FOREST DEPARTMENT
1981-82FOREST DEPARTMENT
ANNUAL REPORT
1981-82INDEX
Chapier Page No°
1. Introduction os ne mn 1
2. Working of the Department we 1 7
3. Development Schemes implemented during 2 19
1981-82 (General Wing).
4, Activities of the Development Wing... 3 27
5. Other important information on the depart- 4 40
ment.
6. Karnataka State Forest industries Corpo- 5 46
ration Ltd.
7. Karnataka State Forest Plantation 6 bl
Corporation Ltd.
8. Karnataka Cashew Development Corpora- 7 53
tion Ltd.
TABLES:
1. Land utilisation pattern wit 1
2. Forest types, areas and estimated growing stook ... 2
3. Circle and divisionwise forest area 2
4. Districtwise forest area in Karnataka State 6
5. District wise forest area by legal status 6
6. Production of timber 8
7. Allot ment of Matchwood and Piywoue st 9
8. Allotment of Eucalyptus wood o nat 10
9. Firewood supply aay we 18
10. Location of Bamboo Depots sit te 14
11. Allotment of Grass to industries 0 wes 16
12. Supply of wooden sleepers ae wit WT
‘13. Supply of Timber (o public Sectors" ... su WW
14. Details of plantations raised 19
15. Plan allocation and expenditure 6
16. Area under National Parks/Sanctuaries etc 29Chapter Page No.
17. Physical and Financial achievements under Social 35
Forestry.
18, Allotment and expenditure under Plan Scheme 37
Development Wing)
19. Progress of working plan organisation be 39
20. Loss of Forest Areas are 40
21. Revenue and expenditure of the Depareinsay we 41
22. Per hectare Revenue and Expenditure we 42
23. Compulsory planting provisions ae we 44
24. K.S.F.LC. financial results wi aaa 49
25. K.S.P.L.C. details of production wee ws 50
26. K.S.F.P.C. out-turn and Revenue... 8 52
27. K.S.F.P.C. progress of Projects... 7 4
28. Target and achievement under Plan Schemes... 5B
29. Tribal Sub-plan ws vs 62
30. Special component programme * wie 64
31. Forest Development Fund Progress Rapes ve 66
32 ahd 33. Progress under Drought’ Prone area Programme 70 &71
84. Progress under Integrated Development of Western 95
Ghat Region
35. Particulars of Government Waste lands @ VW
36. Details of Forest offence cases ee ee 81
37. Details of Plan proposals for 1982-83 se 83
38. Non-plan outlay for 1981-82 Be oe 90
39. Non-plan budget estimates for 1982-83 es oI
40, Organisational set-up of the Dipesiens wee 92
41. Staff position statement = 94
42. Physical and Financial target in respect tof Rica. 9
taka Forest Development Fund for 1982-83.KARNATAKA FOREST DEPARTMENT
Annual Report 1981-82
Introduction
The total forest area of the State is 38,384-06 Square
Kms. as against the State geographical area of 1,91,791 Sq.
Kms. The percentage of forest area to geographical area
is 20.0 as against the all India average of about 23 per cent.
The percentage prescribed in National Forest Policy is
33.33. Thus the percentage of Forest area in the State
is less than the all India average and far less than the
standard prescribed.
The State is situated between 11°30’ and 19° latitudes
and between 74° and 78° east longitudes. The altitude
generally varies from sea level to 1,524 metres on the
Western Ghats. The rainfall varies from 255 mm in the
Eastern plains to over 8900 m.m. in the Western Ghats,
indicating dense forest areas on the Western Ghat side of
the State and sprinkled areas of forest in the Eastern plains
of the State. The following table furnishes the land utilisa-
tion pattern in the State.
TABLE—I
LAND UTILISATION PATTERN
SL. Area in Percentage ‘to
No. Particulars hectares the geogra-
phical area
1. Land put to agriculture inelud-
ing fallow lands ade 1,18,93,479 62.0
2. Forests :
(1) Reserved Forest ve 28,410,047 14.8
(2) Other class of Forest... 9,938,359 5.2
Total Forest ve 38,33,406 200
(3) Other cultivable land and
land not available for
cultivation & 34,47,215 18.0
*Census 1981 (Provisional figures)2
The total forest area of 38,384.06 Sq. Kms. includes
all classes of forests viz., Reserved, Protected, unclassed,
village and Private forests. The increase in forest area
over the previous year is due to incorporation of C and D
class of lands taken over from the Revenue Department
under unclassed forest .
TABLE—2
Forest types area and estimated growing stock
Forest Growing
Percentage under Growing _ stock
Sl. Type to the each type Stock per in each
No total forest (000 Ha.) Ha. (m3) — type
area (in million
m3)
1 2 3 4 5 6
1. Evergreen and Semi
evergreen vg BS 580 101.50
2. Moist Deciduous 15.06 578 57.80
3. Dry Deciduous .. 18.94 727 36.35,
4. Serub and thorny 21.31 818 20.45
5. Un-wooded 29.58 1,135 .
Total -» 100.00 3.838 e 216.10
TABLE--3
Circle and Divisionwise Forest area during 1980-81 (Provisional)
(Area in Sq. Kms.)
Circle Division Area
7 1 2 3
T. BaNcaore 1. Bangalore a 793.05
. 2. Kolar % 1,039.41
3. Tumkur = 866.90
Total... 2,699.361 2 3
Il. Breneaum 4, Belgaum 1,723.02
5. Bagalkot 824.30
6. Dharwar 594.09
7. Gokak 505.63
8. Gadag 765.08
Total... 4,412.12
Tl. Be.iary 9. Bellary a 1,743.53
10. Bidar ails 482.31
11. Chitradurga 1,562.29
12. Gulbarga 1,187.85
13. Raichur 1,090.03
Total =... 6,016.01
IV, Kanara 14. Haliyal 1,441.70
15. Honnavar 1,408.99
16. Karwar 2,239.87
17. Sirsi 1,712.31
18. Yellapur 1,488.64
Total
V. Kopacu 19. Coondapur 2,639.96
20. Hassan 541.07
21. Hunsur 651.39
22. Madikeri 858.16
23. Mangalore 2,405.77
Total oe 7,096.35
VI. Mysore 24. Chamarajanagar .. 560.44
25. Mandya 543.00
26. Mysore 710.65
27. Kollegal 1,916.70
Project Tigr 689.52
Total 4400 0%L 2 3
VII. Suimoea 28. Bhadravathi 1,069.71
29. Chickmagalur 752.38
30. Shimoga 1,031.40
31. Sagar 1,595.60
32. Koppa 999.31
Total 5,448.40
State Tora
38,384.065
TABLE—4
District-wise Forest area in Karnataka State 1980-81
(Area in Sq. Kms.)
Percentage of
forest area
Sl. District Geographical Forest to Geographi-
No. area area cal area
1 2 3 4 5
1, Bangalore 8,005 1,168.55 14.60
2, Belgaum 13,415 2,998.65 16.61
3. Bellary 9,885 1,748.53 17.64
4, Bidar 5,448 482.31 8.85
5. Bijapur 17,069 824.30 4.83
6. Chickmagalur 7,201 2,179.08 30.26
7. Chitradurga aoe 10,852 1,562.29 14.40
8. Dakshina Kannada 8,441 5,045.73 59.78
9. Dharwad 138,738 1,359.17 9.89
10, Gulbarga 16,224 1,137.85, 7.01
11, Hassan 6,814 541.07 7.94
12, Kodagu 4,102 1,234.12 30.09
13, Kolar . 8,223 1,039.41 12.64
14, Mandya ei 4,961 193.79 3.91
15, Mysore =e 11,954 4,126.45 34.52
16, Raichur oe 14,017 1,090.03 7.78
17, Shimoga ae 10,553 3,269.32 30.98
18. Tumkur we 10,598 866.90 8.18
19. Uttara Kannada 10,291 8,291.51 80.57
Srare ToraL «. 191,791 38,384.06 20.00
Note :-—
(1) Forest area figures are provisional and subject to revision
(2) The total forest area is inclusive of C & D class of lands taken
over from Revenue Department,TABLE—5
District-wise forest area by legal Status——1980-81 (Area in Sq. Kms).
S.No. District Reserved Protected ~ Un-classed Village Private Total
1. Bangalore .. 1,124.50 36.05 o 8.00 «1,168.55
2. Belgaum .. 2,067.42 11.78 36.02 . 123.43 2,228.65
3. Bellary . 1,236.21 . 477.59 29.73 1,743.53
4. Bidar : 63.35 90.89 328.07 o 7 482.31
5. Bijapur. 824.19 0.11 . . . $24.30
6. Chickmagalur 1,431.72 184.32 555.29 U7 + 2,179.08
7. Chitradurga 958.30 5.05 593.60 5.34 an 1,562.29
8. D. Kannada 2,080.56 1,587.97 1,288.59 ws 88.61 5,045.73
9. Dharwar. 1,115.13 14.04 172.04 ish 57.97 1,359.17
10. Gulbarga. 345.64 6.60 . 1,137.85
11. Hassan ; 448.71 5.41 . 541.07
12, Kodagu... _——1, 122.26 . «1,284.12
13. Kolar . 877.93 5.61 -. 1,089.41
14. Mandya... 187.19 193.79
15. Mysore ss 8,875.59 4,126.45
16. Raichur.. 251.74 as ws 1,090.03
17. Shimoga. 1,944.88 13.59 - B,269.32
18. Tumkur. 117.31 8.68 866.90
19. U Kannada 7,727.84
20.90 . 8,291.51
28,400.47 58,3847
CHAPTER I
Working of the Department
The main activities of the department are systematic
exploitation of Forest wealth based on the Principal of
progressive and sustained yield encouraging the natural
regeneration, reforestation and afforestation measures and
organising the unorganised forests, meeting the demands of
forest based industries, conservation and protection of
existing forests and also encouraging Social Forestry. The
development schemes are both industrially oriented aimed
at increasing the production potential of forest resources
in the State and to meet the demands of rural population
and economically weaker sections.
