Professional Documents
Culture Documents
Avance El Canto 05 Sep 23
Avance El Canto 05 Sep 23
PORCENTAJE
70 71
01/02/2016 8 38 16 0 66
08/02/2016 9 48 23 0 63 100
60
15/02/2016 10 58 30 0 58 26
22/02/2016 11 66 39 0 51
3.846153846
50
29/02/2016 12 73 51 0 48
07/03/2016 13 80 63 0
40 39
38
14/03/2016 14 85 71 0
21/03/2016 15 90 77 0
30 30
28/03/2016 16 94 83 0 27
23
04/04/2016 17 97 87 0 20 20
11/04/2016 18 100 90 0 16
13
18/04/2016 19 94 0 10 11
8.0
25/04/2016 20 97 0 4.3 4.5
7
4.5
2.082.7 1.2 2.7
02/05/2016 21 99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 1.2
09/05/2016 22 100 0 SEMANAS 0 1 2 3 4 5 6 7 8 9
1 0 1 1 1 2 1 3 1 4 1 5 16 1 7 1 8 1 9 20 2 1 2 2 2 3 24
16/05/2016 23 0 15 19 19 19 19 19 16 616 6 166 6 166 6 6 6 6 6 6 6 6 6 6
/ 20 / 20 / 2 0 / 2 0 / 20 / 2 0 / 2 0 / 2 0 / 20 / 2 0 2 0 1 20 1 2 0 1 2 0 1 2 0 1 20 1 2 0 1 2 0 1 2 0 1 20 1 2 0 1 2 0 1 20 1 20 1 2 0 1
2 1 1 2 2 2 1 1 2 2 / / / / / / / / / / / / / / /
11/10/2016 24 0 7 / 1 2 / 1 6 / 1 3 / 1 0 / 1 7 / 1 8 / 0 5 / 0 1 / 0 8 / 0 / 0 2 / 0 2 / 0 2 / 03 / 03 / 0 3 / 0 3 / 0 4 / 04 / 0 4 / 0 4 / 0 5 / 0 5 / 0 5 / 1 0
0 2 2 0 1 1 1 2 0 0 15 22 29 07 14 21 28 04 11 18 25 02 09 16 11
70 69.3
05/09/2016 8 2.7 0 1 67 67
64.07
12/09/2016 9 4.5 1.2 3
60 60 60 60.05
19/09/2016 10 7.0 2.7 5 57.03
26/09/2016 11 12 4.5 7 53 53 52.89
50 48.87
03/10/2016 12 18 7.0 9 46 46
44
10/10/2016 13 25 12 11 41.31
40 39 39 38.31
34.79
32 32
30 30.16
25 25 25.18
20 21
18 18 19
17
15
12 12 13
10 11
9
7 7 7.0
67 67
PORCENT
64.07
60 60 60 60.05
57.03
53 53 52.89
50 48.87
46 46
44
41.31
40 39 39 38.31
17/10/2016 14 32 18 13 34.79
24/10/2016 15 39 25 15 32 32
30 30.16
31|/10/2016 16 46 32 17 25 25 25.18
07/11/2016 17 53 39 19 20 19
21
18 18 17
14/11/2016 18 60 46 21 15
12 12 13
21/11/2016 19 67 53 25.18 10 9
11
7 7 7.0
28/11/2016 20 72.5 60 30.16 4.5 5 4.5
2.7 3 2.7
05/12/2016 21 77.5 67 34.79 0 0.01.2
0 00 0 00 00 00 00 00 0 1 0 1.2
12/12/2016 22 82 72.5 38.31 SEMANAS
19/12/2016 23 85 77.5 41.31
26/12/2016 24 88 82 44
02/01/2017 25 91 85 48.87
09/01/2017 26 94 88 52.89
16/01/2017 27 96 91 57.03 AVANCE REAL 11/22/2016 23.07 %
23/01/2017 28 98 94 60.05
30/01/2017 29 99 96 64.07
07/02/2017 30 100 98 69.3
14/02/2017 31 99 72.41
21/02/2017 32 100 76.99
28/02/2017 33 81.24
07/03/2017 34 85.29
14/03/2017 35 88.14
21/03/2017 36 90.3
28/03/2017 37 92.04
18/04/2017 40 96.38
02/05/2017 43 98.88
90 89.59
28/11/2016 4 2.7 2.7 12.81 88 88 88.1
85 85 85
05/12/2016 5 4.5 2.7 15.22 PROGRAMADO 82 82 82
80
12/12/2016 6 7.0 2.7 16.46 CRITICO
77.5 77.5 78
76
REAL 74
19/12/2016 7 12 4.5 18.11 72.5 72.5 72 73
PORCENTAJE
70 70.62
26/12/2016 8 18 7.0 20.15 67 67
64.47
02/01/2017 9 25 12 24.29
60 60 60 60.96
09/01/2017 10 32 18 27.89 56
58
55.85
54.45
16/01/2017 11 39 25 30.25 53 53
51.21
50
23/01/2017 12 46 32 33.02 46 46
47.83
45.58
30/01/2017 13 53 39 36.13 41.54
40 39 39.69
39 38.19
06/02/2017 14 60 46 38.19 36.13
32 33.02
32
30 30.25
27.89
24.29 25
25
20 20.15
18.11
18 18
16.46
15.22
12.81 12 12
10 9.31
7 7.0
60 60 60 60.96
58
POR
56
55.85
54.45
53 53
51.21
50
47.83
46 46 45.58
41.54
40 39 39.69
39 38.19
36.13
33.02
13/02/2017 15 67 53 39.69 30
32 32
30.25
27.89
20/02/2017 16 72.5 60 41.54
24.29 25
25
27/02/2017 17 77.5 67 45.58 20 20.15
18.11
18 18
06/03/2017 18 82 72.5 47.83 16.46
15.22
12.81 12 12
13/03/2017 19 85 77.5 51.21 10 9.31
20/03/2017 20 88 82 54.45 5.86 7 7.0
4.5 4.5
2.08
2.72.7 2.72.72.7
2.7
27/03/2017 21 91 85 55.85 1.2
0 0 0 1.2 0
03/04/2017 22 94 88 56 SEMANAS 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36
10/04/2017 23 96 91 58 0 16 0 16 0 16 0 16 0 16 1 7
1 7 1 7 1 7 1 7 1 7 1 7 1 7 1 7 1 7 1 7 1 7 1 7 1 7
/2 /2 /2 /2 /2 20 20 20 20 20 20 20 20 20 20 20 20 20 20
10 /1
1
/1
1
/1
2
/1
2 1/ 1/ 02
/ 2/ 3/ 03
/ 4/ 4/ 5/ 05
/ 5/ 6/ 06
/ 7/
17/04/2017 24 98 94 60.96 / /0 /0 / /0 /0 / /0 /0 /0 / /0 /0 / /0
31 14 28 12 26 09 23 06 20 06 20 03 17 01 15 29 12 26 10
24/04/2017 25 99 96 64.47
