 - 09.30
UTV Machine 55/35 nos
ENGG 2 blocks of 90 Shifting of Loading/unload
minutes each 1 Sleepers/Rails ing LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic
ENGG tamping Plain track
2 x 120mins 2 Machine Tamping DUR-BGM DN 599/700-601/700 LB Block required JE/P.WAY/KNP 11.00 - 13.00
Duomatic
ENGG tamping Plain track
2 x 120mins 3 Machine Tamping PCH-GKK DN 655/000-657/000 LB Block required JE/P.way/SPL/BGM 10.30 - 12.30
Bridge.No.128
ENGG
1 block 90 mnn 4 Guard rail work Br.No.128 GKK-GPB Up/Dn 666/500-600 LB LB Required SSE/PWAY/GPB 10.30 - 12.00
UP TRAIN
ENGG CAN'T
240 BCM WORK 600 MGD-KBI UP 503/450-504/00 LB+PB DISPATCH SSE/PWAY/DWR 01.00 - 04.00
CON
Bridge no.155
Sharad Srivastava
ENGG approaches approach
SSE/PW/KTY
120min 2 packing packing KTY-HBI singl line 64/800-900 Block required Manual 12.00 - 14.00
VC-KTY Ballast Ballast profile & Rekhya naik
ENGG
120min 1 regulation sweeping HBI-KTY Single line 54/0-55/0 Block required BRM-04 JE/PW/KTY 12.00 - 14.00
TRD
RE
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 19.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK REPERCUSSION RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) S REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-DN Tower Car (08310161863) 09.00 - 09.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-DN Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-DN Tower Car (08310161863) 11.30 - 12.15
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-DN Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in HBS B SOREN
45 5 Maintenance 1 HBS YARD Yard 18-20 LB and PB Yard-DN Tower Car (7022029745) 11.30 - 12.15
Movement not
TRD Isolator permitted in HBS B SOREN
45 6 Maintenance 1 HBS YARD Yard 18-20 LB and PB Yard-DN Tower Car (7022029745) NOT PERMITTED
Movement not
TRD Turnout permitted in HBS B SOREN
45 7 Maintenance 1 HBS YARD Yard 18-20 LB and PB Yard-DN Tower Car (7022029745) 12.15 - 13.00
Movement not
TRD Turnout permitted in HBS B SOREN NOT
45 8 Maintenance 1 HBS YARD Yard 18-20 LB and PB Yard-DN Tower Car (7022029745) PERMITTED
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
Reconditionin Road-8 &9 No
0/00-100, Pnt no-
ENGG 150min 6 g of Tounge 1 UBL yard Road-8 LB train can be
138B
Rails passed during Mannually SSE/JE P.Way ----
ENGG
20 Minutes 1 CH1-CH15 CH1-CH15 NVU UP&DN 482.200-482.200 Disconnection UP&DN ESM with 1 nos.staff NA
Disconnection MAINTENAN MAINTENAN RECEPTION
S&T
CE CE AND DISPATCH
KBL-DWR BY PILOTING 10.30 - 10.50
30 minutes 2 ubl-unk b/I ubl-unk b/I ubl-unk UP/DN 469.000-472.600 disconnection All up and dn ESM with 1 nos.staff JE/SIG/UBL
S&T monthly monthly trains piloting
inspection inspection 10.00 - 10.30
30 minutes 3 eubl-kug b/I eubl-kug b/I kug-eubl up/dn 10.010-5.200 disconnection All up and dn ESM with 1 nos.staff JE/SIG/UBL
S&T for monthly for monthly trains plct
inspection inspection 15.00 - 15.30
30 minutes 4 kug-hbs b/I for kug-hbs b/I for kug-hbs up/dn 10.010-19.130 disconnection All up and dn ESM with 1 nos.staff JE/SIG/UBL
S&T montly montly trains plct
inspection inspection 15.30 - 16.00
30 minutes 5 kug crank kug crank kug up/dn 10.01 disconnection All up and dn ESM with 1 nos.staff JE/SIG/UBL
handles handles trains piloting
S&T
monthly monthly
inspection inspection 12.00 - 12.30
35 minutes 6 LC gate 267 LC gate 267 GDI UP/DN 433.72 disconnection UP AND DN ESM with 2 nos.staff NA
EOLB gate EOLB gate TRAINS
normal normal RECEPTION
S&T
maintance maintance AND DISPATCH
ON SLINDING
BOOM 13.030 - 14.05
30 Minutes 7 Monthly Monthly UNK UP/DN 472.6 Disconnection All UP & DN ESM with 2 nos.staff JE/SIG/UBL
Disconnection Inspection of Inspection of trains to be dealt
S&T Interlocked Interlocked on Sliding boom
LC gate LC gate
LC-286 LC-286 10.30 - 11.00
40 minutes 8 LC 26 LC 26 LKT UP/DN 45.48 Disconnection All up and dn ESM with 2 nos.staff NA
S&T
MAINTANCE MAINTANCE trains piloting 11.00 - 11.40
30 minutes 9 LKT -BKIT LKT -BKIT LKT UP/DN 45.48 Disconnection All up and dn ESM with 1 nos.staff NA
S&T BLOCK BLOCK trains plct
MAINTANCE MAINTANCE 11.40 - 12.10
20 10 monthly monthly TLKL both 97/600 discconnectio all up trains need ESM with 1 nos.staff JE/S/KBL
inspection of inspection of n to be given PLCT
S&T
TLKL-BNA TLKL-BNA
Block Block 12.00 - 12.20
ENGG 2 x 75 Min 1 WRJ SVM -CNR UP 72/640-900 JE/Pway /QLM 10.00 - 11.15
ENGG 2 X 90 Min 2 UTV SVM -CNR UP 72/640-900 10.00 - 11.30
ENGG 2 x 90 Min 3 T Machine Working SVM -CNR UP 72/640-900 SHADOW BLOCK
down trains can't
be received and
ENGG PBC work at up trains can be
DDSpoint no Joint attention received by
120min 4 8A PBC work DDS yard Yard 37/300-400 work piloting 13.00 - 15.00
material
ENGG
120 min 5 BFR work shifting DDS-LIM SL 39/000-42/000 LB required SHADOW BLOCK
TRD
60 Minutes 1 LC 344 EOLB LC 344 EOLB LD UP & DN Disconnection Sliding boom ESM with 2 nos.staff NA
S&T
Disconnection maintenance maintenance 562/300-400 working 08.00 - 09.00
30 Minutes 2 Checking of Checking of QLM Yard 50.686 Disconnection 1. Despatch ESM with 1 nos.staff JE/S/QLM
Disconnection QLM-LIM B/I QLM-LIM B/I towards LIM on
S&T
LD-VSG for Monthly for Monthly PLCT. 2. PLCT for
Inspection Inspection dn trains at LIM. 15.00 - 15.30
30 Minutes 3 Checking of Checking of QLM Yard 50.686 Disconnection 1. Despatch ESM with 1 nos.staff JE/S/QLM
Disconnection QLM-KM B/I QLM-LIM B/I towards KM on
S&T
for Monthly for Monthly PLCT. 2. PLCT for
Inspection Inspection up trains at KM. 15.30 - 16.00
30 Minutes 4 SPI-16 EKT SPI-16 EKT VSG Yard 108.458 Disconnection Shunting ESM with 1 nos.staff NA
Disconnection Maintenance Maintenance movement
S&T towards SKVL
side through SPI
not possible. 10.00 - 10.30
30 Minutes 5 Maintenance Maintenance MJO Yard 435.73 Disconnection All up and down ESM with 1 nos.staff NA
Disconnection of MJO-CSM of MJO-CSM trains towards
S&T
B/I B/I VSG through
PLCT. 10.00 - 10.30
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 2 UTV GDG-BDM UP & DN 0/00-67/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 3 DTE -56850 2000m GDG-HLAR UP & DN 0/0-48/0 LB Block required SSE/JE P.Way 12:30-15:00(UP)
No train Fittings and Siddalingeshwar
ENGG 120 Min 1 SEJ Packing 02 Nos LMT Yard SL 127/900-128/00 Line block
movement 12 Man power SSE/P.Way/LMT 11.00 - 13.00
1 Machine
No Up train M. M Munawar
ENGG 150 Min 1 TWR 100 Mtrs MVD-JML UP 176/600-700 Line block 30 Labours,
movement JE/P.way/BSRX
Rail GR Pad & ERC 10.00 - 12.30
No train BT Rake B C Pradhan
ENGG 120 Min 2 BT 900 Cum AYB-MNL UP 207/000-205/000 Line block
movement Manpower SSE/P.Way/BJP 10.00 - 12.00
Tamping By Tamping By No Up & Down Tamping Machine 08 Sachin Mane UP-10.00 - 11.15
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block
Machine Machine train movement Nos Manpower SSE/P.way/IDR DN- 12.00 -13.15
Movement not
TRD Overlap permitted in IDR D. Kishore
45 1 Maintenance 1 IDR Yard Yard 240-242 LB and PB yard DN Tower Car (08310163796) 10.00 - 10.45
Movement not
TRD Overlap permitted in IDR D. Kishore
45 2 Maintenance 1 IDR Yard Yard 240-242 LB and PB yard DN Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Turnout permitted in IDR D. Kishore
45 3 Maintenance 1 IDR Yard Yard 240-242 LB and PB yard DN Tower Car (08310163796) 10.45 - 11.15
Movement not
TRD Turnout permitted in IDR D. Kishore
45 4 Maintenance 1 IDR Yard Yard 240-242 LB and PB yard DN Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Overlap permitted in JML G Mahadev
45 5 Maintenance 1 JML YARD Yard 176-178 LB and PB yard DN Tower Car (08310162957) 12.30 - 13.15
Movement not
TRD Overlap permitted in JML G Mahadev
45 6 Maintenance 1 JML YARD Yard 176-178 LB and PB yard DN Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in JML G Mahadev
45 7 Maintenance 1 JML YARD Yard 176-178 LB and PB yard DN Tower Car (08310162957) 13.15 - 14.00
Movement not
TRD Turnout permitted in JML G Mahadev
45 8 Maintenance 1 JML YARD Yard 176-178 LB and PB yard DN Tower Car (08310162957) NOT PERMITTED
Movement not
GDG-HG TRD Overlap permitted in MVD D. Chinna
45 9 Maintenance 1 MVD Yard Yard 164-166 LB and PB yard DN Tower Car (08310162549) 12.30 - 13.15
Movement not
TRD Overlap permitted in MVD D. Chinna
45 10 Maintenance 1 MVD Yard Yard 164-166 LB and PB yard DN Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Turnout permitted in MVD D. Chinna
45 11 Maintenance 1 MVD Yard Yard 164-166 LB and PB yard DN Tower Car (08310162549) 13.15 - 14.00
Movement not
TRD Turnout permitted in MVD D. Chinna
45 12 Maintenance 1 MVD Yard Yard 164-166 LB and PB yard DN Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Overlap permitted in MLP G Mahadev
45 13 Maintenance 1 MLP Yard Yard 30-33 LB and PB yard DN Tower Car (08310162957) 10.30 - 11.15
Movement not
TRD Overlap permitted in MLP G Mahadev
45 14 Maintenance 1 MLP Yard Yard 30-33 LB and PB yard DN Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in MLP G Mahadev
45 15 Maintenance 1 MLP Yard Yard 30-33 LB and PB yard DN Tower Car (08310162957) 11.15 - 12.00
Movement not
TRD Turnout permitted in MLP G Mahadev
45 16 Maintenance 1 MLP Yard Yard 30-33 LB and PB yard DN Tower Car (08310162957) NOT PERMITTED
90MIN 1 BI AND CH BI AND CH BGK UP/DN 93.29 DISCONNEC UP/DN TRAINS ESM with 1 nos.staff JE/SSE
FOR FOR TION RECEIPTION ON
MAINTENAN MAINTENAN SIGNALS AND
S&T
CE CE DISPATCH ON
PLCT DN
TRAINS 11.00 - 12.30
60 MIN 2 118B END 118B END KDGI-BSRX UP 150.73 DISCONNEC UP TRAIN ESM with 3 nos.staff SSE/SIG/BSRX
HOSE PIPE HOSE PIPE TION RECEIVING ON
REPLACEME REPLACEME CALLING ON
NT WORK NT WORK DISPATCH ON
S&T
MEMO AND DN
TRAIN PILOTING
AND CLAMPING
. 11.00 - 12.00
S&T
CN
Movement not
TRD Isolator permitted in BAY Pavan Kumar
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB yard RD - 4, 5 & 6 Tower Car (08310163339) 09.00 - 09.45
Movement not
TRD Isolator permitted in BAY Pavan Kumar
45 2 Maintenance 1 BAY YARD Yard 207-209 LB and PB yard RD - 4, 5 & 6 Tower Car (08310163339) Not permitted
Movement not
TRD Turnout permitted in BAY Pavan Kumar
45 3 Maintenance 1 BAY YARD Yard 207-209 LB and PB yard RD - 4, 5 & 6 Tower Car (08310163339) 10.30 - 11.15
Movement not
TRD Turnout permitted in BAY Pavan Kumar
45 4 Maintenance 1 BAY YARD Yard 207-209 LB and PB yard RD - 4, 5 & 6 Tower Car (08310163339) Not permitted
Movement not
TRD Isolator permitted in BYO S Ganesh
45 5 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-DN Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Isolator permitted in BYO S Ganesh
45 6 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-DN Tower Car (08310162957) Not permitted
Movement not
TRD Turnout permitted in BYO S Ganesh
45 7 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-DN Tower Car (08310162957) 10.45 - 11.15
Movement not
TRD Turnout permitted in BYO S Ganesh
45 8 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-DN Tower Car (08310162957) Not permitted
BAY-PKL
60" 1 67 AT two 1 KGW UP/DN 149.605 LB DN Rd 5 6 7 ESM with 1 nos.staff SSE/JE/S/HPT
core lead wire calling ON
S&T
replacement Dispatch RD 5 6 7
Authority 10.00 - 11.00
30 mins 2 SLM-OBM Block SLM UP/DN Disconnection Up/Dn trains ESM with 1 nos.staff NA
block Instrument PLCT
S&T
instrument Maintenance
maintenance 30.86 11.00 - 11.30
30 mins 3 LC-110 EKT EKT BYB UP/DN Disconnection Caution order. ESM with 2 nos.staff NA
and maintenance Up/Dn trains to
S&T Emergency observe PHS
Ekt signal.
maintenance 208.06 09.30 - 11.30
DN trains cannot S&T staff and 6 TM & 2 H.Anjanamurhy
ENGG 150 1 WRJ 2 joints PKL X-over 156/800-900 LB
dispatch B/s JE/P.WAY/HPT/ML 10.00 - 12..30
No train
30 movement Machine,TRD staff-3, Mukunda
ENGG 90 min 1 UTV working Bay -obm SL 15/000-20/000 LB & PB
sleepers/Rails between Obm to Dept-6 TM SE/P.Way/Spl works B
Slm 11.00 - 12.30
No train
Point packing LB & movement Agency-15 labour,S&T Raghu prasanna
ENGG 60 min 2 1 Pt Bay yard UP line 207/200-300
Pt.No70/B disconnection between Byc to staff SSE/P.Way/Bay(IC)
Bay 10.00 - 11.00
ENGG
Rajavali,
ENGG
1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL Km 31/669-32/189 Block required Contract Labour JE/P.Way/YTG 11.00 - 14.00
Point attention DN trains cannot S&T staff , blacksmith Hanumanthappa
ENGG
2x120 mins 1 50A 1 unit GIN Yard DN 127/00-100 LB dispatch and AMC labours (SSE/P.Way/KBL) 08.30 - 10.30
Movement not
TRD Isolator permitted in HPT AANJAIAH
45 1 Maintenance 1 HPT YARD Yard 143-145 LB and PB Yard-DN Tower Car (08310162741) 10.00 - 10.45
Movement not
PKL-RLP TRD Isolator permitted in HPT AANJAIAH
45 2 Maintenance 1 HPT YARD Yard 143-145 LB and PB Yard-DN Tower Car (08310162741) NOT PERMITTED
Movement not
TRD Turnout permitted in HPT AANJAIAH
45 3 Maintenance 1 HPT YARD Yard 143-145 LB and PB Yard-DN Tower Car (08310162741) 10.45 - 11.30
Movement not
TRD Turnout permitted in HPT AANJAIAH
45 4 Maintenance 1 HPT YARD Yard 143-145 LB and PB Yard-DN Tower Car (08310162741) NOT PERMITTED
CON
Movement not
TRD Isolator permitted in LWR HANUMANTH RAO
45 1 Maintenance 1 LWR YARD Yard 525-527 LB and PB Yard-UP Tower Car (08310162257) 14.00 - 14.45
Movement not
TRD Isolator permitted in LWR HANUMANTH RAO
45 2 Maintenance 1 KBI YARD Yard 525-527 LB and PB Yard-UP Tower Car (08310162257) 08.00 - 08.45
Movement not
TRD Turnout permitted in LWR HANUMANTH RAO
45 3 Maintenance 1 KBI YARD Yard 525-527 LB and PB Yard-UP Tower Car (08310162257) NOT PERMITTED
Movement not
TRD Turnout permitted in LWR HANUMANTH RAO
45 4 Maintenance 1 KBI YARD Yard 525-527 LB and PB Yard-UP Tower Car (08310162257) 08.45 - 09.15
TRD
TRD
30 Minutes 1 MRJ-VJR MRJ-VJR MRJ DN 297.05 Disconnection UP & DN train on ESM with 1 nos.staff SSE/SIG/MRJ
UFSBI UFSBI PLCT
S&T
Monthly Monthly
Inspection Inspection 14.00 - 14.30
30 Minutes 2 Both side Both side SED UP/DN 930.858 Disconnection UP & DN Train ESM with 1 nos.staff NA
Crank handle Crank handle Reception ON
S&T Maintenance Maintenance Piloting &
Despatch on
Starter memo. 14.00 - 14.30
30 Minutes 3 Both side Both side VJR UP/DN 739.587 Disconnection UP & DN Train ESM with 1 nos.staff NA
Crank handle Crank handle Reception ON
S&T Maintenance Maintenance Piloting &
Despatch on
Starter memo. 14.00 - 14.30
60 Minutes 4 LC 371 EOLB LC 371 EOLB DUR UP & DN 599.637 Disconnection Sliding boom ESM with 2 nos.staff NA
S&T
Disconnection maintenance maintenance working 12.00 - 13.00
20 Minutes 5 DEV-SVTN DEV-SVTN DEV UP&DN 546.55 Disconnection PLCT at both ESM with 1 nos.staff NA
S&T Disconnection B/I FOR B/I FOR stations
maintenance maintenance 08.00 - 08.20
DWR-MRJ
20 Minutes 6 CH1-CH8 CH1-CH8 LWR UP&DN 525.8 Disconnection UP&DN ESM with 1 nos.staff NA
Disconnection MAINTENAN MAINTENAN RECEPTION
S&T
CE CE AND DISPATCH
PILOTING 08.20 - 08.40
30 Minutes 7 62AT TLD 62AT TLD DWR UP&DN 525.8 Disconnection UP&DN TRAIN ESM with 2 nos.staff NA
Disconnection BOX BOX RECEPTION ON
REPLACEME REPLACEME CALLING
NT NT ONROAD 1,UP
S&T TRAIN
DISPATCH
FROM RD-1
WITH STARTER
MEMO 14.00 - 14.30
30 Minutes 8 50BT 51TJ 50BT 51TJ MGD UP 502.56 Disconnection UP TRAIN ESM with 1 nos.staff NA
Disconnection LEAD WIRE LEAD WIRE RECEPTION ON
S&T
REPLACEME REPLACEME CALLING ON
NT NT 14.00 - 14.30
UTV Machine
Shifting of 55/35 nos
ENGG
2 blocks of 90 Sleepers/Rail Loading/unloa
minutes each 1 s ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic
ENGG tamping Plain track
2 x 120mins 2 Machine Tamping DUR-BGM DN 601/700-603/700 LB Block required JE/P.WAY/KNP 11.00 - 13.00
Duomatic
ENGG tamping Plain track
2 x 120mins 3 Machine Tamping PCH-GKK DN 657/000-659/000 LB Block required JE/P.way/SPL/BGM 11.00 - 13.00
Bridge.No.129
ENGG Guard rail
1 block 90 mnn 4 work Br.No.129 GKK-GPB Up/Dn 666/500-600 LB LB Required SSE/PWAY/GPB 11.00 - 12.30
UP TRAIN CAN'T
ENGG
240 BCM WORK 600 MGD-KBI UP 504/00-600 LB+PB DISPATCH SSE/PWAY/DWR 01.00 - 04.00
CON
Ballast Ballast profile Rekhya naik
ENGG
120min 1 regulation & sweeping HBI-KTY Single line 55/0-56/0 Block required BRM-04 JE/PW/KTY 12.00 - 14.00
VC-KTY ENGG
TRD
RE
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 20.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) REPERCUSSIONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-DN Tower Car (08310161863) 09.00 - 09.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-DN Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-DN Tower Car (08310161863) 11.30 - 12.15
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 RLP YARD Yard 75-77 LB and PB RLPYard-DN Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in HBS B SOREN
45 5 Maintenance 1 HBS YARD Yard 18-20 LB and PB Yard-DN Tower Car (7022029745) 11.30 - 12.15
Movement not
TRD Isolator permitted in HBS B SOREN
45 6 Maintenance 1 HBS YARD Yard 18-20 LB and PB Yard-DN Tower Car (7022029745) NOT PERMITTED
Movement not
TRD Turnout permitted in HBS B SOREN
45 7 Maintenance 1 HBS YARD Yard 18-20 LB and PB Yard-DN Tower Car (7022029745) 12.15 - 13.00
Movement not
TRD Turnout permitted in HBS B SOREN
45 8 Maintenance 1 HBS YARD Yard 18-20 LB and PB Yard-DN Tower Car (7022029745) NOT PERMITTED
SSE/JE P.Way 10:30-12.30(DN)
ENGG
120 min 4 BT-Unloading 20 Bobyn KJG-GDI UP & DN 400/100-433/0 LB Block required YLG 14:00-16:30(UP)
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
UP line no train can
ENGG 150min 6 Track attention 1 NVU-DWR UP 484/400-600 LB be passed during Mannuallly
SSE/JE P.Way 10.00 - 12.30
30 minutes 1 eubl-kug b/I eubl-kug b/I kug-eubl up/dn 10.01 disconnection Bl and
All up k tidn trains ESM with 1 nos.staff JE/SIG/UBL
S&T for monthly for monthly plct
inspection inspection 12.00 - 12.30
30 minutes 2 wubl-eubl b/I wubl-eubl b/I eubl-wubl up/dn 5.2 disconnection All up and dn trains ESM with 1 nos.staff JE/SIG/UBL
S&T for montly for montly plct
KBL-DWR inspection inspection 12.30 - 13.00
30 minutes 3 eubl crank eubl crank eubl up/dn 5.2 disconnection All up and dn trains ESM with 1 nos.staff JE/SIG/UBL
handles handles piloting
S&T
monthly monthly
inspection inspection 13.30 - 14.00
31 minutes 4 HBS-NVD HBS-NVD HBS-NVD up/dn 19.3 disconnection All up and dn trains ESM with 1 nos.staff NA
S&T BLOCK BLOCK plct
MAINTANCE MAINTANCE 12.00 - 12.30
32 minutes 5 CRANK CRANK HBS up/dn 19.3 disconnection All up and dn trains ESM with 1 nos.staff NA
S&T HANLE HANLE piloting
MAINTANCE MAINTANCE 12.30 - 13.00
30min 1 Inspection Monthly SOQ both 85/000-200 discconnectio both side piloting and ESM with 1 nos.staff JE/S/GDG
inspection of n PLCT
BLOCK
S&T
SOQ-RLP,
SOQ-BNA &
Crank handle 12.00 - 12.30
20 min 2 Maintenance Maintenance KGX both 66/600 discconnectio Both side piloting ESM with 1 nos.staff JE/S/GDG
S&T of CRANK n
handle 11.30 - 11.50
30min 3 Quaterly Quaterly GDGBP both 55/700 discconnectio Both side PLCT & ESM with 1 nos.staff SSE/S/GDG
Inspection of Inspection of n PILOTING
S&T BLOCK & BLOCK &
CRANK CRANK
handle handle 12.00 - 12.30
60 4 maintanance maintanance TLKL both 97/600 discconnectio all down trains need to ESM with 1 nos.staff JE/S/KBL
S&T of TLKL-BNP of TLKL-BNP n be given PLCT
Block Block 08.15 - 09.15
60 5 maintanance maintanance TLKL both 98/700 discconnectio all up trains reception ESM with 2 nos.staff JE/S/KBL
of LC 53 of LC 53 n by memo and dispatch
S&T through memo and dn
trains by adv.starter
memo 11.50 - 12.50
60 6 maintance of maintance of BNA both 92/500 discconnectio all trains need to be ESM with 1 nos.staff JE/S/KBL
S&T crank handles crank handles n pilated
ch1 to ch4 ch1 to ch4 13.00 - 14.00
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 2 UTV GDG-BDM UP & DN 0/00-67/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 3 DTE -56850 2000m GDG-HLAR UP & DN 0/0-48/0 LB Block required SSE/JE P.Way 12:30-15:00(UP)
Fittings and Siddalingeshwar
ENGG 120 Min 1 SEJ Packing 02 Nos LMT Yard SL 128/500-600 Line block No train movement
12 Man power SSE/P.Way/LMT 11.00 - 13.00
1 Machine
B C Pradhan
ENGG 150 Min 1 TWR 100 Mtrs MVD-JML UP 176/700-800 Line block No Up train movement 30 Labours,
SSE/P.way/BJP
Rail GR Pad & ERC 10.00 - 12.00
Tamping By Tamping By No Up & Down train Tamping Machine 08 Sachin Mane UP-10.00 - 11.15
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block
Machine Machine movement Nos Manpower SSE/P.way/IDR DN- 12.00 -13.15
Movement not
TRD Overlap permitted in IDR yard D. Kishore
45 2 Maintenance 1 IDR Yard Yard 240-242 LB and PB DN Tower Car (08310163796) 10.00 - 10.45
Movement not
TRD Turnout permitted in IDR yard D. Kishore
45 3 Maintenance 1 IDR Yard Yard 240-242 LB and PB DN Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Turnout permitted in IDR yard D. Kishore
45 4 Maintenance 1 IDR Yard Yard 240-242 LB and PB DN Tower Car (08310163796) 10.45 - 11.15
Movement not
TRD Overlap permitted in JML yard G Mahadev
45 5 Maintenance 1 JML YARD Yard 176-178 LB and PB DN Tower Car (08310162957) 12.30 - 13.15
Movement not
TRD Overlap permitted in JML yard G Mahadev
45 6 Maintenance 1 JML YARD Yard 176-178 LB and PB DN Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in JML yard G Mahadev
45 7 Maintenance 1 JML YARD Yard 176-178 LB and PB DN Tower Car (08310162957) 13.15 - 14.00
Movement not
TRD Turnout permitted in JML yard G Mahadev
45 8 Maintenance 1 JML YARD Yard 176-178 LB and PB DN Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Overlap permitted in MVD yard D. Chinna
45 9 Maintenance 1 MVD Yard Yard 164-166 LB and PB DN Tower Car (08310162549) 12.30 - 13.15
Movement not
TRD Overlap permitted in MVD yard D. Chinna
45 10 Maintenance 1 MVD Yard Yard 164-166 LB and PB DN Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Turnout permitted in MVD yard D. Chinna
45 11 Maintenance 1 MVD Yard Yard 164-166 LB and PB DN Tower Car (08310162549) 13.15 - 14.00
Movement not
TRD Turnout permitted in MVD yard D. Chinna
45 12 Maintenance 1 MVD Yard Yard 164-166 LB and PB DN Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Overlap permitted in MLP yard G Mahadev
GDG-HG 45 13 Maintenance 1 MLP Yard Yard 30-33 LB and PB DN Tower Car (08310162957) 10.30 - 11.15
Movement not
TRD Overlap permitted in MLP yard G Mahadev
45 14 Maintenance 1 MLP Yard Yard 30-33 LB and PB DN Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in MLP yard G Mahadev
45 15 Maintenance 1 MLP Yard Yard 30-33 LB and PB DN Tower Car (08310162957) 11.15 - 12.00
Movement not
TRD Turnout permitted in MLP yard G Mahadev
45 16 Maintenance 1 MLP Yard Yard 30-33 LB and PB DN Tower Car (08310162957) NOT PERMITTED
60MI 1 Pt No. 7,8 Pt No. 7,8 LMT UP 128.29 DISCONNEC UP TRAINS ESM with 2 nos.staff JE/SSE
FOR FOR TION RECEIPTION ON
MAINTENAN MAINTENAN CALLING ON AND
CE CE DISPATCH ON
S&T STARTER MEMO DN
TRAINS RECEIPTION
BY PILOTING AND
DISPATCH ON
SIGNALS 11.00 - 12.00
30MIN FOR 2 BDM SIDE BDM SIDE GED UP/DN 80.37 DISCONNEC WILL BE GIVEN ESM with 2 nos.staff JE/SSE
EACH POINT POINTS POINTS TION WITH
S&T
DISCONNECTION OF
CONCERNED POINT 12.00- 12.30
60 MIN 3 GAUGE TIE GAUGE TIE NBL-MNL UP/DN 227.03 DISCONNEC DN TRAIN PILOTING ESM with 2 nos.staff JE/SIG/BJP
PLATE PLATE TION 7 DISPATCH ON and Engg staff
S&T INSULATION INSULATION STARTER MEMO
REPLACEME REPLACEME
NT NT 10.00 - 11.00
30 MIN 4 TVL-HG TVL-HG TVL-HG UP/DN 264.18 DISCONNEC UP & DN TRAIN ESM with 1 nos.staff JE/SIG/IDR
UFSBI B/I UFSBI B/I TION PLCT TOWARDS HG
S&T
MAINTENAN MAINTENAN SIDE
CE CE 10.00 - 10.30
20 MIN 5 BSRX-WDL BSRX-WDL BSRX-WDL UP/DN 145.97 DISCONNEC UP & DN TRAIN ESM with 1 nos.staff SSE/SIG/BSRX
UFSBI UFSBI TION PILOTING
S&T
MONTHLY MONTHLY
INSPECTION INSPECTION 10.00 - 10.20
20 MIN 6 BSRX-KDGI BSRX-KDGI BSRX-KDGI UP/DN 145.97 DISCONNEC UP & DN TRAIN ESM with 1 nos.staff SSE/SIG/BSRX
UFSBI UFSBI TION PILOTING
S&T
MONTHLY MONTHLY
INSPECTION INSPECTION 10.20 - 10.40
10 MIN 7 EI EI BSRX UP/DN 145.97 LINE BLOCK UP & Dn train no ESM with 3 nos.staff SSE/SIG/BSRX
S&T CHANGEOVE CHANGEOVE movement
R R 10.40 - 10.50
S&T
CN
Point No 20B Cannot receive and
TNGL-RNJP ENGG Crossing distpatch towards AMC batch & S7T staff, D.Amru Naik
90 1 renewal 1 BNHT yard Yard 8/500-600 LB TNGL end 2 B/s SSE/P.WAY/TNGL 11.00 - 12.30
Movement not
TRD Isolator permitted in BAY yard Pavan Kumar
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB RD - 4, 5 & 6 Tower Car (08310163339) 09.00 - 09.45
Movement not
TRD Isolator permitted in BAY yard Pavan Kumar
45 2 Maintenance 1 BAY YARD Yard 207-209 LB and PB RD - 4, 5 & 6 Tower Car (08310163339) Not permitted
Movement not
TRD Turnout permitted in BAY yard Pavan Kumar
45 3 Maintenance 1 BAY YARD Yard 207-209 LB and PB RD - 4, 5 & 6 Tower Car (08310163339) 10.30 - 11.15
Movement not
TRD Turnout permitted in BAY yard Pavan Kumar
45 4 Maintenance 1 BAY YARD Yard 207-209 LB and PB RD - 4, 5 & 6 Tower Car (08310163339) Not permitted
Movement not
TRD Isolator permitted in BYO S Ganesh
45 5 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-DN Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Isolator permitted in BYO S Ganesh
45 6 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-DN Tower Car (08310162957) Not permitted
Movement not
TRD Turnout permitted in BYO S Ganesh
45 7 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-DN Tower Car (08310162957) 10.45 - 11.15
Movement not
TRD Turnout permitted in BYO S Ganesh
45 8 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-DN Tower Car (08310162957) Not permitted
20 mins x 2 Crank Handle EKT SLM UP/DN Disconnection Reception/Dispatch ESM with 1 nos.staff NA
S&T EKT. CH1, maintenance RDG end: piloting/ 12.00 - 12.20
CH2 30.86 starter memo. 12.20 - 12.40
30 mins OBM-BYB Block OBM UP/DN Disconnection Up/Dn Trains PLCT ESM with 1 nos.staff NA
Block Instrument
S&T
instrument Maintenance
maintenance 15.4 11.00 - 11.30
20 mins x 2 Crank Handle EKT OBM UP/DN Disconnection Reception from SLM : ESM with 1 nos.staff NA
EKT. CH1, maintenance Piloting, Reception
BAY-PKL S&T CH2 from BAY to M/L
co-on. Dispatch to 11.30 - 11.50
15.4 SLM starter memo 11.50 - 12.10
20 mins Crank Handle EKT BYB UP/DN Disconnection OBM end : Reception ESM with 1 nos.staff NA
EKT. CH1 maintenance piloting, dispatch
starter memo. Starter
S&T memo for branch line
trains at BAY since
SL-10 cannot be
208.06 transmitted. 11.00 - 11.20
20 mins x 3 Crank Handle EKT TNGL BP UP/DN Disconnection CH1- DN trains ESM with 1 nos.staff NA
EKT. CH1, maintenance reception piloting , Up
CH2, CH3 trains dispatch starter
memo. CH2- Dn trains
to Byepass line
S&T piloting. Up trains
dispatch on starter
memo. CH3-Up and
Dn trains to BNHT 10.00 - 10.20
piloting / Starter 10.20 - 10.40
1.658 memo. 10.40 - 11.00
30 mins BNHT-NDHI Block BNHT-NDHI UP/DN 9.02 Disconnection UP/DN Trains PLCT ESM with 1 nos.staff NA
block Instrument
S&T
Instrument Maintenance
maintenance 11.00 - 11.30
UP train cannot
SEJ sleepers Akhilesh Kumar singh
ENGG 90 min 1 5 nos GNR yard UP line 167/700-800 LB dispatch from 8 Track mans 1 B/s
renewal SSE/P,WAY/HPT/ML
GNR-BYO 10.00 - 11.30
30 No train movement Machine,TRD staff-3, Raghu prasanna
ENGG 90 min 1 UTV working Bay -obm SL 15/000-20/000 LB & PB
sleepers/Rails between Obm to Slm Dept-6 TM SSE/P.Way/Bay(IC) 11.00 - 12.30
No train movement
Point packing LB & Agency-15 labour,S&T R.V.Naik
ENGG 60 min 2 1 Pt Bay yard UP line 207/200-300 between Bay to Byc
Pt.No.69/A disconnection staff SSE/P.Way/Obm
and Bay to Byepass 12.00 - 13.00
ENGG
Movement not
TRD Isolator permitted in LWR HANUMANTH RAO
45 1 Maintenance 1 LWR YARD Yard 525-527 LB and PB Yard-UP Tower Car (08310162257) 14.00 - 14.45
Movement not
TRD Isolator permitted in LWR HANUMANTH RAO
45 2 Maintenance 1 KBI YARD Yard 525-527 LB and PB Yard-UP Tower Car (08310162257) 08.00 - 08.45
Movement not
TRD Turnout permitted in LWR HANUMANTH RAO
45 3 Maintenance 1 KBI YARD Yard 525-527 LB and PB Yard-UP Tower Car (08310162257) NOT PERMITTED
Movement not
TRD Turnout permitted in LWR HANUMANTH RAO
45 4 Maintenance 1 KBI YARD Yard 525-527 LB and PB Yard-UP Tower Car (08310162257) 08.45 - 09.15
UTV Machine
55/35 nos
2 blocks of 90 Shifting of
TRD 1 Loading/unloa LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD
minutes each Sleepers/Rail
ding
s 13.00 - 14.30
TRD
30 Minutes 1 Both side Both side CNC UP/DN 708.15 Disconnection UP & DN Train ESM with 1 nos.staff NA
Crank handle Crank handle Reception ON Piloting
S&T
Maintenance Maintenance & Despatch on Starter
memo. 11.00 - 11.30
30 Minutes 2 LC -436 gate LC -436 gate RBG-CKR 697.55 Disconnection Necessary caution ESM with 2 nos.staff NA
S&T EKT EKT order
Maintenance Maintenance 11.00 - 11.30
30 Minutes 3 LC 424 gate LC 424 gate GKK UP 668.845 Disconnection UP Train desaptch on ESM with 2 nos.staff NA
EKT EKT starter memo & DN
S&T
Maintenance Maintenance Train Reception on
Piloting 11.00 - 11.30
60 Minutes 1 Pt no 57 & 58 Pt no 57 & 58 BGM DN 610.39 Disconnection 1. UP reception ESM with 2 nos.staff NA
Disconnection maintenance maintenance piloting
S&T
2. DN despatch by
DWR-MRJ
starter memo 10.00 - 11.00
60 Minutes 2 Pt no 55 & 53 Pt no 55 & 53 BGM DN 610.39 Disconnection 1. UP reception ESM with 2 nos.staff NA
Disconnection maintenance maintenance piloting
S&T
2. DN despatch by
starter memo 11.00 - 12.00
20 Minutes 1 CH1-CH8 M/I CH1-CH8 M/I LWR UP&DN 525.8 Disconnection UP&DN RECEPTION ESM with 1 nos.staff SSE/SIG/LWR
S&T Disconnection AND DISPATCH
PILOTING 08.00 - 08.20
20 Minutes 2 LWR-KBI B/I LWR-KBI B/I LWR UP&DN 525.8 Disconnection PLCT AT BOTH ESM with 1 nos.staff SSE/SIG/LWR
S&T
Disconnection M/I M/I STATION 08.20 - 08.40
20 Minutes 3 LWR-AVA B/I LWR-AVA B/I LWR UP&DN 525.8 Disconnection PLCT AT BOTH ESM with 1 nos.staff SSE/SIG/LWR
S&T
Disconnection M/I M/I STATION 08.40 - 09.00
20 Minutes 4 LWR-TVG B/I LWR-TVG B/I LWR UP&DN 525.8 Disconnection PLCT AT BOTH ESM with 1 nos.staff SSE/SIG/LWR
S&T
Disconnection M/I M/I STATION 09.00 - 09.20
UTV Machine
Shifting of 55/35 nos
ENGG
2 blocks of 90 Sleepers/Rail Loading/unloa
minutes each 1 s ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Unimat Machine &
ENGG
1 block 240m 2 PQRS work 0.52 SBH-SUL Up 628/770-629/290 LB & PB Signal staff SSE/p.way/BGM 10.00 - 12.00
Duomatic
ENGG tamping Plain track
2 x 120mins 3 Machine Tamping DUR-BGM DN 603/700-605/700 LB Block required JE/P.WAY/KNP 11.00 - 13.00
Duomatic
ENGG tamping Plain track
2 x 120mins 4 Machine Tamping PCH-GKK DN 659/000-661/000 LB Block required JE/P.way/SPL/BGM 10.30 - 12.30
Bridge.No.208
ENGG
1 block 90 mnn 5 attention Br.No.208 SED-VJR UP 734/600-700 LB LB Required SSE/PWAY/KUD 14.00 - 15.30
UP TRAIN CAN'T
ENGG
240 BCM WORK 600 MGD-KBI UP 504/600-505/200 LB+PB DISPATCH SSE/PWAY/DWR 01.00 - 04.00
CON
Bridge no.171
Sharad Srivastava
ENGG approaches approach
SSE/PW/KTY
120min 2 packing packing KTY-BEHI singl line 75/500-600 Block required Manual 12.00 - 14.00
Ballast Ballast profile Rekhya naik
ENGG
120min 1 regulation & sweeping HBI-KTY Single line 56/0-57/0 Block required BRM-04 JE/PW/KTY 12.00 - 14.00
VC-KTY
TRD
60" 1 CH No.1 2 3 4 1 VYS UP/DN 10.3 LB DN and UP trains ESM with 1 nos.staff SSE/JE/S/HPT
reception and dispatch
S&T
piloting and starter
memo 11.00 - 12.00
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 21.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK REPERCUSS TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) IONS RESOURCE REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-DN Tower Car (08310161863) 12.00 - 12.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-DN Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-DN Tower Car (08310161863) 15.00 - 15.45
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-DN Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in B SOREN
45 5 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-DN Tower Car (7022029745) 12.00 - 12.45
Movement not
TRD Isolator permitted in B SOREN
45 6 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-DN Tower Car (7022029745) NOT PERMITTED
Movement not
TRD Turnout permitted in B SOREN
45 7 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-DN Tower Car (7022029745) 15.00 - 15.45
Movement not
TRD Turnout permitted in B SOREN
45 8 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-DN Tower Car (7022029745) NOT PERMITTED
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
DN line no
ENGG 150min 6 Track attention 1 BDKA-NVU DN 477/900-478/200 LB train can be Mannuallly
passed during SSE/JE P.Way -----
KBL-DWR ENGG
60 Minutes 1 56AT TLD 56AT TLD BDKA UP/DN 475.95 Disconnection All UP & DN ESM with 2 nos.staff NA
Disconnection lifting work lifting work trains to be
S&T dealt on
calling On for
Road-1 07.00 - 08.00
30 MINUTES 2 NVD-HBS NVD-HBS NVD UP/DN 26.98 Disconnection ALL UP AND ESM with 1 nos.staff NA
BLOCK BLOCK DN TRAINS
S&T INSTRUMEN INSTRUMEN ON PLCT
T T
MAINTANCE MAINTANCE 11.30 - 12.00
30 MINUTES 3 CRANK CRANK NVD UP/DN 26.98 Disconnection ALL TRAINS ESM with 1 nos.staff NA
S&T HANDLE HANDLE PILOTING
MAINTANCE MAINTANCE 12.00 - 12.30
30 1 Maintenance Maintenace of KGX both 66/600 discconnectio Both side ESM with 1 nos.staff JE/S/GDG