The Forest Department has been located in its own
building called “Aranya Bhavan” which was inaugurated
by the President of India. On this occasion, the grafted
variety of ber, obtained from Gujarath and taken up ex-
tensively by the Forest Department for planting, was also
released by the Governor of Karnataka.
An event of considerable significance during the year
was the national seminar on forests and environment,
conducted by the forest department on 2nd and 3rd
December 1981. The Seminar was participated by more
than 170 delegates from all over the country and 67
Technical Papers were discussed. The recommendations
of the Seminar will help to reorient the forestry policies in
all the States of the Country.
Production of Forest produce
Timber
Round timber of commercial importance, both hard
and softwood species, are extracted and brought to Govern-
ment timber depots and exposed for public auction besides
being offered for selection to Railways, Defence, Ship build-8
ing, Industries, housing and for private uses. Timber is
being sold periodically in 36 Government Timber Depots.
In addition to this trees are also sold standing in coupes
in public auction. However, gradually this system is being
discontinued, the work of exploitation being taken up
increasingly large proportion by the department.
TABLE 6
The following table furnishes the production of timber during
1986-81,
Sl. Produce Unit Quantity
No.
1. Rosewood ..m3 (1) 12,395
2. Teakwood . do 73,114
3. Sawn timber . do 10,805
4. Other kinds of timber do 2,47,581
5. Pulp wood ar do 3,03,240
6. Matchwood ve do 15,700
7. Plywood os do 1,30,783
8. Timber in round poles do 1,04,201
9. Fire wood do 10,69,523
19,67,342
Matchwood and Plywood
Softwood of commercial importance is being extracted
by the industries to whom specific areas are leased in ever-
green and. semi-evergreen forests of the State. There are
in all 17 plywood factories, 2 Chip Board Factories, Six
Matchwood Industries and 3 Matchwood Associations
having 24 member factories on their rolls and 2 packing
case manufacturing industries drawing softwood timber
from the department regularly.TABLE 7
Approxi-
Sl. Nature of the No.of Raw Quantity mate Qtty.
No. ....Industry Industries material allotted removed
during
1980-81
1. Plywood 7 17_ Plywood 1,07,116m3(r ) *
2, Matchwood 5) Matchwood 53,780 do |
3. Matchwood Asso- 3d |
ciations with 24 |
member factories. b
4. Chipboard ae 2 Plywood & 40,119 do |
Matchwood
5. Packing case .. 2 Hardwood & 7,120 do|
Softwood. J
*These industries have removed 1,46,483 m3(r) of softwood
during the year 1980-81.
It is the desire of the Government to change over to
departmental extraction.
50 per cent of the lops and tops of softwood extracted
by the industries is permitted to be removed by them. The
balance of 50 per cent is disposed of to the registered small
scale wood based industries like Slate frames, packing case
industries in auction sale.
Eucalyptus wood
The Forest Department has raised large scale planta-
tions of Eucalyptus both pure and mixed. The area raised
upto the end of 1980-81 is 94,392 hectares. The planta-
tions are worked on a rotation of 9 years in respect of
original crop and 8 years in respect of coppice crop. The
wood is used as a raw material in rayon Industry as well
as paper Industry. It is also a good firewood and used as10
poles. The older plantation are allotted to one rayon grade
pulp factory and three paper industries.
The following quantities are allotted to the Industries
noted below :
TABLE—8
Sl Name of the Industry Quantity allotted
No
1. Harihar Polyfibres Harthar # 2,05,000 tonnes
2. Mysore Paper Mills 1.'c,., Bhadravuthi 88,000 do
3. West Coast Paper Mls 7 32,000 do
Eucalyptus Citridora leaves for distillation of Oil—
Three Industries viz M/s Arochem corporation, M/s
Doddannavar Brothers and K.S.F.LC. are permitted to
extract leaves of Eucalyptus Citridora from both pure and
mixed plantations for distillation of oil on lease for 10 years
from areas conceded to M/s. Harihar Polyfibres and M/s.
West Coast Paper Mills Ltd.
Firewood
The State is facing shortage of firewood. As per the
projected demand at the turn of the Century, the require-
ment of firewood will be about 13 million cubic metres,
The present demand is about 7 million cubic metres as
against the total production of about 3 million cubic metres
including private sources. _ The departmental production
on an average is about 1.75 million Cubic metres. The
Forest Department is making all efforts to meet the future
demands of firewood by increasing afforestation and massive
Social Forestry Programme. Annually about 10,000
hectares of fuel plantations are being raised apart from free
supply of 5 to 6 crores seedlings to the farmers for planting
in their Lands. In addition to this the departmental planta-
tions in the dry zone under various schemes like rehabilita-il
tion of degraded forests also include a good number of fast
growing firewood species like Eucalyptus, Soobabul, etc.
The Government have transferred the C & D class of lands,
which are not fit for agriculture to the Forest Department
to take up large scale plantations, mostly of fuel species.
The Central Government is also financing the State under
the rural fuelwood plantation Scheme to meet the increas-
ing demand in the following five selected districts of the
state: (1) Mandya (2) Bellary (3) Kolar (4) Gulbarga and
(5) Bangalore.
A massive Social Forestry Project costing Rs. 60
Crores over a period of 5 years with external assistance has
been approved by the Government and it is before the
Government of India. Swedish International Development
Agency is expected to finance the project from 1982-83
onwards.
Distribution of firewood
In order to cater to the needs of public in general and
particularly of the weaker section, the department by itself
and through Karnataka State Forest Industries Corpora-
tion has opened a number of firewood depots in the State
At present the efforts of the department in making available
firewood is limited only to Malnad areas with the main
objective of discontinuing the prepaid licence system which
has caused considerable damage to the Forests.
The list of Firewood depots are given below :
Depots run by the Forest Department :
Haliyal Division : 6, Hattikeri
1. Dandeli-T x 7. Karwar
2. Dandeli-It : 5. Baad
3. Ambikanage “i 9. Kajunbag
LO. N:
Karwar Division : ll. M
4. Ankola 12. Chit
5. Keni 13. Bings and ChandiaSirsi Division:
14, Sirsi
15. Siddapura
Honnavar Division:
16. Gokatna
17. Gangavali
18. Tadri
19. Bankikodla
20. Heggade
21. Kumta
22, Bad
23. Holegadda
24. Haldipura
Depots run by the K.S.F.1.0.:
1, K. Chaultry
2, Millagatte
3. Honnali Road
4. Durgigudi
5. New Toun Depot,
Bhadravathi.
6. Bullapura
7. MP.M. Colony,
Bhadravathi.
8. Tartkere
9. Kadur
10. Chickmagalur-I
ll. Chickmagalur—II
12. Dharwad-I
13. Dharwad-II
14, Hubli-I
15. Hubli-IL
16. Hubli-III
17. Amargol
18. Laxmeswar
19. Gadag
20. Gdag Botageri
21, Bhatkal-I
22. Haveri-I
23. Mangalore Alpe
24. Monokey Stand
25. Urva
26. Alka
12
25.
26.
27,
28.
29.
30.
31.
32.
33.
34.
27.
28.
29.
30.
31.
32.
33.
34,
35.
36.
37.
38.
39.
40,
41.
42.
43.
44,
45.
46.
47.
48,
49.
50.
51.
52.
53.
Honnavar
Kasargod
Manki
Karki
Murdeshwar
Bhatpal
Shirali and Thingina-
gundi.
Mysore Dist
ELD. Kote
Anthara Santhe
Hediyal.
Nandigudda
Madikeri-I
Madikeri-II
Periyapatna
Ranebennur
Hunsur
K.R. Nagar
Virajpet
Chamarajanagar
Gundlupet
Nanjangud
Tumkur
Haveri-II
Byadagi
Honnali
Chitradurga
Gulbarga
Davangere
Hassan
-V.V.Nagar, Belgaum
Vedagom
Anegol Extension
Thilakawadi
Sholapur
Bangalore
Kollegal
Bhatkal-II
Haliyal.13
In addition to the above firewood is being supplied to
23 co-operative societies functioning at various places in
the State for distribution to the public on no loss ro profit
basis. Firewood is also being supplied to Hostels and
institutions at the sanctioned rates from Government road
side depots.
TABLE 9
Table showing the firewood supply
ce, Firewood released to public for domestic use through:
1980-81
in tonnes
(1) Depots run by K.S.F.LC. ... ve 85,415
it) Depots run by Co-operatives om. 70,000
(iii) Depots run by the Department a 73,341
Ic. Firewood released 10 Industries @ 62,144
Sandal wood
Annually about 1000 tonnes of Sandalwood is being
supplied to the Government Sandal Wood Oil factories
situated at Mysore and Shimoga for distillation of Sandal
wood oil. Besides the requirements of carvers and Ooda-
bathi manufactures have also been met.