01/05/2017 26 100 98 70.62 se crece 2 semanas
08/05/2017 27 99 72 AVANCE REAL 4/14/2015 11.78 %
15/05/2017 28 100 73
22/05/2017 29 74
29/05/2017 30 76
05/06/2017 31 78
12/06/2017 32 82
19/06/2017 33 85
26/06/2017 34 88.1
03/07/2017 35 89.59
10/07/2017 36
72.5 72.5
30/01/2017 8 12 4.5 13.97 70
67 67
06/02/2017 9 18 7.0 16.76
13/02/2017 10 25 12 18.92 60 60 60
57
20/02/2017 11 32 18 21.2 53 53
55
53
51
27/02/2017 12 39 25 24.69 50 49
06/03/2017 13 46 32 27.06 46 46 46 47
44.96
13/03/2017 14 53 39 29.12 40 39 39
40.87
38.64
37
20/03/2017 15 60 46 31.61 34.7335
27/03/2017 16 67 53 34.73 32 32 31.61
30 29.12
27.06
03/04/2017 17 72.5 60 35 25 25
24.69
10/04/2017 18 77.5 67 37 20
21.2
18 18.9218
17/04/2017 19 82 72.5 38.64 16.76
13.97
24/04/2017 20 85 77.5 40.87 12 12
10 9.33
01/05/2017 21 88 82 44.96 7.697 7.0
5.99
4.37 4.5 4.5
1.622.5 2.7 2.7 2.7
0 1.2 2.7
0 0.5 1.2 1.2 1.2 1.2
0 1.2 0
SEMANAS 0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 17 1 8 1 9 20 2 1 2 2 2 3 2 4 2 5 2 6 2 4 2 5
1 6 1 6 1 6 1 6 1 7 17 17 17 17 17 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
/ 2 0 / 20 / 2 0 / 20 / 2 0 / 20 / 20 / 20 / 2 0 / 2 0 2 01 2 0 1 2 0 1 20 1 2 0 1 20 1 20 1 2 01 20 1 20 1 2 0 1 20 1 20 1 2 0 1 2 0 1 20 1 2 0 1 20 1 20 1
2 1 2 / / / / / / / / / / / / / / / / / / /
/ 1 / 1 2 / 1 2 / 1 2 / 0 1 / 0 / 0 1 / 0 1 / 01 / 0 0 2 02 02 0 3 03 0 3 0 3 0 4 0 4 0 4 0 4 0 5 0 5 05 05 0 5 06 0 6 0 6
05 12 19 26 02 09 16 23 30 06 13/ 20 / 27 / 06/ 13/ 20/ 27/ 03/ 10/ 17/ 24/ 01/ 08/ 15/ 22/ 29/ 05/ 13/ 20/
30 29.12
27.06
25 25
24.69
21.2
20
18 18.9218
16.76
13.97
12 12
10 9.33
7.697 7.0
5.99
4.37 4.5 4.5
08/05/2017 22 91 85 46 1.622.5 2.7 2.7 2.7
0 1.2 2.7
0 0.5 1.2 1.2 1.2 1.2
0 1.2 0
15/05/2017 23 94 88 47 SEMANAS 0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 17 1 8 1 9 20 2 1 2 2 2 3 2 4 2 5 2 6 2 4 2 5
22/05/2017 24 96 91 49 6 6 6 6 7 7 7 7 7 7
2 0 1 0 1 01 0 1 01 20 1 0 1 0 1 0 1 2 0 1 01 7 0 1 7 0 1 7 0 1 7 0 1 7 0 1 7 0 1 7 01 7 0 17 0 17 0 1 7 0 17 0 17 0 17 0 17 0 17 0 17 0 17 0 17
/ /2 /2 /2 /2 / /2 /2 /2 / 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
29/05/2017 25 98 94 51 / 12 / 1 2 / 1 2 / 1 2 / 0 1 / 0 1 / 0 1 / 0 1 01 / 02 0 2 / 02 / 02 / 0 3 / 03 / 0 3 / 0 3 / 0 4 / 0 4 / 0 4 / 0 4 / 0 5 / 0 5 / 05 / 05 / 0 5 / 06 / 0 6 / 0 6 /
/
05 12 19 26 02 09 16 23 30 06 13/ 20 / 27 / 06/ 13/ 20/ 27/ 03/ 10/ 17/ 24/ 01/ 08/ 15/ 22/ 29/ 05/ 13/ 20/
05/06/2017 26 99 96 53
13/06/2017 24 100 98 55 AVANCE REAL 11/22/2016 22.87 %
20/06/2017 25 99 57 se crece3 semanas
27/06/2017 26 100 59.01
03/07/2017 27 61.01
24/04/2017 0
PROGRAMADO
0
CRITICO REAL
AVANCE COSL 13VIV MAYO 17 MORERIA
01/05/2017 1 0
100
VACRISA 100 100
08/05/2017 2 0 0 0 98 98 99
96 96
15/05/2017 3 3.5 0 2 94 94
90 91 91
22/05/2017 4 6 0 3.5 88 88
85 85
29/05/2017 5 8.5 3.5 6.5 PROGRAMADO
82 82
80 CRITICO
05/06/2017 6 13 6 8.5 78 78
REAL 75 75
12/06/2017 7 18 8.5 10.3
PORCENTAJE
71.5 71.5
19/06/2017 8 24 13 12.23 70
66 66
26/06/2017 9 31.0 18.0 15.21
61.5 61.5
03/07/2017 10 37 24 21 60
10/07/2017 11 43 31 29.98 55 55
17/07/2017 12 50 37 34.28 50 50 50
24/07/2017 13 55 43
43 43
31/07/2017 14 61.5 50 40
37 37
07/08/2017 15 66 55 34.28
14/08/2017 16 71.5 61.5 30 31 31
29.98
21/08/2017 17 75 66
24 24
28/08/2017 18 78 71.5 20 21
18 18.0
04/09/2017 19 82 75 15.21
13 13
12.23
11/09/2017 20 85 78 10 10.3
8.5 8.5 8.5
18/09/2017 21 88 82 6.5 6
6
3.5 3.5
25/09/2017 22 91 85 3.5
2
0 00 0 0
02/10/2017 23 94 88 SEMANAS 0
0 0
2 4 6 8
7 7 7 7 7 10 12 14 16 18 20 22 24 26 28
09/10/2017 24 96 91 01 01 01 01 01 17 17 17 17 17 17 17 17 17 17
2 2 2 2 2 0 0 0 0 0 0 0 0 0 0
16/10/2017 25 98 94 4/ 5/ 5/ 6/ 6/ /2 /2 /2 /2 /2 /2 /2 /2 /2 /2
/0 /0 / 0 /0 /0 /0
7 07 07 /0
8
/0
8
/0
9
/0
9
/1
0
/1
0 11
24 08 22 05 19 03 17
/
31
/
14 28 11 25 09 23 06
/
23/10/2017 26 100 96
30/10/2017 27 98
06/11/2017 28 99 EL INICIO REAL SE DA EL 8 DE MAYO, NO EL 24 DE ABRIL.
13/11/2017 29 100 SE DAN 2 SEMANAS POR FALTA DE VERIFICACION.
