Ae MILLENNIUM INFRA & REALTY PROJECTS PVT. LTD RA Bill-03
A IF Bill Date 08-09-2023
MULENNIUM cRouP Base Camp construction at Hinotiya
Name of the Sub-Contractor Ms JAGARTYA CONSTRUCTION
[Permanent Account No (PAN) : |DDEPASS14G —
cst : |9DDEPASS14G1ZM - —
Nature of work _ + }Base Camp construction at Hinotiya ~ —
W.O. No & Date : |MIRPPL/Hinotiya/WO/02 Dt. 22.05.2023 i
SNe. Description Upto Date Upto Previous This Bill
1_| Construction of Camp _ 23,05,613 23,05,613
2_| Advance paid
3 | GST @18% 415,010 415,010
A_| Sub Total (1 to 3) 2 27,20,624 27,20,624
3__[ Advance recovery
4 |ITTpse1% 23,056 23,056 |
5_| Labour cess 1% : -
6 | Retention @5% 115,281 115,281
7 _| Material Deductions
8 | Withheld GST 4,15,010 4,15,010
9 |rrensi251%
B_| Total Deduction (3 to 9) 5,538,347 = 553,347
C | Release of GST -
D_| Net Payable Amount (A-B+C) | = 21,67,27 21,67,277
Hee ttturn
Recommended By
Approved ByName of the Sub Contractor
Nature of work
RABiII-03
Ms JAGARIYA CONSTRUCTION
Construction of Camp Building
AF
MILLENNIUM GROUP
ABSTRACT
sno] smuctne | Pant OF STRUCTURE GURNTTNT pae [ ancunt | Anoor) | MARES
Corsets eton oval pnealon wih reared baton for
‘eofshesing sappy roo seat se |
1 ss 63 | stom | 209736 97
Completion of roofing & supply of Electrical & plumbing items at 2152.68 510.00 ae aad a
ste
Fat OT aT FS SOR i IPE VETTE
(ootshetine 8 sappy of ea sheet ste
2 | seenemeensnoon [sctsecinasunpyotrotseetmate || aaasae | saoan | zusnsrest| insaaenzs| sox
fee,
Ce TOT WaT OTT WT TEATS TOOTTTET TF
Footshecting& Sup ofoaf sheet tte
2 | swonsersnoom —[Cofttcie RSupy otrntsectatate | cases | stomo | szgnzocso| 12042298] sox
te
4 [SAFETY ROOM ompelonof werk up pint saaza | noo | assaresr| stavsav| 20m
roTaL Taio ANGUNT aa Taaaar
Harendemanor Aeoroved yRA Bill-03 Ae
Name of the Sub Contractor Ms JAGARIYA CONSTRUCTION ™ ‘(ai
MILLENNIUM GROUP}
Nature of work Construction of Camp Building
MEASUREMENT SHEET
wom | TOTAL
sno STRUCTURE Parrorstaucture | wo's |teworH ouantoy enaanis
| ary
Panel
: ornce Roof sheeting 1 | seen | 4067 | 3738-1328 bie arava
= [Wall Panels ;
a [Roof sheeting $5600 | 32.000 | 2151.68 lable /Not Are
tint
3 | seenaweers room a 1 | 9285 | 4626 | 4295241 [avalable “Not aval
‘Structure (colamnls BT) valle / Not Avalable
ith
4 | ewomcersRoon [all panels 1 | 654s | ssas_ | 23503236 [avalabe [Wot AvaiabTe
Soeur columels Buss] fvalable/ Not valle
nth
5 sareryRoom —[vallpanels 1 | 25641 | 985 | sea.ses |Avatable Not Avaiabie
Structure columes Bru) livable / Not vadable
Total Quantity ofthe alin Safe aaoso.a|
theme +
Haseagevenn roo