Experiments by the Forest Research laboratory Ban-
galore to eradicate sandal spike disease are being continued.
As a precautionary measure all the over mature trees and
trees attacked by spike disease and dead trees are being
extracted.
Concentrated Sandal plantations are also being taken-
up in suitable areas to increase the Sandalwood resources
in the State. A scheme for intensive cultivation of Sandal
Wood costing Rs. 15 lakhs has been sanctioned by Govern-
ment and is being implemented.
Bamboo for Paper Mills
The Out-turn of bamboo in the State has gone down
considerably due to gregarious flowering in many parts of14
the State from 1960 and onwards. The out-turn of bamboo
is about 1.5 lakhs tonnes per annum. The bamboo is
being supplied to the following two paper mills from the
bamboo forests of the State :
Allotment
tonnes
1. West Coast Paper Mills Ltd. Dandeli 1,85,000
2. Mysore Paper Mills, Bhadravathi 1,26,500
During the year 1980-81 the mills have extracted about
1,13,146 tonnes. The Mills are not getting the annually
allotted quota of bamboos on account of decrease in the
out-turn of Bamboo in recent years.
Fresh regeneration of bamboos is getting established
and will require some more years to reach the harvesting
stage. Green bamboos are also being supplied to Medars
and Buruds etc.
Supply of Bamboos to cottage Industrics
In view of the acute shortage of bamboos and also to
avoid reckless removal of bamboos by permit holders, bam-
boos are being extracted departmentally and supply to
Medars, Buruds, Scheduled caste and Scheduled Tribe
people through 37 bamboo depots established by the
department at suitable places where these families live in
more numbers.
TABLE—10
Statement showing the location of Bamboo Depots
Cirele District Town village Total
in the Circle
ro 2 3 q
Sumoca —... Shimoga
Bhadrava! hj on 1S
Channagiri
Joldhal
Lakkaval i
ShimogaKanara
Kopacu
Mysore
Betcaum
BELLARY
15
Chickmagalur
Uttara Kannada
Kodagu
Hassan
D. Kannada ...
Mysore
Mysore
Belgaum
Dharwad
Bellary
Chitradurga
Gulbarga
Raichur
hoo bee
a ao
Chickmagalur
Koppa
Tarikere
Bagawati
Kirwatti
Ramanguli
Malgi
‘Mund god
Gangavathi
Hattikere
Kushalnagar
Madikeri
Hassan
Sullia
Sampaje
Hebri
Periyapatna
Nettanna
Hunsur
K.R. Nagar
Chamarajanagar
Kollegs
Sargur
Sathnur
Belgaum
Nagargali
Dharwad
Kalghatgi
Bellary
Chitradurga.
Gulbarga
Raichur
x
Total
3716
Canes
The department is supplying canes since 1975-76 to
local Industries and Craftsmen through depots after extrac-
ting departmentally. Export of Cane is banned except for
the supply of small quantities to the sports goods export
promotion council. The outturn of cane is about 650
tonnes per year.
Grass for straw Boards and Card-board Industry
The following industries are alloted forest areas for
collection of Bade grass and Elephant grass for the manu-
facture of straw board and Card board on lease basis at
the rate of Rs. 15 per tonne.
TABLE—11
Quantity
Name of Unit Type of grass allotted in
tonnes
1, M/s. Thungabhadra Straw Bade grass aa 30,000
Board Industry, Munirabad
2. M/s. Kabini Paper Limited .... Elephant grass... 16,000
3. M/s. Bhadeka Paper Mills, Elephant grass... 15,000
Nanjangud.
4, M/s. Cavery Papers Private Ltd., Elephant grass... 500
An annual revenue of about Rs. 15 lakhs is expected
from the supply when the industries avail of the allotted
quantities.
Gross for distillation of oil
Rosha grass is permitted to be collected from the forests
by the Karnataka State Industries Corporation, Bangalore
on lease basis. The revenue expected from this supply is
about Rs. 30,000 per year.17
Supply of wooden sleepers to Railways
The total quantity of wooden sleepers supplied during
1981-82 (ie., from Ist November 1980 to 31st October 1981)
to the railways against the demands made is as follows :~-
TABLE--12
Kind Unit Demand Supplied
1, B.G. Sleepers No. 90,000 12,935
2. M.G. Sleepers No. 60,000 35
3, Special Size m3(s) 500
Supply of timber to the Directorate General of Supplies and
disposals, New Delhi, during 1981-82.
The department has agreed to supply 200 m3 of ‘A’
and 2000 m3 of ‘B’ quality of teak timber logs at the rates
fixed by the department with a supply period upto 30th
November 1982 to meet the demands of Railways/
Defence etc.
Supply of Timber to other public sectors
The following indents which were accepted prior to
1980-81 from the various Public Sector underiakings for
supply of various kinds of timber logs against advance pay-
ment of value, taxes etc., at the rates in force are still on
hand,
TABLE— 13
Indenters Kind of timber Unit Quantity
1. N.G.E.F., Bangalore... Haldu logs m3(r) 800
2. BEALL. Bavgalore ... Teak logs c5 960
3. Mozogon Dick Le. Teak logs rr 500
Bombay.
4. Bayat Gol ibacs 1 4.690
F.D.—218
No fresh indents are received/accepted during 1981-82
until the supply of the above quantities are effected
Supply to Karnataka State Forest Industries Corporation
Forest Department is also issuing round timber to the
Karnataka State Forest Industries Corporation Ltd.,
Bangalore with effect from Ist April, 1975 as and when
they are indented for.19
CHAPTER 2
Development Schemes
The Department is implementing various develop-
mental schemes under the following major categories :—
1) State Plan Schemes.
2) Central Sector Schemes.
3) Centrally Sponsored Schemes.
4) Forest Development Fund Schemes.
5) D.P.A.R. Schemes.
6) Command Area Development Schemes and
7) Western Ghats Development Schemes.
Under the various developmental programmes, the
department has raised 5,36,722 hectares of plantations and
623 Kms. of avenue plantations till 1980-81. During the
year 1981-82, (up to end of December 1981) 24,590 hectares
of plantations 175 Kms. of avenue plantations are raised.
The extent of plantations of various species raised by the
Department and the Karnataka Forest plantation Cor-
poration are given in the following table.
TABLE—14
Table showing the plantations raised upto 1981-82
(Area in Hectares)
Provisional
Sl. Species Upto During for ~~ Cumulative
No. 1979-80 1980-8L 1981-82 Total
(up to
Dee, 1981)
1 2 3 4 5 6
1. Teak L004 1,907 2,492 1,15,403
2, Softwood va 88,695 4,763 L747 45,205
3. Cashew v. -29,904 2,356 1,430 33,690
aeSol)
Qa
20 Say
1 9 3 4 5 6
4. Eucalyptus... 89,688 4,704 2,150 96,542
5. Fuel - 230,212 13,931 16,471 2,60,614
6. Bamboo we 72700 BT a 1,244
7. Lavendor ve 1,054 aes ws 1,054
8. Red Oil Palm ... 9 vs wo 9
9. Cocoa ie 1415 180 a 1,595
10. Rubber ss 5,527 ot . 5,b27
LL. Spices a 74 ws ae 74
12. Coffee j 20 _ ve 20
13. Tea - 4 aes wa 4
14. Fruit Orchards ... we 31 on 31
15. Avenue Planting 430 Kms. 193 Kms. 175 Kms, 798 Kms.
16, Sancal (Pure)... 299 ae 300 522
Tozal + 508,555 28,389 24.590 5,61,534
~ and and wal and
130 Kms, 193 Kms. 175 Kms. 798 Kms.
The important schemes which are beit:g implemented
by the General Wing during the year 1981-02 are detailed
below :
Soil Conservation
This scheme is being operated mostly in the drier tracts
of the State, where the areas are prone to soil erosion, on
account of barrenness of the land. The afforestation
works involves digging of contour trenches, formation of
mounds and raising of fuel, fodder and other economically
useful species. The physical target for the year 1981-82 is
1480 hectares and the financial outlay is Rs. 27.50 lakhs.
Soil Conservation measures have been taken up in the
catchment of river valley projects in Nizamsagar, Nagar-
junasagar and Thungabhadra Catchments under Centrally
Sponsored Scheme of Soil Conservation in the catchments21
of River Valley Projects. The financial outlay for 1981-82
is Rs. 25 lakhs.
Teak
The demand for teak timber will be intense in the
years to come and in order to have sustained supply of teak
timber for various constructional, industrial and defence
purposes, teak plantations are raised in the areas clearfelled
after removal of the existing tree-growth. The physical
target fixed under this scheme is 1020 hectares.
Softwood (Matchwood and Plywood Species)
This is a continuing scheme. The demand for soft-
wood particularly the wood required for match and ply-
wood Industries is increasing year after year. In addition
to this. requirement of the existing industries is being
partially met by harvesting the softwood from the natural
forests. The natural forests will not be able to supply the
growing demand in the years to come. Hence in order to
supplement the existing resources, plantations in the suit-
able areas have been taken up during 1981-82 also with a
target of 1060 hectares.
Rehabilitation of degraded Forests
It is proposed to improve the stocking in degraded
forests through planting suitable species in dry zone. The
physical target fixed for the year under this scheme is 688
hectares.