BLOCK n PLCT
S&T
KGX-RLP,
KGX-GDG 11.30 - 12.00
60 2 maintance of maintance of KBL both 115/400 discconnectio all trains need ESM with 1 nos.staff JE/S/KBL
S&T crank handles crank handles n to be pilated
ch1 to ch4 ch1 to ch4 12.00 - 13.00
45 3 maintanance maintanance BNP both 103/300 discconnectio all down trains ESM with 1 nos.staff JE/S/KBL
S&T of BNP-KBL of BNP-KBL n need to be
Block Block given PLCT 12.00 - 12.45
60 4 maintanance maintanance TLKL both 97/600 discconnectio all UP trains ESM with 1 nos.staff JE/S/KBL
S&T of TLKL-BNA of TLKL-BNA n need to be
Block Block given PLCT 13.00 - 14.00
60 5 maintance of maintance of BNA both 92/500 discconnectio all trains need ESM with 1 nos.staff JE/S/KBL
S&T crank handles crank handles n to be pilated
ch5 to ch8 ch5 to ch8 13.00 -14.00
ENGG 2X75 min 1 WRJ SVM -CNR UP 72/640-900 JE/PWay/QLM 10.00 - 11.15
ENGG 2x 90 Min 2 UTV SVM -CNR UP 72/640-900 10.00 - 11.30
ENGG 2 X 90 Min 3 MPT SVM -CNR UP 72/640-900 SHADOW BLOCK
PBC work LB required
ENGG between
120min 4 DDS-LIM PBC work DDS-LIM SL 42/000-250 13.00 - 15.00
PBC at CRZ Disconnection
ENGG
120min 5 yard UP line PBC work CRZ yard Yard 32/000-400 required SHADOW BLOCK
TRD
30 Minutes 1 SSBPAC B/I SSBPAC B/I SVTN UP & DN Disconnection 1. PLC ESM with 1 nos.staff NA
S&T Disconnection maintenance maintenance
SVTN-LD SVTN-LD 554.62 12.00 - 12.30
30 Minutes 2 SSBPAC B/I SSBPAC B/I SVTN UP & DN Disconnection 1. PLC ESM with 1 nos.staff NA
S&T Disconnection maintenance maintenance
SVTN-DEV SVTN-DEV 554.62 12.30 - 13.00
30 Minutes 3 Crank handle Crank handle SVTN UP & DN Disconnection 1. UP & DN ESM with 1 nos.staff NA
Disconnection CH 1 to 6 for CH 1 to 6 for reception by
maintenance maintenance piloting
S&T
2. UP & DN
LD-VSG despatch by
554.62 starter memo 14.30 - 15.00
30 Minutes 1 Maintenance Maintenance VSG Yard 108.458 Disconnection All up and ESM with 1 nos.staff NA
S&T Disconnection of VSG-SKVL of VSG-SKVL down trains
B/I B/I through PLCT 10.00 - 10.30
30 Minutes 2 Checking of Checking of LIM Yard 42.61 Disconnection 1. Despatch ESM with 1 nos.staff JE/SIG/QLM
Disconnection LIM-DDS B/I DDS-CRZ B/I towards DDS
S&T for Monthly for Monthly on PLCT. 2.
Inspection Inspection PLCT for dn
trains at DDS. 13.00 - 13.30
30 Minutes 3 Checking of Checking of LIM Yard 42.61 Disconnection 1. Despatch ESM with 1 nos.staff JE/SIG/QLM
Disconnection LIM-QLM B/I DDS-LIM B/I towards QLM
S&T for Monthly for Monthly on PLCT. 2.
Inspection Inspection PLCT for up
trains at QLM. 13.30 - 14.00
30 Minutes 4 Checking of Checking of LIM Yard 42.61 Disconnection All trains ESM with 1 nos.staff JE/SIG/QLM
Disconnection CH1,CH2,CH CH1,CH2,CH through PLCT
S&T
3 for Monthly 3 I for Monthly and piloting.
Inspection Inspection 14.00 - 14.30
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 2 UTV GDG-BDM UP & DN 0/00-67/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 3 DTE -56850 2000m GDG-HLAR UP & DN 0/0-48/0 LB Block required SSE/JE P.Way 12:30-15:00(UP)
No train Fittings and Siddalingeshwar
ENGG 120 Min 1 SEJ Packing 02 Nos WDL Yard UP/DN 137/500-600 Line block
movement 12 Man power SSE/P.Way/LMT 11.00 - 13.00
1 Machine
No Up train M. M Munawar
ENGG 150 Min 1 TWR 100 Mtrs MVD-JML UP 176/800-900 Line block 30 Labours,
movement JE/P.way/BSRX
Rail GR Pad & ERC 10.00 - 12.30
No Up &
Tamping By Tamping By Tamping Machine 08 Nos Sachin Mane
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block Down train UP-10.00 - 11.15
Machine Machine Manpower SSE/P.way/IDR
movement DN- 12.00 -13.15
Movement not
TRD Overlap permitted in D. Kishore
45 1 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard DN Tower Car (08310163796) 10.00 - 10.45
Movement not
TRD Overlap permitted in D. Kishore
45 2 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard DN Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Turnout permitted in D. Kishore
45 3 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard DN Tower Car (08310163796) 10.45 - 11.30
Movement not
TRD Turnout permitted in D. Kishore
45 4 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard DN Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 5 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard DN Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Overlap permitted in G Mahadev
45 6 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard DN Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 7 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard DN Tower Car (08310162957) 10.45 - 11.30
GDG HG
GDG-HG Movement not
TRD Turnout permitted in G Mahadev
45 8 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard DN Tower Car (08310162957) NOT PERMITTED
Movement not
permitted in
TRD
Overlap HLAR yard D. Chinna
45 9 Maintenance 1 HLAR YARD Yard 48-50 LB and PB DN Tower Car (08310162549) 12.30 - 13.15
Movement not
permitted in
TRD
Overlap HLAR yard D. Chinna
45 10 Maintenance 1 HLAR YARD Yard 48-50 LB and PB DN Tower Car (08310162549) NOT PERMITTED
Movement not
permitted in
TRD
Turnout HLAR yard D. Chinna
45 11 Maintenance 1 HLAR YARD Yard 48-50 LB and PB DN Tower Car (08310162549) 13.15 - 14.00
Movement not
permitted in
TRD
Turnout HLAR yard D. Chinna
45 12 Maintenance 1 HLAR YARD Yard 48-50 LB and PB DN Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 13 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard DN Tower Car (08310162957) 12.00 - 12.45
Movement not
TRD Overlap permitted in G Mahadev
45 14 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard DN Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 15 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard DN Tower Car (08310162957) 12.45 - 13.15
Movement not
TRD Turnout permitted in G Mahadev
45 16 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard DN Tower Car (08310162957) NOT PERMITTED
S&T
CN
Movement not
permitted in
TRD
Overlap BAY yard rD - Pavan Kumar
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB 6, 7 & 8 Tower Car (08310163339) 09.00 - 09.45
Movement not
permitted in
TRD
Overlap BAY yard rD - Pavan Kumar
45 2 Maintenance 1 BAY YARD Yard 207-209 LB and PB 6, 7 & 8 Tower Car (08310163339) Not permitted
Movement not
permitted in
TRD
Turnout BAY yard rD - Pavan Kumar
45 3 Maintenance 1 BAY YARD Yard 207-209 LB and PB 6, 7 & 8 Tower Car (08310163339) 10.30 - 11.15
Movement not
permitted in
TRD
Turnout BAY yard rD - Pavan Kumar
45 4 Maintenance 1 BAY YARD Yard 207-209 LB and PB 6, 7 & 8 Tower Car (08310163339) Not permitted
Movement not
TRD Isolator permitted in S Ganesh
45 5 Maintenance 1 PKL YARD Yard 156-157 LB and PB PKL Yard-DN Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Isolator permitted in S Ganesh
45 6 Maintenance 1 PKL YARD Yard 156-157 LB and PB PKL Yard-DN Tower Car (08310162957) Not permitted
Movement not
TRD Turnout permitted in S Ganesh
45 7 Maintenance 1 PKL YARD Yard 156-157 LB and PB PKL Yard-DN Tower Car (08310162957) 10.45 - 11.30
Movement not
TRD Turnout permitted in S Ganesh
45 8 Maintenance 1 PKL YARD Yard 156-157 LB and PB PKL Yard-DN Tower Car (08310162957) Not permitted
30 mins 1 LC-14 EKT for EKT OBM UP/DN Disconnection BAY end : ESM with 2 nos.staff NA
maintenance maintenance reception
S&T piloting.
Dispatch
14/700-800 starter memo. 11.00 - 11.30
30 mins 2 BYB-BYC Block BYB UP/DN Disconnection Up trains ESM with 1 nos.staff NA
block Instrument PLCT at BYB,
S&T
instrument Maintenance DN trains
maintenance 208.06 PLCT at BYC 11.00 - 11.30
20 mins x 2 3 Crank Handle EKT BYB UP/DN Disconnection CH2- Up ESM with 1 nos.staff NA
EKT. CH2, maintenance trains to BYC
CH3 starter memo
BAY-PKL
at BYB & BAY.
SL no 09 & 11
cannot be
transmitted.
S&T
CH3- Up
trains to BYC
starter memo
at BYB & BAY.
SL no 09 & 11
cannot be 11.30 - 11.50
208.06 transmitted 11.50 - 12.10
30 mins 4 LC-06 EKT EKT BYB-OBM UP/DN Disconnection Caution order. ESM with 2 nos.staff NA
maintenance maintenance Up/Dn trains
S&T
to observe
5/500-600 PHS signal. 11.30 - 12.00
30 mins 5 Crank handle EKT NDHI UP/DN Disconnection Up/Dn trains ESM with 1 nos.staff NA
S&T EKT maintenance piloting.
Maintenance 16.8 11.00 - 11.30
30 mins 6 NDHI-RNJP Block NDHI-RNJP UP/DN Disconnection UP/DN trains ESM with 1 nos.staff NA
S&T block Instrument PLCT
instrument Maintenance 16.8 11.30 - 12.00
20 mins x 2 7 Crank Handle EKT RNJP UP/DN Disconnection Reception : ESM with 1 nos.staff NA
EKT. CH1, maintenance piloting,
S&T
CH2 Dispatch : 12.00 - 12.20
23.02 starter memo 12.20 - 12.40
UP trains
Switch
LB & cannot Akhilesh Kumar singh
ENGG 90 min 1 renewal point 0.5 set PKL yard UP line 155/900-156/000 S&T staff and 12 TM & 2 B/s
Disconnection dispatc from SSE/P.WAY/HPT/ML(IC)
no 57B
PKL-KGW 10.00 - 11.30
No train
30 movement Machine,TRD staff-3, Dept-6 Akash
ENGG 90 min 1 UTV working Bay -obm SL 15/000-20/000 LB & PB
sleepers/Rails between Obm TM JE/P.Way/Rdg
to Slm 11.30 - 13.00
No train
movement
Point packing LB & between Bay Mukunda
ENGG 60 min 2 1 Pt Bay yard UP line 207/500-400 Agency-15 labour,S&T staff
Pt.No.66/B disconnection to Byc and SSE/P.Way/Spl works Ba
Bay to
Byepass 12.00 - 13.00
ENGG
DN train
ENGG Point No 50A cannot be Hanumanthappa
120 min 1 attention 1 point BNP yard DN 104/00-100 LB received AMC Batch (SSE/P.Way/KBL) 08.30 - 10.30
Movement not
TRD Isolator permitted in AANJAIAH
45 1 Maintenance 1 MRB YARD Yard 137-139 LB and PB MRB Yard-UP Tower Car (08310162741) 10.00 - 10.45
Movement not
TRD Isolator permitted in AANJAIAH
45 2 Maintenance 1 MRB YARD Yard 137-139 LB and PB MRB Yard-UP Tower Car (08310162741) NOT PERMITTED
Movement not
PKL-RLP
TRD Turnout permitted in AANJAIAH
45 3 Maintenance 1 MRB YARD Yard 137-139 LB and PB MRB Yard-UP Tower Car (08310162741) 11.00 - 11.45
Movement not
TRD Turnout permitted in AANJAIAH
45 4 Maintenance 1 MRB YARD Yard 137-139 LB and PB MRB Yard-UP Tower Car (08310162741) NOT PERMITTED
TRD
45min 1 LC-77 LC-77 MRB both 134/700 to 134/800 discconnectio Trains to be ESM with 1 nos.staff JE/S/KBL
S&T maintenance maintenance n dealt through
Slide boom 10.00 - 10.45
CON
Movement not
permitted
TRD
Isolator inTVG HANUMANTH RAO
45 1 Maintenance 1 TVG YARD Yard 534-536 LB and PB Yard-UP Tower Car (08310162257) 07.45 - 08.30
Movement not
permitted
TRD
Isolator inTVG HANUMANTH RAO
45 2 Maintenance 1 TVG YARD Yard 534-536 LB and PB Yard-UP Tower Car (08310162257) NOT PERMITTED
Movement not
permitted
TRD
Turnout inTVG HANUMANTH RAO
45 3 Maintenance 1 TVG YARD Yard 534-536 LB and PB Yard-UP Tower Car (08310162257) 08.30 - 09.15
Movement not
permitted
TRD
Turnout inTVG HANUMANTH RAO
45 4 Maintenance 1 TVG YARD Yard 534-536 LB and PB Yard-UP Tower Car (08310162257) NOT PERMITTED
30 Minutes 1 Both side Both side KUD UP/DN 714.48 Disconnection UP & DN ESM with 1 nos.staff NA
Crank handle Crank handle Train
Maintenance Maintenance Reception ON
S&T
Piloting &
Despatch on
Starter memo. 14.00 - 14.30
30 Minutes 2 Track 52 ATR Track 52 ATR KUD DN 714.48 Disconnection UP train ESM with 1 nos.staff NA
two core two core Reception on
S&T
cable cable Calling ON
replaced replaced 14.30 - 15.00
30 Minutes 3 LC -416 gate LC -416 gate PCH-GKK 648/700-800 Disconnection Necessary ESM with 2 nos.staff NA
S&T EKT EKT caution order
Maintenance Maintenance 11.00 - 11.30
60 Minutes 1 LC 409 EOLB LC 409 EOLB SUL UP & DN 637.756 Disconnection Sliding boom ESM with 2 nos.staff NA
S&T
Disconnection maintenance maintenance working 11.00 - 12.00
15 Minutes 1 52AT TLD 52AT TLD DEV DN 546.55 Disconnection DN LOOP ESM with 2 nos.staff NA
DWR-MRJ Disconnection BOX BOX LINE RD-1
REPLACEME REPLACEME RECEPTION
NT NT ON CALLING
S&T
ON,DISPATC
H WITH
STARTER
MEMO 08.00 - 08.15
15 Minutes 2 52BT TLD 52BT TLD DEV DN 546.55 Disconnection DN MAIN ESM with 2 nos.staff NA
Disconnection BOX BOX LINE RD-1
REPLACEME REPLACEME RECEPTION
NT NT ON CALLING
S&T
ON,DISPATC
H WITH
STARTER
MEMO 08.15 - 08.30
20 Minutes 3 LWR-AVA LWR-AVA LWR UP&DN 525.8 Disconnection PLCT AT ESM with 1 nos.staff NA
S&T Disconnection MAINTENAN MAINTENAN BOTH
CE CE STATION 08.00 - 08.20
UTV Machine
Shifting of 55/35 nos
ENGG
2 blocks of 90 Sleepers/Rail Loading/unloa
minutes each 1 s ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic
ENGG tamping Plain track
2 x 120mins 2 Machine Tamping DUR-BGM DN 605/700-607/700 LB Block required JE/P.WAY/KNP 11.00 - 13.00
Duomatic
ENGG tamping Plain track
2 x 120mins 3 Machine Tamping GKK yard UP & DN GKK yard LB Block required JE/P.way/SPL/BGM 10.00 - 12.00
ENGG 1 block 90 mnn 4 ge.No.187 atten Br.No.187 UGR-SED UP 722/300-400 LB LB Required SSE/PWAY/KUD 14.00 - 15.30
UP TRAIN
ENGG CAN'T
240 BCM WORK 600 MGD-KBI UP 505/200-800 LB+PB DISPATCH SSE/PWAY/DWR 01.00 - 04.00
CON
Ballast Ballast profile Rekhya naik
ENGG
120min 1 regulation & sweeping HBI-KTY Single line 57/0-58/0 Block required BRM-04 JE/PW/KTY 12.00 - 14.00
60" 1 CH No.1 2 3 1 VC UP/DN 16.218 LB DN and UP ESM with 1 nos.staff SSE/JE/S/HPT
trains
VC-KTY
reception and
S&T
dispatch
piloting and
starter memo 11.00 - 12.00
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 22.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ LOCATION BLOCK REPERCUSS RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-DN Tower Car (08310161863) 12.00 - 12.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-DN Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-DN Tower Car (08310161863) 15.00 - 15.45
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-DN Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in B SOREN
45 5 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-DN Tower Car (7022029745) 12.00 - 12.45
Movement not
TRD Isolator permitted in B SOREN
45 6 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-DN Tower Car (7022029745) NOT PERMITTED
Movement not
TRD Turnout permitted in B SOREN
KBL-DWR 45 7 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-DN Tower Car (7022029745) 15.00 - 15.45
Movement not
TRD Turnout permitted in B SOREN
45 8 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-DN Tower Car (7022029745) NOT PERMITTED
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
09:45-12:15(DN)
ENGG
120 min 6 BT-Unloading 20 Bobyn HBS-NGR UP & DN 19/100-35/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
Reconditionin 468/200-300, UP line no
ENGG 150min 7 g of Tounge 1 UBL yard UP LB train can be
Pnt no- 126B Mannually SSE/JE P.Way ----
40 MINUTES 1 R il
lc 19 lc 19 NGR UP/DN. 35.42 DISCONNEC dd i
ALL TRAINS ESM with 2 nos.staff NA
S&T MAINTANCE MAINTANCE TION ON SLIDING
BOOM 12.00 - 12.40
30 MINUTES 2 IPS IPS NGR UP/DN 35.42 DISCONNEC ALL TRAINS ESM with 2 nos.staff NA
S&T
MAINTANCE MAINTANCE TION PILOTING 12.40 - 13.10
45min 1 maintenance LC-1 GDGBP both 55/200 disconnection Sliding boom ESM with 2 nos.staff JE/S/GDG
S&T maintenance will be
working 12.00 - 12.45
45 2 maintanance maintanance BNP both 103/300 discconnectio all uptrains ESM with 1 nos.staff JE/S/KBL
S&T of BNP-TLKL of BNP-TLKL n need to be
Block Block given PLCT 12.00 - 12.45
ENGG 180 Min 1 PQRS SVM -CNR UP 73/160-420 SSE/PWay/QLM 10.00 - 11.30
ENGG 60 Min 2 Manual Packing CSM Yard Yard Pt. No 51 B SSE/PWay/VSG 10.00 - 11.00
ENGG 120min 3 BFR Work Material shifting DDS-LIM SL 39/000-42/000 LB required 13.00 - 15.00
PBC work Disconnetion
ENGG
120min 4 CLR-CRZ PBC WORK CLR-CRZ SL 31/100-300 required SHADOW BLOCK
TRD
60 Minutes 1 Pt no 61&62 Pt no 61&62 DUR UP & DN Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. UP
despatch by
599.637 starter memo 12.00 - 13.00
60 Minutes 2 Pt no 63&64 Pt no 63&64 DUR UP & DN Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. UP
despatch by
599.637 starter memo 13.30 - 14.30
30 Minutes 1 Checking of Checking of CRZ Yard 31.699 Disconnection All up and ESM with 1 nos.staff JE/S/CLR
Disconnection CRZ-CLR B/I CLR-CRZ B/I down trains
S&T for Monthly for Monthly towards CLR
Inspection Inspection through PLCT
& Piloting. 13.00 - 13.30
30 Minutes 2 Checking of Checking of CRZ Yard 31.699 Disconnection All up and ESM with 1 nos.staff JE/S/CLR
Disconnection CRZ-DDS B/I CLR-TGT B/I down trains
S&T for Monthly for Monthly towards DDS
Inspection Inspection through PLCT
& Piloting 13.30 - 14.00
LD-VSG 30 Minutes 3 Checking of Checking of CRZ Yard 31.699 Disconnection All train ESM with 1 nos.staff JE/S/CLR
Disconnection CH1,CH2,CH CH1,CH2,CH movements
S&T
3 for Monthly 3 for Monthly though
Inspection Inspection Piloting 14.00 - 14.30
30 Minutes 4 Maintenance Maintenance VSG Yard 108.458 Disconnection MPT side all ESM with 1 nos.staff NA
Disconnection of of trains piloting.
S&T CH1,CH2,CH CH1,CH2,CH
3,CH4,CH5 & 3,CH4,CH5 &
CH6 CH6 10.00 - 10.30
30 Minutes 5 Maintenance Maintenance VSG Yard 108.458 Disconnection SKVL side,all ESM with 1 nos.staff NA
Disconnection of of up and down
S&T CH7,CH8,CH CH7,CH8,CH trains piloting.
9,CH10,CH11 9,CH10,CH11
& CH12 & CH12 10.30 - 11.00
30 Minutes 6 Checking of Checking of DDS Yard 38.017 Disconnection 1. Despatch ESM with 1 nos.staff JE/SIG/QLM
Disconnection DDS-CRZ B/I DDS-CRZ B/I towards CRZ
S&T for Monthly for Monthly on PLCT. 2.
Inspection Inspection PLCT for dn
trains at CRZ. 13.00 - 13.30
30 Minutes 7 Checking of Checking of DDS Yard 38.017 Disconnection 1. Despatch ESM with 1 nos.staff JE/SIG/QLM
Disconnection DDS-LIM B/I DDS-LIM B/I towards LIM
S&T for Monthly for Monthly on PLCT. 2.
Inspection Inspection PLCT for up
trains at LIM. 13.30 - 14.00
30 Minutes 8 Checking of Checking of DDS Yard 38.017 Disconnection All trains ESM with 1 nos.staff JE/SIG/QLM
Disconnection CH1,CH2,CH CH1,CH2,CH through PLCT
S&T
3 for Monthly 3 I for Monthly and piloting.
Inspection Inspection 14.00 - 14.30
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 2 UTV GDG-BDM UP & DN 0/00-67/100 LB Block required SSE/JE P.Way 10:00-15:00
ENGG 150 min *2 3 DTE -56850 2000m GDG-HLAR UP & DN 0/0-48/0 LB Block required SSE/JE P.Way 12:30-15:00(UP)
No train Fittings and Aijt Prasad
ENGG 120 Min 1 SEJ Packing 02 Nos BGK Yard SL 93/100-200 Line block
movement 12 Man power SSE/P.Way/BGK 11.00 - 13.00
1 Machine
176/900-177/ No Up train M. M Munawar
ENGG 150 Min 1 TWR 100 Mtrs MVD-JML UP Line block 30 Labours,
000 movement JE/P.way/BSRX
Rail GR Pad & ERC 10.00 - 12.30
No Up &
Tamping By Tamping By 250/000-281/ Tamping Machine 08 Sachin Mane
ENGG 180 Min 1 LHN-HG UP/DN Line block Down train UP-10.00 - 11.15
Machine Machine 900 Nos Manpower SSE/P.way/IDR
movement DN- 12.00 -13.15
TRD
120MIN 2 Pt No. Pt No. BGK UP 93.29 DISCONNEC UP TRAINS ESM with 2 nos.staff JE/SSE
15,16,17,18 15,16,17,18 TION RECEIPTION
FOR FOR ON CALLING
MAINTENAN MAINTENAN ON AND
CE CE DISPATCH
ON STARTER
S&T MEMO DN
GDG-HG TRAINS
RECEIPTION
BY PILOTING
AND
DISPATCH
ON SIGNALS 11.00 - 13.00
30 MIN 1 TVL-LHN TVL-LHN TVL-LHN UP/DN 264.18 DISCONNEC UP & DN ESM with 1 nos.staff JE/SIG/IDR
UFSBI B/I UFSBI B/I TION TRAIN PLCT
S&T
MAINTENAN MAINTENAN TOWARDS
CE CE LHN SIDE 10.00 - 10.30
60 MIN 2 120AS END 120A END KDGI-BSRX UP 150.73 DISCONNEC UP TRAIN ESM with 3 nos.staff SSE/SIG/BSRX
HOSE PIPE HOSE PIPE TION RECEIVING
REPLACEME REPLACEME ON CALLING
NT WORK NT WORK ON
S&T
DISPATCH
ON STARTER
MEMO AND
CLAMPING . 11.30 - 12.30
S&T
CN
Movement not
permitted in
TRD
Overlap BAY yard rD - Pavan Kumar
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB 6, 7 & 8 Tower Car (08310163339) 09.00 - 09.45
Movement not
permitted in
TRD
Overlap BAY yard rD - Pavan Kumar
45 2 Maintenance 1 BAY YARD Yard 207-209 LB and PB 6, 7 & 8 Tower Car (08310163339) Not permitted
Movement not
permitted in
TRD
Turnout BAY yard rD - Pavan Kumar
45 3 Maintenance 1 BAY YARD Yard 207-209 LB and PB 6, 7 & 8 Tower Car (08310163339) 10.30 - 11.15
Movement not
permitted in
TRD
Turnout BAY yard rD - Pavan Kumar
45 4 Maintenance 1 BAY YARD Yard 207-209 LB and PB 6, 7 & 8 Tower Car (08310163339) Not permitted
Movement not
TRD Isolator permitted in S Ganesh
45 5 Maintenance 1 PKL YARD Yard 161-163 LB and PB PKL Yard-DN Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Isolator permitted in S Ganesh
45 6 Maintenance 1 PKL YARD Yard 161-164 LB and PB PKL Yard-DN Tower Car (08310162957) Not permitted
Movement not
TRD Turnout permitted in S Ganesh
45 7 Maintenance 1 PKL YARD Yard 161-165 LB and PB PKL Yard-DN Tower Car (08310162957) 10.45 - 11.30
Movement not
TRD Turnout permitted in S Ganesh
45 8 Maintenance 1 PKL YARD Yard 161-166 LB and PB PKL Yard-DN Tower Car (08310162957) Not permitted
30 mins x 3 LC-100, Point EKT & Key KDN UP/DN Disconnection LC-100- DN ESM with 2 nos.staff NA
No 15KL & Lock point trains
16KL maintenance reception
piloting . Up
trains
dispatch
starter memo.
15 & 16 KL-
S&T
BAY-PKL Dn trains
reception to
Dn loop line
piloting. Dn
trains
dispatch from 10.00 - 10.30
Dn loop line 10.30 - 11.00
188.23 starter memo. 11.00 - 11.30
30 mins LC-97 EKT EKT DAJ UP/DN Disconnection Dn trains ESM with 2 nos.staff NA
and maintenance dispatch
Emergency starter memo.
S&T
EKT Up trains
reception
181.27 piloting 10.00 - 10.30
30 mins LC 04 EKT EKT DAJ UP/DN Disconnection Caution order. ESM with 2 nos.staff NA
and maintenance Up/Dn trains
S&T
Emergency to observe
EKT 181.27 PHS signal. 10.30 - 11.00
30 mins 8 KL point EKT & Key RNJP UP/DN Disconnection Reception to ESM with 2 nos.staff NA
maintenance Lock point BMM siding
maintenance piloting,
S&T
Dispatch from
BMM line on
23.02 starter memo. 10.00 - 10.30
Rd No 5
Switch Cannot
LB & S&T staff and 2 B/s & H.Anjanamurthy
ENGG 90 1 renewal point 0.5 set PKL yard Rd-5 156/200-300 recieve from
Disconnection AMC batch Je/P.WAY/HPT/ML
no 57B KGW-Rd-5
PKl 10.00 - 11.30
No train
30 16/000-20/00 movement Machine,TRD staff-3, Akash
ENGG 90 min 1 UTV working Obm to Slm SL LB & PB
sleepers/Rails 0 between Bay Dept-6 TM JE/P.Way/Rdg
to Obm 12.00 - 13.30
Jt insp No train
LB & S&T staff,B/s-2,TM-4 R.V.Naik
ENGG 90 min 2 deficiency Pt Slm Yard SL movement
Disconnection staff SSE/P.Way/Obm
No. between SHADOW BLOCK
ENGG
UP train
ENGG Point No 65B cannot be Hanumanthappa
120 min 1 attention 1 point BNP yard UP 102/500-600 LB received AMC Batch (SSE/P.Way/KBL) 08.30 - 10.30
Movement not
TRD Isolator permitted in AANJAIAH
45 1 Maintenance 1 MRB YARD Yard 137-139 LB and PB MRB Yard-UP Tower Car (08310162741) 10.00 - 10.45
Movement not
TRD Isolator permitted in AANJAIAH
45 2 Maintenance 1 MRB YARD Yard 137-139 LB and PB MRB Yard-UP Tower Car (08310162741) NOT PERMITTED
Movement not
TRD Turnout permitted in AANJAIAH
45 3 Maintenance 1 MRB YARD Yard 137-139 LB and PB MRB Yard-UP Tower Car (08310162741) 11.00 - 11.45
Movement not
PKL-RLP
TRD Turnout permitted in AANJAIAH
45 4 Maintenance 1 MRB YARD Yard 137-139 LB and PB MRB Yard-UP Tower Car (08310162741) NOT PERMITTED
TRD
45min 1 LC-79 LC-79 MRB both 138/100 to discconnectio Trains to be ESM with 2 nos.staff JE/S/KBL
S&T maintenance maintenance 138/200 n dealt through
Slide boom SHADOW BLOCK
30min 2 Maintenance Maintenance GIN UP and DN 126/600 Disconnection Both side ESM with 1 nos.staff JE/S/KBL
S&T of GIN-MRB of GIN-MRB PLCT
B/I B/I 10.00 - 10.30
20min 3 Maintenance Maintenance GIN UP and DN 126/600 Disconnection Both side ESM with 1 nos.staff JE/S/KBL
S&T of all crank of all crank piloting
handles handles 10.30 - 11.00
CON
Movement not
permitted
TRD
Isolator inTVG HANUMANTH RAO
45 1 Maintenance 1 TVG YARD Yard 534-536 LB and PB Yard-UP Tower Car (08310162257) 07.45 - 08.30
Movement not
permitted
TRD
Isolator inTVG HANUMANTH RAO
45 2 Maintenance 1 TVG YARD Yard 534-536 LB and PB Yard-UP Tower Car (08310162257) NOT PERMITTED
Movement not
permitted
TRD
Turnout inTVG HANUMANTH RAO
45 3 Maintenance 1 TVG YARD Yard 534-536 LB and PB Yard-UP Tower Car (08310162257) 08.30 - 09.15
Movement not
permitted
TRD
Turnout inTVG HANUMANTH RAO
45 4 Maintenance 1 TVG YARD Yard 534-536 LB and PB Yard-UP Tower Car (08310162257) NOT PERMITTED
TRD
TRD
30 Minutes 1 LC 461gate LC 461 gate VJR DN 739.587 Disconnection UP Train ESM with 2 nos.staff NA
EKT EKT Reception ON
Maintenance Maintenance Piloting & DN
S&T
Train
Despatch on
Starter memo. 15.00 - 15.30
30 Minutes 2 LC 445 gate LC 445 gate CNC DN 708.15 Disconnection UP Train ESM with 2 nos.staff NA
EKT EKT Reception ON
Maintenance Maintenance Piloting & DN
S&T
Train
Despatch on
PLCT 15.00 - 15.30
30 Minutes 3 LC 446 gate LC 446 gate CNC DN 708.15 Disconnection DN Train ESM with 2 nos.staff NA
EKT EKT Reception on
Maintenance Maintenance Piloting & UP
S&T
train despatch
on Starter
memo 15.30 - 16.00
30 Minutes 4 Both side Both side GPB UP/DN 668.466 Disconnection UP & DN ESM with 1 nos.staff NA
Crank handle Crank handle Train
Maintenance Maintenance Reception ON
S&T
Piloting &
Despatch on
Starter memo.
30 Minutes 5 Both side Both side GKK UP/DN 662.845 Disconnection UP & DN ESM with 1 nos.staff NA
Crank handle Crank handle Train
DWR-MRJ Maintenance Maintenance Reception ON
S&T
Piloting &
Despatch on
Starter memo. 11.00 - 11.30
30 Minutes 3 SSBPAC B/I SSBPAC B/I SXB UP & DN Disconnection 1. PLC ESM with 1 nos.staff JE/Sig/BGM
S&T Disconnection Monthly Insp Monthly Insp
SXB-BGM SXB-BGM 619.05 10.00 - 10.30
30 Minutes 4 SSBPAC B/I SSBPAC B/I SXB UP & DN Disconnection 1. PLC ESM with 1 nos.staff JE/Sig/BGM
S&T Disconnection Monthly Insp Monthly Insp
SXB-SBH SXB-SBH 619.05 10.30 - 11.00
30 Minutes 5 All Crank All Crank SXB UP & DN Disconnection 1. UP & DN ESM with 1 nos.staff JE/Sig/BGM
Disconnection handle for handle for reception by
Monthly Insp Monthly Insp piloting
S&T
2. UP & DN
despatch by
619.05 starter memo 11.00 - 11.30
30 Minutes 1 51BT TLD 51BT TLD DEV UP&DN 546.55 Disconnection UP TRAIN ESM with 2 nos.staff NA
Disconnection BOX BOX RECEPTION
REPLACEME REPLACEME ON CALLING
NT NT ON,DISPATC
S&T
H FROM
RD-4 WITH
STARTER
MEMO 08.00 - 08.30
60 Minutes 2 POINT POINT TVG DN 534.61 Disconnection RD-4 DN ESM with 2 nos.staff NA
Disconnection N0-54A GTP N0-54A GTP TRAIN and Engg staff
INSULATION INSULATION DISPATCH
S&T
REPLACEME REPLACEME WITH
NT NT STARTER
MEMO 08.00 - 09.00
UTV Machine
Shifting of 55/35 nos
ENGG
2 blocks of 90 Sleepers/Rail Loading/unloa 558/000-534/
minutes each 1 s ding LD-TVG DN 000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic
ENGG tamping Plain track 607/700-609/
2 x 120mins 2 Machine Tamping DUR-BGM DN 700 LB Block required JE/P.WAY/KNP 11.00 - 13.00
Duomatic
ENGG tamping Plain track 651/000-653/
2 x 120mins 3 Machine Tamping PCH-GKK UP 000 LB Block required JE/P.way/SPL/BGM 10.00 - 12.00
ENGG 1 block 90 mnn 4 ge.No.142A Atte Br.No.142A GPB-CKR Up/Dn 680/500-600 LB LB Required SSE/PWAY/GPB 11.00 - 12.30
UP TRAIN
ENGG 505/800-506/ CAN'T
240 BCM WORK 600 MGD-KBI UP 400 LB+PB DISPATCH SSE/PWAY/DWR 01.00 - 04.00
CON
Ballast Ballast profile Rekhya naik
ENGG
120min 1 regulation & sweeping HBI-KTY Single line 58/059/0 Block required BRM-04 JE/PW/KTY 12.00 - 14.00
60" 1 CH No.4 5 6 1 VC UP/DN 16.218 LB DN and UP ESM with 1 nos.staff SSE/JE/S/HPT
trains
VC-KTY reception and
S&T
dispatch
piloting and
starter memo 11.00 - 12.00
RE
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 23.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK REPERCUSS RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-DN Tower Car (08310161863) 12.00 - 12.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-DN Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-DN Tower Car (08310161863) 15.00 - 15.45
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-DN Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in B SOREN
45 5 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-DN Tower Car (7022029745) 12.00 - 12.45
Movement not
TRD Isolator permitted in B SOREN
45 6 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-DN Tower Car (7022029745) NOT PERMITTED
Movement not
TRD Turnout permitted in B SOREN
45 7 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-DN Tower Car (7022029745) 15.00 - 15.45
Movement not
TRD Turnout permitted in B SOREN
KBL-DWR 45 8 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-DN Tower Car (7022029745) NOT PERMITTED
SSE/JE P.Way 10:30-12.30(DN)
ENGG
120 min 4 BT-Unloading 20 Bobyn KJG-GDI UP & DN 400/100-433/0 LB Block required YLG 14:00-16:30(UP)
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
Reconditioning 2/00-100, Pnt no- DN line no
ENGG 150min 6 1 UBL yard DN LB train can be
of Tounge Rails 270A Mannually SSE/JE P.Way -----
passed during
30 1 Maintenance Maintenace of GDGBP both 55/700 discconnectio Both side ESM with 1 nos.staff JE/S/GDG
S&T BLOCK n PLCT
GDGBP-HBL 12.00 - 12.30
20 min 2 maintenance Maintenace of GDG both 58/000 discconnectio BOTH side ESM with 1 nos.staff JE/S/GDG
S&T CRANK n piloting
handle 12.30 - 12.50
45 3 maintanance of maintanance KBL both 115/400 discconnectio all down trains ESM with 1 nos.staff JE/S/KBL
S&T KBL-GIN Block of KBL-GIN n need to be
Block given PLCT 12.00 - 12.45
20 4 monthly monthly BNA both 92/500 discconnectio all down trains ESM with 1 nos.staff JE/S/KBL
inspection of inspection of n need to be
S&T
BNA-TLKL Block BNA-TLKL given PLCT
Block 12.00 - 12.20
25 5 monthly monthly BNA both 92/500 discconnectio all trains need ESM with 1 nos.staff JE/S/KBL
S&T inspection of inspection of n to be pilated
crank handles crank handles 12.20 - 12.45
ENGG 2X 75 Min 1 WRJ SVM -CNR UP 73/160-420 JE/Pwy QLM 10.00 - 11.15
ENGG 2 X 90 min 2 UTV SVM -CNR UP 73/160-420 10.00 - 11.30
ENGG 2 x 90 Min 3 MPT SVM -CNR UP 73/160-420 SHADOW BLOCK
PBC work
ENGG between
120min 4 CRZ-DDS PBC work CRZ-DDS SL 34/300-500 LB required 13.00 - 15.00
TSR work
ENGG between DDS
120min 5 yard TSR work DDS Yard Yard 37/300-400 LB required SHADOW BLOCK
TRD
LD VSG
LD-VSG 60 Minutes 1 Pt no 50&51 Pt no 50&51 SVTN UP & DN Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. UP
despatch by
554.62 starter memo 08.00 - 09.00
30 Minutes 2 Pt no 52 Pt no 52 SVTN UP & DN Disconnection 1. UP & DN ESM with 2 nos.staff NA
S&T Disconnection maintenance maintenance reception
554.62 piloting 14.30 - 15.00
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
Point Packing No train Fittings and Siddalingeshwar
ENGG 120 Min 1 01 Nos LMT Yard SL 128/600-700 Line block
Point No.13 movement 12 Man power SSE/P.Way/LMT 11.00 - 13.00
1 Machine
No Dn train Santosh Chavan
ENGG 150 Min 1 TWR 100 Mtrs JML-BJP UP 177/000-100 Line block 30 Labours,
movement Tr.JE/P.way/BJP
Rail GR Pad & ERC 10.00 - 12.00
No train BT Rake B C Pradhan
ENGG 120 Min 2 BT 900 Cum AYB-MNL UP 205/000-203/000 Line block
movement Manpower SSE/P.Way/BJP 10. 00 - 12.00
No Up &
Tamping By Tamping By Tamping Machine 08 Sachin Mane
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block Down train UP-10.00 - 11.15
Machine Machine Nos Manpower SSE/P.way/IDR
movement DN- 12.00 -13.15
Movement not
TRD Overlap permitted in D. Kishore
45 1 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard DN Tower Car (08310163796) 10.00 - 10.45
Movement not
TRD Overlap permitted in D. Kishore
45 2 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard DN Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Turnout permitted in D. Kishore
45 3 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard DN Tower Car (08310163796) 10.45 - 11.30
Movement not
TRD Turnout permitted in D. Kishore
45 4 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard DN Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 5 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard DN Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Overlap permitted in G Mahadev
45 6 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard DN Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 7 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard DN Tower Car (08310162957) 10.45 - 11.30
Movement not
TRD Turnout permitted in G Mahadev
45 8 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard DN Tower Car (08310162957) NOT PERMITTED
Movement not
permitted in
TRD
Overlap HLAR yard D. Chinna
45 9 Maintenance 1 HLAR YARD Yard 48-50 LB and PB DN Tower Car (08310162549) 12.30 - 13.15
Movement not
permitted in
TRD
Overlap HLAR yard D. Chinna
GDG-HG 45 10 Maintenance 1 HLAR YARD Yard 48-50 LB and PB DN Tower Car (08310162549) NOT PERMITTED
Movement not
permitted in
TRD
Turnout HLAR yard D. Chinna
45 11 Maintenance 1 HLAR YARD Yard 48-50 LB and PB DN Tower Car (08310162549) 13.15 - 14.00
Movement not
permitted in
TRD
Turnout HLAR yard D. Chinna
45 12 Maintenance 1 HLAR YARD Yard 48-50 LB and PB DN Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 13 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard DN Tower Car (08310162957) 12.00 - 12.45
Movement not
TRD Overlap permitted in G Mahadev
45 14 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard DN Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 15 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard DN Tower Car (08310162957) 12.45 - 13.15
Movement not
TRD Turnout permitted in G Mahadev
45 16 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard DN Tower Car (08310162957) NOT PERMITTED