29/05/2017 0
PROGRAMADO
0
CRITICO REAL
0
AVANCE COSL 11VIV ABRIL 17 MORERIA
05/06/2017 1 3.5 3.1
100
VACRISA 100 100
12/06/2017 2 6 0 5.23 98 99 98 99
96 96
94 94
19/06/2017 3 8.5 3.5 8.99
90 90 91
26/06/2017 4 13 6 12.23 87 88
85
03/07/2017 5 18 8.5 15.21 PRO-
GRA-
83 82
80 MADO
10/07/2017 6 24 13 17.73 78 78
CRITICO 75 75
17/07/2017 7 31.0 18.0 19.11
PORCENTAJE
REAL 71.5 71.5
24/07/2017 8 37 24 70
66 66
31/07/2017 9 43 31
61.5 61.5
07/08/2017 10 50 37 60
14/08/2017 11 55 43 55 55
21/08/2017 12 61.5 50 50 50 50
28/08/2017 13 66 55
43 43
04/09/2017 14 71.5 61.5 40
37 37
11/09/2017 15 75 66
18/09/2017 16 78 71.5 30 31 31
25/09/2017 17 83 75
24 24
02/10/2017 18 87 78 20 19.11
18.0
18 17.73
09/10/2017 19 90 82 15.21
16/10/2017 20 94 85 12.23 13
13
10 8.99
8.5 8.5
23/10/2017 21 96 88 6
65.23
3.1 3.5
30/10/2017 22 98 91 3.5
0 0 0
06/11/2017 23 99 94 SEMANAS 0
0
2 6
4 8 10 12 14 16 18 20 22 24 26
13/11/2017 24 100 96 0 17 0 17 0 17 0 17 0 17 1 7 1 7 1 7 1 7 1 7 1 7 1 7 1 7 1 7
5 /2 6 /2 6 /2 7 /2 7 /2 / 20 20 20 20 20 20 20 20 20
16/09/2017 25 98 /0 /0 /0 /0 /0 08 8/ 9/ 9/ 0/ 0/ 0/ 11
/ 9/
29 12 26 10 24 / /0 /0 /0 /1 /1 /1 / /0
23/09/2017 26 99 07 21 04 18 02 16 30 13 23
PORCENTAJE
REAL
66
16/11/2015 9 48 23 25.74 63
23/11/2015 10 58 30 30.8 60
58
30/11/2015 11 66 39 37.9
07/12/2015 12 73 51 44.09 50 51
48
14/12/2015 13 80 63 44.09
21/12/2015 14 85 71 40
38 39
37.9
28/12/2015 15 89 77
04/01/2016 16 92 83 30 30.8
30
11/01/2016 17 95 87 27
25.74
18/01/2016 18 96.5 90 21.68
23
20 20 19.21
25/01/2016 19 98 94 17.17
16
01/02/2016 20 99 97 13.04
13
10 11
08/02/2016 21 99.5 99 7.54 8.0
5.14 7 4.5
15/02/2016 22 100 99.5 4.5
1.93 1.2 2.7
2.7
0 0 1.2
0 0
22/02/2016 22 100 0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 22
SEMANAS 5
01 01
5 15 15 15 15 15 15 15 15 5 5 5 5 5 5 6 6 6 6 6 6 6 6
/ 2 / 2 /20 / 20 /20 / 20 / 20 / 20 / 20 / 20 201 201 201 201 201 201 201 201 201 201 201 201 201 201
9 9 9 0 0 0 0 1 1 1 / / / / / / / / / / / / / /
0 / 0 1/0 8/ 0 5/ 1 2/ 1 9/ 1 6/ 1 2/ 1 9/ 1 6/ 1 /11 / 11 / 12 / 12 / 12 / 12 / 01 / 01 / 01 / 01 / 02 / 02 / 02 / 02
2 2 2 0 1 1 2 0 0 1 23 30 07 14 21 28 04 11 18 25 01 08 15 22
100
% LEV. IMPORTE
A.- TERRACERIAS VOLUMEN DE PROYECTO UNIDAD
OBRA ACUM
DESPALME DE TERRENO NATURAL
1
1 DESPALME DE 15 CM 15,338.00 4.000% M2 1.00 4.000
2 CARGA Y ACARREO A 1 KM 2,991.00 5.00% M3 1.00 5.000
1 AGUA POTABLE
1 TRAZO Y NIVELACION 1,214.00 0.250% ML 1.00 0.250
2 CORTE CON DISCO 35.00 0.250% ML 1.00 0.250
3 DEMOLICION DE CONCRETO DE PAVIMENTO O BANQUETA 14.00 0.250% M2 1.00 0.250
4 EXCAVACION EN MATERIAL TIPO II 515.00 1.000% M3 1.00 1.000
5 PLANTILLA Y ACOSTILLADO DE ARENA 156.00 0.75% M3 1.00 0.750
6 S. Y COLOC. DE TUBERIA DE PVC HIDRAULICO, 1,214.00 1.250% ML 1.00 1.250
RD 26 DE 75 MM DE DIAMETRO (3") ###
AGUA POTABLE
7 SUMINISTRO Y COLOCACION DE PIEZAS ESPECIALES (33) 1.00 0.300% LOTE 1.00 0.300
8 VALVULA COMPUERTA DE 3" 1.00 0.500% PZA 0.10 0.050
9 CAJA PARA OPERACIÓN DE VALVULAS 1.00 0.250% PZA 0.10 0.025
10 RELLENO CON MATERIAL PROD. DE EXCAVACION 359.00 1.00% M3 1.00 1.000
11 CARGA Y ACARREO FUERA DE OBRA 202.00 0.50% M3 1.00 0.500
12 SUMINISTRO Y COLOCACION DE ATRAQUES DE CONCRETO 24.00 0.500% PZA 1.00 0.500
13 CONEXIÓN A RED EXISTENTE 1.00 0.500% PZA 1.00 0.500
14 SUMINISTRO Y COLOC. DE TOMA DE AGUA DOMICILIARIA, 105.00 2.300% PZA 1.00 2.300
CON TUBERIA PAD ALMA DE AL 13 MM, PRUEBAS (1.25M)
15 CONCRETO PARA REPONER PAVIMENTOS 54.97 0.500% M2 1.00 0.500
16 PRUEBA Y CONEXIÓN A RED 1.00 2.000% PZA 0.00 0.000
12.500% 10.000
2 DRENAJE SANITARIO
1 TRAZO Y NIVELACION 489.00 0.150% ML 1.00 0.150
2 CORTE CON DISCO 10.00 0.100% ML 1.00 0.100
3 DEMOLICION DE CONCRETO 3.00 0.150% M2 1.00 0.150
4 EXCAVACION EN MATERIAL TIPO II 358.00 1.200% M3 1.00 1.200
5 PLANTILLA Y ACOSTILLADO DE ARENA 110.00 0.15% M3 1.00 0.150
6 S. Y COLOC. DE TUBERIA DE JUNTA HERMETICA DE PAD 489.00 4.000% ML 1.00 4.000
25 CM DE DIAMETRO
DRENAJE
17.000% 17.000
3 PAVIMENTOS
1 TRAZO Y NIVELACION 5,570.00 1.000% M2 1.00 1.000
2 SUMINISTRO Y COLOCACION DE C. HIDRAULICO RAYADO 4,119.00 21.000% M2 1.00 21.000
SUMINISTRO Y COLOCACION DE C. HIDRAULICO ESTAMP. - M3
2 GUARNICION G2 903.00 4.000% ML 1.00 4.000
3 GUARNICION TRAPEZOIDAL 40.00 1.250% ML 1.00 1.250
4 BANQUETAS Y RAMPAS, DE CONCRETO F´C=150 1,084.00 5.000% M2 1.00 5.000
5 RAMPAS M. 10.00 0.500% PZA 1.00 0.500
35.000% 35.000
4 RED ELECTRICA BAJA TENSION SUBTERRANEA
1 TRAZO Y NIVELACION 1,926.00 0.200% ML 1.00 0.200
2 EXCAVACION 163.00 0.300% M3 1.00 0.300
3 COLOCACION DE TUBERIA DE POLIETILENO DE ALTA 516.00 0.500% ML 1.00 0.500
DENSIDAD DE 3", INCLUYE CINTA
4 TUBERIA DE POLIETILENO DE AD DE 2" (32 MM), CINTA, 1,410.00 1.000% ML 1.00 1.000
PARA ACOMETIDAS
5 OBRA CIVIL REGISTRO TIPO 2RBTB2. INCLUYE EXCAVACION 20.00 1.000% PZA 1.00 1.000
NIVELACION Y RESANADO.