Cashew
Large scale Cashew Plantations have been raised by
the Department since 1950 both under State Plan and
Centrally Sponsored Schemes in Coastal Districts of the
State. Till the end of 1980-81, 32,260 hectares of Cashew
Plantations have been raised. The Physical target for
1981-82 is 1258 hectares. During the year 40 hectares of
Progeny Orchard was continued to be maintained under
the Centrally Sponsored Scheme,22
The Government of India have approved the imple-
mentation of a package Programme of Intensive Cultivation
in 8000 hectares of existing cashew plantation; Karnataka
Cashew Development Corporation will be implementing
this scheme.
Special component plan for Scheduled Castes
The special component plan is being implemented in
same of the districts of Bangalore, Mysore, Shimoga and
Kodagu Circles in the State for the welfare of the Scheduled
Caste population.
The budget grants earmarked for this scheme is Rs.
40 lakhs; out of this, Central Assistance is Rs. 10 lakhs
and State Plan outlay is Rs. 30 lakhs.
The Government attaches great ‘importance to the
implementation of Special Component Plan for the welfare
of the Scheduled Caste population. The programmes are
to be implemented around cluster of villages with predomi-
nent scheduled caste population, in each district in an inten-
sive manner for providing lasting benefits to each family,
so as to enable this community to cross the poverty line in
the shortest possible time.
The forestry programmes included for implementation
during the year 1981-82 are as follows:
(1) Raising plantations for Tassar Silk Cultivation.
(2) Free supply of Bee-hive boxes.
(3) Supply of seedlings for planting in home-steads
and farm lands.
(4) Silvipasture
(5) Free houses for forest plantation labourers and
(6) Free supply of forest produce to artisans.
he details of physical and financial progress upto end
of December 1981 is given in Table 29,23
Tribal Sub-plan
The Tribal Sub-plan with an outlay of Rs. 25 lakhs is
being implemented in certain districts. of Mysore, Shimoga
and Kodagu Circles for the welfare of the Tribal people.
The Tribals since time immemorial have been forest
dwellers, having a free life in the forests. They had their
traditional vocations like shifting cultivation, hunting,
fishing, catching of birds, collection of Minor Forest
Produce like honey etc. They are also engaged in the
forest works borne on daily wages and on monthly
asis.
The forestry programmes proposed under this scheme
are -— .
(1) Raising of M.F.P. yielding plantations.
(2) Maintenance of fruit orchards earlier raised.
(3) Training in improved method of logging and
supply of logging equipments.
(4) Organisation and promotion of Forest Labour Co-
operative Societies.
(5) Construction of houses for Scheduled Tribe Forest
Workers.
(6) Raising Plantations for Tassar Silk Cultivation.
(7) Raising of fruit yielding trees and
(8) Maintenance of older plantations.
The details of progress achieved under this scheme is
given in table No. 30
Forest Development Fund Scheme
The Forest Development Fund created by levying
cesses on the sale of all Forest Produce is being utilised for
raising plantations, The rate of tax has been raised to4
8 per cent from 5 per cent from Ist April 1980. The follow:
ing statement gives the details of tax collected during the
last five years.
‘Year Amount of Forest Deve-
lopment Tax collected
Rs. in lakhs
1976—77 «. 125,08
1977—78 .. 136.89
1978—719 +» 156.00
1979—80 +» 170.27
1980—81 -. 190.00
(Provisional)
The Forest. Development Tax likely to be collected
during the year 1981-82 is about Rs. 250.00 lakhs. The
following schemes are being financed from out of the
Forest Development Fund during 1981-82.
SI. No. Scheme Amount allotted
Rs. in lakhs
(1) Teak Plantation sr 25.00
(2) Matchwood Plantation a 25.00
(3) Tending logged areas evergreen... 25.00
and semi-evergreen
(4) Other plantations 2 175.00
Total s 250.00
‘The Physical and Financial Targets and achievements
upto December 1981 are furnished in table No. 31.
Drought Prone Area Programme
Drought Prone Area Programme is being implemented
in the State since the Fourth Five Year Plan, during which25
period’ mostly relief type of works to mitigate scarcity
conditions of the drought stricken area were taken up.
During the Fifth Five Year Plan, more diversified activities
were taken up with an emphasis on integrated rural
developmen, and beneficiary approach, to help the weaker
section in gencral. This scheme is being implemented in
10 Districts covering 42 taluks.
The Drought Prone Area Programme with the assis-
tance of World Bank is being implemented in Bijapur
District covering all eleven taluks, from January 1975. The
main objectives of the programme is to conserve soil and
water resource and utilise them economically for increasing
the agriculture production and to restore ecological balance
in the area.
Under foresry sector the following works hive been
taken up and the achievements from 1976-77 to 1981-82
are listed in tables 32 and 33.
(i) Afforestation (ii) Pasture Development and
(iii) Farm Forestry.
Command Area Development Programme
Under this programme, the Forest Department has
taken up afforestation works in the command areas of the
following projects.
(1) Tungabhadra and Upper Krishna projects.
@) Malaprabha and Ghataprabha projects.
(3) Cauvery Basin Projects and
(4) Bhadra Project.
Integrated Development of Western Ghats
Karnataka State’s best forests are located in the
Western Ghats Region. These rich forests have been
subjected to heavy pressure and large areas have been
cleared for other developmental projects, particularly Hydro
Electric and Irrigation Projects. Forest resources have26
been depleted due to heavy mining and excessive graring
in the region also. This has caused serious ecological
imbalance. Since the inception of the scheme several
programmes which include bamboo plantations, Softwood
plantations, Cashew Plantation, cultivation of medicinal
plants and rehabilitation of mining areas have been
implemented. The physical and financial achievements are
given in Table No. 34.
TABLE 15
The following table furnishes the plan allocation and
expenditure since Second Plan period upto 1981-82.
Plan Allocation Expenditure
Rs. in lakhs Re. in lakhs
Second Plan ve 146.81 152.90
Third Plan * 425.00 445.94
Three Annual Plans ... 326.50 291.18
Fourth Plan ves 515.00 574.00
Fifth Plan tee 721.00 795.00
1979-80 Fs 362.00 302.00
1980-81 s 455.24 455.24
1981-82 a6 590.00 NA27
CHAPTER—3
ACTIVITIES OF DEVELOPMENT WING DURING
1981-82
(Upto 3ist December 1981)
The Development wing of the Forest Department
mainly deals with activities connected with the following
subjects :
(1) Research and Utilisation.
(2) Working Plans.
(3) Survey and Demarcation.
(4) Wild Life Preservation.
(5) Project Tiger.
(6) Social Forestory.
(7) Rubber Plantation (Since transferred to Karna-
taka Forest Piantation Corporation Limited from Ist July
1981).
Activities of various units during 1981-82 (to end of
December 1981) are as under :—
Research and Utilisation Activities
(a) About 350 hectares of best teak plantations
were taken up for thinning and application of fertilizers to
encourage wider crown formation and increase in the yield
of seeds. These plantations will provide seeds of superior
genetics sources for the State Teak Plantations Programme.
(b) As a long range measure, teak seed orchards
have also been set up over about 25 hectares out of buds
obtained from plus trees which are the best teak stems in
the country. These plantations will serve as our germ
plasm banks for future teak plantations.
(a) As in case of teak, seed production stands of
eucalyptus and: Sandalwood have also been selected,
thinned and manured.28
({d) Buds of high quality Bor trees obtained from
Gujarat have been grafted over about 1000 trees in
Bangalore District. The results are very encouraging.
Grafting experiments of Tamarind yiclders have also been
taken up.
(ec) An_area of about 60 hectares at Kalkere on
Bannerghatta Road, within 15 kms. of Bangalore has been
taken up for formation of an arboratum which will comprise
of all Forest types occuring in Karnataka State.
(f) Experimental plots have been laid out to study
the growth of tropical Pines and Su-babul in different
climatic zones. Experiments to find out best species for
afforestation of grass lands in the Western ghats were
continued. So fat, Acacia auriculiformis has given good
results.
(g) Mist Chambers have been set up at Mudigere
and Madikeri for rooting experiments.
(h) 12 hectares of experimental Tea plantations
raised during previous years were maintained.
Rubber Plantations
No fresh Rubber Plantations were raised during the
year and 5527 hetares of Rubber Plantations raised
previously were maintained. All the Rubber Plantations
along with the staff have since been transferred to the
control of the Karnalaka Forest Plantation Corporation
Limited, Bangalore, for further management with effect
from Ist July 1981.
Wild Life Preservation
There are 3 National Parks, 13 Sanctuaries one Game
Reserve and one closed area covering in all 9905.90 Square29
kilometre ‘of forest area in the State. Their names and
extent are as under ;—
TABLE--16
SI. Particulars Arex in Square Kms
No.
1. Bandipur National Park = 874.20
2. Bannerghatia National Park se 104.27
3. Nagarhole National Park ee 571.55
4. Tungabhadra closed area oe 224.22
5. Brahmagiri Wild Life Sanctuary Si 184,29
6. B.R.T. Wild Life Sanctuary 23 324.40
7. Bhadea Wild Life Sanctuary a 492.46
8. Dandeli Wild Life Sanctuary wee 5,729.09
9. Ghataprabha Birds Sanctuary gi 29.28
10. Melkote Temple Wild Life Sanctuary ... 19.82
11. Mookambike Wild Life Sanctuary ose 247.00
2. Nugu Wild Life Sanctuary i 30.32
3. Renebernu’ Buck Black Sanctuary ae 119.00
Ranganasdit.u Bids saxctie y
Sh die Wate Lite
Somesiwar Wa bi uscy
Sharavau Valey W Saueu. §
Arbichiitu Game Rese: ve é 13.00
As in previous years, the above National Parks and
sanctuaries were maintained during the year under report,
consistant with the availability of Budget granis. Mini
zoos established at cities and towns were also maintained.