60MIN 1 Pt No. 7,13 FOR Pt No. 7,13 MGH UP/DN 101.72 DISCONNEC UP/DN ESM with 2 nos.staff NA
MAINTENANCE FOR TION TRAINS
MAINTENAN RECEIPTION
CE ON CALLING
S&T
ON AND
DISPATCH
ON STARTER
MEMO 11.00 - 12.0
20 MIN 2 KDGI-BSRX KDGI-BSRX KDGI-BSRX UP/DN 150.73 DISCONNEC UP & DN ESM with 1 nos.staff SSE/SIG/BSRX
UFSBI UFSBI TION TRAIN
S&T
MONTHLY MONTHLY PILOTING
INSPECTION INSPECTION 11.30 - 11.50
20 MIN 3 KDGI-WDL KDGI-WDL KDGI-WDL UP/DN 150.73 DISCONNEC UP & DN ESM with 1 nos.staff SSE/SIG/BSRX
UFSBI UFSBI TION TRAIN
S&T
MONTHLY MONTHLY PILOTING
INSPECTION INSPECTION 11.50 - 12.10
10 MIN 3 EI EI KDGI UP/DN 150.73 LINE BLOCK UP & Dn train ESM with 3 nos.staff SSE/SIG/BSRX
S&T CHANGEOVER CHANGEOVE no movement
R 12.10 - 12.20
S&T
CN
No trains Akhilesh Kumar singh
TNGL-RNJP ENGG movement PQRS machine, SSE/P.WAY/HPT/ML(I
240 1 PQRS work 260 mtr BNHT-NDHi SL 10/840-11/100 LB BNHT-NDHI Agency labor C) 11.00 - 15.00
Movement not
TRD Overlap permitted in Pavan Kumar
45 1 Maintenance 1 OBM YARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) 11.00 - 11.45
Movement not
TRD Overlap permitted in Pavan Kumar
45 2 Maintenance 1 OBM YARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) NOT PERMITTED
Movement not
TRD Turnout permitted in Pavan Kumar
45 3 Maintenance 1 OBMYARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) 11.45 - 12.30
Movement not
TRD Turnout permitted in Pavan Kumar
45 4 Maintenance 1 OBM YARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) NOT PERMITTED
Movement not
TRD Isolator permitted in S Ganesh
45 5 Maintenance 1 PKL YARD Yard 161-163 LB and PB PKL Yard-UP Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Isolator permitted in S Ganesh
45 6 Maintenance 1 PKL YARD Yard 161-164 LB and PB PKL Yard-UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in S Ganesh
45 7 Maintenance 1 PKL YARD Yard 161-165 LB and PB PKL Yard-UP Tower Car (08310162957) 10.45 - 11.30
Movement not
TRD Turnout permitted in S Ganesh
45 8 Maintenance 1 PKL YARD Yard 161-166 LB and PB PKL Yard-UP Tower Car (08310162957) NOT PERMITTED
20 mins x 3 Crank Handle EKT BAY UP/DN Disconnection CH1- GTL ESM with 1 nos.staff NA
CH1, CH2, CH3 maintenance END
Reception/Dis
patch piloting.
CH2- Up
Trains :
Reception to
Rd 2 & 3
piloting. CH3-
S&T
Up Trains :
Reception to
Rd 5,6,7,8
piloting. DN
trains
dispatch :
starter memo 09.00 - 09.20
from Rd 09.20 - 09.40
BAY-PKL 208.06 4,5,6,7 & 8. 09.40 - 10.00
30 mins BYC-KDN block Block BYC UP/DN Disconnection Dn trains ESM with 1 nos.staff NA
instrument Instrument PLCT at KDN,
S&T
Maintenance Up trains
204.1 PLCT at BYC 09.00 - 10.00
20 mins x 3 Crank Handle EKT KDN UP/DN Disconnection CH1- Dn ESM with 1 nos.staff NA
CH1, CH2, CH3 maintenance trains
reception to
CL1 & CL2
piloting. Up
trains
dispatch
starter memo.
Up trains
Reception to
CL 1 & Up
M/L on co-on.
S&T CH2- DAJ
END :
Reception
/Dispatch
piloting. CH3-
Dn trains
reception
piloting all
roads. Up
trains
dispatch from 09.00 - 09.20
ACC Line on 09.20 - 09.40
188.23 starter memo. 09.40 - 10.00
ENGG
Switch renewal LB & Rd-3 no train S&T staff & B/S and H.Anjanamurthy
ENGG 90 min 1 0.5 set PKL yard Rd-3 156/000-100
point no 56A disconnection movement AMC batch Je/P.Way/HPT/ML 10.00 - 11.30
No train
30 movement Machine,TRD staff-3, Akash
ENGG 90 min 1 UTV working Obm to slm SL 15/000-20/000 LB & PB
sleepers/Rails between Obm Dept-6 TM JE/P.Way/Rdg
to Slm 11.30 - 13.00
No train
Point packing LB & movement Agency-15 labour,S&T Mukunda
ENGG 60 min 2 1 Pt Bay yard Dn line 207/500-400
Pt.No.68/B disconnection between Byc staff SSE/P.Way/Spl works Bay
to Bay 09.00 - 10.00
ENGG
Rajavali,
ENGG
1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL Km 32/709-33/229 Block required Contract Labour JE/P.Way/YTG 11.00 - 14.00
DN train
ENGG Br No 63 app cannot be Hanumanthappa
120 min 1 attention 200 mtr BNP-KBL DN 114/300-500 LB received AMC Batch (SSE/P.Way/KBL) 12.00 - 14.00
30min 1 Maintenance of Maintenance GIN UP and DN 126/600 Disconnection Both side ESM with 1 nos.staff JE/S/KBL
PKL-RLP
S&T GIN-JBGD B/I of GIN-JBGD PLCT
B/I 11.00 - 11.30
30min 2 Maintenance of Maintenance GIN UP and DN 126/600 Disconnection Both side ESM with 1 nos.staff JE/S/KBL
S&T GIN-KBL B/I of GIN-KBL PLCT
B/I 11.30 - 12.00
CON
30 Minutes 1 LC -463 gate LC -463 gate VJR-MRJ 743/000-100 Disconnection Necessary ESM with 2 nos.staff NA
S&T EKT EKT caution order
Maintenance Maintenance 10.30 - 11.00
30 Minutes 2 Both side Crank Both side PCH UP/DN 646.706 Disconnection UP & DN ESM with 1 nos.staff NA
handle Crank handle Train
Maintenance Maintenance Reception ON
S&T
Piloting &
Despatch on
Starter memo. 10.00 - 10.30
30 Minutes 3 GKK-GPB GKK-GPB GKK UP 662.845 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 10.0 - 10.30
30 Minutes 4 GKK-PCH GKK-PCH GKK DN 662.845 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 10.30 - 11.00
60 Minutes 1 LC 390 EOLB LC 390 EOLB BGM UP & DN 610.39 Disconnection Sliding boom ESM with 2 nos.staff NA
S&T
DWR-MRJ Disconnection maintenance maintenance working 10.00 - 11.00
60 Minutes 2 LC 392 EOLB LC 392 EOLB BGM UP & DN 610.39 Disconnection Sliding boom ESM with 2 nos.staff NA
S&T
Disconnection maintenance maintenance working 11.00 - 12.00
UTV Machine 55/35 nos
ENGG 2 blocks of 90 Shifting of Loading/unloa
minutes each 1 Sleepers/Rails ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic
ENGG tamping Plain track
2 x 120mins 2 Machine Tamping DEV-TVG DN 536/000-535/000 LB Block required SSE/Pway/LD 11.00 - 13.00
Duomatic
ENGG tamping Plain track
2 x 120mins 3 Machine Tamping PCH-GKK DN 662/000-664/000 LB Block required JE/P.way/SPL/BGM 10.00 - 12.00
ENGG 1 block 90 mnn 4 allast cleaning wor 1 GPB-CKR Up/Dn 682/100-300 LB LB Required SSE/PWAY/GPB 11.00 - 12.30
UP TRAIN
ENGG CAN'T
240 BCM WORK 600 MGD-KBI UP 506/400-507/00 LB+PB DISPATCH SSE/PWAY/DWR 01.00 - 04.00
CON
Ballast Ballast profile Rekhya naik
ENGG
120min 1 regulation & sweeping HBI-KTY Single line 59/0-60/0 Block required BRM-04 JE/PW/KTY 12.00 - 14.00
60" 1 CH No.1 2 3 1 HBI UP/DN 43.47 LB DN and UP ESM with 1 nos.staff SSE/JE/S/HPT
trains
VC-KTY reception and
S&T
dispatch
piloting and
starter memo 12.00 - 13.00
RE
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 24.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK REPERCUSS RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-UP Tower Car (08310161863) 12.00 - 12.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-UP Tower Car (08310161863) 15.00 - 15.45
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in
45 5 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-UP Tower Car B SOREN (7022029745) 12.00 - 12.45
Movement not
TRD Isolator permitted in
45 6 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-UP Tower Car B SOREN (7022029745) NOT PERMITTED
Movement not
TRD Turnout permitted in
45 7 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-UP Tower Car B SOREN (7022029745) 15.00 - 15.45
Movement not
KBL-DWR
TRD Turnout permitted in
45 8 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-UP Tower Car B SOREN (7022029745) NOT PERMITTED
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
30 1 Maintenace Maintenace of GDG both 58/000 discconnectio Both side ESM with 1 nos.staff JE/S/GDG
S&T BLOCK n PLCT
GDG-KGX 12.00 - 12.30
45min 2 Maintenace LC-37 KGX both 67/000 disconnection Sliding boom ESM with 2 nos.staff JE/S/GDG
S&T maintenance will be
working 11
30 3 Maintenace Maintenace of RLP both 76/000 discconnectio Both side ESM with 1 nos.staff JE/S/GDG
BLOCK n PLCT
S&T
RLP-SOQ,
RLP-KGX 00 - 11.45
60 4 LC 66 EKT LC 66 EKT KBL both 117/600 disconnection all trains delt ESM with 2 nos.staff JE/S/KBL
S&T overhouling overhouling on hand
signals 12.00 - 13.00
20 5 monthly monthly BNA both 115/400 discconnectio all up trains ESM with 1 nos.staff JE/S/KBL
inspection of inspection of n need to be
S&T
BNA-SOQ BNA-SOQ given PLCT
Block Block 12.00 - 12.20
RE
ENGG 180 Min 1 PQRS SVM -CNR up 73/420-73/680 SSE/PWay /QLM 10.30 - 12.30
ENGG 60 Min 2 Manual Packing SKVL yard Yard Pt. No 13 , 14B SSE/PWay /VSG 10.30 - 11.30
PBC work
ENGG
120min 3 CLR_CRZ PBC work CLR-CRZ SL 28/400-700 LB required 13.00 - 15.00
TSR work
ENGG between DDS
120min 4 yard TSR work DDS Yard Yard 37/300-400 LB required SHADOW BLOCK
464/300-400, Pnt UP line no
ENGG
150min 5 Track attention 1 SUBL yard UP no-350B LB required train can be Mannually SSE/JE P.Way 009.00 - 11.00
TRD
40 Minutes 1 Pt no 65 Pt no 65 SVTN UP & DN 554.62 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. UP
despatch by
starter memo 14.30 - 15.10
60 Minutes 2 Pt no 63&64 Pt no 63&64 SVTN UP & DN 554.62 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. UP
despatch by
LD-VSG starter memo 12.00 - 13.00
30 Minutes 1 Maintenance of Maintenance DDS Yard 38.017 Disconnection 1. Despatch ESM with 1 nos.staff NA
Disconnection DDS-CRZ B/I of DDS-CRZ towards CRZ
S&T B/I on PLCT. 2.
PLCT for dn
trains at CRZ. 13.00 - 13.30
30 Minutes 2 Maintenance of Maintenance DDS Yard 38.017 Disconnection 1. Despatch ESM with 1 nos.staff NA
Disconnection DDS-LIM B/I of DDS-LIM towards LIM
S&T B/I on PLCT. 2.
PLCT for up
trains at LIM. 13.30 - 14.00
30 Minutes 3 Maintenance of Maintenance QLM Yard 50.686 Disconnection 1. Despatch ESM with 1 nos.staff NA
Disconnection QLM-LIM B/I of QLM-LIM towards LIM
S&T B/I on PLCT. 2.
PLCT for dn
trains at LIM. 09.30 - 10.00
30 Minutes 4 Maintenance of Maintenance QLM Yard 50.686 Disconnection 1. Despatch ESM with 1 nos.staff NA
Disconnection QLM-KM B/I of QLM-KM towards KM
S&T B/I on PLCT. 2.
PLCT for up
trains at KM. 10.00 - 10.30
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
Point Packing No train Fittings and Siddalingeshwar
ENGG 120 Min 1 01 Nos LMT Yard SL 128/700-800 Line block
Point No.14 movement 12 Man power SSE/P.Way/LMT 11.00 - 13.00
1 Machine
No Dn train Santosh Chavan
ENGG 150 Min 1 TWR 100 Mtrs JML-BJP UP 177/100-200 Line block 30 Labours,
movement Tr.JE/P.way/BJP
Rail GR Pad & ERC 10.00 - 12.00
No Up &
Tamping By Tamping By Tamping Machine 08 Sachin Mane
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block Down train UP-10.00 - 11.15
Machine Machine Nos Manpower JE/P.way/TVL
movement DN- 12.00 -13.15
Movement not
TRD Overlap permitted in
45 1 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car D. Kishore (08310163796) 10.00 - 10.45
Movement not
TRD Overlap permitted in
45 2 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car D. Kishore (08310163796) NOT PERMITTED
Movement not
TRD Turnout permitted in
45 3 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car D. Kishore (08310163796) 10.45 - 11.30
Movement not
TRD Turnout permitted in
45 4 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car D. Kishore (08310163796) NOT PERMITTED
Movement not
TRD Overlap permitted in
45 5 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car G Mahadev (08310162957) 10.00 - 10.45
Movement not
TRD Overlap permitted in
45 6 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car G Mahadev (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in
45 7 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car G Mahadev (08310162957) 10.45 - 11.30
Movement not
GDG-HG TRD Turnout permitted in
45 8 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car G Mahadev (08310162957) NOT PERMITTED
Movement not
permitted in
TRD
Overlap HLAR yard
45 9 Maintenance 1 HLAR YARD Yard 48-50 LB and PB UP Tower Car D. Chinna (08310162549) 12.30 - 13.15
Movement not
permitted in
TRD
Overlap HLAR yard
45 10 Maintenance 1 HLAR YARD Yard 48-50 LB and PB UP Tower Car D. Chinna (08310162549) NOT PERMITTED
Movement not
permitted in
TRD
Turnout HLAR yard
45 11 Maintenance 1 HLAR YARD Yard 48-50 LB and PB UP Tower Car D. Chinna (08310162549) 13.15 - 14.00
Movement not
permitted in
TRD
Turnout HLAR yard
45 12 Maintenance 1 HLAR YARD Yard 48-50 LB and PB UP Tower Car D. Chinna (08310162549) NOT PERMITTED
Movement not
TRD Overlap permitted in
45 13 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car G Mahadev (08310162957) 12.00 - 12.45
Movement not
TRD Overlap permitted in
45 14 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car G Mahadev (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in
45 15 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car G Mahadev (08310162957) 12.45 - 13.15
Movement not
TRD Turnout permitted in
45 16 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car G Mahadev (08310162957) NOT PERMITTED
S&T
CN
Movement not
TRD Overlap permitted in Pavan Kumar
45 1 Maintenance 1 OBM YARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) 11.00 - 11.45
Movement not
TRD Overlap permitted in Pavan Kumar
45 2 Maintenance 1 OBM YARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) NOT PERMITTED
Movement not
TRD Turnout permitted in Pavan Kumar
45 3 Maintenance 1 OBMYARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) 11.45 - 12.30
Movement not
TRD Turnout permitted in Pavan Kumar
45 4 Maintenance 1 OBM YARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) NOT PERMITTED
Movement not
TRD Isolator permitted in
45 5 Maintenance 1 PKL YARD Yard 161-163 LB and PB PKL Yard-UP Tower Car S Ganesh (08310162957) 10.00 - 10.45
Movement not
TRD Isolator permitted in
45 6 Maintenance 1 PKL YARD Yard 161-164 LB and PB PKL Yard-UP Tower Car S Ganesh (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in
45 7 Maintenance 1 PKL YARD Yard 161-165 LB and PB PKL Yard-UP Tower Car S Ganesh (08310162957) 10.45 - 11.30
Movement not
TRD Turnout permitted in
45 8 Maintenance 1 PKL YARD Yard 161-166 LB and PB PKL Yard-UP Tower Car S Ganesh (08310162957) NOT PERMITTED
20 mins x 4 Crank Handle EKT BAY UP/DN 208.06 Disconnection CH4- DN ESM with 1 nos.staff NA
CH4, CH5, maintenance trains :
CH6 & CH7 Reception to
Rd 1 piloting.
Up trains:
Dispatch from
Rd 1 starter
memo. CH5-
Reception
from BYC to
Rd 1 & 2
piloting.
Reception
from OBM
piloting all
roads.
Dispatch to
BYC & OBM
S&T starter memo
all roads.
CH6- HPT
end
Reception /
Dispatch
piloting . CH7-
Dn Trains :
Reception to
Rd 4, 5, 6, 7,
8 piloting. Up
trains
dispatch from
Rd 5,6 & 7
starter memo,
BAY-PKL Up trains
reception to 09.00 - 09.20
Rd 5,6,7 & 8 09.20 - 09.40
calling on. 09.40 - 10.00
30 mins KDN-DAJ block Block KDN-DAJ UP/DN 188.23 Disconnection UP Trains ESM with 1 nos.staff NA
instrument Instrument PLCT at KDN
S&T
maintenance Maintenance , DN trains
PLCT at DAJ. 10.00 - 10.30
20 mins x 4 Crank Handle EKT KDN UP/DN 188.23 Disconnection CH4- Up ESM with 1 nos.staff NA
CH4, CH5, maintenance trains
CH6 & CH7 reception
piloting. Up
trains
dispatch from
UP M/L, CL1
& CL2 by
starter memo.
Dn trains
reception to
CL1 piloting .
CH5- UP
trains
reception
S&T piloting. Dn
dispatch from
CL1 & CL2
starter memo.
CH6- Dn
trainsb
dispatch on
starter memo.
Up trains
reception to
ACC line
piloting. CH7-
BAY END : 10.30 - 10.50
Reception 10.50 - 11.10
/Dispatch 11.10 - 11.30
piloting 11.30 - 11.50
20 mins x 2 Crank Handle EKT DAJ UP/DN 181.27 Disconnection Up trains ESM with 1 nos.staff NA
CH3, CH4 maintenance Reception
Piloting. Up
S&T
trains
dispatch 10.00 - 10.20
starter memo 10.20 - 10.40
Crossing
Road No 4
portion
trains cannot D.Amru Naik
ENGG 90 min 1 sleepers 8 TNGL yard Rd-4 176/400-500 LB 10 Track mans and 1 B/s
dispatch DAJ SSE/P.WAY/TNGL
renewal point
end
No 75A 10.00 - 11.30
Switch renewal LB & Rd -6 No train S&T staff & B/S and H.Anjanamurthy
ENGG 90 min 1 0.5 set KGW yard Rd-6 149/300-400
point no 58A Disconnection movement AMC batch Je/P.Way/HPT/ML 12.30 - 14.00
No train
30 movement Machine,TRD staff-3, Akash
ENGG 90 min 1 UTV working Obm to Slm SL 20/000-25/000 LB & PB
sleepers/Rails between Obm Dept-6 TM JE/P.Way/Rdg
to Slm 11.30 - 13.00
ENGG
ENGG
TTR Work at Prasad,
ENGG
1x180 mins 1 P No-13A/VYS 1 Point VYS Yard Yard Km 9/900-10/000 Block required Contract Labour Asst.SSE/P.Way/HPT(BL) 11.00 - 14.00
UP train
ENGG cannot be AMC Batch Sunil Kumar
2x 120 min 1 Point attention 1 unit TLKL Yard UP 97/600-700 LB received Blacksmith Team (SSE/P.Way/GDG ML) 12.00 - 14.00
Movement not
TRD Isolator permitted in AANJAIAH
45 1 Maintenance 1 MRB YARD Yard 137-139 LB and PB MRB Yard-DN Tower Car (08310162741) 10.00 - 10.45
Movement not
TRD Isolator permitted in AANJAIAH
45 2 Maintenance 1 MRB YARD Yard 137-139 LB and PB MRB Yard-DN Tower Car (08310162741) NOT PERMITTED
Movement not
TRD Turnout permitted in AANJAIAH
PKL-RLP 3
45 Maintenance 1 MRB YARD Yard 137-139 LB and PB MRB Yard-DN Tower Car (08310162741) 11.00 - 11.45
Movement not
TRD Turnout permitted in AANJAIAH
45 4 Maintenance 1 MRB YARD Yard 137-139 LB and PB MRB Yard-DN Tower Car (08310162741) NOT PERMITTED
30mins 1 Maintenance of Maintenance MRB UP and DN 137500 Disconnection Both side ESM with 1 nos.staff JE/S/KBL
GIN-MRB of GIN-MRB PLCT
S&T
BLOCK BLOCK
instrument instrument 10.00 - 10.30
30mins 2 Maintenance of Maintenance MRB UP and DN 137500 Disconnection Both side ESM with 1 nos.staff JE/S/KBL
MRB-HPT of MRB-HPT PLCT
S&T
BLOCK BLOCK
instrument instrument 10.30 - 11.00
CON
Movement not
permitted
TRD
Isolator inTVG HANUMANTH RAO
45 1 Maintenance 1 TVG YARD Yard 534-536 LB and PB Yard-DN Tower Car (08310162257) 07.45 - 08.30
Movement not
permitted
TRD
Isolator inTVG HANUMANTH RAO
45 2 Maintenance 1 TVG YARD Yard 534-536 LB and PB Yard-DN Tower Car (08310162257) NOT PERMITTED
Movement not
permitted
TRD
Turnout inTVG HANUMANTH RAO
45 3 Maintenance 1 TVG YARD Yard 534-536 LB and PB Yard-DN Tower Car (08310162257) 08.30 - 09.15
Movement not
permitted
TRD
Turnout inTVG HANUMANTH RAO
45 4 Maintenance 1 TVG YARD Yard 534-536 LB and PB Yard-DN Tower Car (08310162257) NOT PERMITTED
TRD
TRD
30 Minutes 1 Both side Both side CKR UP/DN 683.282 Disconnection UP & DN ESM with 1 nos.staff NA
Crank handle Crank handle Train
Maintenance Maintenance Reception ON
S&T
Piloting &
Despatch on
Starter memo. 11.00 - 11.30
30 Minutes 2 PCH-GKK PCH-GKK PCH DN 646.706 Disconnection UP & DN train ESM with 1 nos.staff NA
DWR-MRJ S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 11.00 - 11.30
30 Minutes 3 PCH-SUL PCH-SUL PCH UP 646.706 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 11.30 - 12.00
60 Minutes 1 LC 410 MOLB LC 410 MOLB SUL UP & DN 637.756 Disconnection Sliding boom ESM with 2 nos.staff NA
S&T
Disconnection maintenance maintenance working 11.00 - 12.00
30 Minutes 1 25XT LEAD 25XT LEAD NAG DN 539.79 Disconnection DN TRAIN ESM with 1 nos.staff NA
Disconnection WIRE WIRE DISPATCH
S&T
REPLACEMEN REPLACEME WITH PLCT
T NT AT DEV 15.00 - 15.30
UTV Machine 55/35 nos
ENGG 2 blocks of 90 Shifting of Loading/unloa
minutes each 1 Sleepers/Rails ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic
ENGG tamping Plain track Block required & Signal
2 x 120mins 2 Machine Tamping TVG YARD DN 535/000-533/800 LB staff SSE/Pway/LD 13.00 - 14.30
Duomatic
ENGG tamping Plain track
2 x 120mins 3 Machine Tamping PCH-GKK UP 655/000-657/000 LB Block required JE/P.way/SPL/BGM 10.00 - 12.00
UGR yd G/J &
ENGG
1 block 90 mnn 4 SEJ Packing 1 UGR Yd UGR Yard 720/400-600 LB Signal Staff SSE/PWAY/KUD 14.00 - 15.30
UP TRAIN
ENGG CAN'T
240 BCM WORK 600 MGD-KBI UP 507/00-600 LB+PB DISPATCH SSE/PWAY/DWR 01.00 - 04.00
CON
Ballast Ballast profile Rekhya naik
ENGG
120min 1 regulation & sweeping HBI-KTY Single line 60/0-61/0 Block required BRM-04 JE/PW/KTY 12.00 - 14.00
ENGG
TRD
60" 1 CH No.1 2 3 1 KTY UP/DN 70.93 LB DN and UP ESM with 1 nos.staff SSE/JE/S/HPT
VC-KTY trains
reception and
S&T
dispatch
piloting and
starter memo 12.00 - 14.00
RE
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 25.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK REPERCUSS RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-UP Tower Car (08310161863) 12.00 - 12.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-UP Tower Car (08310161863) 15.00 - 15.45
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in B SOREN
45 5 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-UP Tower Car (7022029745) 12.00 - 12.45
Movement not
TRD Isolator permitted in B SOREN
45 6 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-UP Tower Car (7022029745) NOT PERMITTED
Movement not
TRD Turnout permitted in B SOREN
45 7 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-UP Tower Car (7022029745) 15.00 - 15.45
Movement not
TRD Turnout permitted in B SOREN
45 8 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-UP Tower Car (7022029745) NOT PERMITTED
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
09:45-12:15(DN)
ENGG
120 min 6 BT-Unloading 20 Bobyn HBS-NGR UP & DN 19/100-35/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
DN line no
ENGG Track 464/300-400, Pnt train can be
150min 7 attention 1 SUBL yard DN no-350A LB required passed during Mannually SSE/JE P.Way 10.00 - 12.30
30 minutes 1 kjg-svnr kjg-svnr kjg-svnr up/dn 400.74 disconnection all trains on ESM with 1 nos.staff NA
S&T ssbpac for ssbpac for block on plct
maintance maintance 09.30 - 10.00
30 minutes 2 svnr-ylg svnr-ylg svnr-ylg up/dn 413.64 disconnection all trains on ESM with 1 nos.staff NA
S&T ssbpac for ssbpac for block on plct
maintance maintance 10.00 - 10.30
30 minutes 3 svnr all crank svnr all crank svnr up/dn 413.64 disconnection all trains to be ESM with 1 nos.staff NA
S&T handles for handles for piloted
maintance maintance 12.00 - 12.30
60 minutes 4 ips system ips system ylg up/dn 421.7 disconnection All up and dn ESM with 2 nos.staff NA
S&T
checking checking trains piloting 15.00 - 16.00
30 minutes 5 HBS-KUG HBS-KUG HBS-KUG up/dn 19.13 disconnection all trains on ESM with 1 nos.staff NA
S&T BLOCK BLOCK block on plct
MAINTANCE MAINTANCE 12.00 - 12.30
30 minutes 6 CRANK CRANK LKT up/dn 45.48 disconnection all trains to be ESM with 1 nos.staff JE/SIG/UBL
S&T HANDLE HANDLE piloted
MAINTANCE MAINTANCE 12.30 - 13.00
30 minutes 7 EI SYSTEM EI SYSTEM LKT up/dn 45.48 disconnection all trains to be ESM with 3 nos.staff JE/SIG/UBL
S&T CHANGEOVE CHANGEOVE piloted
R R 15.00 - 15.30
45min 1 Maintenance KL pont BKIT UP 52/500-600 discconnectio Effect Road 1 ESM with 2 nos.staff JE/S/GDG
S&T maintenae n and UP LSS
(369/3B) 12.00 - 12.45
30min 2 Maintenance Maintenace of SOQ both 85/000 discconnectio Both side ESM with 1 nos.staff JE/S/GDG
BLOCK n PLCT
S&T
SOQ-RLP,SO
Q-BNA 11.30 - 12.00
30min 3 Quaterly Quaterly RLP both 76/00 disconnection Both side ESM with 1 nos.staff SSE/S/GDG
Inspection of Inspection of PLCT &
S&T BLOCK & BLOCK & PILOTING
CRANK CRANK
KBL-DWR handle handle 11.30 - 12.00
60 4 LC 68 EKT LC 68 EKT KBL both 118/400 disconnection all trains delt ESM with 2 nos.staff JE/S/KBL
S&T overhouling overhouling on hand
signals 12.00 - 13.00
45 5 maintance of maintance of BNP both 103/300 discconnectio all trains need ESM with 1 nos.staff JE/S/KBL
S&T crank handles crank handles n to be pilated
ch1 to ch3 ch1 to ch3 12.00 - 12.45
60 6 maintanance maintanance BNA both 92/500 discconnectio all down trains ESM with 1 nos.staff JE/S/KBL
S&T of BNA-TLKL of BNA-TLKL n need to be
Block Block given PLCT 11.30 - 12.30
Movement not
TRD Overlap permitted in Block required D. Kishore
45 1 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP (08310163796) 10.00 - 10.45
Movement not
TRD Overlap permitted in D. Kishore
45 2 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Turnout permitted in D. Kishore
45 3 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car (08310163796) 10.45 - 11.30
Movement not
TRD Turnout permitted in D. Kishore
45 4 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 5 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Overlap permitted in G Mahadev
45 6 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 7 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car (08310162957) 10.45 - 11.30
Movement not
TRD Turnout permitted in G Mahadev
45 8 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
permitted in
TRD
Overlap HLAR yard D. Chinna
45 9 Maintenance 1 HLAR YARD Yard 48-50 LB and PB UP Tower Car (08310162549) 12.30 - 13.15
Movement not
permitted in
TRD
Overlap HLAR yard D. Chinna
45 10 Maintenance 1 HLAR YARD Yard 48-50 LB and PB UP Tower Car (08310162549) NOT PERMITTED
Movement not
permitted in
TRD
Turnout HLAR yard D. Chinna
45 11 Maintenance 1 HLAR YARD Yard 48-50 LB and PB UP Tower Car (08310162549) 13.15 - 14.00
Movement not
permitted in
TRD
Turnout HLAR yard D. Chinna
45 12 Maintenance 1 HLAR YARD Yard 48-50 LB and PB UP Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 13 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car (08310162957) 12.00 - 12.45
Movement not
TRD Overlap permitted in G Mahadev
45 14 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 15 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car (08310162957) 12.45 - 13.15
Movement not
TRD Turnout permitted in G Mahadev
45 16 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car (08310162957) NOT PERMITTED
RE JE/PWay /QLM
ENGG 2 X75 min 1 WRJ SVM -CNR UP 73/420-73/680 10.00 - 11.15
ENGG 2 X 90 Min 2 UTV SVM -CNR UP 73/420-73/680 10.00 - 11.30
ENGG 2 X 90 Min 3 MPT SVM -CNR UP 73/420-73/680 SHADOW BLOCK
PBC work
ENGG between
120min 4 CLR-CRZ PBC work CLR-CRZ SL 28/200-500 LB Required 13.00 - 15.00
TSR work
ENGG between DDS
120min 5 yard TSR work DDS Yard Yard 37/300-400 LB required SHADOW BLOCK
TRD
30 Minutes 1 Maintenance Maintenance CLR Yard 24.5 Disconnection All up and ESM with 1 nos.staff NA
Disconnection of CLR-CRZ of CLR-CRZ down trains
S&T
B/I B/I towards CRZ
through PLCT 13.00 - 13.30
30 Minutes 2 Maintenance Maintenance CLR Yard 24.5 Disconnection All up and ESM with 1 nos.staff NA
Disconnection of CLR-TGT of CLR-TGT down trains
S&T
B/I B/I towards TGT
LD-VSG through PLCT 13.30 - 14.00
30 Minutes 3 Lead wire Lead wire LIM Yard 42.61 Disconnection QLM Train ESM with 1 nos.staff NA
S&T Disconnection replacement replacement movements
at 01AT at 01AT by piloting. 13.00 - 13.30
30 Minutes 4 Maintenance Maintenance DDS Yard 38.017 Disconnection All trains ESM with 1 nos.staff NA
Disconnection of of through PLCT
S&T
CH1,CH2,CH CH1,CH2,CH and piloting.
3 3 13.00 - 13.30
30 Minutes 5 62BT lead 62BT lead svm Yard 75/500 Disconnection Reception ESM with 1 nos.staff NA
Disconnection wire wire from CNR
replacement replacement side Rd3 on
Co on signal
S&T
Reception
from KM side
Rd34,5,6 on
Co on signal 11.00 - 11.30
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
No train Siddalingeshwar
ENGG 120 Min 1 Joint Packing 200 Mtrs JRKT-LMT SL 120/800-121/000 Line block Fittings & Manpower
movement SSE/P.Way/LMT 11.00 - 13.00
1 Machine
No Dn train Santosh Chavan
ENGG 150 Min 1 TWR 100 Mtrs JML-BJP UP 177/200-300 Line block 30 Labours,
movement Tr.JE/P.way/BJP
Rail GR Pad & ERC 10.00 - 12.00
No Up &
Tamping By Tamping By Tamping Machine Sachin Mane
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block Down train UP-10.00 - 11.15
Machine Machine 08 Nos Manpower SSE/P.way/IDR
movement DN- 12.00 -13.15
TRD
90MIN 1 BI AND CH BI AND CH BGK UP/DN BGK STATION DISCONNEC UP/DN ESM with 1 nos.staff JE/SSE
FOR FOR TION TRAINS
MAINTENAN MAINTENAN RECEIPTION
CE CE ON SIGNALS
S&T
GDG-HG AND
DISPATCH
ON PLCT DN
TRAINS 11.00 - 12.30
20 MIN 2 WDL-BSRX WDL-BSRX WDL-BSRX UP/DN WDL YARD DISCONNEC UP & DN ESM with 1 nos.staff SSE/SIG/BSRX
UFSBI UFSBI TION TRAIN
S&T
MONTHLY MONTHLY PILOTING
INSPECTION INSPECTION 11.00 - 11.20
20 MIN 3 WDL -LMT B/I WDL -LMT B/I WDL-LMT UP/DN WDL YARD DISCONNEC UP & DN ESM with 1 nos.staff SSE/SIG/BSRX
S&T MONTHLY MONTHLY TION TRAIN
INSPECTION INSPECTION PILOTING 11.20 - 11.40
10 MIN 4 EI EI WDL UP/DN WDL YARD LINE BLOCK UP & Dn train ESM with 3 nos.staff SSE/SIG/BSRX
S&T CHANGEOVE CHANGEOVE no movement
R R 11.40 - 11.50
CON
Movement not
TRD Isolator permitted in Pavan Kumar
45 1 Maintenance 1 OBM YARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) 11.00 - 11.45
Movement not
TRD Isolator permitted in Pavan Kumar
45 2 Maintenance 1 OBM YARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) NOT PERMITTED
Movement not
TRD Turnout permitted in Pavan Kumar
45 3 Maintenance 1 OBMYARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) 11.45 - 12.30
Movement not
TRD Turnout permitted in Pavan Kumar
45 4 Maintenance 1 OBM YARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) NOT PERMITTED
Movement not
TRD Isolator permitted in S Ganesh
45 5 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-UP Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Isolator permitted in S Ganesh
45 6 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in S Ganesh
45 7 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-UP Tower Car (08310162957) 10.45 - 11.30
Movement not
TRD Turnout permitted in S Ganesh
45 8 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-UP Tower Car (08310162957) NOT PERMITTED
20 mins x 3 Crank Handle EKT BNHT UP/DN 9.02 Disconnection CH1- ESM with 1 nos.staff NA
CH1, CH2, maintenance Reception
CH3 from Jindal,
NDHI and
TNGL -
Piloting.
Dispatch to
JVSL, NDHI &
TNGL - starter
memo. CH2-
Reception
from Jindal,
BAY-PKL NDHI and
TNGL to Rd 4
& 5 - Piloting.
S&T
Dispatch to
JVSL, NDHI &
TNGL from
Rd 4 & 5 -
starter memo.
CH3-
Reception
from Jindal,
NDHI and
TNGL -
Piloting.
Dispatch to
JVSL, NDHI & 10.00 - 10.20
TNGL - starter 10.20 - 10.40
memo. 10.40 - 11.00
30 mins LC-08 EKT EKT BNHT UP/DN 9.02 Disconnection Reception / ESM with 2 nos.staff NA
maintenance maintenance Dispatch from
S&T
NDHI -
Piloting , 11.00 - 11.30
Exisiting heat Road No-4
treaed Trains cannot
crossing LB & dispatch and D.Amru NAik
ENGG 120 min 1 1 TNGL Road No 4 176/400-500 S7T staff, AMC batch
renewed CMS disconnection recieve SSE/P.WAY/TNGL.
crossing point towards DAj
No 75A end
10.00 - 11.30
No train
30 movement Machine,TRD staff-3, Akash
ENGG 90 min 1 UTV working Obm to Slm SL 20/000-25/000 LB & PB
sleepers/Rails between Obm Dept-6 TM JE/P.Way/Rdg
to Slm 11.30 - 13.00
No train
Jt inspection
LB & movement R.V.Naik
ENGG 90 min 2 deficiency 1 pt Slm yard SL 31/200-300 S&T staff,B/s-2,TM-4 men
disconnection between Slm SSe/P.Way/Obm
Pt.No.7/B
to Rdg 11.30 - 13.00
ENGG
Rajavali,
ENGG
1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL Km 33/229-33/749 Block required Contract Labour JE/P.Way/YTG 11.00 - 14.00
Point DN train
ENGG maintainance LB & cannot be AMC labour Sunil Kumar
120min 1 Pt No 52B 1 unit SOQ yard DN 85/500-600 disconnection dispatched Blacksmith team (SSE/P.Way/GDG ML) 12.00 - 14.00
Switch
LB & Rd -6 No train S&T staff & B/S and AMC H.Anjanamurthy
ENGG 90 min 1 renewal point 0.5 set KGW yard Rd-6 149/300-400
Disconnection movement batch Je/P.Way/HPT/ML
no 58B 12.30 - 14.00
Movement not
TRD Isolator permitted in AANJAIAH
45 1 Maintenance 1 GIN YARD Yard 126-128 LB and PB GIN Yard-DN Tower Car (08310162741) 12.00 - 12.45
Movement not
PKL-RLP TRD Isolator permitted in AANJAIAH
45 2 Maintenance 1 GIN YARD Yard 126-128 LB and PB GIN Yard-DN Tower Car (08310162741) NOT PERMITTED
Movement not
TRD Turnout permitted in AANJAIAH
45 3 Maintenance 1 GIN YARD Yard 126-128 LB and PB GIN Yard-DN Tower Car (08310162741) 13.15 - 14.00
Movement not
TRD Turnout permitted in AANJAIAH
45 4 Maintenance 1 GIN YARD Yard 126-128 LB and PB GIN Yard-DN Tower Car (08310162741) NOT PERMITTED
TRD
30mins 1 Maintenance Maintenance MRB both 137/500 Disconnection BOTH side ESM with 1 nos.staff JE/S/KBL
S&T of crank of crank piloting
handle handle 12.00 - 12.30
CON
Movement not
TRD Isolator permitted in HANUMANTH RAO
45 1 Maintenance 1 DEVYARD Yard 546-548 LB and PB DEV Yard-DN Tower Car (08310162257) 08.00 - 08.45
Movement not
TRD Isolator permitted in HANUMANTH RAO
45 2 Maintenance 1 DEVYARD Yard 546-548 LB and PB DEV Yard-DN Tower Car (08310162257) NOT PERMITTED
Movement not
TRD Turnout permitted in HANUMANTH RAO
45 3 Maintenance 1 DEVYARD Yard 546-548 LB and PB DEV Yard-DN Tower Car (08310162257) 08.45 - 09.30
Movement not
TRD Turnout permitted in HANUMANTH RAO
45 4 Maintenance 1 DEVYARD Yard 546-548 LB and PB DEV Yard-DN Tower Car (08310162257) NOT PERMITTED
TRD
TRD
30 Minutes 1 KUD-UGR KUD-UGR KUD UP 714.48 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 11.30 - 12.00
30 Minutes 2 KUD-CNCUF KUD-CNC KUD DN 714.48 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T SBI UFSBI on PLCT
Maintenance Maintenance 12.00 - 12.30
30 Minutes 3 LC - 425 gate LC- 425 gate GPB-GKK 665.466 Disconnection Necessary ESM with 2 nos.staff NA
S&T EKT EKT caution order
Maintenance Maintenance 11.00 - 11.30
30 Minutes 4 LC - 426 gate LC- 426 gate GPB-GKK 665.466 Disconnection Necessary ESM with 2 nos.staff NA
S&T EKT EKT caution order
Maintenance Maintenance 11.30 - 12.00
30 Minutes 5 SUL-PCH SUL-PCH SUL UP 637.756 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 11.00 - 11.30
60 Minutes 1 Pt no 65 Pt no 65 SBH DN 626.144 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. UP
despatch by
starter memo 11.00 - 11.30
60 Minutes 2 Pt no 64 Pt no 65 SBH DN 626.144 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
DWR-MRJ piloting
S&T
2. UP
despatch by
starter memo 11.30 - 12.00
60 Minutes 3 Pt no 65 &64 Pt no 65 &64 TGT DN 11.64 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. UP
despatch by
starter memo 13.00 - 14.00
60 Minutes 4 Pt no 63&62 Pt no 63&62 TGT DN 11.64 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. UP
despatch by
starter memo 14.00 - 15.00
60 Minutes 5 POINT N0-56 POINT N0-56 LWR UP&DN 525.8 Disconnection train cannot ESM with 2 nos.staff NA
Disconnection GTP GTP be dealt engg
S&T INSULATION INSULATION siding and
REPLACEME REPLACEME wagon siding
NT NT 08.00 - 09.00
UTV Machine
Shifting of 55/35 nos
ENGG
2 blocks of 90 Sleepers/Rail Loading/unloa
minutes each 1 s ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic
ENGG tamping Plain track
2 x 120mins 2 Machine Tamping TVG-LWR DN 533/200-531/800 LB Block required SSE/Pway/LD 13.00 - 14.30
Unimat Machine & Signal
ENGG
1 block 240m 3 PQRS work 0.52 SBH-SUL Up 629/290-810 LB & PB staff SSE/p.way/BGM 10.00 - 12.00
Duomatic
ENGG tamping Plain track
2 x 120mins 4 Machine Tamping PCH-GKK UP 647/000-649/000 LB Block required JE/P.way/SPL/BGM 10.00 - 12.00
VJR yd G/J &
ENGG
1 block 90 mnn SEJ Packing 1 SED-VJR VJR Yard 739/900-740/200 LB Signal Staff SSE/PWAY/KUD 09.00 - 10.30
UP TRAIN
ENGG CAN'T
240 BCM WORK 600 MGD-KBI UP 507/600-508/200 LB+PB DISPATCH SSE/PWAY/DWR 01.00 - 04.00
CON
Ballast Ballast profile Rekhya naik
ENGG
120min 1 regulation & sweeping HBI-KTY Single line 61/0-62/0 Block required BRM-04 JE/PW/KTY 12.00 - 14.00
ENGG
TRD
VC-KTY 60" 1 CH No.1 2 3 4 1 RMGD UP/DN 13.122 LB DN and UP ESM with 1 nos.staff SSE/JE/S/HPT
trains
reception and
S&T
dispatch
piloting and
starter memo 11.00 - 12.00
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 26.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK REPERCUSS RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-UP Tower Car (08310161863) 12.00 - 12.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-UP Tower Car (08310161863) 15.00 - 15.45
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 LKT YARD Yard 80-82 LB and PB LKT Yard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in B SOREN
45 5 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-UP Tower Car (7022029745) 12.00 - 12.45
Movement not
TRD Isolator permitted in B SOREN
45 6 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-UP Tower Car (7022029745) NOT PERMITTED
Movement not
TRD Turnout permitted in B SOREN
45 7 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-UP Tower Car (7022029745) 15.00 - 15.45
Movement not
TRD Turnout permitted in B SOREN
45 8 Maintenance 1 KUG YARD Yard 09-11 LB and PB KUG Yard-UP Tower Car (7022029745) NOT PERMITTED
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
UP & DN line
Crossing no train can
ENGG 150min 6 1 NVU yard UP 481/00-100, Pnt no-60B Mannually
Renewal work be passed
KBL-DWR LB and PB SSE/JE P.Way ----
during Block
120 minutes 1 point 52b point 52b svnr up 413.64 disconnetion up trains ESM with 3 nos.staff JE/SIG/YLG
S&T replacement replacement piloting
work work 13.30 - 15.30
60 Minutes 2 25T TLD 25T TLD BDKA DN 475.95 Disconnection All DN trains ESM with 2 nos.staff NA
S&T Disconnection lifting work lifting work to be dealt on
PLCT 08.30 - 09.30
30 MINUTES 3 NVD IPS NVD IPS NVD UP/DN 26.98 Disconnection up trains ESM with 2 nos.staff NA
S&T
MAINTANCE MAINTANCE piloting 12.00 - 12.30
30 MINUTES 4 NVD-NGR NVD-NGR NVD-NGR UP/DN 26.98 Disconnection ALL UP AND ESM with 1 nos.staff NA
S&T MAINTANCE MAINTANCE DN TRAINS
PLCT 12.30 - 13.00
30 1 Maintenace Maintenace of BKIT both 53/100 disconnection Both side ESM with 1 nos.staff JE/S/GDG
S&T BLOCK PLCT
BKIT-LKT 12.00 - 12.30
20 min 2 Maintenance Maintenace of RLP both 76/000 discconnectio BOTH side ESM with 1 nos.staff JE/S/GDG
S&T CRANK n piloting
handle 11.30 - 11.50