6 RELLENO COMPACTADO CON MAT. PROD. EXCAVACION, 136.00 0.350% M3 1.00 0.350
7 CARGA Y ACARREO 35.00 0.250% M3 1.00 0.250
5.000% 5.000
5 RED ELECTRICA MEDIA TENSION
1 TRAZO Y NIVELACION 180.00 0.200% ML 1.00 0.200
2 EXCAVACION 51.00 0.200% M3 1.00 0.200
3 CORTE CON DISCO - 0.300% ML 1.00 0.300
4 DEMOLICION DE CONCRETO - 0.200% M2 1.00 0.200
5 CONCRETO PARA REPONER PAVIMENTOS - 0.200% M2 0.00 0.000
6 COLOCACION DE TUBERIA DE POLIETILENO DE ALTA 180.00 0.500% ML 1.00 0.500
DENSIDAD DE 3", INCLUYE CINTA
7 COLOCACION DE REGISTROS PARA TRANSFORMADOR 4.00 1.250% PZA 1.00 1.250
9 RELLENO COMPACTADO CON MAT. PROD. EXCAVACION, 46.00 0.250% M3 1.00 0.250
10 CARGA Y ACARREO 7.00 0.200% M3 1.00 0.200
11 ENCOFRADO 3.00 0.200% M3 1.00 0.200
5.000% 5.000
6 ALUMBRADO PUBLICO (OBRA CIVIL)
1 TRAZO Y NIVELACION 586.00 0.20% ML 1.00 0.200
2 EXCAVACION - 0.25% M3 1.00 0.250
3 CORTE CON DISCO EN PAVIMENTO - 0.20% ML 1.00 0.200
4 DEMOLICION DE CONCRETO DE PAVIMENTO O BANQUETA - 0.20% M2 1.00 0.200
5 REPOSICION DE PAVIMENTO EXISTENTE - 0.20% M2 1.00 0.200
6 COLOC. DE TUBERIA POLIDUCTO BICAPA 32 MM INC CINTA 586.00 0.50% ML 1.00 0.500
7 REPOSICION DE BANQUETA 4.20 0.15% M2 1.00 0.150
8 COLOC. DE REGISTRO POLIMERICO 40 X 30,5 23.00 0.75% PZA 1.00 0.750
9 RELLENO COMPACTADO CON MAT. PROD. EXCAVACION, 87.30 0.15% M3 1.00 0.150
10 CARGA Y RETIRO PRODUCTO DE EXCAVACION 3.34 0.20% M3 1.00 0.200
11 COLOC, DE ARAÑAS PARA POSTES 23.00 0.20% PZA 1.00 0.200
5.00% 5.000
7 RED DE TELEFONIA (OBRA CIVIL), INCLUYE REGISTROS
1 TRAZO Y NIVELACION 1,675.00 0.10% ML 1.00 0.100
2 EXCAVACION COMPARTIDA CON TELEVISION 88.50 0.25% M3 1.00 0.250
3 SUMINISTRO Y COLOC. DE TUBERIA PVC 1 1/2 ENTRE 510.00 0.75% ML 1.00 0.750
REGISTRO Y REGISTRO INC CINTA
4 SUMINISTRO Y COLOC. DE REGISTROS DE CONCRETO 18.00 2.00% PZA 1.00 2.000
DE TELEFONIA
5 SUMINISTRO Y COLOC. DE TUBERIA POLIDUCTO 32 MM 1,250.00 1.00% ML 1.00 1.000
PARA ACOMETIDAS
6 RELLENO COMPACTADO CON MAT. PROD. EXCAVACION, 87.22 0.25% M3 1.00 0.250
7 CARGA Y ACARREO DE MATERIA PRODUCTO DE EXCAVACION 1.79 0.15% M3 1.00 0.150
6.00% 6.000
8 RED DE TELEVISION. OBRA CIVIL.
1 TRAZO Y NIVELACION 1,675.00 0.10% ML 1.00 0.100
2 EXCAVACION COMPARTIDA CON TELEFONIA 88.50 0.25% M3 1.00 0.250
3 SUMINISTRO Y COLOC. DE TUBERIA PVC 1 1/2 ENTRE 510.00 0.75% ML 1.00 0.750
REGISTRO Y REGISTRO
4 SUMINISTRO Y COLOC. DE REGISTROS DE CONCRETO 18.00 2.00% PZA 1.00 2.000
DE TELEVISION 40 X 40
5 SUMINISTRO Y COLOC. DE TUBERIA POLIDUCTO 32 MM 1,250.00 1.00% ML 1.00 1.000
PARA ACOMETIDAS
6 RELLENO COMPACTADO CON MAT. PROD. EXCAVACION, 87.22 0.25% M3 1.00 0.250
7 CARGA Y ACARREO DE MATERIA PRODUCTO DE EXCAVACION 1.79 0.15% M3 1.00 0.150
4.50% 4.500
12 ACOMETIDAS
77.00 8.00% M2 1.00 8.000
ACOMETIDAS ELECTRICAS (73 VIVIENDAS, 1 CASETA, 2 LOTES
3 COMERCIALES Y 1 ALUMBRADO), FALTA AREA VERDE QUE VIENE EN
AREA VERDE
10.00% 10.000
% P.ACUM.