An amount of Rs. 40.00 lakhs has been provided
during the year 1981-82 under District Sector Scheme of
‘Nature Conservation’ including maintenaiwe of Mini Zoos
in cities and towns. In addition to the uvove, under the30
Centrally Sponsored Scheme’ for development of thé
selected National Parks and Sanctuaries an amount of Rs.
20.00 lakhs has been provided for, during the year 1981-82
for the development of Bannerghatta National Park,
Bhadra and Ranebennur Sanctuaries at the rate of Rs.
8.00, Rs. 6.00 and Rs. 6.00 lakhs respectively, as against
the total allotment of Rs. 16.65 lakhs during 1980-81. The
entire allotment made for the year 1981-82 is expected to
be utilised by the end of March 1982.
3. During the year under report, the State Wild Life
Advisory Board was re-constituted.
The term of office of the members of the Board is
for a period of two years. The Board met on 31st August
1981 and passed resolutions as many as on 31 subjects,
which interalia stipulate the creation of the following new
Wild Life stanctuaries in Karnataka State and expansion
of existing sanctuaries.
(a) Adichunchinagiri Peacock Sanctuary (New)
(b) N.R. Pura Wild Life Sanctuary (Extension).
(c) Cauvery Sanctuary near Sathanur (New).
(d) Extension of B.R.T. Hills Sanctuary.
and the inclusion of lessons on Forests and Wild Life in the
curriculum of the lower classes upto the high school level,
and also making an overall assessment of the Wild Life
Wealth of the State etc., Action is being taken to imple-
ment these and other resolutions.
4. Refresher training was given to a batch of 27
Range Forest Officers for a period of 5 days at Bandipur
from 15th September 1981 to 19th September 1981 in’
Principles of Wild Life Management consisting of both
lecture and Field studies supplemented by film shows and
practical demonstrations.
5. Asa part of the Wild Life Day Celebration this
year, a special Myforest issue consisting of articles on all
aspects of Wild Life Management was brought out and this31
was released by His Excellency the Governor of Karnataka
on 20th November 1981 on the occasion of the inauguration
of ‘Aranya Bhavana’ by the President of India.
6. The Task Force Committee which was constituted
in G.O. No. FFD 113. FWL. 80, dated 13th March 1981
to monitor the Conservation and Management of plans
and to make further recommendations for the development
of Bannerghatta National Park, Bhadra and Ranebennur
Sanctuaries, under the Centrally Sponsored Scheme met
on 6th August 1981 and reviewed the progress during the
year 1980-81 and also the programme for 1981-82.
7. It is proposed to implement the scheme of Non-
formal education and Re-orientation for Middle and High
School Children to cultivate the habit of Nature Conserva-
tion and appreciation from this year onwards, as in the
case of Gujarat State.
8. The Zoo Authority of Karnataka constituted in
G.O. No. FFD. 354, FWL. 78(1) dated 8th January 1979
continued to be under the control of the Forest Department
upto end of October 1981. In G.O. No. FFD. 14. FWL 80,
dated 30th October 1981 the Governing council of the Zoo
Authority of Karnataka was re-constituted by appointing
the Divisional Commissioner, Mysore as its Chairman.
The reconstituted governing council of the Zoo
Authority had already one sitting at Mysore and approved
the plans for carrying out improvement to the Zoo taking
advantage of the Financial Assistance proposed to be given
by the Government of India to the selected Zoos in the
country. The implementation of the proposals requ‘re an
outlay of Rs. 75,00,000 to be contributed equally by the
State and Central Governments.
Project Tiger
The Centrally Sponsored Scheme of Project Tiger was
continued during the year with the assistance of Govern-
ment of India on 50:50 basis. The matching grants given32
byt the Government of India during the year was Rs. 5.50
lakhs.
The Tiger population has shown a definite increase.
Damage to Crop by Wild Elephants
A number of cases of damage to standing agricultural
crops by Wild Elephants and loss of cattle and human life
by Tigers and Panthers were reported during the year and
the department took prompt action to pay compensation
to the affected persons as per Rules laid by the Government
as under:
(a) To pay full compensation for the crops damaged
by Wild animals (except Wild boars) to the Land owner’s
as assessed, by the Conservator of Forests in their respec-
tive jurisdictions.
(b) to pay compensation of Rs. 5,000 (Rupees five
thousand only) for the loss of human life and Rs. 2,000
(Rupees two thousand only) for in-juries leading to per-
manent disability caused by Wild Elephants, Tigers,
Panthers, Wolves, Hyenas, Bisons and Bears after the
Conservator of Forests is satisfied about the genuineness
of the case on the basis of the Post-Mortem certificate or
Memorandum signed by the concerned District Assistant
Surgeon or the District Surgeon as the case may be.
(c) to pay full compensition (i.e. full value) for the
loss of cattle killed by tigers, panthers and Wolves as per
terms and conditions stipulated in Government Order No.
AFD. 68. FWL-73, dated 15th June 1976.
Working Plan Organisation
The Working Plan Divisions continued to attend to
the works of revising the Working Plan reports which had
expired. Drafting of the following Working Plans was
completed during the year,33
1. Working Plans for Forests of Coondapur
Division.
2.Working Plans for Hunsur Division.
3. Working Plans for High Forests Block of Yella-
pur Division.
4. Working Plans for’ Teak Pole Forests of
Mundgod.
5. Working Plans for Forests of Kolar Division.
6. Working Plans for Forests of Chikmagalur
Forest Division.
Field work is taken up for revising the Working Plans
of Shimoga, Bhadravathi, Madikeri and Bidar Forest
Divisions.
A Statement showing the progress of Working Plans
Organisation is enclosed.
Survey and Demarcation
Survey and Demarcation of the State Forests and also
of the ‘C’ & ‘D’ Class revenue waste lands taken over
from Revenue Department were continued during the year.
The Government have recently sanctioned 25 posts
of Range Forest Officers specially to Survey the above
areas and it is expected that the staff will be put to position
soon and the work will be accelerated.
A Statement showing the progress achieved in this
regard is enclosed.
Social Forestry
Of the total geographical area of 1,91,79,100 bectares
of Karnataka State, Forest area represents 38,38,406
hectares i.e., 20% of the land areas as against 22.87 per cent
of the All India average and 33} per cent prescribed in the
National Forest Policy enunciated in 1952. The distribu-
tion of these forest areas also not uniform all over the State.
EN_2Further, of the total forest area, 22.88 per cent are shrub
and thorny forests where the growing stock is very poor.
As a result, the sustained yield of fuelwood from the furests
is only about 1.75 million m? per year as against the
actual requirement of 7 million m3. With the increase
in population, this requirement is estimated ta go up to
13 million cubic meires by 2000 A.D. Realising this
serious problem, the State Government has decided to plant
up all available open lands in the State i.c., Revenue waste
lands, Gomal lands. barren forest areas, foreshores of
tanks and reservoirs. either sides of roads and canals, fallow
and marginal agricultural lands. open areas in industrial
estates etc., under the Social Forestry Schemes. It is
estimated that about ten lakh hectares of such open areas
will be available in the State for planting of trees outside
the limits of the State Forests.
It is estimated that there are about 20 lakh. hectares
of marginal agricultural lands in Karnataka which could be
safely diverted for raising of fuel and fodder yielding trees.
In order to motivate the farmers to plant more and more
trees on their farm lands, the Department has taken steps
to raise good quality seedlings and distribute them free of
cost to the public. During 1981-82 56 million seedlings
were distributed free of cost and the target for next year
is 100 million. The response from farmers is very en-
couraging. It is proposed to involve schools and Colleges,
Voluntary organisations and individual farmers in raising
of these seedlings.
Physical and Financial Targets achieved
4. Consistent with the funds made available under
the Plan Schemes, the following physical and financial
targets were achieved during the year :—TABLE—T
Achievement
Name of Scheme Component Unit =
Physical ancial
target (Rs. in lakhs)
; 2 3 4 5 6
|. Foresiry for Rural Energy 1. Planting of trees on Kms. 50
Needs (State Plan under either side of National
Minimum Needs Pro- and State Highways.
gramme). 2. Planting in Gomal and Ha. 4,000 75.00
Waste lands.
3. Canal Bank Km. 10
4. Free distribution of Lakhs 300
seedlings. 300 .
Total: 75.00
. Contrally sponsored Scheme 1. Planting of seedlings on Ha. 2,800
of Social Forestry includ- waste lands and
ing rising rural fuel wood gomal lands.
plantation. 2. Planting in lands owned Ha. 100 50.00
by Public undertakings.
3. Free distribution of Lakhs 200
seedlings.
Total:
gE36
Under the Centrally sponsored Scheme, 5 districts viz
Gulbarga, Bellary, Kolar, Mandya and Bangalore which
are chronically deficient in fuelwood, are covered and the
Central assistance is limited to Rs. 2.50 crores for 5 years
as against the total outlay of Rs. 601.90 lakhs.