20 min 3 Maintenace Maintenace of SOQ both 85/000 discconnectio BOTH side ESM with 1 nos.staff JE/S/GDG
S&T CRANK n piloting
handle 11.30 - 11.50
45 4 maintance of maintance of BNP both 103/300 discconnectio all trains need ESM and staff JE/S/KBL
S&T crank handles crank handles n to be pilated
ch4 to ch6 ch4 to ch6 12.00 - 12.45
60 5 LC 51 LC 51 BNA both 93/00 discconnectio all down trains ESM with 2 nos.staff JE/S/KBL
Maintanance Maintanance n dispatch by
starter memo
S&T
and up trains
reception by
memo 12.00 - 13.00
ENGG 180 Min 1 PQRS SVM -CNR UP 73/680-940 SSE/PWay/QLM 09.00 - 12.00
ENGG 60 Min 2 Pt. Attention 72 B QLM Yard Yard 72 B QLM Yard SSE/PWay//SVM 09.30 - 10.30
ENGG 60 Min 3 Manual Packing SKVL Yard Yard SKVL Pt 20B SSE/Pway /VSG 10.00 - 11.00
PBC work
ENGG between
120min 4 CLR-CRZ PBC work CLR-CRZ SL 27/800-28/200 LB Required 13.00 - 15.00
TSR work
ENGG between DDS
120min 5 yard TSR work DDS Yard Yard 37/300-400 LB required SHADOW BLOCK
TRD
60 Minutes 1 At Point 4,5 At Point 4,5 CRZ Yard 31.699 Disconnection No Train ESM with 2 nos.staff NA
LD-VSG S&T Disconnection slide cleaning slide cleaning movements
work. work. DDS side 13.00 - 14.00
30 Minutes 2 Maintenance Maintenance CSM Yard 95.873 Disconnection All up and ESM with 1 nos.staff NA
Disconnection of CSM-MJO of CSM-MJO down trains
S&T
B/I B/I towards VSG
through PLCT. 10.00 - 10.30
30 Minutes 3 Maintenance Maintenance CSM Yard 95.873 Disconnection All up and ESM with 1 nos.staff NA
Disconnection of CSM-SKVL of CSM-SKVL down trains
S&T
B/I B/I towards SKVL
through PLCT. 10.30 - 11.00
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
No train Siddalingeshwar
ENGG 120 Min 1 Joint Packing 300 Mtrs JRKT-LMT SL 121/500-800 Line block Fittings & Manpower
movement SSE/P.Way/LMT 11.00 - 13.00
1 Machine
No Dn train Santosh Chavan
ENGG 150 Min 1 TWR 100 Mtrs JML-BJP DN 181/400-500 Line block 30 Labours,
movement Tr.JE/P.way/BJP
Rail GR Pad & ERC 12.00 - 14.30
No Up &
Tamping By Tamping By Tamping Machine 08 Sachin Mane
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block Down train UP-10.00 - 11.15
Machine Machine Nos Manpower SSE/P.way/IDR
movement DN- 12.00 -13.15
Movement not
TRD Overlap permitted in D. Kishore
45 1 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car (08310163796) 10.00 - 10.45
Movement not
TRD Overlap permitted in D. Kishore
45 2 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Turnout permitted in D. Kishore
45 3 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car (08310163796) 10.45 - 11.30
Movement not
TRD Turnout permitted in D. Kishore
45 4 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 5 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Overlap permitted in G Mahadev
45 6 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 7 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car (08310162957) 10.45 - 11.30
Movement not
TRD Turnout permitted in G Mahadev
45 8 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
permitted in
TRD
Overlap HLAR yard D. Chinna
45 9 Maintenance 1 HLAR YARD Yard 48-50 LB and PB UP Tower Car (08310162549) 12.30 - 13.15
Movement not
permitted in
TRD
Overlap HLAR yard D. Chinna
45 10 Maintenance 1 HLAR YARD Yard 48-50 LB and PB UP Tower Car (08310162549) NOT PERMITTED
Movement not
permitted in
GDG-HG TRD
Turnout HLAR yard D. Chinna
45 11 Maintenance 1 HLAR YARD Yard 48-50 LB and PB UP Tower Car (08310162549) 13.15 - 14.00
Movement not
permitted in
TRD
Turnout HLAR yard D. Chinna
45 12 Maintenance 1 HLAR YARD Yard 48-50 LB and PB UP Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 13 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car (08310162957) 12.00 - 12.45
Movement not
TRD Overlap permitted in G Mahadev
45 14 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 15 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car (08310162957) 12.45 - 13.15
Movement not
TRD Turnout permitted in G Mahadev
45 16 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car (08310162957) NOT PERMITTED
60MIN 1 SH KEYS SH KEYS MGH UP/DN MGH STATION DISCONNEC UP/DN ESM with 1 nos.staff JE/SSE
FOR FOR TION TRAINS
MAINTENAN MAINTENAN RECEIPTION
CE CE ON SIGNALS
S&T
AND
DISPATCH
ON PLCT DN
TRAINS 11.00 - 12.00
30MIN FOR 2 BGK SIDE BGK SIDE GED UP/DN GED STATION DISCONNEC WILL BE ESM with 2 nos.staff JE/SSE
EACH POINT POINTS POINTS TION GIVEN WITH
DISCONNEC
S&T
TION OF
CONCERNE
D POINT 11.00 - 11.30
20 MIN 3 MVD-KDGI MVD-KDGI MVD-KDGI UP/DN MVD YARD DISCONNEC UP & DN ESM with 1 nos.staff SSE/SIG/BSRX
UFSBI UFSBI TION TRAIN
S&T
MONTHLY MONTHLY PILOTING
INSPECTION INSPECTION 13.00 - 13.20
20 MIN 4 MVD-JML MVD-JML MVD-JML UP/DN MVD YARD DISCONNEC UP & DN ESM with 1 nos.staff SSE/SIG/BSRX
UFSBI UFSBI TION TRAIN
S&T
MONTHLY MONTHLY PILOTING
INSPECTION INSPECTION 13.20 - 13.40
10 MIN 5 EI EI MVD UP/DN MVD YARD LINE BLOCK UP & Dn train ESM with 2 nos.staff SSE/SIG/BSRX
S&T CHANGEOVE CHANGEOVE no movement
R R 13.40 - 13.50
CON
Movement not
TRD Isolator permitted in Pavan Kumar
45 1 Maintenance 1 OBM YARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) 11.00 - 11.45
Movement not
TRD Isolator permitted in Pavan Kumar
45 2 Maintenance 1 OBM YARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) NOT PERMITTED
Movement not
TRD Turnout permitted in Pavan Kumar
45 3 Maintenance 1 OBMYARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) 11.45 - 12.30
Movement not
TRD Turnout permitted in Pavan Kumar
45 4 Maintenance 1 OBM YARD Yard 12-14 LB and PB OBM yard Tower Car (08310163339) NOT PERMITTED
Movement not
TRD Isolator permitted in S Ganesh
45 5 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-UP Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Isolator permitted in S Ganesh
45 6 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in S Ganesh
45 7 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-UP Tower Car (08310162957) 10.45 - 11.30
Movement not
TRD Turnout permitted in S Ganesh
45 8 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-UP Tower Car (08310162957) NOT PERMITTED
20 mins x 2 1 Crank Handle EKT BYC UP/DN 204.1 Disconnection CH3- Up ESM with 1 nos.staff NA
CH3, CH4 maintenance trains
reception
piloting to Rd
4 & Rd 5. Up
trains
BAY-PKL dispatch on
starter
memo.DN
trains
reception
S&T piloting to Rd
3, Rd 4 & Rd
5. DN trains
dispatch on
starter
memo.CH4-
Up trains
Dispatch on
starter memo.
Up trains
reception to 11.00 - 11.20
Rd 2 piloting. 11.20 - 11.40
TNGL
PSC sleepers TNGL byepass No Vicky Kumar
ENGG 120 min 1 25 Byepass 0/300-400 LB AMC batch 15
renewal byepass train JE/P.WAY/SW/TNGL
movement 10.00 - 12.00
No train
20 movement Machine,TRD staff-3, Mukunda
ENGG 90 min 1 UTV working Obm to Slm SL 25/000-30/000 LB & PB
sleepers/Rails between Obm Dept-6 TM SSE/P.Way/Spl works Bay
to Slm 11.00 - 12.30
No train
Jt inspection movement
LB & S&T staff,B/s-2,TM-4 R.V.Naik
ENGG 90 min 2 deficiency 1 pt Slm yard SL 31/400-300 between Slm
disconnection men SSe/P.Way/Obm
Pt.No.8/A Rd.No.3 to
Rdg 12.00 - 13.30
ENGG
Rajavali,
ENGG
1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL Km 33/749-34/269 Block required Contract Labour JE/P.Way/YTG 11.00 - 14.00
DN train
ENGG cannot be AMC Batch Sunil Kumar
2x 120 min 1 Point packing 2 unit TLKL Yard DN 97/600-700 LB received Blacksmith Team (SSE/P.Way/GDG ML) 12.00 - 14.00
DN train and
UP train Akhilesh Kumar singh
Scabbed rail S&T staff, 8 TM and 2
ENGG 90 min 1 13 mtr HPT yard UP 143/700-800 LB cannot SSE/P.WAY/HPT/ML(IC 10.00 - 11.30
renewal B/s
dispatch Rd )
No 2 to 4
PKL-RLP Isolator Movement not AANJAIAH
TRD
45 1 Maintenance 1 GIN YARD Yard 126-128 LB and PB permitted in Tower Car (08310162741) 12.00 - 12.45
Isolator Movement not AANJAIAH
TRD permitted in
45 2 Maintenance 1 GIN YARD Yard 126-128 LB and PB Tower Car (08310162741) NOT PERMITTED
GIN Yard DN
Turnout Movement not AANJAIAH
TRD permitted in
45 3 Maintenance 1 GIN YARD Yard 126-128 LB and PB Tower Car (08310162741) 13.15 - 14.00
GIN Y d DN
Movement not
TRD Turnout AANJAIAH
permitted in
45 4 Maintenance 1 GIN YARD Yard 126-128 LB and PB Tower Car (08310162741) NOT PERMITTED
GIN Yard DN
CON
Isolator Movement not HANUMANTH RAO
TRD permitted in
45 1 Maintenance 1 DEVYARD Yard 546-548 LB and PB Tower Car (08310162257) 08.00 - 08.45
DEV Yard DN
Isolator Movement not HANUMANTH RAO
TRD permitted in
45 2 Maintenance 1 DEVYARD Yard 546-548 LB and PB Tower Car (08310162257) NOT PERMITTED
DEV Yard DN
Turnout Movement not HANUMANTH RAO
TRD permitted in
45 3 Maintenance 1 DEVYARD Yard 546-548 LB and PB Tower Car (08310162257) 08.45 - 09.30
DEV Yard DN
Turnout Movement not HANUMANTH RAO
TRD permitted in
45 4 Maintenance 1 DEVYARD Yard 546-548 LB and PB Tower Car (08310162257) NOT PERMITTED
TRD DEV Y d DN
30 Minutes 1 CNC-KUD CNC-KUD CNC UP 708.15 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 11.00 - 11.30
30 Minutes 2 CNC-RBG CNC-RBG CNC DN 708.15 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T UFSBI UFSBI on PLCT
Maintenance Maintenance 11.30 - 12.00
30 Minutes 1 SSBPAC B/I SSBPAC B/I DUR UP & DN 599.637 Disconnection 1. PLC ESM with 1 nos.staff NA
S&T Disconnection maintenance maintenance
DUR-BGM DUR-BGM 11.30 - 12.00
30 Minutes 2 SSBPAC B/I SSBPAC B/I DUR UP & DN 599.637 Disconnection 1. PLC ESM with 1 nos.staff NA
S&T Disconnection maintenance maintenance
DUR-KNP DUR-KNP 12.00 - 12.30
30 Minutes 3 All crank All crank DUR UP & DN 599.637 Disconnection 1. UP & DN ESM with 1 nos.staff NA
Disconnection handle for handle for reception by
maintenance maintenance piloting
S&T
2. UP & DN
despatch by
starter memo 12.30 - 13.00
30 Minutes 1 52AT TLD 52AT TLD DEV DN 546.55 Disconnection DN TRAIN ESM with 3 nos.staff NA
Disconnection BOX BOX RECEPTION
REPLACEME REPLACEME TO RD-4ON
NT NT CALLING
S&T
DWR-MRJ ON,DISPATC
H WITH
STARTER
MEMO 08.00 - 08.30
120 Minutes 2 TLD lifting TLD lifting LWR DN 525.8 Disconnection UP ESM with 3 nos.staff NA
Disconnection work at road 5 work at road 5 &DNTRAIN
berthing track berthing track SHOULD
S&T
NOT BE
DEALT ON
ROAD 5 13.00 - 14.30
20 Minutes 6 MGD-KBI B/I MGD-KBI B/I MGD UP&DN 502.56 Disconnection PLCT at both ESM with 1 nos.staff NA
S&T Disconnection FOR FOR stations
maintenance maintenance 14.00 - 14.20
20 Minutes 7 MGD-KRKP MGD-KRKP MGD UP&DN 502.56 Disconnection PLCT at both ESM with 1 nos.staff NA
S&T Disconnection B/I FOR B/I FOR stations
maintenance maintenance 14.20 - 14.40
20 Minutes 8 CH1-CH6 CH1-CH6 MGD UP&DN 502.56 Disconnection UP&DN ESM with 1 nos.staff NA
Disconnection MAINTENAN MAINTENAN RECEPTION
S&T
CE CE AND
DISPATCH 14.40 - 15.00
UTV Machine 55/35 nos
ENGG 2 blocks of 90 Shifting of Loading/unloa
minutes each 1 Sleepers/Rail ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic
ENGG tamping Plain track
2 x 120mins 2 Machine Tamping TVG-LWR DN 531/800-530/500 LB Block required SSE/Pway/LD 13.00 - 14.30
Duomatic
ENGG tamping Plain track 628/770-629/810
2 x 120mins 3 Machine Tamping SBH-SUL Up (PQRS Location) LB Block required JE/P.way/SPL/BGM 10.00 - 12.00
ENGG 1 block 90 mnn 4 yd G/J & SEJ Pa 1 UGR Yd UGR Yard 720/600-800 LB Signal Staff SSE/PWAY/KUD 14.00 - 15.30
UP TRAIN
ENGG CAN'T
240 BCM WORK 600 MGD-KBI UP 508/200-508/800 LB+PB DISPATCH SSE/PWAY/DWR 01.00 - 04.00
CON
Ballast Ballast profile Rekhya naik
ENGG
120min 1 regulation & sweeping HBI-KTY Single line 62/0-63/0 Block required BRM-04 JE/PW/KTY 12.00 - 14.00
60" 1 CH No.1 2 3 4 1 YTG UP/DN 23.992 LB DN and UP ESM with 1 nos.staff SSE/JE/S/HPT
VC-KTY trains
S&T reception and
dispatch
12.00 - 13.00
piloting and
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 27.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION QUANTUM BLOCK SEC/ BLOCK REPERCUSS RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. TYPE OF WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 1 Maintenance 1 SOQ YARD Yard 84-86 LB and PB SOQ Yard-UP Tower Car (08310161863) 12.00 - 12.45
Movement not
TRD Isolator permitted in SIVARAMNANDH
45 2 Maintenance 1 SOQ YARD Yard 84-86 LB and PB SOQ Yard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 3 Maintenance 1 SOQ YARD Yard 84-86 LB and PB SOQ Yard-UP Tower Car (08310161863) 13.00 - 13.45
Movement not
TRD Turnout permitted in SIVARAMNANDH
45 4 Maintenance 1 SOQ YARD Yard 84-86 LB and PB SOQ Yard-UP Tower Car (08310161863) NOT PERMITTED
Movement not
TRD Isolator permitted in B SOREN
45 5 Maintenance 1 UNK YARD Yard 472-474 LB and PB UNK Yard-UP Tower Car (7022029745) 09.00 - 09.45
Movement not
TRD Isolator permitted in B SOREN
45 6 Maintenance 1 UNK YARD Yard 472-474 LB and PB UNK Yard-UP Tower Car (7022029745) NOT PERMITTED
Movement not
TRD Turnout permitted in B SOREN
45 7 Maintenance 1 UNK YARD Yard 472-474 LB and PB UNK Yard-UP Tower Car (7022029745) 10.00 - 10.45
Movement not
TRD Turnout permitted in B SOREN
45 8 Maintenance 1 UNK YARD Yard 472-474 LB and PB UNK Yard-UP Tower Car (7022029745) NOT PERMITTED
SSE/JE P.Way 10:30-12.30(DN)
ENGG
120 min 4 BT-Unloading 20 Bobyn KJG-GDI UP & DN 400/100-433/0 LB Block required YLG 14:00-16:30(UP)
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
UP & DN line
KBL-DWR Crossing Renewal 481/00-100, Pnt no train can
ENGG 150min 6 1 NVU yard DN Mannually
work no-60A be passed
LB and PB SSE/JE P.Way ----
during Block
30 minutes 1 kjg-svnr ssbpac for kjg-svnr kjg-svnr up/dn 400.74 disconnetion All trains in ESM with 1 nos.staff JE/SIG/YLG
montly inspection ssbpac for block on plct
S&T
montly
inspection 09.30 - 10.00
30 minutes 2 ei system ei system kjg up/dn 400.74 disconnetion All trains ESM with 3 nos.staff JE/SIG/YLG
S&T
changeover changeover piloting 10.00 - 10.30
30 minutes 3 crank handle crank handle kjg up/dn 400.74 disconnetion all trains ESM with 1 nos.staff JE/SIG/YLG
S&T
maintance maintance piloting 12.00 - 12.30
30 MINUTES 4 pt no 52 indication pt no 52 GDI UP 433.72 DISCONNCTI UP TRAIN ESM with 2 nos.staff NA
rod playing indication rod ON RECEPTION
S&T adjestment work playing ON
adjestment PILOTING
work 14.00 - 14.30
30 minutes 5 NVD-NGR NVD-NGR NGR up/dn 35.42 DISCONNCTI All trains ESM with 1 nos.staff JE/SIG/UBL
S&T MONTHLY MONTHLY ON piloting
INSPECTION INSPECTION 12.00 - 12.30
30 minutes 6 MONTHLY MONTHLY NGR up/dn 35.42 DISCONNCTI All trains in ESM with 1 nos.staff JE/SIG/UBL
INSPECTION OF INSPECTION ON block on plct
S&T
CRANK HANDLES OF CRANK
HANDLES 12.30 - 13.00
20 min 1 Maintenace Maintenace of BKIT both 53/100 discconnectio BOTH side ESM with 1 nos.staff JE/S/GDG
S&T CRANK n piloting
handle 12.00 - 12.20
45min 2 Maintenace KL pont SOQ both 84/900 discconnectio Reception & ESM with 2 nos.staff JE/S/GDG
maintenae n Dispatch of
S&T
Road 1 Not
possible 12.00 - 12.45
ENGG 2 x 75 Min 1 WRJ SVM -CNR UP 73/420-680 JE/Pway /QLM 10.00 - 11.15
ENGG 2 X 90 Min 2 UTV SVM-CNR UP 73/420-680 10.00 - 11.30
ENGG 2 X 90 Min 3 MPT SVM -CNR UP 73/420-680 SHADOW BLOCK
PBC work between
ENGG
120min 4 CRZ-DDS PBC work CRZ-DDS SL 33/000-400 LB required 13.00 - 15.00
TSR work between
LD-VSG ENGG
120min 5 DDS yard TSR work DDS Yard Yard 37/300-400 LB required SHADOW BLOCK
30 Minutes 1 Maintenance of Maintenance LIM Yard Disconnection All up and ESM with 1 nos.staff NA
Disconnection LIM-QLM B/I of LIM-QLM down trains
S&T
B/I towards QLM
through PLCT 13.00 - 13.30
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
No train Chaturanan Chandan
ENGG 120 Min 1 Joint Packing 300 Mtrs MGH-JRKT SL 108/500-800 Line block Fittings & Manpower
movement SSE/P.Way/BGK 11.00 - 13.00
1 Machine
No Dn train Santosh Chavan
ENGG 150 Min 1 TWR 100 Mtrs JML-BJP DN 181/500-600 Line block 30 Labours,
movement Tr.JE/P.way/BJP
Rail GR Pad & ERC 12.00 - 14.30
No Up &
Tamping By Tamping By Tamping Machine 08 Sachin Mane
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block Down train UP-10.00 - 11.15
Machine Machine Nos Manpower SSE/P.way/IDR
movement DN- 12.00 -13.15
Movement not
TRD Overlap permitted in D. Kishore
45 1 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car (08310163796) 10.00 - 10.45
Movement not
TRD Overlap permitted in D. Kishore
45 2 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Turnout permitted in D. Kishore
45 3 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car (08310163796) 10.45 - 11.30
Movement not
TRD Turnout permitted in D. Kishore
45 4 Maintenance 1 NBL YARD Yard 227-229 LB and PB NBLyard UP Tower Car (08310163796) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 5 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Overlap permitted in G Mahadev
45 6 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 7 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car (08310162957) 10.45 - 11.30
Movement not
TRD Turnout permitted in G Mahadev
45 8 Maintenance 1 AYB YARD Yard 197-199 LB and PB AYB yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Overlap permitted in D. Chinna
GDG-HG 45 9 Maintenance 1 LKY YARD Yard 56-58 LB and PB LKY yard UP Tower Car (08310162549) 12.30 - 13.15
Movement not
TRD Overlap permitted in D. Chinna
45 10 Maintenance 1 LKY YARD Yard 56-58 LB and PB LKY yard UP Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Turnout permitted in D. Chinna
45 11 Maintenance 1 LKY YARD Yard 56-58 LB and PB LKY yard UP Tower Car (08310162549) 13.15 - 14.00
Movement not
TRD Turnout permitted in D. Chinna
45 12 Maintenance 1 LKY YARD Yard 56-58 LB and PB LKY yard UP Tower Car (08310162549) NOT PERMITTED
Movement not
TRD Overlap permitted in G Mahadev
45 13 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car (08310162957) 12.00 - 12.45
Movement not
TRD Overlap permitted in G Mahadev
45 14 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in G Mahadev
45 15 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car (08310162957) 12.45 - 13.15
Movement not
TRD Turnout permitted in G Mahadev
45 16 Maintenance 1 KDGI YARD Yard 150-152 LB and PB KDGI yard UP Tower Car (08310162957) NOT PERMITTED
150MIN 1 Pt No. Pt No. BGK UP 93.29 DISCONNEC UP TRAINS ESM with 2 nos.staff NA
20,21,22,23,24 FOR 20,21,22,23,2 TION RECEIPTION
MAINTENANCE 4 FOR ON CALLING
MAINTENAN ON AND
CE DISPATCH
ON STARTER
S&T MEMO DN
TRAINS
RECEIPTION
BY PILOTING
AND
DISPATCH
ON SIGNALS 11.00 - 13.30
CON
Movement not
TRD Isolator permitted in Pavan Kumar
45 1 Maintenance 1 SLM YARD Yard 38-40 LB and PB SLM yard Tower Car (08310163339) 11.30 - 12.15
Movement not
TRD Isolator permitted in Pavan Kumar
45 2 Maintenance 1 SLM YARD Yard 38-40 LB and PB SLM yard Tower Car (08310163339) NOT PERMITTED
Movement not
TRD Turnout permitted in Pavan Kumar
45 3 Maintenance 1 SLM YARD Yard 38-40 LB and PB SLM yard Tower Car (08310163339) 12.15 - 13.00
Movement not
TRD Turnout permitted in Pavan Kumar
45 4 Maintenance 1 SLM YARD Yard 38-40 LB and PB SLM yard Tower Car (08310163339) NOT PERMITTED
Movement not
TRD Isolator permitted in S Ganesh
45 5 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-DN Tower Car (08310162957) 10.00 - 10.45
Movement not
TRD Isolator permitted in S Ganesh
45 6 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-DN Tower Car (08310162957) NOT PERMITTED
Movement not
TRD Turnout permitted in S Ganesh
45 7 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-DN Tower Car (08310162957) 10.45 - 11.30
Movement not
TRD Turnout permitted in S Ganesh
45 8 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-DN Tower Car (08310162957) NOT PERMITTED
30 mins x 2 LC-112A & 100 KL EKT & Key BAY UP/DN 208.06 Disconnection LC-112A- ESM with 2 nos.staff NA
point manitenance Lock point Reception to
maintenance Rd 6,7 & 8
BAY-PKL
piloting.
Dispatch from
Rd 6, 7 & 8
S&T starter memo.
KL100-
Reception to
Rd 1 piloting.
Dispatch from
Rd 1 starter 11.00 - 11.30
memo. 12.00 - 12.30
30 mins LC -05 EKT & EKT BNHT-TNGL UP/DN 9.02 Disconnection Caution order. ESM with 2 nos.staff NA
Emergency EKT maintenance BP Up/Dn trains
S&T
to observe
PHS signal. 10.00 - 10.30
TNGL
PSC sleepers TNGL byepass No Vicky Kumar
ENGG 120 min 1 25 Byepass 0/300-400 LB AMC batch 15
renewal byepass train JE/P.WAY/SW/TNGL
movement 10.00 - 12.00
No train
20 movement Machine,TRD staff-3, Mukunda
ENGG 90 min 1 UTV working Slm yard SL 30/000-31/500 LB & PB
sleepers/Rails Slm yard Dept-6 TM SSE/P.Way/Spl works Ba
Rd.No.3 11.30 - 13.00
No train
Jt inspection
LB & movement S&T staff,B/s-2,TM-4 R.V.Naik
ENGG 90 min 2 deficiency 1 pt Slm yard SL 30/600-700
disconnection between Obm men SSe/P.Way/Obm
Pt.No.13/B
to Slm SHADOW BLOCK
ENGG
MH siding no Akhilesh Kumar singh
S&T staff, 8 TM and 2
ENGG Switch renewal LB&Disconne train SSE/P.WAY/HPT/ML(I
B/s
90 min 1 point No 260A 0.5 set HPT yard MH siding 141/700-800 ction movement C) 10.00 - 11.30
Rajavali,
ENGG
1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL Km 34/269-34/789 Block required Contract Labour JE/P.Way/YTG 12.00 - 15.00
Sunil Kumar
ENGG
150 min 1 Curve attention 200 mtr KGX-RLP DN Km 74/100-300 LB AMC batch (SSE/P.Way/GDG ML) 08.00 - 10.00
Movement not
TRD Isolator permitted in AANJAIAH
45 1 Maintenance 1 GIN YARD Yard 126-128 LB and PB GIN Yard-DN Tower Car (08310162741) 12.00 - 12.45
Movement not
TRD Isolator permitted in AANJAIAH
45 2 Maintenance 1 GIN YARD Yard 126-128 LB and PB GIN Yard-DN Tower Car (08310162741) NOT PERMITTED
Movement not
PKL-RLP TRD Turnout permitted in AANJAIAH
45 3 Maintenance 1 GIN YARD Yard 126-128 LB and PB GIN Yard-DN Tower Car (08310162741) 13.15 - 14.00
Movement not
TRD Turnout permitted in AANJAIAH
45 4 Maintenance 1 GIN YARD Yard 126-128 LB and PB GIN Yard-DN Tower Car (08310162741) NOT PERMITTED
TRD
30mins 1 Maintenance of Maintenance GGVT both 38/500 Disconnection Both side ESM with 1 nos.staff JE/S/KBL
JBGD-GGVT of PLCT/piloting
S&T BLOCK instrument JBGD-GGVT
BLOCK
instrument 10.00 - 10.30
30 min 2 Maintenace of Maintenace of GGVT both 38/500 Disconnection BOTH side ESM with 1 nos.staff JE/S/KBL
S&T CRANK handle CRANK piloting
handle 10.30 - 11.00
CON
Movement not
TRD Isolator permitted in HANUMANTH RAO
45 1 Maintenance 1 DEVYARD Yard 546-548 LB and PB DEV Yard-DN Tower Car (08310162257) 08.00 - 08.45
Movement not
TRD Isolator permitted in HANUMANTH RAO
45 2 Maintenance 1 DEVYARD Yard 546-548 LB and PB DEV Yard-DN Tower Car (08310162257) NOT PERMITTED
Movement not
TRD Turnout permitted in HANUMANTH RAO
45 3 Maintenance 1 DEVYARD Yard 546-548 LB and PB DEV Yard-DN Tower Car (08310162257) 08.45 - 09.30
Movement not
TRD Turnout permitted in HANUMANTH RAO
45 4 Maintenance 1 DEVYARD Yard 546-548 LB and PB DEV Yard-DN Tower Car (08310162257) NOT PERMITTED
30 Minutes 1 SED-VJR UFSBI SED-VJR SED UP 730.858 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T Maintenance UFSBI on PLCT
Maintenance 14.00 - 14.30
30 Minutes 2 SED-UGR UFSBI SED-UGR SED DN 730.858 Disconnection UP & DN train ESM with 1 nos.staff NA
S&T Maintenance UFSBI on PLCT
Maintenance 14.30 - 15.00
30 Minutes 3 Both side Crank Both side RBG UP/DN 697.55 Disconnection UP & DN ESM with 1 nos.staff NA
handle Maintenance Crank handle Train
Maintenance Reception ON
S&T
Piloting &
Despatch on
Starter memo. 11.00 - 11.30
30 Minutes 4 LC - 429 gate EKT LC- 429 gate GPB-CKR 665.466 Disconnection Necessary ESM with 2 nos.staff NA
S&T Maintenance EKT caution order
Maintenance 11.00 - 11.30
40 Minutes 5 Pt no 61 Pt no 61 SXB UP & DN 619.05 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting to Rd
S&T 1&2
2. UP
DWR-MRJ despatch by
starter memo 10.00 - 10.40
40 Minutes 6 Pt no 62 Pt no 62 SXB UP & DN 619.05 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. UP
despatch by
starter memo 10.40 - 11.20
40 Minutes 7 Pt no 50&51 Pt no 51&52 DUR UP & DN 599.637 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting to Rd
S&T 1&2
2. UP&DN
despatch by
starter memo 11.30 - 12.10
40 Minutes 8 Pt no 52&54 Pt no 52&54 DUR UP & DN 599.637 Disconnection 1. UP & DN ESM with 2 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T
2. UP&DN
despatch by
starter memo 12.10 - 12.50
UTV Machine 55/35 nos
ENGG 2 blocks of 90 Shifting of Loading/unloa
minutes each 1 Sleepers/Rails ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD 13.00 - 14.30
Duomatic tamping Plain track
ENGG
2 x 120mins 2 Machine Tamping TVG-LWR DN 530/500-529/200 LB Block required SSE/Pway/LD 13.00 - 14.30
Duomatic tamping Plain track
ENGG
2 x 120mins 3 Machine Tamping PCH-GKK UP 649/000-651/000 LB Block required JE/P.way/SPL/BGM 10.00 - 12.00
ENGG 1 block 90 mnn 4 R yd G/J & SEJ Packi 1 SED-VJR VJR Yard 739/100-200 LB Signal Staff SSE/PWAY/KUD 09.00 - 10.30
UP TRAIN
ENGG CAN'T
240 BCM WORK 600 MGD-KBI UP 508/800-509/400 LB+PB DISPATCH SSE/PWAY/DWR 01.00 - 04.00
CON
Point no-65B & 64B
Sharad Srivastava
ENGG packing and fittings guaging &
SSE/PW/KTY
120Min 2 attention packing KTY yard single line 70/200-400 Block required Manual 12.00 - 14.00
Ballast profile Rekhya naik
ENGG
120min 1 Ballast regulation & sweeping HBI-KTY Single line 63/0-64/0 Block required BRM-04 JE/PW/KTY SHADOW BLOCK
VC-KTY 60" 1 CH No.5 6 1 YTG UP/DN 23.992 LB DN and UP ESM with 1 nos.staff SSE/JE/S/HPT
trains
reception and
S&T
dispatch
piloting and
starter memo 12.00 - 13.00
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 28.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) REPERCUSSIONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SOQ SIVARAMNANDH 07:45 - 08:30
45 1 Maintenance 1 SOQ YARD Yard 84-86 LB and PB Yard-UP Tower Car (08310161863)
Movement not
TRD Isolator permitted in SOQ SIVARAMNANDH Not permitted
45 2 Maintenance 1 SOQ YARD Yard 84-86 LB and PB Yard-UP Tower Car (08310161863)
Movement not
TRD Turnout permitted in SOQ SIVARAMNANDH 09:00 - 09:45
45 3 Maintenance 1 SOQ YARD Yard 84-86 LB and PB Yard-UP Tower Car (08310161863)
Movement not
TRD Turnout permitted in SOQ SIVARAMNANDH Not permitted
45 4 Maintenance 1 SOQ YARD Yard 84-86 LB and PB Yard-UP Tower Car (08310161863)
Movement not
TRD Isolator permitted in UNK B SOREN 08:50-09:35
45 5 Maintenance 1 UNK YARD Yard 472-474 LB and PB Yard-UP Tower Car (7022029745)
Movement not
TRD Isolator permitted in UNK B SOREN Not permitted
45 6 Maintenance 1 UNK YARD Yard 472-474 LB and PB Yard-UP Tower Car (7022029745)
Movement not
TRD Turnout permitted in UNK B SOREN 16:00 - 16:45
45 7 Maintenance 1 UNK YARD Yard 472-474 LB and PB Yard-UP Tower Car (7022029745)
Movement not
TRD Turnout permitted in UNK B SOREN Not permitted
45 8 Maintenance 1 UNK YARD Yard 472-474 LB and PB Yard-UP Tower Car (7022029745)
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
Switch 483/00-100, Pnt DN line no train can
ENGG 150min 6 1 NVU yard DN be passed during Mannually 08:40-11:00
Renewal work no-94A LB and PB SSE/JE P.Way
Block time
30 Minutes 1 EI System EI System UBL UP/DN 469 Disconnection TRAINS TO BE ESM with 1 no. staff JE
Disconnection changeover changeover PILOTED IN A
S&T 01:00-01:30
OF UBL A OF ubL A CABIN
CABIN CABIN
30 minutes 2 kjg-svnr kjg-svnr kjg-svnr up/dn 400.74 disconnection all trains on block on ESM with 1 no. staff je
S&T ssbpac ssbpac for plct 12:30-13:00
formontly monthly
30 minutes 3 svnr-ylg svnr-ylg svnr-ylg up/dn 413.64 disconnection all trains on block on ESM with 1 no. staff je
S&T ssbpac for ssbpac for plct 17:15-17:45
monthly monthly
KBL-DWR 30 minutes 4 svnr all crank svnr all crank svnr up/dn 413.64 disconnection all trains to be piloted ESM with 1 no. staff je
S&T handles for handles for 16:45-17:15
monthly monthly
30 minutes 5 Crank hanle Crank hanle ylg UP/DN 421.7 disconnetion up and dn trains on ESM with 1 no. staff NA
S&T 17:15-17:45
maintance maintance piloting
30 Minutes 6 Maintenance Maintenance UNK UP/DN 472.6 Disconnection All UP & DN trains to ESM with 1 no. staff SSE
Disconnection and safety and safety be dealt on PLCT
check of check of
S&T UNK-UBL UNK-UBL
block for block for
Quarterly Quarterly
Inspection Inspection 09.00 - 09.30
30 Minutes 7 IPS IPS UNK UP/DN 472.6 Disconnection All UP & DN trains to ESM with 2 nos. staff SSE
Disconnection Maintenance Maintenance be piloted and
S&T
for Quarterly for Quarterly dispatched on Starter
Inspection Inspection memo 09.30 - 10.00
30 Minutes 8 All Crank All Crank UNK UP/DN 472.6 Disconnection All UP & DN trains to ESM with 1no. staff SSE
Disconnection handle for handle for be piloted and
S&T
Quaarterly Quaarterly dispatched on Starter
Inspection Inspection memo 10.30 - 11.00
30 Minutes 9 Maintenance Maintenance UNK UP/DN 472.6 Disconnection All UP & DN trains to ESM with 2 nos. staff SSE
Disconnection of Interlocked of Interlocked be dealt on Sliding
S&T
LC gate LC gate boom
LC-286 LC-286 13.00 - 13.30
30 minutes 10 LKT-NGR LKT-NGR LKT UP/DN 45.48 Disconnection all trains on block on ESM with 1 no. staff je
S&T BLOCK BLOCK plct
MONTHLY MONTHLY 12.30 - 13.00
30 minutes 11 LKT IPS LKT IPS LKT UP/DN 45.48 Disconnection all trains to be piloted ESM with 1 no. staff je
S&T
MONTHLY MONTHLY 13.00 - 13.30
45min 12 maintenance LC-30 GDGBP both 54/800 discconnectio Sliding boom will be ESM with 2 nos.staff JE/S/GDG
S&T
maintenance n working 12.00 - 12.45
45min 13 maintenance LC-43 RLP both 76/00 discconnectio Sliding boom will be ESM with 2 nos. staff JE/S/GDG
S&T
maintenance n working 11.30 - 12.15
45 14 maintanance maintanance BNA both 92/500 discconnectio all up trains need to ESM with 1 no. staff JE/S/KBL
S&T of BNA-SOQ of BNA-SOQ n be given PLCT
Block Block 08.30 - 09.15
45 15 61BT TLD 61BT TLD BNA up 92/100-200 discconnectio up trains dispatch by ESM with 2 nos. staff JE/S/KBL
S&T replacement replacement n memo
work work 12.00 - 12.45
ENGG 180 Min 1 PQRS SVM -CNR UP 73/940-74/200 SSE/Pway /QLM 09.00 - 12.00
Manual
ENGG
60 Min 2 Packing SKVL Yard Yard Pt. 20A SKVL SSE/Pway /VSG 10.00 - 11.00
TSR work
ENGG between DDS
120min 3 yard TSR work DDS Yard Yard 37/300-400 LB required 13.00 - 15.00
PBC work at
ENGG
120min 4 DDS-LIM PBC work DDS-LIM SL 42/000-250 LB required SHADOW BLOCK
TRD
40 Minutes 1 At 55T & 57T At 55T & 57T CLR Yard 24.5 Disconnection Shunting movement ESM with 1 no. staff NA
Disconnection rewiring of rewiring of to shunting neck from
S&T
Battery Battery Rd1,2,3,4 on memo
Terminals Terminals 370. 13.00 - 13.40
30 Minutes 2 Maintenance Maintenance CRZ Yard 31.699 Disconnection All up and down ESM with 1 no. staff NA
S&T Disconnection of CRZ-CLR of CRZ-CLR trains towards CLR
B/I B/I through PLCT 13.00 - 13.30
30 Minutes 3 Maintenance Maintenance CRZ Yard 31.699 Disconnection All up and down ESM with 1 no. staff NA
S&T Disconnection of CRZ-DDS of CRZ-DDS trains towards DDS
B/I B/I through PLCT 13.30 - 14.00
LD-VSG
30 Minutes 4 KL 101/102 KL 101/102 VSG Yard 108.458 Disconnection Shunting movement ESM with 1 no. staff NA
S&T Disconnection EKT EKT from Rd2 to Rd1&
Maintenance Maintenance VIP siding on piloting. 10.00 - 10.30
30 Minutes 5 Maintenance Maintenance CSM Yard 95.873 Disconnection All trains movement ESM with 1 no. staff NA
S&T Disconnection All crank All crank on piloting
handles handles 10.00 - 10.30
30 Minutes 6 Maintenance Maintenance KM Yard 59.07 Disconnection 1. Despatch towards ESM with 1 no. staff NA
Disconnection of KM-QLM of KM-QLM QLM on PLCT. 2.
S&T
B/I B/I PLCT for down trains
at QLM. 09.00 - 09.30
30 Minutes 7 Maintenance Maintenance KM Yard 59.07 Disconnection 1. Despatch towards ESM with 1 no. staff NA
Disconnection of KM-SVM of KM-SVM SVM on PLCT. 2.
S&T
B/I B/I PLCT for up trains at
SVM. 09.30 - 10.00
30 Minutes 8 Maintenance Maintenance KM Yard 59.07 Disconnection reception from QLM ESM with 1 no. staff NA
Disconnection of CH1 TO of CH1 TO sidepiloting and
S&T
CH7 CH7 reception from SVM
side Co on signal 11.00 - 11.30
ENGG
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
Fittings and Aijt Prasad
ENGG 120 Min 1 SEJ Packing 02 Nos MGH Yard SL 101/700-800 Line block No train movement
12 Man power SSE/P.Way/BGK 11.00 - 13.00
1 Machine
No Dn train M. M Munawar
ENGG 150 Min 1 TWR 100 Mtrs JML-BJP DN 181/600-700 Line block 30 Labours,
movement JE/P.way/BSRX
Rail GR Pad & ERC 12.00 - 14.30
BT Rake B C Pradhan
ENGG 120 Min 2 BT 900 Cum JML-BJP UP 173/000-176/000 Line block No train movement
Manpower SSE/P.Way/BJP 10.00 - 12.00
Tamping By Tamping By No Up & Down train Tamping Machine 08 Sachin Mane UP-10.00 - 11.15
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block
Machine Machine movement Nos Manpower SSE/P.way/IDR DN- 12.00 -13.15
Movement not
TRD Overlap permitted in LHN D. Kishore 13:45-14:30
45 1 Maintenance 1 LHN Yard Yard 251-253 LB and PB yard DN Tower Car (08310163796)
Movement not
TRD Overlap permitted in LHN D. Kishore Not permitted
45 2 Maintenance 1 LHN Yard Yard 251-253 LB and PB yard DN Tower Car (08310163796)
Movement not
TRD Turnout permitted in LHN D. Kishore 15:00-15:45
45 3 Maintenance 1 LHN Yard Yard 251-253 LB and PB yard DN Tower Car (08310163796)
Movement not
TRD Turnout permitted in LHN D. Kishore Not permitted
45 4 Maintenance 1 LHN Yard Yard 251-253 LB and PB yard DN Tower Car (08310163796)
Movement not
TRD Overlap permitted in BJP yard G Mahadev 10:45-11:30
45 5 Maintenance 1 BJP YARD Yard 190-192 LB and PB DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in BJP yard G Mahadev Not permitted
45 6 Maintenance 1 BJP YARD Yard 190-192 LB and PB DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in BJP yard G Mahadev 15:00-15:45
45 7 Maintenance 1 BJP YARD Yard 190-192 LB and PB DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in BJP yard G Mahadev Not permitted
45 8 Maintenance 1 BJP YARD Yard 190-192 LB and PB DN Tower Car (08310162957)
GDG-HG Movement not
TRD Overlap permitted in LKY yard D. Chinna 13:15-14:00
45 9 Maintenance 1 LKY YARD Yard 56-58 LB and PB UP Tower Car (08310162549)
Movement not
TRD Overlap permitted in LKY yard D. Chinna Not permitted
45 10 Maintenance 1 LKY YARD Yard 56-58 LB and PB UP Tower Car (08310162549)
Movement not
TRD Turnout permitted in LKY yard D. Chinna 12:00-12:45
45 11 Maintenance 1 LKY YARD Yard 56-58 LB and PB UP Tower Car (08310162549)
Movement not
TRD Turnout permitted in LKY yard D. Chinna Not permitted
45 12 Maintenance 1 LKY YARD Yard 56-58 LB and PB UP Tower Car (08310162549)
Movement not
TRD Overlap permitted in BSRX G Mahadev 13:15-14:00
45 13 Maintenance 1 BSRX Yard Yard 137-139 LB and PB yard DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in BSRX G Mahadev Not permitted
45 14 Maintenance 1 BSRX Yard Yard 137-139 LB and PB yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in BSRX G Mahadev 11:30-12:15
45 15 Maintenance 1 BSRX Yard Yard 137-139 LB and PB yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in BSRX G Mahadev Not permitted
45 16 Maintenance 1 BSRX Yard Yard 137-139 LB and PB yard DN Tower Car (08310162957)
120MIN 2 Pt No. Pt No. BGK UP 93.29 DISCONNEC UP TRAINS ESM with 3 nos. staff JE/SSE
15,16,17,18 15,16,17,18 TION RECEIPTION ON
FOR FOR CALLING ON AND
MAINTENAN MAINTENAN DISPATCH ON
CE CE STARTER MEMO DN
S&T 13:00-13:45
TRAINS
RECEIPTION BY
PILOTING AND
DISPATCH ON
SIGNALS
CON
Akhilesh Kumar
Singh
TNGL-RNJP ENGG
PQRS machine, SSE/P.WAY/HPT/ML
240 1 PQRS work 260 mtr BNHT-NDHI SL 11/100 to 360 LB ains movement BNHT-N Agency labor (IC)
Movement not
TRD Overlap permitted in BAY yard Pavan Kumar 14:15-15:00
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB RD - 1, 2 & 3 Tower Car (08310163339)
Movement not
TRD Overlap permitted in BAY yard Pavan Kumar Not permitted
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB RD - 1, 2 & 3 Tower Car (08310163339)
Movement not
TRD Turnout permitted in BAY yard Pavan Kumar 13:00-13:45
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB RD - 1, 2 & 3 Tower Car (08310163339)
Movement not
TRD Turnout permitted in BAY yard Pavan Kumar Not permitted
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB RD - 1, 2 & 3 Tower Car (08310163339)
Movement not
TRD 5 Isolator permitted in BYO S Ganesh 13:00-13:45
45 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-UP Tower Car (08310162957)
Movement not
TRD 6 Isolator permitted in BYO S Ganesh Not permitted
BAY-PKL 45 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-UP Tower Car (08310162957)
Movement not
TRD 7 Turnout permitted in BYO S Ganesh 14:15-15:00
45 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-UP Tower Car (08310162957)
Movement not
TRD 8 Turnout permitted in BYO S Ganesh Not permitted
45 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-UP Tower Car (08310162957)
30 mins LC-06 EKT EKT BNHT-TNGL UP/DN 9.02 Disconnection Caution order. Up/Dn ESM with 1 no. staff NA
maintenance maintenance BP trains to observe
S&T & Emergency PHS signal.
EKT
maintenance
20 No train movement Machine,TRD staff-3, Mukunda
ENGG 90 min 1 UTV working Slm yard SL 30/000-31/500 LB & PB
sleepers/Rails Slm yard Rd.No.3 Dept-6 TM SE/P.Way/Spl works Bay
Jt inspection
LB & No train movement S&T staff,B/s-2,TM-4 R.V.Naik
ENGG 90 min 2 deficiency 1 pt Slm yard SL 30/600-700
disconnection between Obm to Slm men SSe/P.Way/Obm
Pt.No.13/A
ENGG