ANTICIPO PAGADO 20
PAGO 1 PAGADO 1.918
PAGO 2 PAGADO 3.836
PAGO 3 PAGADO 5.754
PAGO 4 PAGADO 7.682
PAGO 5 PAGADO 9.61
PAGO 6 PAGADO 11.538
PAGO 7 PAGADO 13.466
PAGO 8 PAGADO 15.394
PAGO 9 PAGADO 17.322
PAGO 10 PAGADO 19.25
PAGO 11 PAGADO 21.178
PAGO 12 PAGADO 23.106
PAGO 13 PAGADO 25.034
PAGO 14 PAGADO 26.962
PAGO 15 PAGADO 28.89
PAGO 16 PAGADO 30.818
PAGO 17 PAGADO 32.746
PAGO 18 PAGADO 34.674
PAGO 19 PAGADO 36.602
PAGO 20 PAGADO 38.53
PAGO 21 PAGADO 40.458
PAGO 22 PAGADO 42.386
PAGO 23 PAGADO 44.314
PAGO 24 PAGADO 46.242
PAGO 25 PAGADO 48.17
PAGO 26 PAGADO 50.098
PAGO 27 PAGADO 52.026
PAGO 28 PAGADO 53.954
PAGO 29 PAGADO 55.882
PAGO 30 PAGADO 57.81
PAGO 31 PAGADO 59.728
PAGO 32 PAGADO 61.646
PAGO 33 63.564
PAGO 34 65.482
PAGO 35 67.4
PAGO 36 69.318
PAGO 37 71.236
PAGO 38 73.154
PAGO 39 75.072
PAGO 40 76.99
PAGO 41 78.908
PAGO 42 80.826
PAGO 43 82.744
PAGO 44 84.662
PAGO 45 86.58
PAGO 46 88.498
PAGO 47 90.416
PAGO 48 92.334
PAGO 49 94.252
PAGO 50 96.17
PAGO 51 98.088
PAGO 52 100.006
FRENTE: EL CANTO SEMANA: 1 ENVIO: DIRECCION
CASAS CON SOBRESUELO E IMPER. QUIMICO, TUBERIA DE PVC 6" EN RED PRINCIPAL, 4 CIRCUITOS, ATERR
OCTAVIO INDICAR AVANCE 0. HABITA Y CONFORT SIN PLANO AL 26/04/21, AL 04/05 21 SIN PLANO
CASAS CON SOBRE SUELO E IMPER. QUIMIC0, TUBERIA DE PVC 6" EN RED PRINCIPAL, 4 CIRCUITOS, ATERR
OCTAVIO INDICAR AVANCE 0
CTO. COLIBRI
HABITA CONFORT TRRRACE
NO RUV
124.7 108.59 94.41
L1 M3 L2 M3 L3 M3
26 26 26
103 105 107
3/22/2021 3/22/2021 3/22/2021
9/20/2021 9/20/2021 9/20/2021
0.150 0.150 0.150
0.250 0.250 0.250
1.000 1.000 1.000
3.000 3.000 3.000
6.000 6.000 6.000
4.500 4.500 4.500 20 MARZO SE SACA 15% ANTICIPO ACERO
6.000 6.000 6.000
5.000 5.000 5.000 20 MARZO SE SACA 15% ANTICIPO ACERO
3.500 3.500 3.500
11/16/2021
C. COLIBRI
CELEBRA
RUV
77.32
L6 M1
26
110
3/22/2021
9/20/2021
0.200
0.350
1.200
3.500
7.000
5.000 20 MARZO SE SACA 15% ANTICIPO ACERO
3.550
3.700
1.800
3.500
3.750
2.000
2.500
0.500
1.000
3.000
3.000
5.750
6.250 MARZO 22 SE SACA ANTICIPO
1.000
2.500
0.850
2.000
2.000
2.000
1.000
2.000
2.500
1.000
4.500
1.000
4.200
4.200
4.000
1.200 MARZO 22 SE SACA ANTICIPO
4.000
2.500
100.00
C. COLIBRI
CELEBRA
NO RUV
77.32
L4 M3
26
109
3/22/2021
9/20/2021
0.200
0.350
1.200
3.500
7.000
5.000
3.550
4.000
1.500
3.500
3.750
2.000
2.500
0.500
1.000
3.000
3.000
5.750
6.250 MARZO 22 SE SACA ANTICIPO
1.000
2.500
0.850
2.000
2.000
2.000
1.000
2.000
2.500
1.000
4.500
1.000
4.200
4.200
4.000
1.200 MARZO 22 SE SACA ANTICIPO
4.000
2.500
100.00
11/5/2021
NIQITO SE INSTALA SEMANA DE 18 DE AGOSTO
FRENTE: EL CANTO SEMANA: 1 ENVIO: DIRECCION CTO. COLIBRI
No. CONTRATO: IPSL 06/21 CNTO-CONCRETA-OT08-8 VIV MAYO PROTOTIPO HABITA CONFORT
CONTRATISTA: CONCRE-TA SH SA DE CINICIO: 5/6/2021 TERMINO: 11/15/2021 AMPLIACION RUV
CONTRATANTE IPSL M2 CONST. 124.7 108.59
FECHA: 6/1/2021 LOTE-MANZ. L13 M1 L12 M1
PERIODO: No. VIV. 2 SEMANAS 26 26
26 SEMANAS No. OFICIAL 124 122
CONCEPTOS : VIVIENDA DE 2 NIVELES FACTOR FACTOR NUMERO AVANCE INICIO 5/6/2021 5/6/2021
1 viv. 2 VIV LOTES ETAPA TERMINO 11/15/2021 11/15/2021
1 TRAZO Y NIVELACION 0.150 0.075 2.00 0.150 0.150 0.150
2 EXCAVACION DRENAJE 6", RELLENOS 0.260 0.130 2.00 0.260 0.260 0.260
3 REGISTRO SANITARIO 1.000 0.500 2.00 1.000 1.000 1.000
4 CIMENTACION 3.000 1.500 2.00 3.000 3.000 3.000
5 MUROS Y CASTILLOS PLANTA BAJA 5.990 2.995 2.00 5.990 5.990 5.990
6 LOSA DE ENTREPISO 4.400 2.200 2.00 4.400 4.400 4.400
7 MUROS Y CASTILLOS PLANTA ALTA 5.900 2.950 2.00 5.900 5.900 5.900 se saca anticipo de ladrillo ya pagado el 6 de julio 21
8 LOSA DE AZOTEA Y ESCALERA 4.800 2.400 2.00 4.800 4.800 4.800 |
9 ALBAÑILERIA EN AZOTEA 3.400 1.700 2.00 3.400 3.400 3.400
10 SOBRESUELO EN AZOTEA. TIERRA, LADRILLO, 5.000 2.500 2.00 5.000 5.000 5.000
