Professional Documents
Culture Documents
Ranked
Positional
Weight
Types of Cells
Speed,
GT Flow Line dedication
GT Cell
GT Center Variety of
routings
GT Flow Lines
T M
D B
Processing times
are proportional
M D
GT Cells
Product Family 1 Product Family 2 Parts move from
any machine to
any other
Flow is not
unidirectional
Machines still
in proximity
GT Centers
Part Family 1 Part Family 2
Logical arrangement
Machines still in a
process layout
●
Classification and Coding: Grouping based on design
attributes and coding.
●
Production Flow Analysis: Analyze the operation sequence and
the production routing of a part or component through the plant.
●
Part - Machine Clustering Methodologies:
– Uses matrix methods to find clusters
– Heuristics and mathematical models
Original Process Layout
Assembly
Parts Machines
4 6 7 9
1 2 3 4 5 6 7 8 9 10 11 12
A X X X X X
B X X X X
C X X X
D X X X X X
E X X X
F X X X
G
H
X X
X
X
X
X
X 5 8
2 10 12
1 3 11
A B C Raw materials
Groesbeck, 2005
Cellular Assembly
Layout
8 10 9 12
Solution
11
4 Cell1 6 Cell 3
Cell 2
7
2 1 3 5
Raw materials A C B
Groesbeck, 2005
Groesbeck, 2005
Algorithm: BOA
Binary
Ordering
Algorithm
Production capacity of workcells
different
5 2 5 2 5 2
numbers of
people
6 1 6 1 6 1