Switch S&T staff & B/S and H.Anjanamurthy


ENGG
renewal point LB & Rd No -5 No train AMC batch Je/P.Way/HPT/ML
90 min 1 no 225A 0.5 set HPT yard Rd-5 142/800-900 Disconnection movement
Sunil Kumar
ENGG Curve DN Train cannot be (SSE/P.Way/GDG
150 min 1 attention 300 mtr KGX-RLP DN Km 74/300-600 LB dealt AMC batch ML)
No Trains Can be Raviteja
ENGG
120 mins 1 SEJ attention 100 m CKBK-GGVT Single Km: 34/9-35/00 LB dealt AMC batch (JE/P.Way/GGVT)
Movement not
TRD Isolator permitted in GIN AANJAIAH
PKL-RLP 45 1 Maintenance 1 GIN YARD Yard 126-128 LB and PB Yard-UP Tower Car (08310162741)
Movement not
TRD Isolator permitted in GIN AANJAIAH
45 2 Maintenance 1 GIN YARD Yard 126-128 LB and PB Yard-UP Tower Car (08310162741)
Movement not
TRD Turnout permitted in GIN AANJAIAH
45 3 Maintenance 1 GIN YARD Yard 126-128 LB and PB Yard-UP Tower Car (08310162741)
Movement not
TRD Turnout permitted in GIN AANJAIAH
45 4 Maintenance 1 GIN YARD Yard 126-128 LB and PB Yard-UP Tower Car (08310162741)
CON
Movement not
TRD Isolator permitted in DEV HANUMANTH RAO
45 1 Maintenance 1 DEVYARD Yard 546-548 LB and PB Yard-UP Tower Car (08310162257)
Movement not
TRD Isolator permitted in DEV HANUMANTH RAO
45 2 Maintenance 1 DEVYARD Yard 546-548 LB and PB Yard-UP Tower Car (08310162257)
Movement not
TRD Turnout permitted in DEV HANUMANTH RAO
45 3 Maintenance 1 DEVYARD Yard 546-548 LB and PB Yard-UP Tower Car (08310162257)
Movement not
TRD Turnout permitted in DEV HANUMANTH RAO
45 4 Maintenance 1 DEVYARD Yard 546-548 LB and PB Yard-UP Tower Car (08310162257)
TRD
TRD
30 Minutes 1 UGR-SED UGR-SED UGR UP 721.235 Disconnection UP & DN train on ESM with 1 no.staff NA
S&T UFSBI UFSBI PLCT
Maintenance Maintenance
30 Minutes 2 UGR-KUD UGR-KUD UGR DN 721.235 Disconnection UP & DN train on ESM with 1 no.staff NA
S&T UFSBI UFSBI PLCT
Maintenance Maintenance
40 Minutes 1 Pt no 65 Pt no 65 SXB UP & DN 619.05 Disconnection 1. UP & DN reception ESM with 3 nos. staff NA
Disconnection maintenance maintenance piloting
S&T
2. UP despatch by
starter memo
40 Minutes 2 Pt no 64 Pt no 64 SXB UP & DN 619.05 Disconnection 1. UP & DN reception ESM with 3 nos. staff NA
Disconnection maintenance maintenance piloting
S&T
2. UP despatch by
starter memo
60 Minutes 1 Pt no 61&62 Pt no 61&62 DUR UP & DN 599.637 Disconnection 1. UP & DN reception ESM with 3 nos. staff NA
DWR-MRJ Disconnection maintenance maintenance piloting
S&T
2. UP despatch by
starter memo
60 Minutes 2 Pt no 63&64 Pt no 63&64 DUR UP & DN 599.637 Disconnection 1. UP & DN reception ESM with 3 nos. staff NA
Disconnection maintenance maintenance piloting
S&T
2. UP despatch by
starter memo
45 Minutes 1 LC-1 GATE LC-1 GATE LWR UP&DN 525.8 Disconnection UP & DN TRAINS ESM with 2 nos. staff NA
Disconnection MAINTENAN MAINTENAN CANNOT BE DEALT
S&T
CE CE ON SIGNAL
TOWORDS AVA
30 Minutes 2 DWR-KRKP DWR-KRKP DWR UP&DN 489.09 Disconnection PLCT at both stations ESM with 1 no. staff NA
S&T Disconnection B/I FOR B/I FOR
Maintenance Maintenance
30 Minutes 3 DWR-NVU B/I DWR-NVU B/I DWR UP&DN 489.09 Disconnection PLCT AT BOTH ESM with 1 no. staff NA
S&T Disconnection MAINTENAN MAINTENAN STATION
CE CE
UTV Machine
Shifting of 55/35 nos
ENGG
2 blocks of 90 Sleepers/Rail Loading/unloa
minutes each 1 s ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD
Duomatic
ENGG tamping Plain track
2 x 120mins 2 Machine Tamping TVG-LWR DN 529/200-528/000 LB Block required SSE/Pway/LD
Duomatic
ENGG tamping Plain track
2 x 120mins 3 Machine Tamping PCH-GKK UP 651/000-653/000 LB Block required JE/P.way/SPL/BGM
ENGG 1 block 90 mnn 4 llast cleaning wo 1 GPB-CKR Up/Dn 682/300-600 LB LB Required SSE/PWAY/GPB
UP TRAIN CAN'T
ENGG 16:15-18:45
240 BCM WORK 600 MGD-KBI UP 509/400-510/00 LB+PB DISPATCH SSE/PWAY/DWR
ENGG
Ballast Ballast profile Rekhya naik
ENGG 12:00-14:00
120min 1 regulation & sweeping HBI-KTY Single line 64/0-65/0 Block required BRM-04 JE/PW/KTY
TRD
VC-KTY
60" 1 LC 08 EKT 1 YTG UP/DN 23.992 LB DN and UP trains ESM with 1 no. staff SSE/JE/S/HPT
Overhauling reception and
S&T 12:00-13:00
dispatch Normal
signals
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 29.10.2023
BLOCK TYPE OF BLOCK
TENTATIVE
BOARD DEPT DURATION TYPE OF QUANTUM OF BLOCK SEC/ BLOCK REPERCUSS RESOURCE AVAILED BLOCK PROGRESS
TIMINGS
(MINS) S. N. WORK WORK STATION UP/DN LOCATION (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH 07:45 - 08:30
45 1 Maintenance 1 SOQ YARD Yard 84-86 LB and PB SOQ Yard-UP Tower Car (08310161863)
Movement not
TRD Isolator permitted in SIVARAMNANDH Not permitted
45 2 Maintenance 1 SOQ YARD Yard 84-86 LB and PB SOQ Yard-UP Tower Car (08310161863)
Movement not
TRD Turnout permitted in SIVARAMNANDH 09:00 - 09:45
45 3 Maintenance 1 SOQ YARD Yard 84-86 LB and PB SOQ Yard-UP Tower Car (08310161863)
Movement not
TRD Turnout permitted in SIVARAMNANDH Not permitted
45 4 Maintenance 1 SOQ YARD Yard 84-86 LB and PB SOQ Yard-UP Tower Car (08310161863)
Movement not
TRD Isolator permitted in 08:50-09:35
45 5 Maintenance 1 UNK YARD Yard 472-474 LB and PB UNK Yard-UP Tower Car B SOREN (7022029745)
Movement not
TRD Isolator permitted in Not permitted
45 6 Maintenance 1 UNK YARD Yard 472-474 LB and PB UNK Yard-UP Tower Car B SOREN (7022029745)
Movement not
TRD Turnout permitted in 16:00 - 16:45
45 7 Maintenance 1 UNK YARD Yard 472-474 LB and PB UNK Yard-UP Tower Car B SOREN (7022029745)
Movement not
KBL-DWR TRD Turnout permitted in Not permitted
45 8 Maintenance 1 UNK YARD Yard 472-474 LB and PB UNK Yard-UP Tower Car B SOREN (7022029745)
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
UP line no
GJ/Renewal/
ENGG 150min 6 1 NVU-DWR UP 487/300-400 train can be Mannually 15:45 -18:45
WRJ work
LB and PB passed during SSE/JE P.Way
40 MINUTES 1 LC 18 LC 18 MAINTANCE LKT. UP/DN 45.48 DISCONNEC ALL TRAINS ESM with 2 nos. staff NA
MAINTANCE TION DEALT
S&T USING 11:40-12:20
SIDING
BOOM
30 MINUTES 2 NGR -NVD NGR -NVD BLOCK NGR-NVD UP/DN 35.42 DISCONNEC NGR-NVD ESM with 1 no. staff NA
S&T BLOCK MAINTANCE TION BLOCK 14:30- 15:00
MAINTANCE MAINTANCE
45 1 maintanance maintanance of KBL both 115/400 discconnectio all up trains ESM with 1 no. staff JE/S/KBL
S&T of KBL-BNP KBL-BNP Block n need to be 12:00-12:45
Block given PLCT
60 2 maintance of maintance of crank TLKL both 97/600 discconnectio all trains need ESM with 1 no. staff JE/S/KBL
S&T 12:00-13:00
crank handles handles n to be pilated
45 3 63BT TLD 63BT TLD BNA DN 92/500 discconnectio DN trains ESM with 2 nos. staff JE/S/KBL
S&T replacement replacement work n reception by 15:30-16:15
work collingon
09:00-10:15 &
ENGG
2 x 75 Min 1 WRJ SVM -CNR UP 73/940-74/200 JE/Pway /QLM 10:45-12:00
ENGG 2 X 90 Min 2 UTV SVM -CNR UP 73/940-74/200 SHADOW
ENGG 2 X 90 Min 3 MPT SVM -CNR UP 73/940-74/200 SHADOW
TSR work
ENGG between DDS 13:00 - 15:00
120min 3 yard TSR work DDS Yard Yard 37/400-500 LB required
ENGG 120min 4 BFR work Materal shifting CRZ-DDS SL 33/000-37/000 LB required 13:00 - 15:00
PBC work
ENGG between 13:00 - 15:00
120min 5 CLR-CRZ PBC work CLR-CRZ SL 31/000-300 LB required
TRD
60 Minutes 1 Pt no 51&52 Pt no 51&52 TGT UP & DN 11.64 Disconnection 1. UP & DN ESM with 3 nos. staff NA
Disconnection maintenance maintenance reception
piloting
S&T 12:00-13:00
2. UP
despatch by
starter memo
60 Minutes 2 Pt no 53&54 Pt no53&54 TGT UP & DN 11.64 Disconnection 1. UP & DN ESM with 3 nos. staff NA
Disconnection maintenance maintenance reception
piloting
LD-VSG S&T 14:00-15:00
2. UP
despatch by
starter memo
30 Minutes 1 Maintenance Maintenance of LIM Yard 42.61 Disconnection All up and ESM with 1 no. staff NA
Disconnection of LIM-DDS LIM-DDS B/I down trains
S&T 13:00-13:30
B/I towards DDS
through PLCT
30 Minutes 2 Maintenance Maintenance of SKVL Yard 100.434 Disconnection All up and ESM with 1 no. staff NA
S&T Disconnection of SKVL-VSG SKVL-VSG B/I down trains 12:00-12:30
B/I through PLCT.
30 Minutes 3 Maintenance Maintenance of SKVL Yard 100.434 Disconnection 1. All down ESM with 1 no. staff NA
Disconnection of SKVL-CSM SKVL-CSM B/I trains through
B/I PLCT at
S&T CSM. 2. All up 11:00-11:30
trains through
PLCT at
SKVL.
CON
S&T
PROJ
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-13:00
LHS-37 No train Fittings and Aijt Prasad
ENGG 120 Min 1 100 Mtrs BDM-GED UP/DN 72/000-100 Line block 12:30-14:30
Packing movement 12 Man power SSE/P.Way/BGK
1 Machine
No Dn train M. M Munawar
ENGG 150 Min 1 TWR 100 Mtrs JML-BJP DN 181/700-800 Line block 30 Labours, 12:30-14:30
movement JE/P.way/BSRX
Rail GR Pad & ERC
No Up &
Tamping By Tamping By Tamping Machine 08 Sachin Mane 10:00-11:30
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block Down train
Machine Machine Nos Manpower SSE/P.way/IDR 15:00-16:30
movement
ENGG
TRD
UP/DN
TRAINS
BI AND ECH RECEIPTION
FOR BI AND ECH FOR DISCONNEC ON SIGNALS
GDG-HG S&T 90MIN 1 GED UP/DN 80.37 ESM with 1 no. staff JE/SSE 12:00-13:30
MAINTENAN MAINTENANCE TION AND
CE DISPATCH
ON PLCT DN
TRAINS
20 MIN 2 JML-MVD JML-MVD UFSBI JML-MVD UP/DN 176.45 DISCONNEC UP & DN ESM with 1 no. staff SSE/SIG/BSRX
UFSBI MONTHLY TION TRAIN
S&T 12:30-12:50
MONTHLY INSPECTION PILOTING
INSPECTION
20 MIN 3 JML-BJP JML-BJP UFSBI JML-BJP UP/DN 176.45 DISCONNEC UP & DN ESM with 1 no. staff SSE/SIG/BSRX
UFSBI MONTHLY TION TRAIN
S&T 13:00-13:20
MONTHLY INSPECTION PILOTING
INSPECTION
10 MIN 4 EI EI CHANGEOVER JML UP/DN 176.45 LINE BLOCK UP & Dn train ESM with 2 nos.staff SSE/SIG/BSRX
S&T CHANGEOVE no movement 13:20-13:30
R
CON
30 mins LC- 33 EKT & EKT maintenance RDG-SLM UP/DN 53.77 Disconnection UP & DN ESM with 2 nos.staff NA
Emergency trains on PHS
S&T 12:00-12:30
EKT and Caution
order
ENGG
No train
movement Machine,TRD staff-3, Mukunda
ENGG 90 min 1 UTV working 20 sleepers/Rails Slm yard SL 30/000-31/500 LB & PB 12:00-13:30
Slm yard Dept-6 TM SSE/P.Way/Spl works Bay
BAY-PKL
Rd.No.3
No train
movement
Pt packing
LB & between Agency - 15 men, S&T R,V.Naik
ENGG 60 min 2 byepass 1 Pt Byepass UP line 206/500-700 10:00 - 11:00
Disconnection Byepas to Byc staff -2 men, SSE/P.Way/Obm
Pt.No.64/B
and Bay to
Byc upline.
ENGG
Switch Rd No 7
LB & S&T staff & B/S and H.Anjanamurthy AS PER TRAIN
ENGG 90 min 1 renewal point 0.5 set HPT yard Rd No-7 143/800-900 Trains
Disconnection AMC batch Je/P.Way/HPT/ML SERVICE
no 222B movement
DN train
08:00-09:30 &
ENGG Br No 63 cannot be AMC Batch Hanumanthappa
16:15 - 17:45
2x120 min 1 attention 50 mtrs KBL Yard DN 114/00-300 LB received Blacksmith Team (SSE/P.Way/KBL)
Movement not
TRD Isolator permitted in AANJAIAH 16:00-16:45
PKL-RLP 45 2 Maintenance 1 GIN YARD Yard 126-128 LB and PB GIN Yard-UP Tower Car (08310162741)
Movement not
AS PER TRAIN
TRD Turnout permitted in AANJAIAH
3 SERVICE
45 Maintenance 1 GIN YARD Yard 126-128 LB and PB GIN Yard-UP Tower Car (08310162741)
RE
Movement not
Turnout AANJAIAH
TRD 45 4 1 GIN YARD Yard 126-128 LB and PB permitted in Tower Car 11:30-12:15
Maintenance (08310162741)
GIN Yard-UP
TRD
CON
Movement not
TRD Isolator permitted in HANUMANTH RAO 07:45-08:30
45 1 Maintenance 1 DEVYARD Yard 546-548 LB and PB DEV Yard-UP Tower Car (08310162257)
Movement not
As per train
TRD Isolator permitted in HANUMANTH RAO
service
45 2 Maintenance 1 DEVYARD Yard 546-548 LB and PB DEV Yard-UP Tower Car (08310162257)
Movement not
TRD Turnout permitted in HANUMANTH RAO 09:00-09:45
45 3 Maintenance 1 DEVYARD Yard 546-548 LB and PB DEV Yard-UP Tower Car (08310162257)
Movement not
As per train
TRD Turnout permitted in HANUMANTH RAO
service
45 4 Maintenance 1 DEVYARD Yard 546-548 LB and PB DEV Yard-UP Tower Car (08310162257)
TRD
TRD
30 Minutes 1 VJR-MRJ VJR-MRJ UFSBI VJR UP 739.587 Disconnection UP & DN train ESM with 1 no. staff NA
S&T UFSBI Maintenance on PLCT 15:00-15:30
Maintenance
30 Minutes 2 VJR-SED VJR-SED UFSBI VJR UP 739.587 Disconnection UP & DN train ESM with 1 no. staff NA
S&T UFSBI Maintenance on PLCT 09:30-10:00
Maintenance
40 Minutes 1 Pt no 65 Pt no 65 SUL UP & DN 637.756 Disconnection 1. UP & DN ESM with 3 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T 13:00-13:40
2. UP
despatch by
starter memo
40 Minutes 2 Pt no 64 Pt no 64 SUL UP & DN 637.756 Disconnection 1. UP & DN ESM with 3 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T 10:30-11:10
2. UP
despatch by
starter memo
40 Minutes 3 Pt no 63 Pt no 63 SUL UP & DN 637.756 Disconnection 1. UP & DN ESM with 3 nos.staff NA
Disconnection maintenance maintenance reception
piloting
S&T 14:40-15:10
2. UP
despatch by
starter memo
30 Minutes 4 SSBPAC B/I SSBPAC B/I SXB UP & DN 619.05 Disconnection 1. PLC ESM with 1 no. staff JE/Sig/BGM
DWR-MRJ S&T Disconnection Maintenance Maintenance 13:00-13:30
SXB-BGM SXB-BGM
30 Minutes 5 SSBPAC B/I SSBPAC B/I SXB UP & DN 619.05 Disconnection 1. PLC ESM with 1 no. staff JE/Sig/BGM
S&T Disconnection Maintenance Maintenance 14:00-14:30
SXB-SBH SXB-SBH
30 Minutes 6 All Crank All Crank handle SXB UP & DN 619.05 Disconnection 1. UP & DN ESM with 1 no. staff JE/Sig/BGM
Disconnection handle Maintenance reception by
Maintenance piloting
S&T 10:00-10:30
2. UP & DN
despatch by
starter memo
30 Minutes 1 50BT TLD 50BT TLD BOX DEV DN 546.55 Disconnection DN TRAIN ESM with 2 nos. staff NA
Disconnection BOX REPLACEMENT RECEPTION
REPLACEME ON CALLING
S&T NT ON,DISPATC 07:30-10:00
H WITH
STARTER
MEMO
30 Minutes 4 CH1-CH10 CH1-CH10 FOR DWR UP&DN 489.09 Disconnection both UP and ESM with 1 no. staff NA
Disconnection FOR maintenance DN trains
S&T maintenance reception and 16:30-17:00
dispatch by
pilotting
Duomatic
07:30 - 09:00
ENGG tamping SSE/Pway/LD
15:00 - 16:30
2 x 120mins 1 Machine Plain track Tamping TVG-LWR DN 528/000-526/700 LB Block required
UTV Machine
Shifting of 13:00 - 15:00
ENGG SSE/Pway/SPL/LD
2 blocks of 90 Sleepers/Rail 55/35 nos 02:00 - 04:00
minutes each 2 s Loading/unloading LD-TVG DN 558/000-534/000 LB & PB Contract Labours
Unimat Machine &
ENGG SSE/p.way/BGM 12:30-15:30
1 block 240m 3 PQRS work 0.52 SBH-SUL Up 629/810-630/330 LB & PB Signal staff
Duomatic
ENGG tamping JE/P.way/SPL/BGM 16:15 -17:45
2 x 120mins 4 Machine Plain track Tamping PCH-GKK UP 653/000-655/000 LB Block required
ENGG 1 block 90 mnn Ballast cleaning wo 1 GPB-CKR Up/Dn 682/600-800 LB LB Required SSE/PWAY/GPB 15:00-17:00
UP TRAIN
ENGG CAN'T 16:15-18:45
240 BCM WORK 600 MGD-KBI UP 510/00-600 LB+PB DISPATCH SSE/PWAY/DWR
CON
Ballast Ballast profile & Rekhya naik
ENGG 13:00-15:00
120min 1 regulation sweeping HBI-KTY Single line 65/0-66/0 Block required BRM-04 JE/PW/KTY
ENGG
TRD
VC-KTY 60" 1 LC 10 EKT 1 VYS UP/DN 10.3 LB DN and UP ESM with 1 no. staff SSE/JE/S/HPT
Overhauling trains
reception and
S&T 12:00-13:00
dispatch
Normal
signals
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 30.10.2023
BLOCK TYPE OF BLOCK
TENTATIVE
BOARD DEPT DURATION QUANTUM BLOCK SEC/ BLOCK RESOURCE AVAILED BLOCK PROGRESS
TIMINGS
(MINS) S. N. TYPE OF WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) REPERCUSSIONS REQUIREMENT SUPERVISORS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SOQ SIVARAMNANDH 07:45 - 08:30
45 1 Maintenance 1 SOQ YARD Yard 84-86 LB and PB Yard-DN Tower Car (08310161863)
Movement not
TRD Isolator permitted in SOQ SIVARAMNANDH Not permitted
45 2 Maintenance 1 SOQ YARD Yard 84-86 LB and PB Yard-DN Tower Car (08310161863)
Movement not
TRD Turnout permitted in SOQ SIVARAMNANDH 09:00 - 09:45
45 3 Maintenance 1 SOQ YARD Yard 84-86 LB and PB Yard-DN Tower Car (08310161863)
Movement not
TRD Turnout permitted in SOQ SIVARAMNANDH Not permitted
45 4 Maintenance 1 SOQ YARD Yard 84-86 LB and PB Yard-DN Tower Car (08310161863)
Movement not
TRD Isolator permitted in UNK 08:50-09:35
45 5 Maintenance 1 UNK YARD Yard 472-474 LB and PB Yard-DN Tower Car B SOREN (7022029745)
Movement not
TRD Isolator permitted in UNK Not permitted
45 6 Maintenance 1 UNK YARD Yard 472-474 LB and PB Yard-DN Tower Car B SOREN (7022029745)
Movement not
TRD Turnout permitted in UNK 16:00 - 16:45
KBL-DWR 45 7 Maintenance 1 UNK YARD Yard 472-474 LB and PB Yard-DN Tower Car B SOREN (7022029745)
Movement not
ENGG Turnout permitted in UNK Not permitted
45 8 Maintenance 1 UNK YARD Yard 472-474 LB and PB Yard-DN Tower Car B SOREN (7022029745)
SSE/JE P.Way 11:00-13:00 &
ENGG
120 min 4 BT-Unloading 20 Bobyn KJG-GDI UP & DN 400/100-433/0 LB Block required YLG 16:00-17:30
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
TWS 482/00-100, Pnt DN line no train can
ENGG 150min 6 Packing/Housing 1 NVU yard DN be passed during Mannually 08:40-11:00
no-73A LB and PB SSE/JE P.Way
attention work Block time
40 MINUTES 1 LC 26 MAINTANCE LC 26 LKT UP/DN 45.48 DISCONNEC All trains on siding ESM with 2 nos. staff NA
S&T 11:00 - 11:40
MAINTANCE TION boom
60 1 maintance of crank maintance of KBL both 115/400 discconnectio all trains need to be ESM with 1 no. staff JE/S/KBL
S&T handles ch5 to ch8 crank handles n pilated 11:00 - 12:00
ch5 to ch8
60 2 LC 56 Maintanance LC 56 BNP both 103/300 discconnectio dn trains reception ESM with 2 nos. staff JE/S/KBL
Maintanance n through colling on and
S&T dispatch through 11:00 - 12:00
memo up trains
reception by memo
ENGG 180 Min 1 PQRS SVM - CNR UP 74/200-460 S& T Staff SSE/pWAY /QLM 09:00-12:00
ENGG 90 Min 2 Manual Packing SVM - CNR UP 74/460-579 SSE/PWAY /QLM shadow
Bridge No.69
ENGG Sleeper creep Creep 12:00-14:00
120min 3 adjustment adjustment CLR-CRZ SL 27/100-200 LB required
TSR work between
ENGG 12:00-14:00
120min 3 DDS yard TSR work DDS Yard Yard 37/400-500 LB required
TRD shadow
60 Minutes 1 1T two core lead 1T two core SVTN DN 554.62 Disconnection UP reception by ESM with 1 no. staff NA
S&T 08:00-09:00
Disconnection wire lead wire Calling on
45 Minutes 1 CRZ end Co-on CRZ end CLR Yard 24.5 Disconnection 1.CRZ end, no train ESM with 1 no. staff NA
Disconnection signals normal Co-on signals movement. 2.TGT
S&T shadow engg
Maintenance normal end, reception on
Maintenance calling on signals.
30 Minutes 2 Maintenance of Maintenance CRZ Yard 31.699 Disconnection Train movements by ESM with 1 no. staff NA
Disconnection CH1,CH2,CH3 of piloting.
S&T shadow engg
CH1,CH2,CH
3
30 Minutes 3 Maintenance of All Maintenance SKVL Yard 100.434 Disconnection 1.Despatching ESM with 1 no. staff NA
Disconnection crank handles of All crank towards VSG on
handles PLCT and starter
memo. 2. Reception
from VSG on piloting.
S&T
3. Despatching
towards CSM on
PLCT and starter
LD-VSG memo. 4.. Reception
from CSM on piloting.
30 Minutes 4 Maintenance of Maintenance SVM Yard 69/199 Disconnection 1. PLCT for down ESM with 1 no. staff NA
Disconnection SVM-CNR B/I of SVM-CNR trains at SVM. 2. shadow engg
S&T
B/I PLCT for up trains at PQRS
CNR.
30 Minutes 5 Maintenance of Maintenance SVM Yard 69/200 Disconnection 1. PLCT for down ESM with 1 no. staff NA
shadow engg
S&T Disconnection SVM-KM B/I of SVM-KM trains at KM. 2. PLCT
PQRS
B/I for up trains at SVM.
30 Minutes 6 Maintenance of Maintenance SVM Yard 69/201 Disconnection 1.Reception from CNR ESM with 2 nos. staff NA
Disconnection CH1,CH2,CH3,CH4, of side piloting.
CH5 & CH6 CH1,CH2,CH 2.Reception from KM
shadow engg
S&T 3,CH4,CH5 & side on calling on
PQRS
CH6 signals. 3.Despatch
towards CNR on
piloting.
30 Minutes 7 Maintenance of Maintenance SVM Yard 69/202 Disconnection 1.Reception from KM ESM with 2 nos. staff NA
Disconnection CH7,CH8,CH9,CH1 of side piloting.
0,CH11 & CH12 CH7,CH8,CH 2.Reception from CNR
shadow engg
S&T 9,CH10,CH11 side on calling on
PQRS
& CH12 signals. 3.Despatch
towards KM on
piloting.
CON
S&T
PROJ
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-13:00
Point Packing Point Fittings and Siddalingeshwar
ENGG 120 Min 1 01 Nos BSRX Yard DN 145/600-700 Line block No train movement 12:30-14:30
No.63A 12 Man power SSE/P.Way/LMT
1 Machine
Santosh Chavan
ENGG 150 Min 1 TWR 100 Mtrs JML-BJP DN 181/800-900 Line block No Dn train movement 30 Labours, 12:30-14:30
Tr.JE/P.way/BJP
Rail GR Pad & ERC
Tamping By Tamping By No Up & Down train Tamping Machine Sachin Mane 10:00-11:30
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block
Machine Machine movement 08 Nos Manpower SSE/P.way/IDR 15:00-16:30
Movement not
TRD Overlap permitted in TVL yard D. Kishore Not permitted
45 1 Maintenance 1 TVL Yard Yard 279-281 LB and PB UP Tower Car (08310163796)
Movement not
TRD Overlap permitted in TVL yard D. Kishore 15:00-15:45
45 2 Maintenance 1 TVL Yard Yard 279-281 LB and PB UP Tower Car (08310163796)
Movement not
TRD Turnout permitted in TVL yard D. Kishore Not permitted
45 3 Maintenance 1 TVL Yard Yard 279-281 LB and PB UP Tower Car (08310163796)
Movement not
TRD Turnout permitted in TVL yard D. Kishore 13:45-14:30
45 4 Maintenance 1 TVL Yard Yard 279-281 LB and PB UP Tower Car (08310163796)
Movement not
TRD Overlap permitted in MNL yard G Mahadev Not permitted
45 5 Maintenance 1 MNL YARD Yard 202-204 LB and PB UP Tower Car (08310162957)
Movement not
TRD Overlap permitted in MNL yard G Mahadev 15:00-15:45
45 6 Maintenance 1 MNL YARD Yard 202-204 LB and PB UP Tower Car (08310162957)
Movement not
TRD Turnout permitted in MNL yard G Mahadev Not permitted
45 7 Maintenance 1 MNL YARD Yard 202-204 LB and PB UP Tower Car (08310162957)
Movement not
TRD Turnout permitted in MNL yard G Mahadev 13:45-14:30
45 8 Maintenance 1 MNL YARD Yard 202-204 LB and PB UP Tower Car (08310162957)
Movement not
TRD Overlap permitted in LKY yard Not permitted
45 9 Maintenance 1 LKY YARD Yard 56-58 LB and PB DN Tower Car D. Chinna (08310162549)
GDG-HG Movement not
TRD Overlap permitted in LKY yard 12:00-12:45
45 10 Maintenance 1 LKY YARD Yard 56-58 LB and PB DN Tower Car D. Chinna (08310162549)
Movement not
TRD Turnout permitted in LKY yard Not permitted
45 11 Maintenance 1 LKY YARD Yard 56-58 LB and PB DN Tower Car D. Chinna (08310162549)
Movement not
TRD Turnout permitted in LKY yard 13:15-14:00
45 12 Maintenance 1 LKY YARD Yard 56-58 LB and PB DN Tower Car D. Chinna (08310162549)
Movement not
TRD Overlap permitted in WDL yard G Mahadev Not permitted
45 13 Maintenance 1 WDL Yard Yard 137-139 LB and PB UP Tower Car (08310162957)
Movement not
TRD Overlap permitted in WDL yard G Mahadev 11:30-12:15
45 14 Maintenance 1 WDL Yard Yard 137-139 LB and PB UP Tower Car (08310162957)
Movement not
TRD Turnout permitted in WDL yard G Mahadev Not permitted
45 15 Maintenance 1 WDL Yard Yard 137-139 LB and PB UP Tower Car (08310162957)
Movement not
TRD Turnout permitted in WDL yard G Mahadev 13:00-13:45
45 16 Maintenance 1 WDL Yard Yard 137-139 LB and PB UP Tower Car (08310162957)
Movement not
TRD Overlap permitted in BAY yard Pavan Kumar As per train service
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB RD - 1, 2 & 3 Tower Car (08310163339)
Movement not
TRD Overlap permitted in BAY yard Pavan Kumar 07:30-08:45
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB RD - 1, 2 & 3 Tower Car (08310163339)
TRD
60MIN 1 SH KEYS FOR SH KEYS JRKT UP/DN 113 DISCONNEC UP/DN TRAINS ESM with 1 no. staff JE/SSE
MAINTENANCE FOR TION RECEIPTION ON
S&T MAINTENAN SIGNALS AND 15:45-16:45
CE DISPATCH ON PLCT
DN TRAINS
CON
S&T
CN
Movement not
TRD Turnout permitted in BAY yard Pavan Kumar 10:30-11:15
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB RD - 1, 2 & 3 Tower Car (08310163339)
Movement not
TRD Turnout permitted in BAY yard Pavan Kumar As per train service
45 1 Maintenance 1 BAY YARD Yard 207-209 LB and PB RD - 1, 2 & 3 Tower Car (08310163339)
Movement not
TRD 5 Isolator permitted in BYO 09:45-10:30
45 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-UP Tower Car S Ganesh (08310162957)
Movement not
TRD 6 Isolator permitted in BYO As per train service
45 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-UP Tower Car S Ganesh (08310162957)
Movement not
TRD 7 Turnout permitted in BYO 11:15-12:00
45 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-UP Tower Car S Ganesh (08310162957)
Movement not
TRD 8 Turnout permitted in BYO As per train service
45 Maintenance 1 BYO YARD Yard 161-163 LB and PB Yard-UP Tower Car S Ganesh (08310162957)
Movement not
TRD Turnout permitted in DAJ 12:15-13:00
45 7 Maintenance 1 DAJ YARD Yard 181-183 LB and PB Yard-DN Tower Car S Ganesh (08310162957)
Turnout Movement not
TRD Not permitted
45 8 Maintenance 1 DAJ YARD Yard 181-183 LB and PB permitted in DAJ Tower Car S Ganesh (08310162957)
15 MINS X4 Crank handle EKT EKT RDG UP/DN 53.77 Disconnection CH1- UP Trains ESM with 1 no. staff NA
maintenance. CH1, maintenance reception Piloting, Dn
CH2, CH3, CH4 trains dispatch starter
memo. CH2-Dn trains
reception Piloting, Up
trains dispatch starter
memo. CH3-UP Trains
S&T 12:00 - 13:00
reception Piloting, Dn
trains dispatch starter
memo. CH4-Trains to
KRYP: dispatch on
starter memo,
Reception from KRYP
- Piloting.
20 mins x 2 Crank handle EKT EKT BYC UP/DN 204.1 Disconnection CH1-UP/DN trains ESM with 1 no. staff NA
BAY-PKL
maintenance. CH1 maintenance piloting . CH2- Up
& CH2 trains reception
S&T 10:00 - 10:40
piloting to Rd 1 & 2 .
Up trains dispatch on
starter memo.
20 mins x 2 Crank handle EKT EKT DAJ UP/DN 181.27 Disconnection CH1-Dn trains ESM with 1 no. staff NA
maintenance. CH1, maintenance reception piloting, Up
CH2 trains dispatch starter
S&T 12:20-13:00
memo. CH2- Up/Dn
trains Piloting/ starter
memo
30 MINS DAJ-TNGL block Block DAJ UP/DN 181.27 Disconnection Dn trains PLCT at ESM with 1 no. staff NA
S&T Instrument Instrument TNGL, Up trains PLCT
Maintenance Maintenance at DAJ
20 mins x 3 Crank handle EKT EKT TNGL UP/DN 175.7 Disconnection CH1-Up Trains ESM with 1 no. staff NA
maintenance. CH1, maintenance reception Piloting. Dn
CH2, CH3 trains dispatch starter
memo. CH2- Up trains
reception to Rd 1 & 2
piloting. Dn trains
S&T 08:30-09:30
dispatch from Rd 1 &
2 starter memo. CH3-
Dn trains dispatch
starter memo. Dn
trains reception to Rd
4 & Rd 5 calling on.
CMS crossing
Up trains cannot S7T staff and 10 Track D>Amru Naik
ENGG 60 min 1 renewal point no 1 DAJ yard UP line 182/200-300 LB 10:30 - 11:30
recive from KDN-DAJ mans SSE/P.WAY/TNGL
20B
Point No 57B
LB& Rd No 5 no train S&T staff & B/S and H.Anjanamurthy
ENGG 90 min 1 attention housing 1 point PKL yard Rd-5 156/100-200 10:30-12:00
Disconnection movement AMC batch Je/P.Way/HPT/ML
and throw
20 No train movement Machine,TRD staff-3, Mukunda
ENGG 90 min 1 UTV working Slm - Rdg SL 31/500-40/000 LB & PB 12:30 - 14:00
sleepers/Rails Slm to Rdg Dept-6 TM SSE/P.Way/Spl works Bay
No train movement
Pt packing pt LB & Agency-20 labour,S&T Raghu prasanna
ENGG 60 min 2 1 pt BYC yard UP line 201/600-700 between Byc to Kdn 11:00-12:00
.no.33/A Disconnection staff SS/P.Way/Bay(IC)
UP line
ENGG
TTR Work at P Prasad,
ENGG 12:00 - 15:00
1x180 mins 1 No-13B 1 Point VYS Yard Yard Km 9/900-10/100 Block required Contract Labour Asst.SSE/P.Way/HPT(BL)
DN train cannot be AMC Batch Hanumanthappa 08:00-09:30 &
ENGG
2x120 min 1 Br No 63 attention 50 mtrs KBL Yard DN 114/00-300 LB received Blacksmith Team (SSE/P.Way/KBL) 16:15 - 17:45
Movement not
TRD Isolator permitted in KBL AANJAIAH 08:00-08:45
45 1 Maintenance 1 KBL YARD Yard 115-117 LB and PB Yard-UP Tower Car (08310162741)
Movement not
TRD Isolator permitted in KBL AANJAIAH As per train service
PKL-RLP 45 2 Maintenance 1 KBL YARD Yard 115-117 LB and PB Yard-UP Tower Car (08310162741)
Movement not
TRD Turnout permitted in KBL AANJAIAH 10:00-10:45
45 3 Maintenance 1 KBL YARD Yard 115-117 LB and PB Yard-UP Tower Car (08310162741)
Movement not
TRD Turnout permitted in KBL AANJAIAH As per train service
45 4 Maintenance 1 KBL YARD Yard 115-117 LB and PB Yard-UP Tower Car (08310162741)
RE
RE
CON
Movement not
TRD Isolator permitted in SVTN HANUMANTH RAO 07:45-08:30
45 1 Maintenance 1 SVTN YARD Yard 554-557 LB and PB Yard-UP Tower Car (08310162257)
Movement not
TRD Isolator permitted in SVTN HANUMANTH RAO As per train service
45 2 Maintenance 1 SVTN YARD Yard 554-557 LB and PB Yard-UP Tower Car (08310162257)
Movement not
TRD Turnout permitted in SVTN HANUMANTH RAO 09:00-09:45
45 3 Maintenance 1 SVTN YARD Yard 554-557 LB and PB Yard-UP Tower Car (08310162257)
Movement not
TRD Turnout permitted in SVTN HANUMANTH RAO As per train service
45 4 Maintenance 1 SVTN YARD Yard 554-557 LB and PB Yard-UP Tower Car (08310162257)
TRD
TRD
30 Minutes 1 MRJ-VJR UFSBI MRJ-VJR MRJ DN 279.05 Disconnection UP & DN train on ESM with 1 no. staff NA
S&T Maintenance UFSBI PLCT 09:00 - 09:30
Maintenance
30 Minutes 2 RBG-CNC UFSBI RBG-CNC RBG UP 697.55 Disconnection UP & DN train on ESM with 1 no. staff NA
S&T Maintenance UFSBI PLCT 14:00-14:30
Maintenance
30 Minutes 3 RBG-CKR UFSBI RBG-CKR RBG DN 697.55 Disconnection UP & DN train on ESM with 1 no. staff NA
S&T Maintenance UFSBI PLCT 15:00 - 15:30
Maintenance
20 Minutes 1 SSBPAC B/I SSBPAC B/I SUL UP & DN 637.756 Disconnection 1. PLC ESM with 1 no. staff JE/Sig/BGM
S&T Disconnection Monthly insp Monthly insp 13:00-13:40
SUL-SBH SUL-SBH
20 Minutes 2 All crank handle for All crank SUL UP & DN 637.756 Disconnection 1. UP & DN reception ESM with 1 no. staff JE/Sig/BGM
Disconnection monthly insp handle for by piloting
S&T 10:30-11:10
DWR-MRJ monthly insp 2. UP & DN despatch
by starter memo
20 Minutes 1 DEV-TVG B/I FOR DEV-TVG B/I DEV UP&DN 546.55 Disconnection PLCT at both stations ESM with 1 no. staff NA
S&T Disconnection Maintenance FOR 07:30 - 07:50
Maintenance
20 Minutes 2 CH1-CH8 FOR CH1-CH8 DEV UP&DN 546.55 Disconnection both UP and DN trains ESM with 1 no. staff NA
S&T Disconnection maintenance FOR reception and dispatch 07:50 - 08:10
maintenance by pilotting
30 Minutes 3 TVG-DEV B/I TVG-DEV B/I TVG UP&DN 534.61 Disconnection PLCT AT BOTH ESM with 1 no. staff NA
S&T Disconnection MAINTENANCE MAINTENAN STATION 07:45 - 08:15
CE
20 Minutes 3 KBI-LWR B/I FOR KBI-LWR B/I KBI UP&DN 514.23 Disconnection PLCT at both stations ESM with 1 no. staff NA
S&T Disconnection maintenance FOR 08:00 - 08:20
maintenance
20 Minutes 4 KBI- MGDB/I FOR KBI- MGDB/I KBI UP&DN 514.23 Disconnection PLCT at both stations ESM with 1 no. staff NA
S&T Disconnection maintenance FOR 08:40 - 09:00
maintenance
20 Minutes 5 CH1-CH6 CH1-CH6 KBI UP&DN 514.23 Disconnection UP&DN RECEPTION ESM with 2 nos. staff NA
S&T Disconnection MAINTENANCE MAINTENAN AND DISPATCH 16:20 - 16:40
CE PILOTING
UTV Machine 55/35 nos
07:30 - 09:00
ENGG 2 blocks of 90 Shifting of Loading/unloa
15:00 - 16:30
minutes each 1 Sleepers/Rails ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD
Duomatic tamping Plain track 13:00 - 15:00
ENGG
2 x 120mins 2 Machine Tamping PCH-GKK UP 655/000-657/000 LB Block required JE/P.way/SPL/BGM 02:00 - 04:00
ENGG 1 block 90 mnn 3 SEJ SP & Alignment 1 RBG-CNC UP 703/000-100(Up) LB LB Required SSE/PWAY/GPB 16:15 -17:45
UP TRAIN CAN'T
ENGG 16:15-18:45
240 BCM WORK 600 MGD-KBI UP 510/600-511/200 LB+PB DISPATCH SSE/PWAY/DWR
CON
Bridge no.66 approach Sharad Srivastava
ENGG 120min 1 VC-HBI singl line 20/400-500 Block required Manual 12:00-14:00
approaches packing packing SSE/PW/KTY
Ballast profile Rekhya naik
ENGG 12:00-14:00
120min 2 Ballast regulation & sweeping HBI-KTY Single line 66/0-67/0 Block required BRM-04 JE/PW/KTY
VC-KTY
TRD
60" 1 LC 11 EKT 1 VYS UP/DN 10.3 LB DN and UP trains ESM with 2 nos. staff SSE/JE/S/HPT
S&T Overhauling reception and dispatch 12:00-13:00
Normal signals
Rolling Block from 11.09.2023 to 05.11.2023
Date: 31.10.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION QUANTUM BLOCK SEC/ BLOCK RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. TYPE OF WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) REPERCUSSIONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Isolator Movement not permitted in SIVARAMNANDH
TRD 1 07:45 - 08:30
45 Maintenance 1 SOQ YARD Yard 84-86 LB and PB SOQ Yard-DN Tower Car (08310161863)
Isolator Movement not permitted in SIVARAMNANDH
TRD Not permitted
45 2 Maintenance 1 SOQ YARD Yard 84-86 LB and PB SOQ Yard-DN Tower Car (08310161863)
Turnout Movement not permitted in SIVARAMNANDH
TRD 3 09:00 - 09:45
45 Maintenance 1 SOQ YARD Yard 84-86 LB and PB SOQ Yard-DN Tower Car (08310161863)
Turnout Movement not permitted in SIVARAMNANDH
TRD Not permitted
45 4 Maintenance 1 SOQ YARD Yard 84-86 LB and PB SOQ Yard-DN Tower Car (08310161863)
Isolator Movement not permitted in B SOREN
TRD 5 08:50-09:35
45 Maintenance 1 UNK YARD Yard 472-474 LB and PB UNK Yard-DN Tower Car (7022029745)
Isolator Movement not permitted in B SOREN
TRD Not permitted
45 6 Maintenance 1 UNK YARD Yard 472-474 LB and PB UNK Yard-DN Tower Car (7022029745)
Turnout Movement not permitted in B SOREN
TRD 7 16:00 - 16:45
45 Maintenance 1 UNK YARD Yard 472-474 LB and PB UNK Yard-DN Tower Car (7022029745)
Turnout Movement not permitted in B SOREN
KBL-DWR TRD Not permitted
45 8 Maintenance 1 UNK YARD Yard 472-474 LB and PB UNK Yard-DN Tower Car (7022029745)
10:15 -12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
476/600-700,LC-2 UP line no train can be
ENGG 180min 6 LC O & E work 1 BDKA yard UP Mannually 15:45 -18:45
89 passed during Block time.
LB and PB SSE/JE P.Way
20 Minutes 3 NVU-BDKA B/I NVU-BDKA NVU UP&DN 482.2 Disconnection PLCT at both stations ESM with 1 no. staff NA
S&T Disconnection FOR B/I FOR SHADOW ENGG
maintenance maintenance
20 Minutes 4 NVU-DWR B/I NVU-DWR B/I NVU UP&DN 482.2 Disconnection PLCT at both stations ESM with 1 no. staff NA
S&T Disconnection FOR FOR SHADOW ENGG
maintenance maintenance
20 Minutes 1 UBL-UNK Block UBL-UNK UBL B cabin UP/DN 469 Disconnection All UP & DN trains to be ESM with 1 no. staff NA
Disconnection Instrument for Block piloted
S&T 11:40 - 12:00
maintenance Instrument for
maintenance
Bridge No.69
ENGG Sleeper creep Creep 13:00 - 15:00
120min 1 adjustment adjustment CLR-CRZ SL 27/100-200 LB required
TSR work
ENGG between DDS SHADOW
120min 2 yard TSR work DDS Yard Yard 37/400-500 LB required
TRD
60 Minutes 1 50BT two core 50B two core LD &DN 559.45 Disconnection 1. UP reception calling on 2. ESM with 2 nos. staff NA
Disconnection lead wire & TLD lead wire & DN despatch by starter
S&T 11:00 - 12:00
replacement TLD memo
LD-VSG
replacement
45 Minutes 1 Maintenance of Maintenance LIM Yard 42.61 Disconnection Train movements by ESM with 1 no. staff NA
Disconnection CH1,CH2,CH3 of piloting.
S&T 14:00 - 14:45
CH1,CH2,CH
3
CON
S&T
PROJ
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-13:00
Point Packing Fittings and Siddalingeshwar
ENGG 120 Min 1 01 Nos BSRX Yard DN 145/500-600 Line block No train movement 12:30-14:30
Point No.63B 12 Man power SSE/P.Way/LMT
1 Machine
Santosh Chavan
ENGG 150 Min 1 TWR 100 Mtrs JML-BJP DN 181/900-182/000 Line block No Dn train movement 30 Labours, 12:30-14:30
Tr.JE/P.way/BJP
Rail GR Pad & ERC
Tamping By Tamping By No Up & Down train Tamping Machine 08 Sachin Mane 10:00-11:30
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block
Machine Machine movement Nos Manpower SSE/P.way/IDR 15:00-16:30