ENMACILLADO, CHAPALQUEADO, IMPER QUIMICA
13 PRUEBAS EN AZOTEA, DETALLADO 1.000 0.500 2.00 1.000 1.000 1.000
11 APLANADOS EN PATIO 2.450 1.225 2.00 2.450 2.450 2.450
12 APLANADOS Y RECUB. EN FACHADA 3.500 1.750 2.00 3.500 3.500 3.500
19 CISTERNA 1.400 0.700 2.00 1.400 1.400 1.400
14 PISO PATIO, HUELLAS, LAVADERO 2.000 1.000 2.00 2.000 2.000 2.000
16 RELLENOS EN PATIO Y JARDIN 0.500 0.250 2.00 0.500 0.500 0.500
17 REPELLADOS EN INTERIOR 0.500 0.250 2.00 0.500 0.500 0.500
18 AZULEJOS Y BARRAS 3.000 1.500 2.00 3.000 3.000 3.000
19 FIRME Y ENHUACALADOS O TABLAROCA DE WC 2.000 1.000 2.00 2.000 2.000 2.000
20 PISOS 6.100 3.050 2.00 6.100 6.100 6.100
21 COLOC.Y SUM. ALUMINIO Y DOMOS 6.100 3.050 2.00 6.100 6.100 6.100 21 DE MAYO SE PAGA ANTICIPO DE ALUMINIO
22 COLOC. ACCESORIOS BAÑO 0.500 0.250 2.00 0.500 0.500 0.500
23 BARDAS 2.000 1.000 2.00 2.000 2.000 2.000
24 INSTALACION ELEC. POL. LOSA 1/5 0.850 0.425 2.00 0.850 0.850 0.850
25 I. ELECT EN MUROS 2/5, 4 CIRCUITOS 0.950 0.475 2.00 0.950 0.950 0.950
26 CABLEADOS 3/5, ATERRIZAR TODO 0.900 0.450 2.00 0.900 0.900 0.900
27 ACC. ELECTRICOS CASA, INCLUYE 6 FOCOS AH. CONT FT 2.150 1.075 2.00 2.150 2.150 2.150
28 PRUEBAS ELECTRICAS 5/5 0.800 0.400 2.00 0.800 0.800 0.800
29 INSTALACION SANITARIA 2.050 1.025 2.00 2.050 2.050 2.050
30 RAMALEO HIDRAULICO Y GAS 1.950 0.975 2.00 1.950 1.950 1.950
31 ALIMENTACION, CUADRO Y TINACO 1.000 0.500 2.00 1.000 1.000 1.000
32 MUEBLES, TARJA, CALENTADOR 2.000 1.000 2.00 2.000 2.000 2.000
33 PRUEB. HIDRAULICAS, SANIT Y GAS 1.000 0.500 2.00 1.000 1.000 1.000
34 YESO 4.450 2.225 2.00 4.450 4.450 4.450
35 TIROL Y PINTURA INTERIOR 4.450 2.225 2.00 4.450 4.450 4.450
36 PINTURAS EXTERIORES 3.500 1.750 2.00 3.500 3.500 3.500
37 MARCO-PUERTA DE ACCESO, PASAMANOS 1.000 0.500 2.00 1.000 1.000 1.000 21 DE MAYO SE PAGA ANTICIPO DE ALUMINIO
38 PUERTAS INTERIORES 5.000 2.500 2.00 5.000 5.000 5.000
39 LIMPIEZA PARA ENTREGA 3.000 1.500 2.00 3.000 3.000 3.000
TOTAL FACTORES = 100.00 100.00 100.000 100.000
PORCENTAJE 1, 2 NIVELES SEGUNDA
CASAS CON SOBRESUELO E IMPER. QUIMICO, TUBERIA DE PVC 6" EN RED PRINCIPAL, 4 CIRCUITOS, ATERRIZADA TODA LA CASA, VARIOS CONTACTOS FALLA TIERR
OCTAVIO INDICAR FECHA DE INICIO, HABITA Y CONFORT SIN PLANO AL 06/05/21, AL 17/05/21 SIN PLANO
FRENTE: EL CANTO SEMANA: 1 ENVIO: DIRECCION CTO. COLIBRI
No. CONTRATO: IPSL 06/21 CNTO-CONCRETA-OT08-8 VIV MARZO PROTOTIPO CONFORT CONFORT TRRRACE TRRRACE HABITA
CONTRATISTA: CONCRE-TA SH SA DE CINICIO: 5/6/2021 TERMINO: 11/15/2021 AMPLIACION NO RUV
CONTRATANTE IPSL M2 CONST. 108.59 108.59 94.41 94.41 124.7
FECHA: 6/1/2021 LOTE-MANZ. L11 M1 L10 M1 L9 M8 L8 M1 L14 M1
PERIODO: No. VIV. 5 SEMANAS 26 26 26 26 26
26 SEMANAS No. OFICIAL 120 118 116 114 126
CONCEPTOS : VIVIENDA DE 2 NIVELES FACTOR FACTOR NUMERO AVANCE INICIO 5/6/2021 5/6/2021 5/6/2021 5/6/2021 5/6/2021
1 viv. 5 VIV LOTES ETAPA TERMINO 11/15/2021 11/15/2021 11/15/2021 11/15/2021 11/15/2021
1 TRAZO Y NIVELACION 0.150 0.030 5.00 0.150 0.150 0.150 0.150 0.150 0.150
2 EXCAVACION DRENAJE 6", RELLENOS 0.250 0.050 5.00 0.250 0.250 0.250 0.250 0.250 0.250
3 REGISTRO SANITARIO 1.000 0.200 5.00 1.000 1.000 1.000 1.000 1.000 1.000
4 CIMENTACION 3.000 0.600 5.00 3.000 3.000 3.000 3.000 3.000 3.000
5 MUROS Y CASTILLOS PLANTA BAJA 6.000 1.200 5.00 6.000 6.000 6.000 6.000 6.000 6.000
6 LOSA DE ENTREPISO 4.500 0.900 5.00 4.500 4.500 4.500 4.500 4.500 4.500
7 MUROS Y CASTILLOS PLANTA ALTA 6.000 1.200 5.00 6.000 6.000 6.000 6.000 6.000 6.000
8 LOSA DE AZOTEA Y ESCALERA 5.000 1.000 5.00 5.000 5.000 5.000 5.000 5.000 5.000
9 ALBAÑILERIA EN AZOTEA 3.500 0.700 5.00 3.500 3.500 3.500 3.500 3.500 3.500
10 SOBRESUELO EN AZOTEA. TIERRA, LADRILLO, 4.500 0.900 5.00 4.500 4.500 4.500 4.500 4.500 4.500
ENMACILLADO, CHAPALQUEADO, ETC.