Project report with much bigger outlays has been now
prepared and submitted to Government of India for arrang-
ing financial assistance from SIDA or World Bank.
The Physical and Financial targets to be achieved
under this Project are as under :—
Physical targets for 5 years:
1. Road side plantations .. 1500 Kms,
2. Canal Bank plantations .. 2000 ,,
3. Revenue Waste lands «. 40000 Ha
4. Foreshores of tanks and
reservoirs -. 8000 ,,
5. Open lands in Government
undertakings .. 10000 ,,
6. Barren Forest areas .. 10000 ,,
7. Private holdings .- 10000 ,,
8. Free distribution of
seedlings si 250 Million seedlings.
Financial target for 5 years:
1982-83 3 7.95 Crores.
1983-84 » 10.03,
1984-85 - 11.84,
1985-86 « IS)
1986-87 -- 15.60
Total .. 58.92 Crores:Biospheres
The State Government have agreed to set up the
following Biospheres in the State :-—
(1) Narasimha Parvatha S.F. Thunga-
bhadra S.F. and Upper Bridge of
Narvi S.F. 9,000 ha.
(2) Kadamkal S.F. anl Pushpagiri
R.F.
3,750 ha.
(3) Govardhanagiri, Attigedu and Jog
R.F. 9,000 ha.
(4) Madeshwaramalai R.F. 3,000 ha.
(5) Bandipur-Nagarhole Sanctuaries 68,300 ha.
Total 93,050 ha.
Management Plans for the above areas are stili to be
formed and the Government of India directions in the
matter are still awaited.
Statement of Expenditure under different plan Schemes
under implementation in the Development wing upto 31st
December 1981, is enclosed.
Statement showing the Allotment and Expenditure under
Plan Schemes for 1981-82 (to end of December 1981) in
Development Wing.
TABLE—18
SL Budget Expenditure
No. Name of the Scheme for up to end of
1981—82 31-12-1981
1. Forest Research 9.00 5.61
2. Training Institution 1.50 1.11
3. Survery and Demarcation 10.00 1.02
4. Sandalwood plantation 15.00 3.04
45. Tea plantation 2.00 1.6138
2 3 4
6. Communication 1.00 wee
7. Buildings 2.00 2.00
8. Forest publicity 3.00 0.66
9. Minimum Needs programme 195.00 75.00
10. Nature Conservation 40.00 20.00
11. Rubber Plantation 50.00 10.00
12. C.S.S-—Social Forestry 70.00 50.00.
13. Plan monitoring Cell 0.60 20
14. Project Tiger 11.00 7.09
15. C.S.S.—Bannerghatta 8.00
16. C.S.S.—Bhadra Sanctuary 6.00
17. C.S.S.—Ranebennur Sanctuary 6.00
Total 430.10
175.14TABLE=19
Progress of Working Plan Organisation
(Arca in Sq. Kms.)
Sl. Name of the Citele Totalarea Area already covered Revised working Balance area
No. by working Plans Plan under to be covered
Progress
7 2 3 4 5 .
1. Bangalore 6,818.90 6,691.82 $9 127.00
2. Shimoga 3,059.19 1,109.44 1,949.75
3. Chickmagalur 2,667.59 2,667.59 . ..
4. Mysore 7,603.89 6,024.95 981.51 527.42
5. Dharwar 11,830.72 7,482.41 3 848.31
Total 31,430.29 23,976.21 2,931.26
6€40
CHAPTER—4
Other Important Information on the Department
The increasing population has direct bearing on incre-
ased demand for agriculturai land and this has always an
adverse impact on valuable forests. Besides increased
communications, settlement of expropriated ryots and
refugees, release of lands for irrigation and hydro-electric
projects have also made a heavy impact on forests.
The release of forest lands has now been discouraged
and any such proposal has to be approved by both the
Houses of Legislature. -According to the recently enacted
Central Forest Conservation Act, no forest land can be
released for non-forestry purpose in the State without
specific approval of Government of India.
The following table furnishes the forest area lost from
1956 till date for various purposes.
TABLE—20
SL. Purpose Extent, lost
No. in Hectares
1. Areas gone under submersion 35,840
2. Areas released for rehabilitation of expro-
priated ryots. 25.820
3. Areas gone under power lines 1,688
4. Areas given for cultivation 67.217
5. Areas gone under mining 42.676
6. Areas given for town-ships 1,791
7. Areas given for other non-agricultural
purpose. 6,297
8. Area lost for Kalinadi project 12,500
9. Area lost for Chakra Project 2,690
10. Area lost for Varahi project 15,634
11. Area lost for Gangavathi Project 10,039
12. Area lost for Colony and roads 330
13. Area lost for Beadati Project I Phase 295
Total 222,7274}
FOREST FINANCE
‘The foilowing Table furnishes the—Revenue and Expendi-
ture of the Forest Department since 1965-66
TABLE—21
Revenue Expenditure
Year in Crores in Crores
of Rupees of Rupees
1965—66 10.08 5:15
1966—67 10.97 5.14
1967—68 11.06 5.82
1968—69 13.35 6.16
1969-70 14.02 7.9
1970—71 14.50 2.54
1971—72 16.40 8.18
1972—73 20.85 8.35
1973—74 21-64 8.85
1974—75 27.82 10.45
1975-76 29,29 11.09
1976—77 29.00 12.30
1977-78 29.92 13.31
1978—79 30.85 15.28
1979—80 33.55 17.42
1980—81 35.74 25.17"
1981—82 40.00* 25.55*
*Provisional Esimate, ~oTABLE--22
Per Hectare Revenue and E:.penditure
wy
Per Ha. Revenue Per Ha. Expenditure
State (in Rupees) (in Rupees)
Major Minor Non; Plan and
Products Products Total Plan Development Total
~ 1 2 3 4 5 6 7
1976-77 #
Karnataxa ae ae 78.81 10.31 89.12 33.40 8.11 41.51
Aub INpia oe oe 29.47 18.63 48.10 20.73 6.36 27.09
1977-78
Karnataka ay 8% 74.11 TET 85.88 30.17 7.29 37.46
1978-79
Karnataka te we 79.01 11.04 90.05 33.37 10.27 43.64
1979-80
Karnataka ae we 79.24 14.61 93.85 36.37 12.96 49.33
1980-81 (Provisional)
Karnataka 90.46 8.71 99.17 43.43 12.16 55.5943
Forest Protection
Forest Protection is posing a problem to the Depart-
ment. To over come this the Department has taken
several measures.
The staff at the root level has been organised in Kanara
Citcle. Proposals for the strengthening of staff in Shimoga
Circle are before the Government for sanction.
The various protective staff of the department are
provided with arms and ammunition, specially in the border
areas and it has had beneficial effects on protection.
There are 18 Forest Mobile Squads in the State
attending only to anti-smugging duties.
The details of the number of cases booked both by the
territorial staff and the Forest Mobile Squads are furnished
in Table-36.
Karnataka is the pioneer in introducing wireless net
work for prevention of smuggling forest produce. A net
work of 74 Stations has already been established along the
border of the State which is immensely helping the depart-
ment. To over come this the Department has taken
of this new work through out the major forest areas of the
State is under the consideration of the Government.
Rewards
During the year the following 10 Officers have been
given Chief Minister’s awards for showing, out standing .
courage while apprehending the smugglers :
1. B. Natarajan, IF.S., Deputy Conservator of
Forests.
2. K. A. Prabhakar, Range Forest Officer.
3. S. R. Gopalakrishna, Range Forest Officer.44
Shiva Puttegowda, Range Forest Officer.
K. Raju, Range Forest Officer.
V. K. Narayana, Forester.
Rangaswamy, Forest Guard.
Chandrashekharaiah, Forest Guard.
N. K. Hanumegowda, Forest Guard.
10. Abdul Rasheed, Driver.
CRIA
‘Compulsory Planting
The State Government have recently brought into
force the* Compulsory planting provisions of the Tree
Preservation Act through-out the State. The Government
have also fixed standards for compulsory planting both in
the Urban and Rural areas as follows :-—
TABLE -23
Minimum number
Locality Area of trees to be
planted
I. Unnan Argas :
House sites 1) 222 sq. Mtrs. 2 trees
2) Above 222 Sq. 3 trees
Mrs., bat
below 892
xq. Mrs.
28 : 4 trees
Vacant lands incluling 25 trees per
vacant lands under Heetare
the control of indus-
tries and instivutions.
HI. Rurau Areas:
1) Agricultural lands aa Minimum of 10
trees per
hectare.
2) Non-Agricultural os 25 trees per
vacant lands. hectare.45
Posting of Range Forest Officers in each taluk of the State
The Government have sanctioned creation of 64 posts
of Range Forest Officers for posting to Taluks where there
were no Range Officers earlier.
Scarcity Relief Works
The Forest Department has helped to tide over the
scarcity conditions in the State by employing a large number
of affected people in various forestry works The total
amount spent during 1981-82 is Rs. 35.67 lakhs. Apart
from providing relief to the people, afforestation taken-up
under the Scarcity relief works will help to ameliorate the
conditions in the dry zone.