TRD Overlap Movement not permitted in D. Kishore Not permitted


45 1 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard UP Tower Car (08310163796)

TRD Overlap Movement not permitted in D. Kishore 15:00-15:45


45 2 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard UP Tower Car (08310163796)
TRD Turnout Movement not permitted in D. Kishore Not permitted
45 3 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard UP Tower Car (08310163796)

TRD Turnout Movement not permitted in D. Kishore 13:45-14:30


45 4 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard UP Tower Car (08310163796)

TRD Overlap Movement not permitted in G Mahadev Not permitted


45 5 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard UP Tower Car (08310162957)

TRD Overlap Movement not permitted in G Mahadev 15:00-15:45


45 6 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard UP Tower Car (08310162957)

TRD Turnout Movement not permitted in G Mahadev Not permitted


45 7 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard UP Tower Car (08310162957)

TRD Turnout Movement not permitted in G Mahadev 13:45-14:30


45 8 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard UP Tower Car (08310162957)
GDG-HG Overlap Movement not permitted in D. Chinna
TRD Not permitted
45 9 Maintenance 1 LKY YARD Yard 56-58 LB and PB LKY yard DN Tower Car (08310162549)

TRD Overlap Movement not permitted in D. Chinna 12:00-12:45


45 10 Maintenance 1 LKY YARD Yard 56-58 LB and PB LKY yard DN Tower Car (08310162549)

TRD Turnout Movement not permitted in D. Chinna Not permitted


45 11 Maintenance 1 LKY YARD Yard 56-58 LB and PB LKY yard DN Tower Car (08310162549)

TRD Turnout Movement not permitted in D. Chinna 13:15-14:00


45 12 Maintenance 1 LKY YARD Yard 56-58 LB and PB LKY yard DN Tower Car (08310162549)

TRD Overlap Movement not permitted in G Mahadev Not permitted


45 13 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard UP Tower Car (08310162957)

TRD Overlap Movement not permitted in G Mahadev 11:30-12:15


45 14 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard UP Tower Car (08310162957)

TRD Turnout Movement not permitted in G Mahadev Not permitted


45 15 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard UP Tower Car (08310162957)

TRD Turnout Movement not permitted in G Mahadev 13:00-13:45


45 16 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard UP Tower Car (08310162957)

TRD

30 MIN 1 LHN-TVL UFSBI LHN-TVL LHN-TVL UP/DN 251 DISCONNEC UP & DN TRAIN PLCT ESM with 1 no. staff JE/SIG/IDR
B/I UFSBI B/I TION TOWARDS LHN SIDE
S&T 10:00 - 10:30
MAINTENANCE MAINTENAN
CE
CON
S&T
CN
Overlap Movement not permitted in Pavan Kumar
TRD 12:15-13:00
45 1 Maintenance 1 SLM YARD Yard 38-40 LB and PB SLM yard Tower Car (08310163339)
Overlap Movement not permitted in Pavan Kumar
TRD Not permitted
45 2 Maintenance 1 SLM YARD Yard 38-40 LB and PB SLM yard Tower Car (08310163339)
Turnout Movement not permitted in Pavan Kumar
TRD 13:30-14:15
45 3 Maintenance 1 SLM YARD Yard 38-40 LB and PB SLM yard Tower Car (08310163339)
Turnout Movement not permitted in Pavan Kumar
TRD Not permitted
45 4 Maintenance 1 SLM YARD Yard 38-40 LB and PB SLM yard Tower Car (08310163339)
Isolator Movement not permitted in S Ganesh
TRD 11:00-11:45
45 5 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-DN Tower Car (08310162957)
Isolator Movement not permitted in S Ganesh
TRD Not permitted
45 6 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-DN Tower Car (08310162957)
Turnout Movement not permitted in S Ganesh
TRD 12:15-13:00
45 7 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-DN Tower Car (08310162957)
Turnout Movement not permitted in S Ganesh
TRD Not permitted
45 8 Maintenance 1 DAJ YARD Yard 181-183 LB and PB DAJ Yard-DN Tower Car (08310162957)
60" 1 LC 90 EKT 1 BYO UP/DN 161.53 LB DN and UP trains reception ESM with 1 no. staff SSE/JE/S/HPT
S&T
Overhauling and dispatch Normal signals
30 MINS RDG-SLM Block EKT RDG UP/DN 53.77 Disconnection UP/DN trains PLCT ESM with 1 no. staff NA
S&T Instrument maintenance 12:00 - 12:30
Maintenance
30 mins LC-35 EKT & EKT RDG UP/DN 53.77 Disconnection UP Trains reception Piloting, ESM with 1 no. staff NA
S&T Emergency EKT maintenance Dn trains dispatch starter 13:00- 13:30
memo.
30 mins LC-02 EKT & EKT BYB UP/DN 208.06 Disconnection Caution order. Up/Dn trains ESM with 1 no. staff NA
S&T 08:00 - 08:30
Emergency EKT maintenance to observe PHS signal.
20 mins X 4 Crank Handle EKT TNGL UP/DN 175.7 Disconnection CH4- Up trains reception to ESM with 1 no. staff NA
EKT. CH4, CH5, maintenance Rd 6 to 10 Piloting. Dn
BAY-PKL CH6, CH7 trains reception to Rd 6 to
10 on co-on. Dn trains
dispatch from Rd 6 to 10 on
starter memo.CH5- Dn
trains reception to Rd 6 to
10 Piloting. Up trains
reception to Rd 6 to 10 on
07:45-08:05
co-on. Up trains dispatch
08:45-09:05
S&T from Rd 6 to 10 on starter
10:30-10:50
memo. CH6- Up trains
11:50- 12:10
reception to Rd 1, 2 & 3
co-on. Up trains dispatch
from Rd 1 , 2 & 3 on starter
memo. Dn trains reception
to Rd 1 , 2 & 3 piloting.
CH7- Dn trains reception
piloting. Up trains dispatch
from Rd 4 to 10 starter
memo.
30 mins TNGL-GNR Block Block TNGL BP UP/DN 174.105 NA Up trains PLCT at TNGL BP, ESM with 1 no. staff NA
S&T Instrument Instrument DN trains PLCT at GNR 15:00 -15:30
Maintenance Maintenance
Joint inspection
LB & D.Amru Naik
ENGG 90 min 1 deficeancy 2 TNGL yard DN/UP 175/000-500 No train movement S&T Staff and 1 B/s 4 10:00 - 11:30
Disconnection SSE/P.WAY/TNGL
attention Track amans
Pt packing pt LB & No train movement between Agency-20 labour,S&T Mukunda
ENGG 60 min 1 1 pt Kdn yard UP line 188/700-800 10:00 - 11:00
.no.19/B Disconnection Byc to Kdn UP line staff JE/P.Way/Spl works Bay
ENGG
ENGG
S&T staff & B/S and H.Anjanamurthy
ENGG S PER TRAIN SERVIC
90 min 1 Rail renewal 13 mtr HPT yard UP 143/800-900 LB UP train cannot recieve AMC batch Je/P.Way/HPT/ML
Rajavali,
ENGG 12:00 - 15:00
1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL Km 34/789-35/309 Block required Contract Labour JE/P.Way/YTG
Br No 63 AMC Batch Hanumanthappa 08:00-09:30 &
ENGG
2x120 min 1 attention 50 mtrs KBL Yard DN 114/00-300 LB DN train cannot be received Blacksmith Team (SSE/P.Way/KBL) 16:15 - 17:45
Isolator Movement not permitted in AANJAIAH
TRD 1 09:00-09:45
45 Maintenance 1 KBL YARD Yard 115-117 LB and PB KBL Yard-UP Tower Car (08310162741)
Isolator Movement not permitted in AANJAIAH
TRD Not permitted
45 2 Maintenance 1 KBL YARD Yard 115-117 LB and PB KBL Yard-UP Tower Car (08310162741)
PKL-RLP Turnout Movement not permitted in AANJAIAH
TRD 3 10:00-10:45
45 Maintenance 1 KBL YARD Yard 115-117 LB and PB KBL Yard-UP Tower Car (08310162741)
Turnout Movement not permitted in AANJAIAH
TRD Not permitted
45 4 Maintenance 1 KBL YARD Yard 115-117 LB and PB KBL Yard-UP Tower Car (08310162741)