13 PRUEBAS EN AZOTEA, DETALLADO 1.000 0.200 5.00 1.000 1.000 1.000 1.000 1.000 1.000
11 APLANADOS EN PATIO 2.500 0.500 5.00 2.500 2.500 2.500 2.500 2.500 2.500
12 APLANADOS Y RECUB. EN FACHADA 3.500 0.700 5.00 3.500 3.500 3.500 3.500 3.500 3.500
19 CISTERNA 1.400 0.280 5.00 1.400 1.400 1.400 1.400 1.400 1.400
14 PISO PATIO, HUELLAS, LAVADERO 2.000 0.400 5.00 2.000 2.000 2.000 2.000 2.000 2.000
16 RELLENOS EN PATIO Y JARDIN 0.500 0.100 5.00 0.500 0.500 0.500 0.500 0.500 0.500
17 REPELLADOS EN INTERIOR 0.500 0.100 5.00 0.500 0.500 0.500 0.500 0.500 0.500
18 AZULEJOS Y BARRAS 3.000 0.600 5.00 3.000 3.000 3.000 3.000 3.000 3.000
19 FIRME Y ENHUACALADOS O TABLAROCA DE WC 2.000 0.400 5.00 2.000 2.000 2.000 2.000 2.000 2.000
20 PISOS 6.200 1.240 5.00 6.200 6.200 6.200 6.200 6.200 6.200
21 COLOC.Y SUM. ALUMINIO Y DOMOS 6.100 1.220 5.00 6.100 6.100 6.100 6.100 6.100 6.100
22 COLOC. ACCESORIOS BAÑO 0.500 0.100 5.00 0.500 0.500 0.500 0.500 0.500 0.500
23 BARDAS 2.000 0.400 5.00 2.000 2.000 2.000 2.000 2.000 2.000
24 INSTALACION ELEC. POL. LOSA 1/5 0.850 0.170 5.00 0.850 0.850 0.850 0.850 0.850 0.850
25 RANURADOS EN MUROS 2/5 0.850 0.170 5.00 0.850 0.850 0.850 0.850 0.850 0.850
26 CABLEADOS 3/5 0.850 0.170 5.00 0.850 0.850 0.850 0.850 0.850 0.850
27 ACC. ELECTRICOS CASA 2.000 0.400 5.00 2.000 2.000 2.000 2.000 2.000 2.000
28 PRUEBAS ELECTRICAS 5/5 0.850 0.170 5.00 0.850 0.850 0.850 0.850 0.850 0.850
29 INSTALACION SANITARIA 2.100 0.420 5.00 2.100 2.100 2.100 2.100 2.100 2.100
30 RAMALEO HIDRAULICO Y GAS 2.000 0.400 5.00 2.000 2.000 2.000 2.000 2.000 2.000
31 ALIMENTACION, CUADRO Y TINACO 1.000 0.200 5.00 1.000 1.000 1.000 1.000 1.000 1.000
32 MUEBLES, TARJA, CALENTADOR 2.000 0.400 5.00 2.000 2.000 2.000 2.000 2.000 2.000
33 PRUEB. HIDRAULICAS, SANIT Y GAS 1.000 0.200 5.00 1.000 1.000 1.000 1.000 1.000 1.000
34 YESO 4.450 0.890 5.00 4.450 4.450 4.450 4.450 4.450 4.450
35 TIROL Y PINTURA INTERIOR 4.450 0.890 5.00 4.450 4.450 4.450 4.450 4.450 4.450
36 PINTURAS EXTERIORES 3.500 0.700 5.00 3.500 3.500 3.500 3.500 3.500 3.500
37 MARCO-PUERTA DE ACCESO, PASAMANOS 1.000 0.200 5.00 1.000 1.000 1.000 1.000 1.000 1.000
38 PUERTAS INTERIORES 5.000 1.000 5.00 5.000 5.000 5.000 5.000 5.000 5.000
39 LIMPIEZA PARA ENTREGA 3.000 0.600 5.00 3.000 3.000 3.000 3.000 3.000 3.000
TOTAL FACTORES = 100.00 100.00 100.000 100.000 100.000 100.000 100.000
PORCENTAJE 1, 2 NIVELES SEGUNDA
CONCEPTOS : VIVIENDA DE 2 NIVELES FACTOR FACTOR NUMERO AVANCE INICIO 6/26/2022 6/26/2022 6/26/2022
1 viv. 3 VIV LOTES ETAPA TERMINO 1/15/2022 1/15/2022 1/15/2022
1 TRAZO Y NIVELACION 0.150 0.050 3.00 0.150 0.150 0.150 0.150
2 EXCAVACION DRENAJE 6", RELLENOS 0.260 0.087 3.00 0.260 0.260 0.260 0.260
3 REGISTRO SANITARIO 1.000 0.333 3.00 1.000 1.000 1.000 1.000
4 CIMENTACION 3.000 1.000 3.00 3.000 3.000 3.000 3.000
5 MUROS Y CASTILLOS PLANTA BAJA 5.990 1.997 3.00 5.990 5.990 5.990 5.990
6 LOSA DE ENTREPISO 4.400 1.467 3.00 4.400 4.400 4.400 4.400
7 MUROS Y CASTILLOS PLANTA ALTA 5.900 1.967 3.00 5.900 5.900 5.900 5.900
8 LOSA DE AZOTEA Y ESCALERA 4.800 1.600 3.00 4.800 4.800 4.800 4.800
9 ALBAÑILERIA EN AZOTEA 3.400 1.133 3.00 3.400 3.400 3.400 3.400
10 SOBRESUELO EN AZOTEA. TIERRA, LADRILLO, 5.000 5.000
ENMACILLADO, CHAPALQUEADO, IMPER QUIMICA 1.667 3.00 5.000 5.000 5.000
13 PRUEBAS EN AZOTEA, DETALLADO 1.000 0.333 3.00 1.000 1.000 1.000 1.000
11 APLANADOS EN PATIO 2.450 0.817 3.00 2.450 2.450 2.450 2.450
12 APLANADOS Y RECUB. EN FACHADA 3.500 1.167 3.00 3.500 3.500 3.500 3.500
19 CISTERNA 1.400 0.467 3.00 1.400 1.400 1.400 1.400
14 PISO PATIO, HUELLAS, LAVADERO 2.000 0.667 3.00 2.000 2.000 2.000 2.000
16 RELLENOS EN PATIO Y JARDIN 0.500 0.167 3.00 0.500 0.500 0.500 0.500
17 REPELLADOS EN INTERIOR 0.500 0.167 3.00 0.500 0.500 0.500 0.500
18 AZULEJOS Y BARRAS 3.000 1.000 3.00 3.000 3.000 3.000 3.000
19 FIRME Y ENHUACALADOS O TABLAROCA DE WC 2.000 0.667 3.00 2.000 2.000 2.000 2.000
20 PISOS 6.100 2.033 3.00 6.100 6.100 6.100 6.100
21 COLOC.Y SUM. ALUMINIO Y DOMOS 6.100 2.033 3.00 6.100 6.100 6.100 6.100
22 COLOC. ACCESORIOS BAÑO 0.500 0.167 3.00 0.500 0.500 0.500 0.500
23 BARDAS 2.000 0.667 3.00 2.000 2.000 2.000 2.000
24 INSTALACION ELEC. POL. LOSA 1/5 0.850 0.283 3.00 0.850 0.850 0.850 0.850
25 I. ELECT EN MUROS 2/5, 4 CIRCUITOS 0.950 0.317 3.00 0.950 0.950 0.950 0.950
26 CABLEADOS 3/5, ATERRIZAR TODO 0.900 0.300 3.00 0.900 0.900 0.900 0.900
27 ACC. ELECTRICOS CASA, INCLUYE 6 FOCOS AH. CONT FT 2.150 0.717 3.00 2.150 2.150 2.150 2.150