Employment Affirmation Scheme
The Forest Department is also associating itself in the
implementation of the employment affirmation Schemes in
the State. Works like advance pitting and trenching, raising
of scedlings are taken-up under the schemes during the
lean period.40
CHAPTER—5
Karnataka State Forest Industries Corporation Limited
The Karnataka State Forest Industries Corporation
Limited, was established in the year 1973 with the object of
achieving better utilisation of forest land and Forest
resources and. also to have salvage recovery from rejects and
dead woods etc. The Corporation is a fully owned Govern-
ment of Karnataka undertaking, entire capital having been
contributed by the State Government. The company has
an authorised Equity Capital of Rs. Two crores divided
into 20,000 equity shares of Rs. 1,000. The paid up capital
is Rs. 67-62 lakhs. Out of Rs, 67-62 lakhs capital,
Rs, 28-49 lakhs has been invested by the Corporation in
the equity capital of its subsidiaries viz., (1} Karnataka State |
Veneers Lid., (2) Rosewood Products Limited and (3)
Mysore Match Company Ltd. These subsidiary companies
are deemed to be Government Companies by virtue of the
provisions of the companies Act. The Directors of the
Corporation are nominated by the Government.
The Corporation deals in the following products/acti-
vities at present.
(a) Saw Mills and Wood Preservation Piants and
manufacturing of furniture, Sawn sizes, house bui.ding
materiais for Janatha Housing Scheme ete.
(b) Firewood Depots,
ic) Green grass dehydration and pelletisation plant
(d) Pineapple cultivation
(e) Distillation of essential oils
(f) Trading of polythene bags, paper and barbedwire
The Corporation is running three saw mills, four season-
ing kilns and two wood preservation plants handed over
by the Forest Department with effect from Ist Aprii 1975
along with men, machine and material.aT
The Corporation’s products are being catered to
Government Departments, Industrial users farmers and
general consumers.
Firewood Depots
The Corporation has been entrusted with the work of
distribution of firewood to bonafide consumers. Presently
the Corporation has 53 depots. On an average about 150
tonnes of firewood per month is being sold from each Depot.
It had handled about 85,500 tonnes of firewood during the
year 1980-81.
Green Grass Dehydration and Pelletisation Plant
The project is undertaken under Grant-in-aid provided
in the Integrated Development of Western Ghat Region
The preiect has about 350 acres. The plant h en Set
up at Balekoppa in Siddapura Taluk. Gcverament have
realised Rs. 63.75 lakhs out of which Rs, 10.85 lakhs was
treated as equity contribution and Rs, 52.90 lakhs as grant-
in-aid. The commercial production was started during
January 198i. The company has sold 1390 tonnes of grass
during 1979-80. During 1980-81 the unit has produced 45
tonnes of pellets and sold about 40 tonnes.
Pineapple cultivation
During 1974-75 the Corporation took up cultivation
of Pineapple at Banavasi in U.K. District in about 150 acres
of Forest land. The production of pineapple during 1979-80
was 285 tonnes and that during 1980-81 was about 250
tonnes.
Distillation of Essential Oils
The Corporation had started distillation of Eucalyptus
Citridora Oil from 1974. The production of this oil which
is used in the manufacture of aromatics and soaps during
1980-81, was 3 tonnes.48
Manufacture of Katha from Catechu trees
The unit is at Bhatkal. The manufacture of Katha is.
seasonal. The production of katha during 1979-80 was.
about a tonne. The production is temporarily suspended.
Activities of the subsidiaries
{1) Karnataka State Veneers Ltd,, Dandeli
The company has installed sophisticated slicing unit
capable of slicing veneers down to 0.18 m.m. with minimum
tolerance confirming to International Standards. This is
one of the two units of this kind in India. It has got steady
market within and outside. The company has already
entered the International Market and is securing regular
orders from countries fike Japan, Italy and U.S.S.R. The
unit has an installed capacity of 4200 CMT. The net profit
during previous 3 years was.6.09, 35.59 and 20.68 lakhs
respectively. The company has plans to improve the unit
further.49
TABLE—24
Financial Results of KSFIC for the 1979-80 and 1980-81
(Provisional)
Rs. in lakhs
Particulars 1979-80 1980-81
(provisional) - (provisional)
(a) Sales wv $40.51 366.54
(5) Other Service charges 38.56 14.57
{e) Miscellancous receipis ae 2.25 1.66
(@) enterest Earned... we 0.32 4,15
(e) Closing stock a. 1BT.02 132.67
To... 532.66 516.59
(f) Opening stock... ke 49.45 151.02
(9) Purchases ve ws 842,03 246.13
(h) Manufacturing, administra-
tive and Selling expenses 102.63 138.34
I... 494,11 535.49
Cash Profit LIT Lessinterest 38.55 (--) 18.90
Less interest wee a 0.80 4.94
Less Depreciation we 37.75 (—-)23 84 ~
_ 1.90 1.98
Net Adjust ments aes 35.85 {--) 25.80
~-17,86 +) 34.95
+17 99 (-) 9.15
The figures furnished for the year 1979-80 are provisional and
subject to aulit. The iaformation “+ the year 198-81 is yet
to be finalised.
TaeTABLE--25
Tae detai’s of production of differ iat products. «te during the last 5 years are given below
_ 198-81
Products Unit 7-78 1978-79 1979-80 (Provisiotnnat
audit) |
2 3 4 5 6 7
(Tonnes) 9.8 8.0
Ka hy do : <3
Sawn sz 8 (mir) 1741 2,500
Persitwre .. (Nos) 5256 12,208 15.000 8,000
LW lows/JHS Doors do 10,409 16 1,668, 35,058 a 8
do 10,369, 40 512 35,058 . S
miss do @ 35,058 +
P novggle (T nnes) 5 250
Fee wsss pellets do . is 45
Poles Nos.) 2.136 7.009 4,000
Sleepar as 16,000 ”
Purchase of :
(a) Timber logs . .. (Cmtr.) 9,207 6,115 7644 6,138 5,500
(0) Berbot wie wt .. (Tonne) 199 26 69 o
(2) Pity hes do 297 256 32h
CBr ewoout do 41,8601 98 361 £0,000
KY Bam’ oos (Nos.) 615,925 6,27,156
(A) Panes (Tonnes) ly
(7) Hardie atis (Nos.) 1,85451
CHAPTER—6
Karnataka Forest Plantation Corporation Limited
Karnataka Forest Plantation Corporation, Limited
was established during 1971. The authorised phase capital
of the Corporation is Rs. 1,000 lakhs. The Corporation
has already subscribed and paid up a sum of Rs. 137 lakhs.
>the objectives of the corporation is to raise industrial planta-
tions like Eucalyptus, Cocoa, Rubber etc.
Eucalyptus Plantations
The Corporation has raised 26,000 ha. of Eucalyptus
Plantatation. Out of 26,000 ha., 12,000 ha. have been raised
with institutional finance and the balance area with the
internal resources of the Corporation. The 26,000 ha.
Eucalyptus plantations are expected to yield pulp-wood
from 1982-83 till 1997-98 for being supplied to the Industries
depending upon pulp-wood to the tune of 5,92,000 tonnes.
‘The Revenue expected is about Rs. 1870 lakhs.
The Corporation has a programme to raise 15,000 ha,
‘of new Eucalyptus plantations between 81-82 to 85-86. The
total project cost is Rs. 1955 lakhs out of which Rs, 1430
lakhs is from the institutional finance and Rs. 525 lakhs
from the share capital to be contributed by the State
Government. The Agricultural Refinance and Develop
qnent Corporation has cleared the project. In the mean-
while the Corporation has borrowed over Rs. 30 lakhs arid
has started the project implementation. It is estimated that
this 15.000 ha., plantations will yield pulpwood between
1988-89 and 2002-2003 to the tone of 13 lakhs tonnes and
‘the revenue expected is Rs. 4,473 lakhs.
The Corporation is also distilling the Eucalyptus Oil
from. Eucalyptus citridora plantations. Annually about
4 to 6 tonnes of Oil is being distilled.52
Cocoa Plantations
The Corporation has raised over 600 ha., of cocoa
polantatins so far in addition to maintaining of the 1056 ha.
of cocoa plantations transferred by the Forest Department
Raising of Cocoa plantations further is discontinued due
to poor market rates and also other unfavourable factors.
Rubber Plantations
Over 4,000 ha., of Rubber Plantations have transferred’
to the Corporation for intensive and commercial manage~
ment with the help of the Institutional Finance. The Capital
cost of over Rs. 600 lakhs spent on rubber plantations by
the Government is being treated as equity contribution.
towards the authorised capital of the Corporation. The
daily production of rubber now is around 5 tonnes.
Agave Plantation
The Corporation has also raised plantations in Rane-.
bennur areas of the Corporation. The harvesting of this:
crop has been taken-up during this year.
TABLE--26
Table showing the Out-turn and Revenue
Quantity in tonnes Revenue in Rupees
St. Produce - 1980-81 1981-82 1980-81 1981-82
No. upto Dec. upto Dee
1981) 1981)
I 2 3 4 5 6
1. Eucalypius
Wood wo. 76,834 25.234 40,49,727 5,92,762
2. Cocoa Beans... 16.6 5.5 355,696 99,000
3. *Rubbar ae 1,326 ae 1,05,68,566
*Information pertains to Forest Department.53
CHAPTER—7
Activities of the Karnataka Cashew Development Corpo-
ration Ltd.
The Karnataka Cashew Development Corporation Ltd.
was established during 1978. The Government of Karna-
taka have transferred 8,000 ha. of Forest Cashew Planta-
tions to Karnataka Cashew Development Corporation
Limited during 1979 for intensive cultivation.