TRD
45min 2 LC-76 LC-76 MRB Both 133/800 to Trains to be dealt through ESM with 3 staff JE/S/KBL
S&T 12:00-12:45
maintenance maintenance 133/900 Slide boom
CON
Isolator Movement not permitted in HANUMANTH RAO
TRD 1 07:45-08:30
45 Maintenance 1 SVTN YARD Yard 554-557 LB and PB SVTN Yard-UP Tower Car (08310162257)
Isolator Movement not permitted in HANUMANTH RAO
TRD Not permitted
45 2 Maintenance 1 SVTN YARD Yard 554-557 LB and PB SVTN Yard-UP Tower Car (08310162257)
Turnout Movement not permitted in HANUMANTH RAO
TRD 3 09:00-09:45
45 Maintenance 1 SVTN YARD Yard 554-557 LB and PB SVTN Yard-UP Tower Car (08310162257)
Turnout Movement not permitted in HANUMANTH RAO
TRD Not permitted
45 4 Maintenance 1 SVTN YARD Yard 554-557 LB and PB SVTN Yard-UP Tower Car (08310162257)
TRD
TRD
30 Minutes 1 CKR-RBG UFSBI CKR-RBG CKR UP 683.282 Disconnection UP & DN train on PLCT ESM with 1 no. staff NA
S&T Maintenance UFSBI 14:00-14:30
Maintenance
30 Minutes 2 CKR-GPB UFSBI CKR-GPB CKR DN 683.282 Disconnection UP & DN train on PLCT ESM with 1 no. staff NA
S&T Maintenance UFSBI 15:00 - 15:30
Maintenance
40 Minutes 1 Pt no 50 Pt no 50 SUL UP & DN 637.756 Disconnection 1. UP & DN reception ESM with 3 nos. staff NA
Disconnection maintenance maintenance piloting
S&T 13:00-13:40
2. DN despatch by starter
memo
DWR-MRJ 40 Minutes 2 Pt no 51 Pt no 51 SUL UP & DN 637.756 Disconnection 1. UP & DN reception ESM with 3 nos. staff NA
Disconnection maintenance maintenance piloting
S&T 10:30-11:10
2. DN despatch by starter
memo
40 Minutes 3 Pt no 52 Pt no 52 SUL UP & DN 637.756 Disconnection 1. UP & DN reception ESM with 3 nos. staff NA
Disconnection maintenance maintenance piloting
S&T 14:00- 14:40
2. DN despatch by starter
memo
30 Minutes 1 CH1-CH8 CH1-CH8 TVG UP&DN 534.61 Disconnection UP&DN RECEPTION AND ESM with 2 nos. staff NA
S&T Disconnection MAINTENANCE MAINTENAN DISPATCH PILOTING 09:00-09:30
CE
UTV Machine 55/35 nos
07:30 - 09:00
ENGG 2 blocks of 90 Shifting of Loading/unloa
15:00 - 16:30
minutes each 1 Sleepers/Rails ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD
Duomatic Plain track 13:00 - 15:00
ENGG
2 x 120mins 2 tamping Machine Tamping PCH-GKK UP 657/000-659/000 LB Block required JE/P.way/SPL/BGM 02:00 - 04:00
SED yd G/J &
ENGG 16:15 -17:45
1 block 90 mnn 3 SEJ Packing 1 SED-VJR SED Yard 731/400-500 LB Signal Staff SSE/PWAY/KUD
UP TRAIN CAN'T
ENGG 16:15-18:45
240 BCM WORK 600 MGD-KBI UP 511/200-800 LB+PB DISPATCH SSE/PWAY/DWR
CON
ENGG
VC-KTY ENGG
TRD
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 01.11.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) REPERCUSSIONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SOQ SIVARAMNANDH 07:45 - 08:30
45 1 Maintenance 1 SOQ YARD Yard 84-86 LB and PB Yard-DN Tower Car (08310161863)
Movement not
TRD Isolator permitted in SOQ SIVARAMNANDH Not permitted
45 2 Maintenance 1 SOQ YARD Yard 84-86 LB and PB Yard-DN Tower Car (08310161863)
Movement not
TRD Turnout permitted in SOQ SIVARAMNANDH 09:00 - 09:45
45 3 Maintenance 1 SOQ YARD Yard 84-86 LB and PB Yard-DN Tower Car (08310161863)
Movement not
TRD Turnout permitted in SOQ SIVARAMNANDH Not permitted
45 4 Maintenance 1 SOQ YARD Yard 84-86 LB and PB Yard-DN Tower Car (08310161863)
Movement not
TRD Isolator permitted in UNK B SOREN 08:50-09:35
45 5 Maintenance 1 UNK YARD Yard 472-474 LB and PB Yard-DN Tower Car (7022029745)
Movement not
TRD Isolator permitted in UNK B SOREN Not permitted
45 6 Maintenance 1 UNK YARD Yard 472-474 LB and PB Yard-DN Tower Car (7022029745)
Movement not
TRD Turnout permitted in UNK B SOREN 16:00 - 16:45
45 7 Maintenance 1 UNK YARD Yard 472-474 LB and PB Yard-DN Tower Car (7022029745)
Movement not
TRD Turnout permitted in UNK B SOREN Not permitted
45 8 Maintenance 1 UNK YARD Yard 472-474 LB and PB Yard-DN Tower Car (7022029745)
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
KBL-DWR 11:45-12:45(DN)
ENGG
120 min 6 BT-Unloading 20 Bobyn HBS-NGR UP & DN 19/100-35/400 LB Block required SSE/JE P.Way 14:30-15:30(UP)
UP line no train can be
ENGG 90min 7 UBL-UNK UP 469/500-473/00 LB passed during Block 16:00- 17:30
BT-Unloading 30 Bobyn Block/BT required SSE/JE P.Way
time
ENGG
ENGG
30 Minutes 1 Maintenance Maintenance BDKA UP/DN 475.95 Disconnection All UP & DN trains to ESM with 1 no. staff NA
Disconnection and safety and safety be dealt on PLCT
check of check of
S&T 15:45 - 16:15
BDKA-NVUL BDKA-NVUL
block for block for
maintenance maintenance
30 Minutes 2 Maintenance Maintenance BDKA UP/DN 475.95 Disconnection All UP & DN trains to ESM with 1 no. staff NA
Disconnection and safety and safety be dealt on PLCT
check of check of
S&T 16:45-17:15
BDKA-BMAP BDKA-BMAP
block for block for
maintenance maintenance
30 minutes 3 ei system ei system hbs up/dn 19.13 Disconnection all trains to be piloted ESM with 1 no. staff je
S&T 12:15-12:45
changeover changeover
30 minutes 4 crank handle crank handle ngr up/dn 35.42 Disconnection all trains to be piloted ESM with 1 no. staff NA
S&T 12:15-12:45
maintance maintance
30 minutes 5 lc 7 maintance lc 7 ngr up/dn 35.42 Disconnection all trains to be dealt on ESM with 3 nos. staff NA
S&T 15:15-15:45
maintance siding boom
30 1 Maintenace Maintenace of GDG both 58/000 discconnectio Both side PLCT ESM with 1 no. staff JE/S/GDG
S&T BLOCK n 11:15-11:45
GDG-KGX
09:20-10:35 &
ENGG
2 X 75 Min 1 WRJ SVM CNR UP 74/200-460 JE/Pway QLM 11:00 - 12:15
ENGG 2 X 90 Min 2 UTV SVM CNR UP 74/200-460 SHADOW
ENGG 2 X 90 Min 3 MPT machine SVM CNR UP 74/200-460 SHADOW
Bridge No.69
ENGG Sleeper creep Creep 13:00 - 15:00
120min 4 adjustment adjustment CLR-CRZ SL 27/100-200 LB required
TSR work
ENGG between DDS SHADOW
120min 5 yard TSR work DDS Yard Yard 37/400-500 LB required
TRD
LD-VSG 60 Minutes 1 Pt no 50&51 Pt no 50&51 GNJ UP & DN 572.99 Disconnection 1. UP & DN reception ESM with 3 nos. staff NA
Disconnection maintenance maintenance piloting
S&T 11:00-12:00
2. DN despatch by
starter memo
40 Minutes 2 Pt no 51 Pt no 51 GNJ UP & DN 572.99 Disconnection 1. UP & DN reception ESM with 3 nos. staff NA
Disconnection maintenance maintenance piloting
S&T 09:00-09:40
2. DN despatch by
starter memo
CON
S&T
PROJ
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-12:00
Point Packing Fittings and Siddalingeshwar
ENGG 120 Min 1 01 Nos BSRX Yard DN 145/500-600 Line block No train movement 12:30-14:30
Point No.64A 12 Man power SSE/P.Way/LMT
1 Machine
Santosh Chavan
ENGG 150 Min 1 TWR 100 Mtrs JML-BJP DN 182/000-100 Line block No Dn train movement 30 Labours, 12:30-14:30
Tr.JE/P.way/BJP
Rail GR Pad & ERC
Tamping By Tamping By No Up & Down train Tamping Machine Sachin Mane 10:00-11:30
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block
Machine Machine movement 08 Nos Manpower SSE/P.way/IDR 15:00-16:30
Movement not
TRD Overlap permitted in TVL yard D. Kishore Not permitted
45 1 Maintenance 1 TVL Yard Yard 279-281 LB and PB DN Tower Car (08310163796)
Movement not
TRD Overlap permitted in TVL yard D. Kishore 15:00-15:45
45 2 Maintenance 1 TVL Yard Yard 279-281 LB and PB DN Tower Car (08310163796)
Movement not
TRD Turnout permitted in TVL yard D. Kishore Not permitted
45 3 Maintenance 1 TVL Yard Yard 279-281 LB and PB DN Tower Car (08310163796)
Movement not
TRD Turnout permitted in TVL yard D. Kishore 13:45-14:30
45 4 Maintenance 1 TVL Yard Yard 279-281 LB and PB DN Tower Car (08310163796)
Movement not
TRD Overlap permitted in MNL yard G Mahadev Not permitted
45 5 Maintenance 1 MNL YARD Yard 202-204 LB and PB DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in MNL yard G Mahadev 15:00-15:45
45 6 Maintenance 1 MNL YARD Yard 202-204 LB and PB DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in MNL yard G Mahadev Not permitted
45 7 Maintenance 1 MNL YARD Yard 202-204 LB and PB DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in MNL yard G Mahadev 13:45-14:30
45 8 Maintenance 1 MNL YARD Yard 202-204 LB and PB DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in BDM yard D. Chinna Not permitted
45 9 Maintenance 1 BDM YARD Yard 67-69 LB and PB DN Tower Car (08310162549)
Movement not
GDG-HG TRD Overlap permitted in BDM yard D. Chinna 12:00-12:45
45 10 Maintenance 1 BDM YARD Yard 67-69 LB and PB DN Tower Car (08310162549)
Movement not
TRD Turnout permitted in BDM yard D. Chinna Not permitted
45 11 Maintenance 1 BDM YARD Yard 67-69 LB and PB DN Tower Car (08310162549)
Movement not
TRD Turnout permitted in BDM yard D. Chinna 13:15-14:00
45 12 Maintenance 1 BDM YARD Yard 67-69 LB and PB DN Tower Car (08310162549)
Movement not
TRD Overlap permitted in WDL yard G Mahadev Not permitted
45 13 Maintenance 1 WDL Yard Yard 137-139 LB and PB DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in WDL yard G Mahadev 11:30-12:15
45 14 Maintenance 1 WDL Yard Yard 137-139 LB and PB DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in WDL yard G Mahadev Not permitted
45 15 Maintenance 1 WDL Yard Yard 137-139 LB and PB DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in WDL yard G Mahadev 13:00-13:45
45 16 Maintenance 1 WDL Yard Yard 137-139 LB and PB DN Tower Car (08310162957)
60MIN 1 SH KEYS FOR SH KEYS BGK UP/DN 93.29 DISCONNEC UP/DN TRAINS ESM with 1 no. staff JE/SSE
MAINTENANCE FOR TION RECEIPTION ON
S&T MAINTENAN SIGNALS AND 12:00 - 13:00
CE DISPATCH ON PLCT
DN TRAINS
60 MIN 2 TAIL CABLE TAIL CABLE BJP-AYB UP 190.15 DISCONNEC UP TAIN ON ESM with 2 nos. staff JE/SIG/BJP
REPLACEMEN REPLACEME TION AUTHORITY
S&T T FROM NT FROM 10:00-11:00
LOCATION TO LOCATION
TLJB TO TLJB
30 MIN 3 LHN-IDR UFSBI LHN-IDR LHN-IDR UP/DN 251 DISCONNEC UP & DN TRAIN PLCT ESM with 1 no. staff JE/SIG/IDR
B/I UFSBI B/I TION TOWARDS LHN SIDE
S&T 10:00 - 10:30
MAINTENANCE MAINTENAN
CE
CON
S&T
CN
Isolator Movement not Pavan Kumar
TRD
45 1 Maintenance 1 RDG Yard Yard 52-53 LB and PB permitted in RDG yard Tower Car (08310163339) 12:15-13:00
Isolator Movement not Pavan Kumar
TRD Not permitted
45 2 Maintenance 1 RDG Yard Yard 52-53 LB and PB permitted in RDG yard Tower Car (08310163339)
Turnout Movement not Pavan Kumar
TRD
45 3 Maintenance 1 RDG Yard Yard 52-53 LB and PB permitted in RDG yard Tower Car (08310163339) 13:30-14:15
Turnout Movement not Pavan Kumar
TRD Not permitted
45 4 Maintenance 1 RDG Yard Yard 52-53 LB and PB permitted in RDG yard Tower Car (08310163339)
Movement not
TRD Overlap permitted in KDN yard S Ganesh 11:00-11:45
45 5 Maintenance 1 KDN YARD Yard 187-189 LB and PB DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in KDN yard S Ganesh Not permitted
45 6 Maintenance 1 KDN YARD Yard 187-189 LB and PB DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in KDN yard S Ganesh 12:15-13:00
45 7 Maintenance 1 KDN YARD Yard 187-189 LB and PB DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in KDN yard S Ganesh Not permitted
45 8 Maintenance 1 KDN YARD Yard 187-189 LB and PB DN Tower Car (08310162957)
DN and UP trains
LC 85 EKT
S&T 60" 1 1 BYO UP/DN 161.53 LB reception and dispatch ESM with 1 no. staff SSE/JE/S/HPT 07:00-08:00
Overhauling
Normal signals
LC 111 EKT EKT Up trains piloting, Dn
S&T 30 mins BYB UP/DN 208.06 Disconnection ESM with 1 no. staff NA 08:00 - 08:30
maintenance maintenance trains starter memo
CH8- Up trains
dispatch on starter
BAY-PKL memo. Dn trains
reception piloting. CH9
- Up trains dispatch on
starter memo. Up train
reception to Rd 3 07:45-08:05
Crank handle
EKT piloting. CH10- Up 08:45-09:05
S&T 20 mins x 4 EKT. CH8, CH9, TNGL UP/DN 175.7 Disconnection ESM with 1 no. staff NA
maintenance trains dispatch on 10:30-10:50
CH10, CH11
starter memo. Up train 11:50- 12:10
reception to Rd 3
piloting. CH11- Up
trains dispatch on
starter memo. Up train
reception to Rd 3
piloting.
Dn trains PLCT and
LC 109 EKT &
EKT caution order for both
S&T 30 mins Emergency EKT BYC UP/DN 204.1 Disconnection ESM with 1 no. staff NA 08:00 - 08:30
maintenance Up and DN trains for
maintenance
observing PHS.
TNGL-BNHT Block
S&T 30 mins block instrument Instrument TNGL BP UP/DN 174.105 Disconnection UP/DN trains PLCT ESM with 1 no. staff NA 15:00 -15:30
maintenance Maintenance
Joint inspection
TNGL LB & No train movement S7T staff, 1 B/s, 4 Track D.Amru Naik
ENGG 90 min 1 deficeancy 2 point DN/UP 173/800-174/000 15:00 - 16:30
byepass Disconnection From GNR-TNGL mans SSE/P.WAY/TNGL
attention
20 No train movement Slm Machine,TRD staff-3, Mukunda
ENGG 90 min 1 UTV working Slm - Rdg SL 31/500-40/000 LB & PB 12:30 - 14:00
sleepers/Rails to Rdg Dept-6 TM SSE/P.Way/Spl works Bay
ENGG
ENGG
UP trains cannot S&T staff & B/S and H.Anjanamurthy 09:30-10:30
ENGG
150 1 WRJ 2 joints KGW yard UP 149/000-100 LB dispatch AMC batch Je/P.Way/HPT/ML & 11:15 - 12:15
Km Rajavali,
ENGG 12:00 - 15:00
1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL 35/309-35/829 Block required Contract Labour JE/P.Way/YTG
NO train can be AMC Batch Ravi Teja
ENGG 15:45 - 17:45
120 min 1 SEJ maintainace 1 Unit GIN-JBGD SL 10/800-900 LB dealt Blacksmith team (JE/P.Way/GGVT)
Movement not
TRD Isolator permitted in KBL AANJAIAH 09:00-09:45
45 1 Maintenance 1 KBL YARD Yard 115-117 LB and PB Yard-DN Tower Car (08310162741)
Movement not
PKL-RLP TRD Isolator permitted in KBL AANJAIAH Not permitted
45 2 Maintenance 1 KBL YARD Yard 115-117 LB and PB Yard-DN Tower Car (08310162741)
Movement not
TRD Turnout permitted in KBL AANJAIAH 10:00-10:45
45 3 Maintenance 1 KBL YARD Yard 115-117 LB and PB Yard-DN Tower Car (08310162741)
Movement not
TRD Turnout permitted in KBL AANJAIAH Not permitted
45 4 Maintenance 1 KBL YARD Yard 115-117 LB and PB Yard-DN Tower Car (08310162741)
RE
RE
CON
Movement not
TRD Isolator permitted in SVTN HANUMANTH RAO 07:45-08:30
45 1 Maintenance 1 SVTN YARD Yard 554-557 LB and PB Yard-DN Tower Car (08310162257)
Movement not
TRD Isolator permitted in SVTN HANUMANTH RAO Not permitted
45 2 Maintenance 1 SVTN YARD Yard 554-557 LB and PB Yard-DN Tower Car (08310162257)
Movement not
TRD Turnout permitted in SVTN HANUMANTH RAO 09:00-09:45
45 3 Maintenance 1 SVTN YARD Yard 554-557 LB and PB Yard-DN Tower Car (08310162257)
Movement not
TRD Turnout permitted in SVTN HANUMANTH RAO Not permitted
45 4 Maintenance 1 SVTN YARD Yard 554-557 LB and PB Yard-DN Tower Car (08310162257)
TRD
TRD
30 Minutes 1 LC-432 gate LC-432 gate CKR DN 683.282 Disconnection UP train Reception on ESM with 1 no. staff NA
S&T EKT EKT piloting & DN train 14:00-14:30
Maintenance Maintenance despatch on PLCT
60 Minutes 1 Pt no 65 & 64 Pt no 65 & 64 BGM DN 610.39 Disconnection 1. DN reception piloting ESM with 3 nos. staff NA
S&T Disconnection maintenance maintenance 2. UP despatch by 07:00-08:00
starter memo
60 Minutes 2 Pt no 63 & 62 Pt no 63 & 62 BGM DN 610.39 Disconnection 1. DN reception piloting ESM with 3 nos. staff NA
DWR-MRJ
S&T Disconnection maintenance maintenance 2. UP despatch by 13:30-14:30
starter memo
30 Minutes 1 TVG-LWR B/I TVG-LWR B/I TVG UP&DN 534.61 Disconnection PLCT AT BOTH ESM with 1 no. staff NA
Disconnection FOR FOR STATION
S&T 09:00-09:30
MAINTENANCE MAINTENAN
CE
30 Minutes 2 LWR-TVG B/I LWR-TVG B/I LWR UP&DN 489.09 Disconnection PLCT at both stations ESM with 1 no. staff NA
Disconnection FOR FOR
S&T 08:00-08:30
MAINTENANCE MAINTENAN
CE
UTV Machine 55/35 nos
07:30 - 09:00
ENGG 2 blocks of 90 Shifting of Loading/unloa
15:00 - 16:30
minutes each 1 Sleepers/Rails ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD
Duomatic
13:00 - 15:00
ENGG tamping Plain track
02:00 - 04:00
2 x 120mins 2 Machine Tamping PCH-GKK UP 659/000-661/000 LB Block required JE/P.way/SPL/BGM
SED yd G/J &
ENGG 16:15 -17:45
1 block 90 mnn 3 SEJ Packing 1 SED-VJR SED Yard 730/300-500 LB Signal Staff SSE/PWAY/KUD
UP TRAIN CAN'T
ENGG 16:15-18:45
240 BCM WORK 600 MGD-KBI UP 511/800-512/400 LB+PB DISPATCH SSE/PWAY/DWR
CON
Ballast Ballast profile Rekhya naik
ENGG 12:00 - 14:00
120min 1 regulation & sweeping HBI-KTY Single line 67/0-68/0 Block required BRM-04 JE/PW/KTY
VC-KTY
ENGG
TRD
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 02.11.2023
BLOCK TYPE OF BLOCK PROGRES
BOARD DEPT DURATION QUANTUM BLOCK SEC/ BLOCK REPERCUSS RESOURCE TENTATIVE AVAILED BLOCK S
(MINS) S. N. TYPE OF WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD permitted in SIVARAMNANDH 08:00 - 08:45
45 1 Isolator Maintenance 1 BNP YARD Yard 92-94 LB and PB BNP Yard-DN Tower Car (08310161863)
Movement not
TRD permitted in SIVARAMNANDH Not permitted
45 2 Isolator Maintenance 1 BNP YARD Yard 92-94 LB and PB BNP Yard-DN Tower Car (08310161863)
Movement not
TRD Turnout permitted in SIVARAMNANDH 09:00 - 09:45
45 3 Maintenance 1 BNP YARD Yard 92-94 LB and PB BNP Yard-DN Tower Car (08310161863)
Movement not
TRD Turnout permitted in SIVARAMNANDH Not permitted
45 4 Maintenance 1 BNP YARD Yard 92-94 LB and PB BNP Yard-DN Tower Car (08310161863)
Movement not
TRD permitted in
45 5 Isolator Maintenance 1 WUBL YARD Yard 475-477 LB and PB WUBLYard-DN Tower Car B SOREN (7022029745) 08:45-09:30
Movement not
TRD permitted in Not permitted
45 6 Isolator Maintenance 1 WUBL YARD Yard 475-477 LB and PB WUBLYard-DN Tower Car B SOREN (7022029745)
Movement not
TRD Turnout permitted in
45 7 Maintenance 1 WUBL YARD Yard 475-477 LB and PB WUBLYard-DN Tower Car B SOREN (7022029745) 09:50 - 10:35
Movement not
TRD Turnout permitted in Not permitted
45 8 Maintenance 1 WUBL YARD Yard 475-477 LB and PB WUBLYard-DN Tower Car B SOREN (7022029745)
KBL-DWR 09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:15-15:15(UP)
UP line no
ENGG 180min 6 LC O & E work 1 UNK-BDKA UP 474/00-200,LC-286 LB and PB train can be Mannually 15:45 -18:45
passed during SSE/JE P.Way
35 MINUTES LC 266 EOLB gate LC 266 EOLB GDI UP/DN 433.72 DISCONNECTI UP AND DN ESM with 3 nos. staff NA
normal maintance gate normal ON TRAINS
work maintance work RECEPTION
S&T AND 09:15-09:45
DISPATCH
WITH SIDING
BOOM
30 Minutes 1 Maintenance and Maintenance KNO UP/DN 453.17 Disconnec on All UP & DN ESM with 2 nos. staff NA
Disconnec on safety check of and safety trains to be
KNO-SUBL block for check of
S&T dealt on PLCT 09:00-09:30
maintenance KNO-SUBL
block for
maintenance
30 Minutes 1 Maintenance and Maintenance KNO UP/DN 453.17 Disconnec on All UP & DN ESM with 2 nos. staff NA
Disconnec on safety check of and safety trains to be
KNO-SNH block for check of
S&T
maintenance KNO-SNH
dealt on PLCT 17:00 - 17:30
block for
maintenance
S&T
45min 1 maintenance LC-1 GDGBP both 55/200 disconnection Sliding boom ESM with 3 nos. staff JE/S/GDG
maintenance will be working 12:10- 12:50
ENGG 180 min 1 PQRS CNR Yard UP 74/560-75/120 SSE/Pway/QLM 09:15- 12:15
ENGG 60 min 2 Packing Pt No. 75B VSG VSG Yard Yard S & T Staff SSE/Pway/VSG 10:30 - 11:30
PBC at CRZ yard Joint attention
ENGG
120min 3 point no.8B PBC work CRZ yard Yard 31/200-300 work 13:00 - 15:00
TSR work between
ENGG
120min 4 DDS yard TSR work DDS Yard Yard 37/400-500 LB required Shadow of Engg
TRD
60 Minutes 1 LC 344 EOLB LC 344 EOLB LD UP & DN 559.45 Disconnection Sliding boom ESM with 3 nos. staff NA
S&T 14:00-15:00
Disconnection maintenance maintenance working
LD-VSG 60 Minutes 1 LC 8 maintenance LC 8 TGT UP & DN 11.64 Disconnection Sliding boom ESM with 3 nos. staff NA
S&T 13:00 - 14:00
Disconnection maintenance working
45 Minutes 1 TGT end Co-on TGT end CLR Yard 24.5 Disconnection 1.TGT end, ESM with 1 no. staff NA
Disconnection signals normal Co-on signals no train
Maintenance normal movement.
S&T Maintenance 2.CRZ end, 14:00 - 14:45
reception on
calling on
signals.
CON
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-13:00
Point Packing No train Fittings and Aijt Prasad
ENGG 150 Min 1 01 Nos MGH Yard SL 101/700-800 Line block 11:00-13:30
Point No.07 movement 12 Man power SSE/P.Way/BGK
1 Machine
No Dn train Santosh Chavan
ENGG 150 Min 1 TWR 100 Mtrs JML-BJP DN 182/100-200 Line block 30 Labours, 12:30-15:00
movement Tr.JE/P.way/BJP
Rail GR Pad & ERC
No Up &
Tamping By Tamping By 250/000-281/90 Tamping Machine Sachin Mane 10:00-11:30
ENGG 180 Min 1 LHN-HG UP/DN Line block Down train
Machine Machine 0 08 Nos Manpower SSE/P.way/IDR 15:00-16:30
movement
Movement not
TRD Overlap permitted in Not permitted
45 1 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car D. Kishore (08310163796)
Movement not
TRD Overlap permitted in 15:00-15:45
45 2 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car D. Kishore (08310163796)
Movement not
TRD Turnout permitted in Not permitted
45 3 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car D. Kishore (08310163796)
Movement not
TRD Turnout permitted in 13:45-14:30
45 4 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car D. Kishore (08310163796)
Movement not
TRD Overlap permitted in G Mahadev Not permitted
45 5 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in G Mahadev 15:00-15:45
45 6 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in G Mahadev Not permitted
45 7 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car (08310162957)
GDG-HG Movement not
TRD Turnout permitted in G Mahadev 13:45-14:30
45 8 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in Not permitted
45 9 Maintenance 1 BDM YARD Yard 67-69 LB and PB BDM yard DN Tower Car D. Chinna (08310162549)
Movement not
TRD Overlap permitted in 12:00-12:45
45 10 Maintenance 1 BDM YARD Yard 67-69 LB and PB BDM yard DN Tower Car D. Chinna (08310162549)
Movement not
TRD Turnout permitted in Not permitted
45 11 Maintenance 1 BDM YARD Yard 67-69 LB and PB BDM yard DN Tower Car D. Chinna (08310162549)
Movement not
TRD Turnout permitted in 13:15-14:00
45 12 Maintenance 1 BDM YARD Yard 67-69 LB and PB BDM yard DN Tower Car D. Chinna (08310162549)
Movement not
TRD Overlap permitted in G Mahadev Not permitted
45 13 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in G Mahadev 11:30-12:15
45 14 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in G Mahadev Not permitted
45 15 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in G Mahadev 13:00-13:45
45 16 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car (08310162957)
GAUGE TIE
DN TRAIN
64T GAUGE TIE PLATE
DISCONNECTI RECEIVING ESM with 3 nos. staff +
S&T 60 MIN 1 PLATE INSULATION INSULATION NBL-MNL UP/DN 227.03 JE/SIG/BJP 10:15-11:15
ON ON CALLING Engg. staff
REPLACEMENT REPLACEMEN
ON
T
CON
No train
TNGL-RNJP ENGG movement PQRS machine, Agency Akhilesh Kumar Singh 15:00-18:00
240 1 PQRS work 260 mtr BNHT-NDHi SL 11/360-620 LB BNHT-NDHi labor SSE/P.WAY/HPT/ML (IC)
Movement not
TRD permitted in Pavan Kumar
45 1 Isolator Maintenance 1 RDG Yard Yard 52-53 LB and PB RDG yard Tower Car (08310163339) 12:15-13:00
Movement not
TRD permitted in Pavan Kumar Not permitted
45 2 Isolator Maintenance 1 RDG Yard Yard 52-53 LB and PB RDG yard Tower Car (08310163339)
Movement not
TRD Turnout permitted in Pavan Kumar
45 3 Maintenance 1 RDG Yard Yard 52-53 LB and PB RDG yard Tower Car (08310163339) 13:30-14:15
Movement not
TRD Turnout permitted in Pavan Kumar Not permitted
45 4 Maintenance 1 RDG Yard Yard 52-53 LB and PB RDG yard Tower Car (08310163339)
Movement not
TRD Overlap permitted in 11:00-11:45
45 5 Maintenance 1 KDN YARD Yard 187-189 LB and PB KDN yard DN Tower Car S Ganesh (08310162957)
Movement not
TRD Overlap permitted in Not permitted
45 6 Maintenance 1 KDN YARD Yard 187-189 LB and PB KDN yard DN Tower Car S Ganesh (08310162957)
Movement not
TRD Turnout permitted in 12:15-13:00
45 7 Maintenance 1 KDN YARD Yard 187-189 LB and PB KDN yard DN Tower Car S Ganesh (08310162957)
Movement not
TRD Turnout permitted in Not permitted
45 8 Maintenance 1 KDN YARD Yard 187-189 LB and PB KDN yard DN Tower Car S Ganesh (08310162957)
60" 1 LC 86EKT 1 BYO UP/DN 161.53 LB DN and UP ESM with 1 no. staff SSE/JE/S/HPT
BAY-PKL Overhauling trains reception
S&T 13:00-14:00
and dispatch
Normal signals
30 mins SLM-OBM block Block SLM UP/DN 30.86 Disconnection Up/Dn trains ESM with 1 no. staff NA
S&T instrument Instrument PLCT 09:10-09:40
maintenance Maintenance
30 mins LC-110 EKT and EKT BYB UP/DN 208.06 Disconnection Caution order. ESM with 1 no. staff NA
Emergency Ekt maintenance Up/Dn trains to
S&T 08:30-09:00
maintenance observe PHS
signal.

