Answer: 6 mm
**************************
Answer: If the ratio of Longer Span to Shorter Span is more than or equal to 2, then it is known
as One way Slab.
**************************
**************************
Answer: Zone - 3
**************************
**************************
Q205. Which Code do we use for Concrete Mix Design in civil engineering?
**************************
Q206. What is the size of Cube taken for Compressive Strength Test?
Answer: 150 mm x 150 mm x 150 mm
**************************
Answer: 8.1 Kg
**************************
Answer: Cement grade indicates the Compression strength of cement after 28 days of setting.
**************************
**************************
Answer: A transit Theodolite is one in which the telescope can be revolved completely about the
horizontal axis in a vertical plane.
**************************
Answer: The function of a theodolite is to measure the following quantities: a) Horizontal angle,
b) Vertical angle, c) Deflection angle, d) Magnetic Bearing, e) Horizontal Distance
**************************
Answer: 3 mm
**************************
Answer: Zone - 4
**************************
Answer: 35 mm
**************************
Answer: 190 mm x 90 mm x 90 mm
**************************
Answer: 19 mm
**************************
Answer: Zone - 2
**************************
Answer: 12 mm
**************************
**************************
**************************
**************************
**************************
**************************
Answer: As per IS 456:2000, the slope or pitch of stairs should be between 25 degrees to 40
degrees.
**************************
**************************
Q226. What is the Initial and Final setting time of cement in civil engineering?
**************************
Answer: Bleeding is one form of segregation, where water comes out to the surface of the
concrete.
**************************
Q228. What is the name of the machine to do a Compression test in civil engineering?
Answer: Stirrups are provided to resist the Shear force. It also holds the main bars in position.
**************************
Answer: 12 m
**************************
Answer: Soil reinforcement is the act of improving soil strength to enable it to support or carry
more load.
**************************
Q232. Why foundations are placed below ground level in civil engineering?
**************************
Q233. What is the use of the 3-4-5 method in construction sites in civil engineering?
Answer: This method used for setting out plans accurately at the right angle.
**************************
**************************
Answer: As per [IS 2911, Part – 1, Section – 2], the minimum recommended diameter of the pile
is 450 mm.
**************************
Q236. What is the full form of RCC?
**************************
**************************
Q238. What is the factor that helps in converting Wet concrete volume to Dry concrete volume?
Answer: 1.54
**************************
**************************
Q240. What is the direction of the Main & Distribution bar in RCC Slab?
Answer: Main bar in Shorter span and Distribution bar in a longer span.
**************************
Answer: If the pile supports the load primarily by resistance developed at the pile tip or base,
then it is called End Bearing Pile.
**************************
I hope you find this civil engineering interview information useful. If there is something that I
have missed or I do not know, you can comment and tell me which I will try to rectify as soon as
possible.
You can also follow me on Instagram, Telegram and Facebook page. Because many small
things, which are very important from interview point of view, it is not possible to put here, I put
all that on Instagram, Telegram and Facebook page. You can take it from there. You will find the
links of all social media below.
INSTAGRAM | TELEGRAM | FACEBOOK PAGE
Thanks!
Click Below