The Corporation is engaged in maintaining 8000 hect-
ares of old Cashew Plantation. In addition to this it has
got the following projects to be implemented.
(1) LD.A. (WBA) Cashew Project
It comprises of raising 2,500 hectares of Cashew Planta-
tions in the areas released by the Forest Department and
improvement of 500 hectares. The Agricultural Refinance
and Development Corporation and Government of Karna-
taka have sanctioned the project and the peried uf imple-
mentation is 5 years fram 1980-81 to 1984-85.
(2) Pilot Project (1300 Ha.)
The A.R.D.C. have accorded sanction for 478
hectares. The Corporation has already implemented the
project with the internal resources.
43) Rehabilitation of older Cashew Plantations (6000 ha.)
Pending receipt of sanctions from ARDC and Govern-
ment of Karnataka, the Corporation had already started
implementing this project. The entire area of 6000
hectares is to be covered in a period of 3 years starting
from 1981-82 to 1983-84 at 2000 hectares annually.
The progress achieved under the above projects are
given at the end of this chapter.
Areal Spraying.—Areal spraying of 8000 ha. of cashew
plantations has given good result in controlling Tea Mos-
quito menace. During 1981-82 also I and IE round of
arial spraying has been completed.TABLE
Statement showing the progress of the projects of K.F.F.C.
Target for Turget for
SL Name of the Scheme : the plan for 1980-81/
Achievement
Progress
in 1980-81] expected in
No. period 1981-3 1981 the remaining
period
1 2 8 4 5 6
(1) I.D.A. (WBA) Cashew Project 1980-81 to 1984- &5:
(a) Now plen'ing we .. 2,600 ha. 615 he. 400 ho, 2,100 ha,
(0) Improvement “3 BOO he, 125 ha. 175 ha B25 ha
(2) Pilot Scheme (1300 ha.) 1981-82 to 1984-85:
1,300 ha 853 ha. 853 ha 4/7 ha.
(.) Rehabilitation of older Cashew Plantations: 1981 $2 to 192-84:
6,000 his. 2,060 ks. 2,000 he 4,000 haTABLE 28
Statement showingthe Target and Achievement under Plan Schemes upto end of
December 1981—- Karnataka Forest Department
Sl. Name of the Allotmentfor Physical Target for 1981-82 Achievement upto end. of Dec. 1981
No. Scheme 1981-82
(Rs. in lakhs) Physical Financial
1 2 3 4 5 6 7
1,,Rehabilitation 10.00 (1) Maintenance of Plantations (1) Maintenance of Planta- 8.17
Degraded Forests. 274 Hect. tions 274 Hect.
(2) Raising of Plantations (2) Raised Plantations
668 Hect. 446 Hect.
(3) Raising of Polythene bagged (3) Raised Polythene bagged
Seedlings. 2.50 lakhs. seedlings 3.10 lakhs.
(4) Advance Work 70 Hect. sees
2. Matchwood 14.00 (1) Maintenance of Plantation (1) Maintenance of 96 Hect, Go:
Plantations. 40 Hect.
(2) Maintenance of Nursery beds (2) Maintained.
500 Nos. .
(3) Advance work 45 Hects. (3)
(4) Raising Nursery Beds (4)
306 Beds.
(5) Raising Plantations 807 Hect. (5) Plantations Raisud 807 Hect,
sgTapue-28—(contd.)
‘Allotment ‘Achievement upto end of Dec. 1981
Sl. Name of the for Pysical Target for 1981-82 We
No. Schemes ‘1981-82 Physical Financial
(Rs. in lakhs)
- 2 3 4 =, 5 6
3. Teak Plantations 15.00 (1) Raising Plantations 520 Hect (1) Reised Plantations 7.63
487 Hect.
4. Cashew Planta- 8.34
tions
5. Nature Conser- 40.00
vation
(2) Maintenance of Teak Planta- (2) Maintained.
tions 151 Hects.
(3) Raising Nursery Beds 1960 (3) 500 Nursery Beds raised.
(4) Collection of Seeds 10,000 (4)
igs.
(5) Advance work 20 Hee (5)
(1) Raising Cashew Platnataion (1) Raised 339 Hects 7.00.
350 Heel. _
(2) Purchase of Seeds (2) 1.00 M. Tonne
(3) Maintenance of Older Plan (3) Maintained
tations 330 Hect.
(1) Development of Sanctuaries, (1)
National Parks and Mini
Zoos.
9¢6. 513 Capital Out-
lay on Forests,
Communications.
7. 513-Capital Out-
lay on Forests—
Buildings.
8. Tribal Sub-Plan
9. General Sub-Plan
5.00
20.00
25.00
30.00
Formation of Roads Formation of Roads 0.36
Construction of Staff Quarters Construction of Staff 3.66
Quarters.
(1) Maintenance of Fruit Yield- (1) Maintained 9.23
ing Plantations.
(2) Construction of Tribal (2) 13 Houses completed
Houses 124 Nos.
(3) Raising of M-F.P. Planta~ 3
tions 100 Heets.
(1) Raising P.B. Seedlings - (1) Raised 8.5 lakhs 9.19 o
6.5 lakhs. “
(2) Construction of Houses (2)
37 Nos.
(3) Raising Plantations 215 Hect. (3) 88 Hects.
(4) Purchase of Bechive Boxes (4) 150
(5) Maintenance of P.B. (5) :
Seedilings 8 lakh .
(6) Raising Nursery beds (6) 100 Beds
400 Nos.
(7) Advance Work 70 Heets (7)
(8) Supply of Bamboos to Arti- (8)
sans of Schedule Castes
20,000 Nos1 2 3
10. Tea Plantations 2.00
11. Soil Conservation 27.50
Afforestation.
12. Rural Bnergy 195,00
Neod (M.N.P.)
Minimum Need
Programme.
TABLE 28 (Contd.)
4 a 5 "6
(1) Maintenance of Tea Planta-
tions.
(1) Maintenance
(1) Raising Plantations 563 Hect. (1) 427 Hect. Plantations raised.
(2) Maintenance of Plantations (2) Maintenance
1110 Heet.
(3) Spill over works 100 Hect. (3) 100 Hects.
(4) Raising of Boundary Trench (4) 2000 Rmtr. Completed
Mounds Planatations
10,000 RMtr.
(5) Raising of P.B. Seedlings
5.09 lakhs
(6) Maintenance of P.B. Seedli-
lings 3 lakhs.
(7) Ripping work 40 TI cts.
(1) Free distribution of 300
lakhs P.B. Seedlings.
17.31
(5) Raised 3.87 Lakhs.
(6) Maintenance of P.B. geadings
1.00 lakhs.
(7) Ripping work 16 Heets.
(1) Raising of Avenue 75.00
Trees, (National and (1)
State Highways 50 Kms.
(2) Plantations of Gomal and
aste lands.
(3) Canal Bank 10 Kms,
(2) 4000 Hect.
(3) Canal Banks 10 Kms,
8gcad
Forest Research 9.00
14. Forest Training 8.00
15. Forest Survey and 10 00
Dem®teation.
16. Forest Statistics 2.00
17. Forest Publicity 3.00
18. Centrally Sponsored
_Schomes (Central
Sector).
19. Rubber Plantations 50.00
20. Rural Energy Need s0.60
Establishment of
Monitering Cell.
(1) Chief Conservator of Forests (Development).
(2) (3) (4) do
(5) CCF CL).
(6) CCF (Development)
Q)
(1) Training of Forest Guards
(1) Survey and Demareation
(1) Maintenance of Staff
(1) Expenditure towards publi
city.
(1)
a)
(1) Survey and Demarea-
tion.
(1) Maintenance of Staff
(1) Expenditure towards
Pabticity.
(1) Maintenance of Rubber Plan— (1)Maintenance of Rubber
tations.
(7) Transferred to Plantation C rrv
(8) do
3.61
2
ru
(3)
1.02
)
0.22
()
0.66
(6)
10.00
fi)
(8)
6¢1 2 3
Centrally Sponsored Schemes :
21. Area Expansion of 9.00
CaShew
22. Soil Conservation 25.00
(Biver Valley
Project.)
23, Maintenance of 0.20
Progeny Orchard
for Cashew.
24, Raral Energy Needs 70.00
Centrally Spon-
sored Schemes
including Rural
Fuel Wood Plau-
tations.
(1) Raising of Cashew Planta-
tions—-258 He t.
(2) Advance work-~210 Hect.
(3) Maintenance of Plantations
(1) Raising of Plantations
670 Heets.
(2) Maintenance of Plantations
720 Heets.
(3) Construction of Check Dams.
(4) Raising of P.B. Seedlings
1.50 lakhs,
(2) Maintenaney of 44 Hoot. of
Progony Orchard for
Cashew.
(1) Maintenance of B.B. Seed-
Tings 80 lakhs.
(2) Planting of 2,300 Heot.
(8) Raising of PB. Seodlings
95.00 lakhs.
(4) Avenue Trees planting
4K.Ms.
(5) Public Under a ing Plan
ations 100 Hect:
(1) Raised 275 Hect. 2.11
, (2) 626 Heets.
(1) Raised 180 Heets 9.98
(2) Maintenance
@)
4)
(1) Maintained 44 Hoet. 0.16
( 50.00*
(2) Planting 2,800 Hoots,
(8) P.B. Seedlings 2.00 lakhs
(4)
(5) 100 Heets,
ag