Point no 56B DN trains


LB & S&T staff and 4 TM H.Anjanamurthy
ENGG 90 min 1 deficeancy 1 point PKL yard DN 156/000-100 cannot 06:30-08:00
Disconnection and 1 B/s Je/P.WAy/HPT/ML
attention recieve
No train
20 Machine,TRD staff-3, Mukunda
ENGG 90 min 1 UTV working Slm - Rdg SL 31/500-40/000 LB & PB movement 12:00 - 13:30
sleepers/Rails Dept-6 TM SSE/P.Way/Spl works Bay
Slm to Rdg
No train
movement
Pt packing LB & between Bay Agency-15 men R.V.Naik
ENGG 60 min 2 1 Pt Byepass SL 1/400-500 13:00 - 14:00
Pt.No.50/A Disconnection to Obm and ,S&T-2 men SSE/P.Way/Obm
Byepass to
obm
ENGG
Km
ENGG 11:00 - 14:00
1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL 35/829-36/349 Block required Contract Labour Rajavali, JE/P.Way/YTG
DN train
ENGG cannot be Sunil Kumar 07:30 - 09:30
150 min 1 Curve attention 200 mtr KGX-RLP DN 72/000-200 LB dealt LB (SSE/P.Way/GDG ML)
Movement not
TRD permitted in AANJAIAH 09:00-09:45
45 1 Isolator Maintenance 1 KBL YARD Yard 115-117 LB and PB KBL Yard-DN Tower Car (08310162741)
PKL-RLP Movement not
TRD permitted in AANJAIAH Not permitted
45 2 Isolator Maintenance 1 KBL YARD Yard 115-117 LB and PB KBL Yard-DN Tower Car (08310162741)
Movement not
TRD Turnout permitted in AANJAIAH 10:00-10:45
45 3 Maintenance 1 KBL YARD Yard 115-117 LB and PB KBL Yard-DN Tower Car (08310162741)
Movement not
TRD Turnout permitted in AANJAIAH Not permitted
45 4 Maintenance 1 KBL YARD Yard 115-117 LB and PB KBL Yard-DN Tower Car (08310162741)
CON
Movement not
TRD permitted in HANUMANTH RAO 07:45-08:30
45 1 Isolator Maintenance 1 SVTN YARD Yard 554-557 LB and PB SVTN Yard-DN Tower Car (08310162257)
Movement not
TRD permitted in HANUMANTH RAO Not permitted
45 2 Isolator Maintenance 1 SVTN YARD Yard 554-557 LB and PB SVTN Yard-DN Tower Car (08310162257)
Movement not
TRD Turnout permitted in HANUMANTH RAO 09:00-09:45
45 3 Maintenance 1 SVTN YARD Yard 554-557 LB and PB SVTN Yard-DN Tower Car (08310162257)
Movement not
TRD Turnout permitted in HANUMANTH RAO Not permitted
45 4 Maintenance 1 SVTN YARD Yard 554-557 LB and PB SVTN Yard-DN Tower Car (08310162257)
TRD
TRD
30 Minutes 1 GPB-CKR UFSBI GPB-CKR GPB UP 665.466 Disconnection UP & DN train ESM with 1 no. staff NA
S&T Maintenance UFSBI on PLCT 13:30-14:00
Maintenance
30 Minutes 2 GPB-GKK UFSBI GPB-GKK GPB DN 665.466 Disconnection UP & DN train ESM with 1 no. staff NA
S&T Maintenance UFSBI on PLCT 10:00-10:30
Maintenance
30 Minutes 3 LC-428 gate EKT LC-428 gate GPB UP 665.466 Disconnection DN train ESM with 1 no. staff NA
Maintenance EKT Reception on
S&T Maintenance piloting & UP 15:00-15:30
train despatch
on PLCT
40 Minutes 1 Pt no 62 Pt no 62 DUR UP & DN 599.637 Disconnection 1. DN ESM with 3 nos. staff NA
Disconnection maintenance maintenance reception
piloting
S&T 11:00-11:40
2. UP
despatch by
DWR-MRJ starter memo
40 Minutes 2 Pt no 61 Pt no 61 DUR UP & DN 599.637 Disconnection 1. DN ESM with 3 nos. staff NA
Disconnection maintenance maintenance reception
piloting
S&T 12:00-12:40
2. UP
despatch by
starter memo
60 Minutes 1 32T TLD BOX& 32T TLD BOX DEV DN 546.55 Disconnection DN TRAIN ESM with 2 nos. staff NA
Disconnection LEAD WIRE & LEAD WIRE RECEPTION
REPLACEMENT REPLACEMEN PLCT FROM
S&T T SVTN 08:00-09:00
,RECEPTION
AT DEV ON
CALLING ON,
30 Minutes 2 LWR-KBI B/I FOR LWR-KBI B/I LWR UP&DN 525.8 Disconnection PLCT at both ESM with 1 no. staff NA
Disconnection MAINTENANCE FOR stations
S&T 08:00-08:30
MAINTENANC
E
UTV Machine 55/35 nos
07:30 - 09:00
ENGG 2 blocks of 90 Shifting of Loading/unloa
15:00 - 16:30
minutes each 1 Sleepers/Rails ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD
Unimat Machine &
ENGG 12:30 - 15:30
1 block 240m 2 PQRS work 0.52 SBH-SUL Up 630/330-850 LB & PB Signal staff SSE/p.way/BGM
Duomatic tamping Plain track 13:00 - 15:00
ENGG 3 Block required JE/P.way/SPL/BGM
2 x 120mins Machine Tamping PCH-GKK UP 661/000-663/000 LB 02:00 - 04:00
ENGG 1 block 90 mnn 4 SEJ SP & Alignment 1 RBG-CNC DN 703/000-100(Dn) LB LB Required SSE/PWAY/GPB 16:15 -17:45
UP TRAIN
ENGG 240 BCM WORK 600 MGD-KBI UP 512/400-513/00 LB+PB CAN'T SSE/PWAY/DWR 16:15-18:45
DISPATCH
CON
Ballast profile Rekhya naik
ENGG 12:00 -14:00
120min 1 Ballast regulation & sweeping HBI-KTY Single line 68/0-69/0 Block required BRM-04 JE/PW/KTY
VC-KTY
ENGG
TRD
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 03.11.2023
BLOCK TYPE OF BLOCK
BOARD DEPT DURATION QUANTUM BLOCK SEC/ BLOCK REPERCUSS RESOURCE TENTATIVE AVAILED BLOCK PROGRESS
(MINS) S. N. TYPE OF WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) IONS REQUIREMENT SUPERVISORS TIMINGS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in SIVARAMNANDH 08:00 - 08:45
45 1 Maintenance 1 BNP YARD Yard 92-94 LB and PB BNP Yard-DN Tower Car (08310161863)
Movement not
TRD Isolator permitted in SIVARAMNANDH Not permitted
45 2 Maintenance 1 BNP YARD Yard 92-94 LB and PB BNP Yard-DN Tower Car (08310161863)
Movement not
TRD Turnout permitted in SIVARAMNANDH 09:00 - 09:45
45 3 Maintenance 1 BNP YARD Yard 92-94 LB and PB BNP Yard-DN Tower Car (08310161863)
Movement not
TRD Turnout permitted in SIVARAMNANDH Not permitted
45 4 Maintenance 1 BNP YARD Yard 92-94 LB and PB BNP Yard-DN Tower Car (08310161863)
Movement not
permitted in
TRD
Isolator WUBLYard-D
45 5 Maintenance 1 WUBL YARD Yard 475-477 LB and PB N Tower Car B SOREN (7022029745) 08:45-09:30
Movement not
permitted in
TRD Not permitted
Isolator WUBLYard-D
45 6 Maintenance 1 WUBL YARD Yard 475-477 LB and PB N Tower Car B SOREN (7022029745)
Movement not
permitted in
TRD
Turnout WUBLYard-D
45 7 Maintenance 1 WUBL YARD Yard 475-477 LB and PB N Tower Car B SOREN (7022029745) 09:50 - 10:35
Movement not
permitted in
TRD Not permitted
Turnout WUBLYard-D
45 8 Maintenance 1 WUBL YARD Yard 475-477 LB and PB N Tower Car B SOREN (7022029745)
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
KBL-DWR
DN line no
474/00-200,LC-
ENGG 180min 6 LC O & E work 1 UNK-BDKA DN train can be Mannually 08:40-10:40
286
LB and PB passed during SSE/JE P.Way
30 Minutes 6 POINT N0-70A POINT NVU UP&DN 482.2 Disconnection DN train ESM with 3 nos. staff NA
Disconnection INSULATION N0-70A reception on
REPLACEMENT INSULATION piloting for
S&T REPLACEME rd-3 & 4 UP 15:30-16:00
NT train reception
for rd-4 by
piloting
30 minutes 1 Subl-kno B/I Subl-kno B/I subl-kno up/dn 465.12 disconnection All up and dn ESM with 1 no. staff NA
S&T 08:00-08:30
maintance maintance trains piloting
30 Minutes 2 Maintenance and Maintenance UNK UP/DN 472.6 Disconnection All UP & DN ESM with 1 no. staff NA
Disconnection safety check of and safety trains to be
UNK-UBL block check of dealt on PLCT
S&T 15:30-16:00
for maintenance UNK-UBL
block for
maintenance
30 minutes 3 nvd-hbs b/I nvd-hbs b/I nvd UP/DN 26.98 Disconnection all up and dn ESM with 1 no. staff NA
S&T 12:00-12:30
maintance maintance trains on plct
30 minutes 4 crank ghandle crank ghandle nvd UP/DN 26.98 Disconnection all trains ESM with 1 no. staff NA
S&T 15:00-15:30
maintance maintance piloting
30 minutes 5 ips maintance ips maintance hbs UP/DN 19.13 Disconnection all trains ESM with 2 nos. staff NA
S&T 12:00-12:30
piloting
20 min 1 Maintenace Maintenace of BKIT both 53/100 discconnectio BOTH side ESM with 1 no. staff JE/S/GDG
S&T CRANK n piloting
handle 14:00-14:20
20 min 2 maintenance Maintenace of GDG both 58/000 discconnectio BOTH side ESM with 1 no. staff JE/S/GDG
S&T CRANK n piloting 11:30 - 11:50
handle
ENGG 2 x 75 min 1 WRJ CNR YARD UP 74/860-75/120 JE/Pway /QLM
09:20-10:35 &
ENGG
2 x 90 min 2 UTV CNR YARD UP 74/860-75/120 11:00 - 12:15
ENGG 2x 90 min 3 MPT machine CNR YARD UP 74/860-75/120 SHADOW
PBC at CRZ yard Joint attention
ENGG
120min 4 point no.8A PBC work CRZ yard Yard 31/300-400 work SHADOW
TSR work
ENGG between DDS
120min 5 yard TSR work DDS Yard Yard 37/400-500 LB required 13:00-15:00
TRD SHADOW
60 Minutes 1 LC 6 EOLB LC 6 EOLB TGT UP & DN 11.64 Disconnection Sliding boom ESM with 3 nos. staff NA
S&T
Disconnection maintenance maintenance working 14:00-15:00
60 Minutes 2 LC 356 LC 356 KNP UP & DN 584.86 Disconnection Sliding boom ESM with 3 nos. staff NA
S&T
Disconnection maintenance maintenance working 11:00-12:00
30 Minutes 3 Lead wire Lead wire LIM Yard 42.61 Disconnection QLM end ESM with 2 nos. staff NA
LD-VSG Disconnection replacement at replacement Train
S&T
04BT at 04BT movements
by piloting. SHADOW ENGG
30 Minutes 4 SPI-23 EKT SPI-23 EKT VSG Yard 108.458 Disconnection Shunting ESM with 2 nos. staff NA
Disconnection Maintenance Maintenance movement
towards MPT
S&T
side through
SPI not
possible. 11:30-12:00
30 Minutes 5 SPI-16 EKT SPI-16 EKT VSG Yard 108.458 Disconnection Shunting ESM with 2 nos. staff NA
Disconnection Maintenance Maintenance movement
towards SKVL
S&T
side through
SPI not
possible. 10:30-11:00
CON
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
Point Packing No train Fittings and Aijt Prasad
ENGG 150 Min 1 01 Nos MGH Yard SL 100/700-800 Line block 11:00 - 13:00
Point No.13 movement 12 Man power SSE/P.Way/BGK
1 Machine
No Dn train Santosh Chavan
ENGG 150 Min 1 TWR 100 Mtrs JML-BJP DN 182/200-300 Line block 30 Labours, 12:45-15:15
movement Tr.JE/P.way/BJP
Rail GR Pad & ERC
No Up &
Tamping By Tamping By 250/000-281/90 Tamping Machine Sachin Mane 10:00-11:30
ENGG 180 Min 1 LHN-HG UP/DN Line block Down train
Machine Machine 0 08 Nos Manpower SSE/P.way/IDR 15:00-16:30
movement
Movement not
TRD Overlap permitted in Not permitted
45 1 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car D. Kishore (08310163796)
Movement not
TRD Overlap permitted in 15:00-15:45
45 2 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car D. Kishore (08310163796)
Movement not
TRD Turnout permitted in Not permitted
45 3 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car D. Kishore (08310163796)
Movement not
TRD Turnout permitted in 13:45-14:30
45 4 Maintenance 1 TVL Yard Yard 279-281 LB and PB TVL yard DN Tower Car D. Kishore (08310163796)
Movement not
TRD Overlap permitted in Not permitted
45 5 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car G Mahadev (08310162957)
Movement not
TRD Overlap permitted in 15:00-15:45
45 6 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car G Mahadev (08310162957)
Movement not
TRD Turnout permitted in Not permitted
45 7 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car G Mahadev (08310162957)
Movement not
TRD Turnout permitted in 13:45-14:30
45 8 Maintenance 1 MNL YARD Yard 202-204 LB and PB MNL yard DN Tower Car G Mahadev (08310162957)
Movement not
TRD Overlap permitted in Not permitted
45 9 Maintenance 1 BDM YARD Yard 67-69 LB and PB BDM yard UP Tower Car D. Chinna (08310162549)
Movement not
GDG-HG TRD Overlap permitted in 12:00-12:45
45 10 Maintenance 1 BDM YARD Yard 67-69 LB and PB BDM yard UP Tower Car D. Chinna (08310162549)
Movement not
TRD Turnout permitted in Not permitted
45 11 Maintenance 1 BDM YARD Yard 67-69 LB and PB BDM yard UP Tower Car D. Chinna (08310162549)
Movement not
TRD Turnout permitted in 13:15-14:00
45 12 Maintenance 1 BDM YARD Yard 67-69 LB and PB BDM yard UP Tower Car D. Chinna (08310162549)
Movement not
TRD Overlap permitted in Not permitted
45 13 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car G Mahadev (08310162957)
Movement not
TRD Overlap permitted in 11:30-12:15
45 14 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car G Mahadev (08310162957)
Movement not
TRD Turnout permitted in Not permitted
45 15 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car G Mahadev (08310162957)
Movement not
TRD Turnout permitted in 13:00-13:45
45 16 Maintenance 1 WDL Yard Yard 137-139 LB and PB WDL yard DN Tower Car G Mahadev (08310162957)
TRD
90MIN 1 BI AND CH FOR BI AND CH BGK UP/DN 93.29 DISCONNEC UP/DN ESM with 1 no. staff JE/SSE
MAINTENANCE FOR TION TRAINS
MAINTENAN RECEIPTION
CE ON SIGNALS
S&T 11:30 - 13:00
AND
DISPATCH
ON PLCT DN
TRAINS
30MIN FOR 2 BDM SIDE BDM SIDE GED UP/DN 80.37 DISCONNEC WILL BE ESM with 1 no. staff JE/SSE
EACH POINT POINTS POINTS TION GIVEN WITH
DISCONNEC 12:00 - 12:30
S&T
TION OF 13:00 - 13:30
CONCERNE
D POINT
CON
S&T
CN
No trains
Switch reneal LB & S&T staff adn AMC D.Amru Naik
TNGL-RNJP 90 min 1 0.5 set TRNJP yard Yrad 22/300-400 movement 15:00 - 16:30
point No 14B Disconnection batch, 2 B/s SSE/P.WAY/TNGL
ENGG RNJP-NDHi
Movement not
Isolator permitted in 13:00 - 13:45
TRD 45 1 Maintenance 1 RDG Yard Yard 52-53 LB and PB RDG yard Tower Car Pavan Kumar (08310163339)
Movement not
Isolator permitted in Not permitted
TRD 45 2 Maintenance 1 RDG Yard Yard 52-53 LB and PB RDG yard Tower Car Pavan Kumar (08310163339)
Movement not
Turnout permitted in 14:15-15:00
TRD 45 3 Maintenance 1 RDG Yard Yard 52-53 LB and PB RDG yard Tower Car Pavan Kumar (08310163339)
Movement not
Turnout permitted in Not permitted
TRD 45 4 Maintenance 1 RDG Yard Yard 52-53 LB and PB RDG yard Tower Car Pavan Kumar (08310163339)
Movement not
Overlap permitted in 11:00-11:45
TRD 45 5 Maintenance 1 KDN YARD Yard 187-189 LB and PB KDN yard DN Tower Car S Ganesh (08310162957)
Movement not
Overlap permitted in Not permitted
TRD 45 6 Maintenance 1 KDN YARD Yard 187-189 LB and PB KDN yard DN Tower Car S Ganesh (08310162957)
Movement not
Turnout permitted in 12:15-13:00
TRD 45 7 Maintenance 1 KDN YARD Yard 187-189 LB and PB KDN yard DN Tower Car S Ganesh (08310162957)
Movement not
Turnout permitted in Not permitted
TRD 45 8 Maintenance 1 KDN YARD Yard 187-189 LB and PB KDN yard DN Tower Car S Ganesh (08310162957)
60" 1 LC 82EKT 1 BYO UP/DN 161.53 LB DN and UP ESM with 1 no. staff SSE/JE/S/HPT
Overhauling trains
reception and
S&T 11:00-12:00
dispatch
Normal
signals
20 mins x 2 Crank Handle EKT SLM UP/DN 30.86 Disconnection Reception/Dis ESM with 1 no. staff NA
EKT. CH1, CH2 maintenance patch RDG
S&T 12:30 - 13:10
end: piloting/
starter memo.
30 mins OBM-BYB Block Block OBM UP/DN 15.4 Disconnection Up/Dn Trains ESM with 1 no. staff NA
S&T instrument Instrument PLCT 09:10-09:40
maintenance Maintenance
20 mins x 2 Crank Handle EKT OBM UP/DN 15.4 Disconnection Reception ESM with 1 no. staff NA
EKT. CH1, CH2 maintenance from SLM :
Piloting,
Reception
S&T from BAY to 12:30 - 13:10
M/L co-on.
Dispatch to
SLM starter
BAY-PKL memo
20 mins Crank Handle EKT BYB UP/DN 208.06 Disconnection OBM end : ESM with 1 no. staff NA
EKT. CH1 maintenance Reception
piloting,
dispatch
starter memo.
S&T Starter memo 08:30-09:10
for branch line
trains at BAY
since SL-10
cannot be
transmitted.
20 mins x 3 Crank Handle EKT TNGL BP UP/DN 174.105 Disconnection CH1- DN ESM with 1 no. staff NA
EKT. CH1, CH2, maintenance trains
CH3 reception
piloting , Up
trains
dispatch
starter memo.
CH2- Dn
trains to
S&T Byepass line 15:00 - 16:00
piloting. Up
trains
dispatch on
starter memo.
CH3-Up and
Dn trains to
BNHT piloting
/ Starter
memo.
30 mins BNHT-NDHI Block BNHT-NDHI UP/DN 9.02 Disconnection UP/DN Trains ESM with 1 no. staff NA
S&T block Instrument Instrument PLCT 15:00 - 15:30
maintenance Maintenance
Disconnection DN trains
Point no 52A
LB & cannot S&T staff and 4 TM and H.Anjanamurthy
ENGG 90 min 1 Deficeancy 1 point PKL yard DN 07:30-09:00
Disconnection recieve from 1 B/s Je/P.WAy/HPT/ML
attention
KGW-PKL
Disconnection No train
20 Machine,TRD staff-3, Mukunda
ENGG 90 min 1 UTV working Slm - Rdg SL LB & PB movement 13:00-14:30
sleepers/Rails Dept-6 TM SSE/P.Way/Spl works Bay
Slm to Rdg
No train
Pt Packing LB & movement Agency-15 men,S&T Akash
ENGG 60 min 2 1Pt Byc to Kdn UP 202/400-500 11:00- 12:00
Pt.No.30/B Disconnection between Byc staff JE/P.Way/Rdg
to Kdn Up line
ENGG
Km
ENGG 12:00 - 15:00
1x180 mins 1 TRR Work 520 mtrs YTG-SMLI SL 36/349-36/869 Block required Contract Labour Rajavali, JE/P.Way/YTG
UP train can
ENGG SEJ be dealt AMC Batch Sunil Kumar 08:00-10:00
120 min 1 Maintainance 1 Unit SOQ yard UP 85/500-600 LB through Rd-4 Blacksmith Team (SSE/P.Way/GDG ML)
No trains can
ENGG 15:45 - 17:45
120 mim 1 SEJ maintenance 1 unit BDGU single 10/2-3 Line block be dealt Contract Labour RaviTeja (JE/P.Way/GGVT/
Movement not
Isolator permitted in AANJAIAH 08:00-08:45
TRD 45 1 Maintenance 1 BNP YARD Yard 103-105 LB and PB BNP Yard-DN Tower Car (08310162741)
PKL-RLP
Movement not
Isolator permitted in AANJAIAH Not permitted
TRD 45 2 Maintenance 1 BNP YARD Yard 103-105 LB and PB BNP Yard-DN Tower Car (08310162741)
Movement not
Turnout permitted in AANJAIAH 09:15 - 10:00
TRD 45 3 Maintenance 1 BNP YARD Yard 103-105 LB and PB BNP Yard-DN Tower Car (08310162741)
Movement not
Turnout permitted in AANJAIAH Not permitted
TRD 45 4 Maintenance 1 BNP YARD Yard 103-105 LB and PB BNP Yard-DN Tower Car (08310162741)
CON
Movement not
Isolator permitted in HANUMANTH RAO 09:00-09:45
TRD 45 1 Maintenance 1 LD YARD Yard 559 LB and PB LD Yard-DN Tower Car (08310162257)
Movement not
Isolator permitted in HANUMANTH RAO Not permitted
TRD 45 2 Maintenance 1 SVTN YARD Yard 559 LB and PB LD Yard-DN Tower Car (08310162257)
Movement not
Turnout permitted in HANUMANTH RAO 08:00-08:45
TRD 45 3 Maintenance 1 SVTN YARD Yard 559 LB and PB LD Yard-DN Tower Car (08310162257)
Movement not
Turnout permitted in HANUMANTH RAO Not permitted
TRD 45 4 Maintenance 1 SVTN YARD Yard 559 LB and PB LD Yard-DN Tower Car (08310162257)
TRD
TRD
30 Minutes 1 LC -446 gate LC -447 gate CNC UP 708.15 Disconnection Necessary ESM with 1 no. staff NA
S&T EKT EKT caution order 14:00-14:30
Maintenance Maintenance
30 Minutes 2 PCH-GKK UFSBI PCH-GKK PCH UP 646.706 Disconnection UP & DN train ESM with 1 no. staff JE/SIG/GPB
Monthly UFSBI on PLCT
S&T 13:30-14:00
Inspection Monthly
Inspection
30 Minutes 3 PCH-SUL UFSBI PCH-SUL PCH DN 646.706 Disconnection UP & DN train ESM with 1 no. staff JE/SIG/GPB
Monthly UFSBI on PLCT
S&T 11:30-12:00
Inspection Monthly
Inspection
20 Minutes 1 SSBPAC B/I SSBPAC B/I SBH UP & DN 626.144 Disconnection 1. PLC ESM with 1 no. staff JE/Sig/BGM
S&T Disconnection Monthly insp Monthly insp 11:40-12:00
SBH-SXB SBH-SXB
20 Minutes 2 SSBPAC B/I SSBPAC B/I SBH UP & DN 626.144 Disconnection 1. PLC ESM with 1 no. staff JE/Sig/BGM
S&T Disconnection Monthly insp Monthly insp 11:20-11:40
SBH-SUL SBH-SUL
20 Minutes 3 All crank handle All crank SBH UP & DN 626.144 Disconnection 1. UP & DN ESM with 1 no. staff JE/Sig/BGM
Disconnection for monthly insp handle for reception by
DWR-MRJ monthly insp piloting
S&T 11:00 - 11:20
2. UP & DN
despatch by
starter memo
20 Minutes 1 DEV-SVTN B/I DEV-SVTN DEV UP&DN 546.55 Disconnection PLCT at both ESM with 1 no. staff NA
S&T Disconnection FOR B/I FOR stations 08:30 - 08:50
maintenance maintenance
30 Minutes 2 CH1-CH6 CH1-CH6 KRKP UP&DN 495.07 Disconnection UP&DN ESM with 1 no. staff NA
Disconnection MAINTENANCE MAINTENAN RECEPTION
S&T CE AND 08:30 - 09:00
DISPATCH
PILOTING
30 Minutes 3 KRKP-DWR B/I KRKP-DWR KRKP UP&DN 495.07 Disconnection PLCT AT ESM with 1 no. staff NA
Disconnection MAINTENANCE B/I BOTH
S&T 08:00 - 08:30
MAINTENAN STATION
CE
30 Minutes 4 KRKP-MGD B/I KRKP-MGD KRKP UP&DN 495.07 Disconnection PLCT AT ESM with 1 no. staff NA
Disconnection MAINTENANCE B/I BOTH
S&T 16:30 - 17:00
MAINTENAN STATION
CE
20 Minutes 5 LWR-AVA LWR-AVA LWR UP&DN 525.8 Disconnection PLCT AT ESM with 1 no. staff NA
S&T Disconnection MAINTENANCE MAINTENAN BOTH 08:00 - 08:20
CE STATION
UTV Machine 55/35 nos
07:30 - 09:00
ENGG 2 blocks of 90 Shifting of Loading/unloa 558/000-534/00
15:00 - 16:30
minutes each 1 Sleepers/Rails ding LD-TVG DN 0 LB & PB Contract Labours SSE/Pway/SPL/LD
629/810-630/85
13:00 - 15:00
ENGG Duomatic Plain track 0 (PQRS
02:00 - 05:00
2 x 120mins 2 tamping Machine Tamping SBH-SUL Up location) LB Block required JE/P.way/SPL/BGM
ENGG 1 block 90 mnn 3 SEJ SP & Alignmen 1 RBG-CNC UP 04/900-705/400(Up LB LB Required SSE/PWAY/GPB 14:00-15:30
UP TRAIN
ENGG CAN'T 16:15 -18:45
240 BCM WORK 500 MGD-KBI UP 513/00-600 LB+PB DISPATCH SSE/PWAY/DWR
CON
Ballast profile Rekhya naik
VC-KTY ENGG 12:30-14:30
120min 1 Ballast regulation & sweeping HBI-KTY Single line 69/0-70/0 Block required BRM-04 JE/PW/KTY
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 04.11.2023
BLOCK TYPE OF BLOCK
TENTATIVE
BOARD DEPT DURATION TYPE OF QUANTUM BLOCK SEC/ BLOCK RESOURCE AVAILED BLOCK PROGRESS
TIMINGS
(MINS) S. N. WORK OF WORK STATION UP/DN LOCATION (KM) (LB/PB) REPERCUSSIONS REQUIREMENT SUPERVISORS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
TRD Isolator permitted in BNP SIVARAMNANDH 08:00 - 08:45
45 1 Maintenance 1 BNP YARD Yard 92-94 LB and PB Yard-DN Tower Car (08310161863)
Movement not
TRD Isolator permitted in BNP SIVARAMNANDH Not permitted
45 2 Maintenance 1 BNP YARD Yard 92-94 LB and PB Yard-DN Tower Car (08310161863)
Movement not
TRD Turnout permitted in BNP SIVARAMNANDH 09:00 - 09:45
45 3 Maintenance 1 BNP YARD Yard 92-94 LB and PB Yard-DN Tower Car (08310161863)
Movement not
TRD Turnout permitted in BNP SIVARAMNANDH Not permitted
45 4 Maintenance 1 BNP YARD Yard 92-94 LB and PB Yard-DN Tower Car (08310161863)
Movement not
TRD Isolator permitted in B SOREN
45 5 Maintenance 1 WUBL YARD Yard 475-477 LB and PB WUBLYard-DN Tower Car (7022029745) 08:45-09:30
Movement not
TRD Isolator permitted in B SOREN Not permitted
45 6 Maintenance 1 WUBL YARD Yard 475-477 LB and PB WUBLYard-DN Tower Car (7022029745)
Movement not
TRD Turnout permitted in B SOREN
45 7 Maintenance 1 WUBL YARD Yard 475-477 LB and PB WUBLYard-DN Tower Car (7022029745) 09:50 - 10:35
Movement not
TRD Turnout permitted in B SOREN Not permitted
45 8 Maintenance 1 WUBL YARD Yard 475-477 LB and PB WUBLYard-DN Tower Car (7022029745)
09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
UP line no train can
ENGG 90min 6 NVU-DWR UP 482/00-487/600 LB be passed during 16:00-17:30
KBL-DWR BT-Unloading 20 Bobyn Block/BT required SSE/JE P.Way
30 minutes 1 ylg-gdi b/I ylg-gdi b/I ylg-gdi UP/DN 421.7 disconnection allBltrains
k ti to be ESM with 1 no. staff NA
S&T 12:30- 13:00
maintance maintance piloted in block
30 minutes 2 ylg-svnr b/I ylg-svnr b/I ylg-svnr up/dn 421.7 disconnection all trains to be ESM with 1 no. staff NA
S&T 13:00-13:30
maintance maintance piloted in block
30 Minutes 3 Maintenance Maintenance SNH UP/DN 444.657 Disconnection All UP & DN trains ESM with 1 no. staff NA
Disconnection and safety and safety to be dealt on PLCT
check of check of
S&T 09:00-09:30
SNH-GDI SNH-GDI
block for block for
maintenance maintenance
30 Minutes 4 Maintenance Maintenance SNH UP/DN 444.657 Disconnection All UP & DN trains ESM with 1 no. staff NA
Disconnection and safety and safety to be dealt on PLCT
check of check of
S&T 08:00-08:30
SNH-KNO SNH-KNO
block for block for
maintenance maintenance
40 minute 5 Lc 26 Lc 26 lkt UP/DN 45.48 Disconnection all up/dn trains on ESM with 3 nos. staff NA
S&T 15:00-15:40
maintance maintance siding boom
40 minutes 6 lc 5 lc 5 kug UP/DN 10.01 Disconnection all up/dn trains on ESM with 3 nos. staff NA
S&T 15:40-16:10
maintance maintance siding boom
30 1 Maintenace Maintenace of BKIT both 53/100 disconnection Both side PLCT ESM with 1 no. staff JE/S/GDG
S&T BLOCK 15:00 - 15:30
BKIT-LKT
45min 2 maintenance LC-30 GDGBP both 54/800 discconnectio Sliding boom will be ESM with 3 nos. staff JE/S/GDG
S&T 10:00 - 10:45
maintenance n working
30min 3 Maintenance Maintenace of GDGBP both 55/700 discconnectio Both side PLCT ESM with 1 no. staff JE/S/GDG
S&T BLOCK n 11:30 - 12:00
GDGBP-HBL
ENGG 180 min 1 PQRS CNR YARD UP 75/120-380 SSE/Pway /QLM 09:15-12:15
ENGG 60 min 2 Manual Packing VSG Yard Yard Pt. No. 72 A VSG S& T Staff required SSE/Pway /VSG 11:30-12:30
TSR work
ENGG between DDS 13:30-15:30
120min 3 yard TSR work DDS Yard Yard 37/400-500 LB required
CRZ Up line Disconnection
ENGG 13:30-15:30
120min 4 PBC PBC work CRZ Yard Yard 31/500-800 required
TRD
60 Minutes 1 Pt no 61&62 Pt no 61&62 LD UP & DN 559.45 Disconnection 1. UP & DN ESM with 3 nos. staff NA
Disconnection maintenance maintenance reception piloting
S&T 08:00-09:00
2. DN despatch by
starter memo
60 Minutes 2 Pt no 63&65 Pt no 63&65 LD UP & DN 559.45 Disconnection 1. UP & DN ESM with 3 nos. staff NA
LD-VSG Disconnection maintenance maintenance reception piloting
S&T 07:30- 08:30
2. DN despatch by
starter memo
60 Minutes 1 At Point At Point CRZ Yard 31.699 Disconnection No Train ESM with 3 nos. staff NA
S&T Disconnection 8A,8B slide 8A,8B slide movements CLR Shadow Engg
cleaning work. cleaning work. side
30 Minutes 2 Maintenance Maintenance VSG Yard 108.458 Disconnection All up and down ESM with 1 no. staff NA
S&T Disconnection of VSG-SKVL of VSG-SKVL trains through PLCT 11:30 - 12:00
B/I B/I
CON
S&T
PROJ
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10:00-15:00
Chaturanan Chandan
ENGG 120 Min 1 Joint Packing 300 Mtrs MGH-JRKT SL 103/800-104/100 Line block No train movement Fittings & Manpower 11:00 - 13:00
SSE/P.Way/BGK
1 Machine
No Dn train Santosh Chavan
ENGG 150 Min 1 TWR 100 Mtrs JML-BJP DN 182/300-400 Line block 30 Labours, 12:45-15:15
movement Tr.JE/P.way/BJP
Rail GR Pad & ERC
Tamping By Tamping By No Up & Down train Tamping Machine 08 Sachin Mane 10:00-11:30
ENGG 180 Min 1 LHN-HG UP/DN 250/000-281/900 Line block
Machine Machine movement Nos Manpower SSE/P.way/IDR 15:00-16:30
Movement not
TRD Overlap permitted in TVL D. Kishore Not permitted
45 1 Maintenance 1 TVL Yard Yard 279-281 LB and PB yard DN Tower Car (08310163796)
Movement not
TRD Overlap permitted in TVL D. Kishore 15:00-15:45
45 2 Maintenance 1 TVL Yard Yard 279-281 LB and PB yard DN Tower Car (08310163796)
Movement not
TRD Turnout permitted in TVL D. Kishore Not permitted
45 3 Maintenance 1 TVL Yard Yard 279-281 LB and PB yard DN Tower Car (08310163796)
Movement not
TRD Turnout permitted in TVL D. Kishore 13:45-14:30
45 4 Maintenance 1 TVL Yard Yard 279-281 LB and PB yard DN Tower Car (08310163796)
Movement not
TRD Overlap permitted in MNL G Mahadev Not permitted
45 5 Maintenance 1 MNL YARD Yard 202-204 LB and PB yard DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in MNL G Mahadev 15:00-15:45
45 6 Maintenance 1 MNL YARD Yard 202-204 LB and PB yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in MNL G Mahadev Not permitted
45 7 Maintenance 1 MNL YARD Yard 202-204 LB and PB yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in MNL G Mahadev 13:45-14:30
45 8 Maintenance 1 MNL YARD Yard 202-204 LB and PB yard DN Tower Car (08310162957)
Movement not
GDG-HG
TRD Overlap permitted in BDM D. Chinna Not permitted
45 9 Maintenance 1 BDM YARD Yard 67-69 LB and PB yard UP Tower Car (08310162549)
Movement not
TRD Overlap permitted in BDM D. Chinna 12:00-12:45
45 10 Maintenance 1 BDM YARD Yard 67-69 LB and PB yard UP Tower Car (08310162549)
Movement not
TRD Turnout permitted in BDM D. Chinna Not permitted
45 11 Maintenance 1 BDM YARD Yard 67-69 LB and PB yard UP Tower Car (08310162549)
Movement not
TRD Turnout permitted in BDM D. Chinna 13:15-14:00
45 12 Maintenance 1 BDM YARD Yard 67-69 LB and PB yard UP Tower Car (08310162549)
Movement not
TRD Overlap permitted in WDL G Mahadev Not permitted
45 13 Maintenance 1 WDL Yard Yard 137-139 LB and PB yard DN Tower Car (08310162957)
Movement not
TRD Overlap permitted in WDL G Mahadev 11:30-12:15
45 14 Maintenance 1 WDL Yard Yard 137-139 LB and PB yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in WDL G Mahadev Not permitted
45 15 Maintenance 1 WDL Yard Yard 137-139 LB and PB yard DN Tower Car (08310162957)
Movement not
TRD Turnout permitted in WDL G Mahadev 13:00-13:45
45 16 Maintenance 1 WDL Yard Yard 137-139 LB and PB yard DN Tower Car (08310162957)
ENGG
TRD
60MIN 1 Pt No. 7,13 Pt No. 7,13 MGH UP/DN 101.72 DISCONNEC UP/DN TRAINS ESM with 3 nos. staff JE/SSE
FOR FOR TION RECEIPTION ON
S&T MAINTENAN MAINTENAN CALLING ON AND 11:30-12:30
CE CE DISPATCH ON
STARTER MEMO
CON
S&T
CN
Movement not
Overlap permitted in RDG Pavan Kumar 13:00 - 13:45
TRD 45 1 Maintenance 1 RDG Yard Yard 52-53 LB and PB yard Tower Car (08310163339)
Movement not
Overlap permitted in RDG Pavan Kumar Not permitted
TRD 45 1 Maintenance 1 RDG Yard Yard 52-53 LB and PB yard Tower Car (08310163339)
Movement not
Turnout permitted in RDG Pavan Kumar 14:15-15:00
TRD 45 1 Maintenance 1 RDG Yard Yard 52-53 LB and PB yard Tower Car (08310163339)
Movement not
Turnout permitted in RDG Pavan Kumar Not permitted
TRD 45 1 Maintenance 1 RDG Yard Yard 52-53 LB and PB yard Tower Car (08310163339)
Movement not
Overlap permitted in KDN S Ganesh 11:00-11:45
TRD 45 1 Maintenance 1 KDN YARD Yard 187-189 LB and PB yard UP Tower Car (08310162957)
Movement not
Overlap permitted in KDN S Ganesh Not permitted
TRD 45 1 Maintenance 1 KDN YARD Yard 187-189 LB and PB yard UP Tower Car (08310162957)
Movement not
Turnout permitted in KDN S Ganesh 12:15-13:00
TRD 45 1 Maintenance 1 KDN YARD Yard 187-189 LB and PB yard UP Tower Car (08310162957)
Movement not
Turnout permitted in KDN S Ganesh Not permitted
TRD 45 1 Maintenance 1 KDN YARD Yard 187-189 LB and PB yard UP Tower Car (08310162957)
60" 1 LC 82A EKT 1 BYO UP/DN 161.53 LB DN and UP trains ESM with 2 nos. staff SSE/JE/S/HPT
Overhauling reception and
S&T 11:00-12:00
dispatch Normal
signals
30 mins LC-14 EKT for EKT OBM UP/DN 15.4 Disconnection BAY end : reception ESM with 2 nos. staff NA
S&T maintenance maintenance piloting. Dispatch 13:00 - 13:30
starter memo.
30 mins BYB-BYC Block BYB UP/DN 208.06 Disconnection Up trains PLCT at ESM with 1 no. staff NA
block Instrument BYB, DN trains
S&T 09:10-09:40
instrument Maintenance PLCT at BYC
BAY-PKL maintenance
20 mins x 2 Crank Handle EKT BYB UP/DN 208.06 Disconnection CH2- Up trains to ESM with 1 no. staff NA
EKT. CH2, maintenance BYC starter memo
CH3 at BYB & BAY. SL
no 09 & 11 cannot
be transmitted.
S&T 08:30-09:10
CH3- Up trains to
BYC starter memo
at BYB & BAY. SL
no 09 & 11 cannot
be transmitted
30 mins LC-06 EKT EKT BYB-OBM UP/DN 208.06 Disconnection Caution order. ESM with 1 no. staff NA
S&T maintenance maintenance Up/Dn trains to 12:00-12:30
observe PHS signal.
30 mins Crank handle EKT NDHI UP/DN 16.8 Disconnection Up/Dn trains ESM with 1 no. staff NA
S&T EKT maintenance piloting. 15:00 - 15:30
Maintenance
30 mins NDHI-RNJP Block NDHI-RNJP UP/DN 16.8 Disconnection UP/DN trains PLCT ESM with 1 no. staff NA
S&T block Instrument 15:30 - 16:00
instrument Maintenance
20 mins x 2 Crank Handle EKT RNJP UP/DN 23.02 Disconnection Reception : piloting, ESM with 1 no. staff NA
S&T EKT. CH1, maintenance Dispatch : starter 17:00 - 17:40
CH2 memo
Switch
LB & Road No 1 no train S7T staff, 12 TM and D.Amru Naik
ENGG 90 min 1 renewal Point 0.5 set TNGL yard Road No 1 175/500-600 11:30-13:00
Disconnection movement 2 B/s SSE/P.WAY/TNGL
No 90A
Point no 51A
LB & UP trains cannot S&T staff and 4 TM & H.Anjanamurthy
ENGG 90 1 deficeancy 1 point PKL yard UP 155/800-900 07:30-09:00
Disconnection dispatch 1 B/s Je/P.WAy/HPT/ML
attention
ENGG
20 No train movement Machine,TRD staff-3, Akash
ENGG 90 min 1 UTV working Slm - Rdg SL 31/500-40/000 LB & PB 13:00-14:30
sleepers/Rails Slm to Rdg Dept-6 TM JE/P.Way/Rdg
ENGG
ENGG
Sunil Kumar
ENGG SEJ DN train cannot be AMC Batch (SSE/P.Way/GDG 08:15-10:15
120 min 1 maintainance 1 Unit TLKL Yard DN 97/600-700 LB received Blacksmith Team ML)
ENGG
Movement not
Shadow SEJ block
Isolator permitted in BNP AANJAIAH
1 at TLKL
TRD 45 Maintenance 1 BNP YARD Yard 103-105 LB and PB Yard-DN Tower Car (08310162741)
Movement not
Isolator permitted in BNP AANJAIAH Not permitted
PKL-RLP
TRD 45 2 Maintenance 1 BNP YARD Yard 103-105 LB and PB Yard-DN Tower Car (08310162741)
Movement not
Shadow SEJ block
Turnout permitted in BNP AANJAIAH
3 at TLKL
TRD 45 Maintenance 1 BNP YARD Yard 103-105 LB and PB Yard-DN Tower Car (08310162741)
Movement not
Turnout permitted in BNP AANJAIAH Not permitted
TRD 45 4 Maintenance 1 BNP YARD Yard 103-105 LB and PB Yard-DN Tower Car (08310162741)
45min 1 LC-77 LC-77 MRB both 134/700 to discconnectio Trains to be dealt ESM with 3 nos. staff JE/S/KBL
S&T 10:00-10:45
maintenance maintenance 134/800 n through Slide boom
Movement not
Isolator permitted in LD HANUMANTH RAO 09:00-09:45
TRD 45 1 Maintenance 1 LD YARD Yard 559 LB and PB Yard-DN Tower Car (08310162257)
Movement not
Isolator permitted in LD HANUMANTH RAO Not permitted
TRD 45 2 Maintenance 1 SVTN YARD Yard 559 LB and PB Yard-DN Tower Car (08310162257)
Movement not
Turnout permitted in LD HANUMANTH RAO 08:00-08:45
TRD 45 3 Maintenance 1 SVTN YARD Yard 559 LB and PB Yard-DN Tower Car (08310162257)
Movement not
Turnout permitted in LD HANUMANTH RAO Not permitted
TRD 45 4 Maintenance 1 SVTN YARD Yard 559 LB and PB Yard-DN Tower Car (08310162257)
TRD
TRD
30 Minutes 1 Track 02 TR Track 02 TR GPB DN 665.466 Disconnection Up train reception ESM with 2 nos. staff NA
two core two core on Road 2 on
S&T 10:00-10:30
cable cable Calling ON
replaced replaced
40 Minutes 1 Pt no 50 Pt no 50 DUR UP & DN 599.637 Disconnection 1. UP reception ESM with 3 nos. staff NA
Disconnection maintenance maintenance piloting
S&T 11:00-11:40
2. DN despatch by
starter memo
60 Minutes 2 Pt no 52 & 53 Pt no 52 & 53 DUR UP & DN 599.637 Disconnection 1. UP reception ESM with 3 nos. staff NA
Disconnection maintenance maintenance piloting
S&T 12:00-13:00
2. DN despatch by
starter memo
45 Minutes 1 32CT TLD 32CT TLD DEV DN 546.55 Disconnection NIL, ESM with 2 nos. staff NA
Disconnection BOX& LEAD BOX & LEAD
DWR-MRJ
S&T WIRE WIRE 08:00-08:45
REPLACEME REPLACEME
NT NT
20 Minutes 1 CH1-CH8 CH1-CH8 LWR UP&DN 525.8 Disconnection UP&DN ESM with 2 nos. staff NA
Disconnection MAINTENAN MAINTENAN RECEPTION AND
S&T 08:00-08:20
CE CE DISPATCH
PILOTING
30 Minutes 2 60TR TLD 60TR TLD DWR UP&DN 489.09 Disconnection UP&DN TRAIN ESM with 2 nos. staff NA
Disconnection BOX BOX RECEPTION ON
REPLACEME REPLACEME CALLING ON
NT NT ROAD 4&5,UP
S&T 16:00 - 16:30
TRAIN DISPATCH
FROM RD-4&5
WITH STARTER
MEMO
UTV Machine
Shifting of 55/35 nos
ENGG 07:30-09:00
2 blocks of 90 Sleepers/Rail Loading/unloa
minutes each 1 s ding LD-TVG DN 558/000-534/000 LB & PB Contract Labours SSE/Pway/SPL/LD
Duomatic
ENGG tamping Plain track 14:00 -16:00
2 x 120mins 2 Machine Tamping PCH-GKK UP 663/000-664/000 LB Block required JE/P.way/SPL/BGM
ENGG 1 block 90 mnn 3 EJ SP & Alignme 1 CNC-KUD DN 709/900-708/100(Dn LB LB Required SSE/PWAY/KUD 10:00-11:30
UP TRAIN CAN'T
ENGG 16:15 -18:45
240 BCM WORK 500 KBI YARD UP 513/600-514/100 LB+PB DISPATCH SSE/PWAY/DWR
RE
TRD
CON
Bridge no.121
Sharad Srivastava
ENGG approaches approach 12:30-14:30
SSE/PW/KTY
120min 2 packing packing KTY-HBI singl line 48/900-49/100 Block required Manual
VC-KTY
Ballast Ballast profile Rekhya naik
ENGG 12:30-14:30
120min 1 regulation & sweeping HBI-KTY Single line 70/0-71/0 Block required BRM-04 JE/PW/KTY
TRD
SWR Railway - Hubballi Division
Rolling Block from 11.09.2023 to 05.11.2023
Date: 05.11.2023
BLOCK TYPE OF BLOCK
TENTATIVE
BOARD DEPT DURATION QUANTUM BLOCK SEC/ LOCATION BLOCK RESOURCE AVAILED BLOCK PROGRESS
TIMINGS
(MINS) S. N. TYPE OF WORK OF WORK STATION UP/DN (KM) (LB/PB) REPERCUSSIONS REQUIREMENT SUPERVISORS STATUS DURATION ACHIEVED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Movement not
Isolator permitted in BNP SIVARAMNANDH 08:00 - 08:45
TRD 45 1 Maintenance 1 BNP YARD Yard 92-94 LB and PB Yard-UP Tower Car (08310161863)
Movement not
Isolator permitted in BNP SIVARAMNANDH Not permitted
TRD 45 2 Maintenance 1 BNP YARD Yard 92-94 LB and PB Yard-UP Tower Car (08310161863)
Movement not
Turnout permitted in BNP SIVARAMNANDH 09:00 - 09:45
TRD 45 3 Maintenance 1 BNP YARD Yard 92-94 LB and PB Yard-UP Tower Car (08310161863)
Movement not
Turnout permitted in BNP SIVARAMNANDH Not permitted
TRD 45 4 Maintenance 1 BNP YARD Yard 92-94 LB and PB Yard-UP Tower Car (08310161863)
Movement not
Isolator permitted in 08:45-09:30
TRD 45 5 Maintenance 1 WUBL YARD Yard 475-477 LB and PB WUBLYard-UP Tower Car B SOREN (7022029745)
Movement not
Isolator permitted in Not permitted
TRD 45 6 Maintenance 1 WUBL YARD Yard 475-477 LB and PB WUBLYard-UP Tower Car B SOREN (7022029745)
Movement not
Turnout permitted in 09:50 - 10:35
TRD 45 7 Maintenance 1 WUBL YARD Yard 475-477 LB and PB WUBLYard-UP Tower Car B SOREN (7022029745)
Movement not
Turnout permitted in Not permitted
TRD 45 8 Maintenance 1 WUBL YARD Yard 475-477 LB and PB WUBLYard-UP Tower Car B SOREN (7022029745)
KBL-DWR 09:45-12:15(DN)
ENGG
150 min *2 5 UNIMAT-8409 4 UNIT LKT-HBS UP & DN 19/100-45/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
09:45-12:15(DN)
ENGG
120 min 6 BT-Unloading 20 Bobyn HBS-NGR UP & DN 19/100-35/400 LB Block required SSE/JE P.Way 13:00-15:00(UP)
UP line no train
ENGG 120min 7 BMAP-BDKA UP 3/00-9/500 LB can be passed 10.00 - 12.00
BT-Unloading 30 Bobyn Block/BT required SSE/JE P.Way
during Block time
30 Minutes 1 EI system EI system UNK UP/DN 472.6 Disconnection All UP & DN trains ESM with 2 nos. staff JE
S&T 09.00 - 09.30
Disconnection changeover changeover to be piloted
40 minutes 2 lc 19 maintance lc 19 ngr UP/DN 35.42 Disconnection all trains on siding ESM with 3 nos. staff NA
S&T 11.00 - 11.40
maintance boom
40 minutes 3 ngr-lkt block ngr-lkt block ngr UP/DN 35.42 Disconnection all trains on PLCT ESM with 1 no. staff NA
S&T 11.40 - 12.20
maintance maintance
30 4 Maintenance Maintenace of GDGBP both 55/700 discconnectio Both side PLCT ESM with 1 no. staff JE/S/GDG
S&T BLOCK n 12.00 - 12.30
GDGBP-HBL
20 5 Inspection CRANK GDG both 58/000 disconnection Both side Piloting ESM with 1 no. staff JE/S/GDG
handle
S&T 12.00 - 12.20
Monthly
inspection
60 6 maintance of crank maintance of KBL both 115/400 discconnectio all trains need to be ESM with 1 no. staff JE/S/KBL
S&T handles ch1 to ch4 crank handles n pilated 12.00 - 13.00
ch1 to ch4
ENGG 2 X 75 min 1 WRJ CNR Yard UP 74/860-75/120 S& T Staff required JE/PWAY /QLM 10.00 - 11.15
ENGG 2 x 90 min 2 MPT Machine CNR Yard UP 74/860-75/120 10.00 - 11.30
ENGG 2 x 90 min 3 UTV CNR Yard UP 74/860-75/120 10.00 - 11.30
TSR work between
ENGG 13.00 - 15.00
120min 4 DDS yard TSR work DDS Yard Yard 37/500-600 LB required
PBC work between Disconnection
ENGG 13.00 - 15.00
120min 5 CLR-CRZ PBC work CLR-CRZ SL 25/200/500 required
TRD
60 Minutes 1 Pt no 50&51 Pt no 50 & 51 LD DN 559.45 Disconnection 1. UP reception ESM with 3 nos. staff NA
Disconnection maintenance maintenance piloting
S&T 12.00 - 13.00
2. DN despatch by
starter memo
60 Minutes 2 Pt no 52 & 53 Pt no 52 & 53 LD DN 559.45 Disconnection 1. UP reception ESM with 3 nos. staff NA
Disconnection maintenance maintenance piloting
S&T 13.00 - 14.00
2. DN despatch by
LD-VSG starter memo
30 Minutes 1 Maintenance of Maintenance VSG Yard 108.458 Disconnection MPT side all trains ESM with 2 nos. staff NA
Disconnection CH1,CH2,CH3,CH4 of piloting.
S&T ,CH5 & CH6 CH1,CH2,CH 10.00 - 10.30
3,CH4,CH5 &
CH6
30 Minutes 2 Maintenance of Maintenance VSG Yard 108.458 Disconnection SKVL side,all up ESM with 2 nos. staff NA
Disconnection CH7,CH8,CH9,CH1 of and down trains
S&T 0,CH11 & CH12 CH7,CH8,CH piloting. 10.30-11.00
9,CH10,CH11
& CH12
CON
S&T
PROJ
S&T
CN
ENGG 300 Min 1 TWR 200m LKY-BDM DN 56/00-68/100 LB Block required SSE/JE P.Way 10.00 - 12.30
Fittings and Aijt Prasad
ENGG 120 Min 1 SEJ Packing 01 Nos GED Yard UP 80/400-500 Line block No train movement 12.00 - 14.00
12 Man power SSE/P.Way/BGK
1 Machine
No Dn train Santosh Chavan
ENGG 150 Min 1 TWR 100 Mtrs JML-BJP DN 182/400-500 Line block 30 Labours, 12.00 - 14.30
movement Tr.JE/P.way/BJP
Rail GR Pad & ERC
Tamping By Tamping By 250/000-281/9 No Up & Down train Tamping Machine 08 Sachin Mane 10:00-11:30
ENGG 180 Min 1 LHN-HG UP/DN Line block
Machine Machine 00 movement Nos Manpower SSE/P.way/IDR 15:00-16:30
ENGG
TRD
60MI 1 Pt No. 7,8 FOR Pt No. 7,8 LMT UP 128.29 DISCONNEC UP TRAINS ESM with 3 nos. staff JE/SSE
MAINTENANCE FOR TION RECEIPTION ON
MAINTENAN CALLING ON AND
CE DISPATCH ON
STARTER MEMO
S&T 11:00-12:00
DN TRAINS
RECEIPTION BY
PILOTING AND
GDG-HG DISPATCH ON
SIGNALS
90MIN 2 BI AND CH FOR BI AND CH MGH UP/DN 101.72 DISCONNEC UP/DN TRAINS ESM with 1 no. staff JE/SSE
MAINTENANCE FOR TION RECEIPTION ON
S&T MAINTENAN SIGNALS AND 11:30-13:00
CE DISPATCH ON
PLCT DN TRAINS
UP TRAINS
RECEIPTION ON
CALLING ON AND
Pt No.
Pt No. DISPATCH ON
20,21,22,23,2
20,21,22,23,24 DISCONNEC STARTER MEMO As per train
S&T 150MIN 3 4 FOR BGK UP 93.29 ESM with 3 nos. staff JE/SSE
FOR TION DN TRAINS service
MAINTENAN
MAINTENANCE RECEIPTION BY
CE
PILOTING AND
DISPATCH ON
SIGNALS
CON
S&T
CN
Movement not
Overlap permitted in RDG Pavan Kumar 13:00 - 13:45
TRD 45 1 Maintenance 1 RDG Yard Yard 52-53 LB and PB yard Tower Car (08310163339)
Movement not
Overlap permitted in RDG Pavan Kumar Not permitted
TRD 45 1 Maintenance 1 RDG Yard Yard 52-53 LB and PB yard Tower Car (08310163339)
Movement not
Turnout permitted in RDG Pavan Kumar 14:15-15:00
TRD 45 1 Maintenance 1 RDG Yard Yard 52-53 LB and PB yard Tower Car (08310163339)
Movement not
Turnout permitted in RDG Pavan Kumar Not permitted
TRD 45 1 Maintenance 1 RDG Yard Yard 52-53 LB and PB yard Tower Car (08310163339)
Movement not
Overlap permitted in KDN S Ganesh 11:00-11:45
TRD 45 1 Maintenance 1 KDN YARD Yard 187-189 LB and PB yard UP Tower Car (08310162957)
Movement not
Overlap permitted in KDN S Ganesh Not permitted
TRD 45 1 Maintenance 1 KDN YARD Yard 187-189 LB and PB yard UP Tower Car (08310162957)
Movement not
Turnout permitted in KDN S Ganesh 12:15-13:00
TRD 45 1 Maintenance 1 KDN YARD Yard 187-189 LB and PB yard UP Tower Car (08310162957)
Movement not
Turnout permitted in KDN S Ganesh Not permitted
TRD 45 1 Maintenance 1 KDN YARD Yard 187-189 LB and PB yard UP Tower Car (08310162957)
60" 1 LC 81 EKT 1 BYO UP/DN 161.53 LB DN and UP trains ESM with 2 nos. staff SSE/JE/S/HPT
Overhauling reception and
S&T 11:00-12:00
dispatch Normal
signals
30 mins x 3 LC-100, Point No EKT & Key KDN UP/DN 188.23 Disconnection LC-100- DN trains ESM with 2 nos. staff NA
BAY-PKL
15KL & 16KL Lock point reception piloting .
maintenance Up trains dispatch
starter memo. 15 &
07:45-08:15
16 KL- Dn trains
S&T 08:30 -09:00
reception to Dn loop
09:15-09:45
line piloting. Dn
trains dispatch from
Dn loop line starter
memo.
30 mins LC-97 EKT and EKT DAJ UP/DN 181.27 Disconnection Dn trains dispatch ESM with 2 nos. staff NA
Emergency EKT maintenance starter memo. Up
S&T 10:30-11:00
trains reception
piloting
30 mins LC 04 EKT and EKT DAJ UP/DN 181.27 Disconnection Caution order. ESM with 2 nos. staff NA
Emergency EKT maintenance Up/Dn trains to
S&T 12:30-13:00
observe PHS
signal.
30 mins 8 KL point EKT & Key RNJP UP/DN 23.02 Disconnection Reception to BMM ESM with 2 nos. staff NA
maintenance Lock point siding piloting,
S&T maintenance Dispatch from BMM 15:00 - 15:30
line on starter
memo.
Point attention 180/800-181/0 S&T staff, 1 B/s, 5 Vicky Kumar
ENGG 90 min 1 2 DAJ DN/UP DN/UP No train movement Not Permitted
Throw 00 Track mans JE/P.WAY/SW/TNGL.
Mukunda
20 No train movement Machine,TRD staff-3,
ENGG 90 min 1 UTV working Slm - Rdg SL 31/500-40/000 LB & PB SSE/P.Way/Spl works 13:00-14:30
sleepers/Rails Slm to Rdg Dept-6 TM
Bay
ENGG
ENGG
Point No 265B LB & UP trains cannot S&T staff and 4 TM & H.Anjanamurthy As per train
ENGG
90 min 1 deficeancy attention 1 point HPT yard UP 141/500-600 Disconnecion dispatch 1 B/s Je/P.WAy/HPT/ML service
UP train cannot be AMC Batch Sunil Kumar
ENGG 11:30-13:30
120 min 1 SEJ maintainance 1 Unit TLKL Yard UP 97/600-700 LB dispatched Blacksmith Team (SSE/P.Way/GDG ML)
ENGG 120 mims 1 SEJ Packing 1 unit
45min 1 LC-79 maintenance LC-79 MRB both 138/100 to discconnectio Trains to be dealt ESM with 3 nos. staff JE/S/KBL
S&T 09:30-10:15
maintenance 138/200 n through Slide boom
30mins 2 Maintenance JBGD Both 18/100 disconnection Both side PLCT ESM with 2 nos. staff JE/S/KBL
of
S&T 11:20-11:50
PKL-RLP JBGD-GGVT
B/I
30mins 3 Maintenance JBGD Both 18/100 disconnection Both side PLCT ESM with 2 nos. staff JE/S/KBL
of GIN-JBGD
S&T 11:00-11:30
BLOCK
instrument
30mins 4 Maintenance JBGD Both 18/100 disconnection Both side piloting ESM with 2 nos. staff JE/S/KBL
S&T of Crank 10:30-11:00
handles
CON
ENGG
40 Minutes 1 Pt no 50 Pt no 50 SBH UP & DN 626.144 Disconnection 1. UP & DN ESM with 2 nos. staff NA
Disconnection maintenance maintenance reception piloting
S&T 12:50-13:30
2. DN despatch by
starter memo
40 Minutes 2 Pt no 51 Pt no 51 SBH UP & DN 626.144 Disconnection 1. UP & DN ESM with 2 nos. staff NA
Disconnection maintenance maintenance reception piloting
S&T 12:30-13:10
2. DN despatch by
starter memo
30 Minutes 1 50AT TLD BOX 50AT TLD DEV UP 546.55 Disconnection UP TRAIN ESM with 2 nos. staff NA
Disconnection REPLACEMENT BOX RECEPTION ON
S&T 08:30-09:10
DWR-MRJ REPLACEME CALLING ON
NT
UTV Machine 55/35 nos
ENGG 2 blocks of 90 Shifting of Loading/unloa 558/000-534/0 07:30-09:30
minutes each 1 Sleepers/Rails ding LD-TVG DN 00 LB & PB Contract Labours SSE/Pway/SPL/LD
Duomatic tamping Plain track 13:30 - 15:30
ENGG
2 x 120mins 2 Machine Tamping SUL yard UP SUL yard LB Block required JE/P.way/SPL/BGM 02:00 - 04:00
1 block 90 SEJ SP & 709/000-100(U
ENGG
mnn 3 Alignment 1 CNC-KUD UP/DN p/Dn) LB LB Required SSE/PWAY/KUD
UP TRAIN CAN'T
ENGG 16:30 -18:30
240 BCM WORK 500 KBI YARD UP 514/100-600 LB+PB DISPATCH SSE/PWAY/DWR
CON
Ballast profile Rekhya naik
ENGG 15:30 - 17:30
120min 1 Ballast regulation & sweeping KTY-BEHI Single line 71/0-72/0 Block required BRM-04 JE/PW/KTY
VC-KTY
ENGG
TRD

Digitally signed by BUTCHI


MANISH Digitally signed by
BUTCHI VENKATA VENKATA RAO GANTA
MANISH AGARWAL

AGARWAL Date: 2023.09.09 HARIETHA S Digitally signed by HARIETHA S


Date: 2023.09.08 18:43:23 +05'30'
RAO GANTA Date: 2023.09.09 09:35:58
11:40:00 +05'30' +05'30'
Sr.DOM/UBL