28 PRUEBAS ELECTRICAS 5/5 0.800 0.267 3.00 0.800 0.800 0.800 0.800
29 INSTALACION SANITARIA 2.050 0.683 3.00 2.050 2.050 2.050 2.050
30 RAMALEO HIDRAULICO Y GAS 1.950 0.650 3.00 1.950 1.950 1.950 1.950
31 ALIMENTACION, CUADRO Y TINACO 1.000 0.333 3.00 1.000 1.000 1.000 1.000
32 MUEBLES, TARJA, CALENTADOR 2.000 0.667 3.00 2.000 2.000 2.000 2.000
33 PRUEB. HIDRAULICAS, SANIT Y GAS 1.000 0.333 3.00 1.000 1.000 1.000 1.000
34 YESO 4.450 1.483 3.00 4.450 4.450 4.450 4.450
35 TIROL Y PINTURA INTERIOR 4.450 1.483 3.00 4.450 4.450 4.450 4.450
36 PINTURAS EXTERIORES 3.500 1.167 3.00 3.500 3.500 3.500 3.500
37 MARCO-PUERTA DE ACCESO, PASAMANOS 1.000 0.333 3.00 1.000 1.000 1.000 1.000
38 PUERTAS INTERIORES 5.000 1.667 3.00 5.000 5.000 5.000 5.000
39 LIMPIEZA PARA ENTREGA 3.000 1.000 3.00 3.000 3.000 3.000 3.000
TOTAL FACTORES = 100.00 100.00 100.00 100.00 100.00
PORCENTAJE 1, 2 NIVELES SEGUNDA
CASAS CON SOBRESUELO E IMPER. QUIMICO, TUBERIA DE PVC 6" EN RED PRINCIPAL, 4 CIRCUITOS, ATERRIZADA TODA LA CASA, VARIOS CONTACTOS FALLA TIERRA
CONCEPTOS : VIVIENDA DE 2 NIVELES FACTOR FACTOR NUMERO AVANCE INICIO 9/20/2021 9/20/2021 9/20/2021
1 viv. 3 VIV LOTES ETAPA TERMINO 4/12/2022 4/12/2022 4/12/2022
1 TRAZO Y NIVELACION 0.150 0.050 3.00 0.150 0.150 0.150 0.150
2 EXCAVACION DRENAJE 6", RELLENOS 0.260 0.087 3.00 0.260 0.260 0.260 0.260
3 REGISTRO SANITARIO 1.000 0.333 3.00 1.000 1.000 1.000 1.000
4 CIMENTACION 3.000 1.000 3.00 3.000 3.000 3.000 3.000
5 MUROS Y CASTILLOS PLANTA BAJA 5.990 1.997 3.00 5.990 5.990 5.990 5.990
6 LOSA DE ENTREPISO 4.400 1.467 3.00 4.400 4.400 4.400 4.400
7 MUROS Y CASTILLOS PLANTA ALTA 5.900 1.967 3.00 5.900 5.900 5.900 5.900
8 LOSA DE AZOTEA Y ESCALERA 4.800 1.600 3.00 4.800 4.800 4.800 4.800
9 ALBAÑILERIA EN AZOTEA 3.400 1.133 3.00 3.400 3.400 3.400 3.400
10 SOBRESUELO EN AZOTEA. TIERRA, LADRILLO, 5.000 5.000
ENMACILLADO, CHAPALQUEADO, IMPER QUIMICA 1.667 3.00 5.000 5.000 5.000
13 PRUEBAS EN AZOTEA, DETALLADO 1.000 0.333 3.00 1.000 1.000 1.000 1.000
11 APLANADOS EN PATIO 2.450 0.817 3.00 2.450 2.450 2.450 2.450
12 APLANADOS Y RECUB. EN FACHADA 3.500 1.167 3.00 3.500 3.500 3.500 3.500
19 CISTERNA 1.400 0.467 3.00 1.400 1.400 1.400 1.400
14 PISO PATIO, HUELLAS, LAVADERO 2.000 0.667 3.00 2.000 2.000 2.000 2.000
16 RELLENOS EN PATIO Y JARDIN 0.500 0.167 3.00 0.500 0.500 0.500 0.500
17 REPELLADOS EN INTERIOR 0.500 0.167 3.00 0.500 0.500 0.500 0.500
18 AZULEJOS Y BARRAS 3.000 1.000 3.00 3.000 3.000 3.000 3.000
19 FIRME Y ENHUACALADOS O TABLAROCA DE WC 2.000 0.667 3.00 2.000 2.000 2.000 2.000
20 PISOS 6.100 2.033 3.00 6.100 6.100 6.100 6.100
21 COLOC.Y SUM. ALUMINIO Y DOMOS 6.100 2.033 3.00 6.100 6.100 6.100 6.100
22 COLOC. ACCESORIOS BAÑO 0.500 0.167 3.00 0.500 0.500 0.500 0.500
23 BARDAS 2.000 0.667 3.00 2.000 2.000 2.000 2.000
24 INSTALACION ELEC. POL. LOSA 1/5 0.850 0.283 3.00 0.850 0.850 0.850 0.850
25 I. ELECT EN MUROS 2/5, 4 CIRCUITOS 0.950 0.317 3.00 0.950 0.950 0.950 0.950
26 CABLEADOS 3/5, ATERRIZAR TODO 0.900 0.300 3.00 0.900 0.900 0.900 0.900
27 ACC. ELECTRICOS CASA, INCLUYE 6 FOCOS AH. CONT FT 2.150 0.717 3.00 2.150 2.150 2.150 2.150
28 PRUEBAS ELECTRICAS 5/5 0.800 0.267 3.00 0.800 0.800 0.800 0.800
29 INSTALACION SANITARIA 2.050 0.683 3.00 2.050 2.050 2.050 2.050
30 RAMALEO HIDRAULICO Y GAS 1.950 0.650 3.00 1.950 1.950 1.950 1.950
31 ALIMENTACION, CUADRO Y TINACO 1.000 0.333 3.00 1.000 1.000 1.000 1.000
32 MUEBLES, TARJA, CALENTADOR 2.000 0.667 3.00 2.000 2.000 2.000 2.000
33 PRUEB. HIDRAULICAS, SANIT Y GAS 1.000 0.333 3.00 1.000 1.000 1.000 1.000
34 YESO 4.450 1.483 3.00 4.450 4.450 4.450 4.450
35 TIROL Y PINTURA INTERIOR 4.450 1.483 3.00 4.450 4.450 4.450 4.450
36 PINTURAS EXTERIORES 3.500 1.167 3.00 3.500 3.500 3.500 3.500
37 MARCO-PUERTA DE ACCESO, PASAMANOS 1.000 0.333 3.00 1.000 1.000 1.000 1.000
38 PUERTAS INTERIORES 5.000 1.667 3.00 5.000 5.000 5.000 5.000
39 LIMPIEZA PARA ENTREGA 3.000 1.000 3.00 3.000 3.000 3.000 3.000
TOTAL FACTORES = 100.00 100.00 100.00 100.00 100.00
PORCENTAJE 1, 2 NIVELES SEGUNDA
CASAS CON SOBRESUELO E IMPER. QUIMICO, TUBERIA DE PVC 6" EN RED PRINCIPAL, 4 CIRCUITOS, ATERRIZADA TODA LA CASA, VARIOS C
CONCEPTOS : VIVIENDA DE 2 NIVELES FACTOR FACTOR NUMERO AVANCE INICIO 11/8/2022 11/8/2022
1 viv. 3 VIV LOTES ETAPA TERMINO 5/23/2022 5/23/2022
1 TRAZO Y NIVELACION 0.150 0.050 3.00 0.150 0.150 0.150
2 EXCAVACION DRENAJE 6", RELLENOS 0.260 0.087 3.00 0.260 0.260 0.260
3 REGISTRO SANITARIO 1.000 0.333 3.00 1.000 1.000 1.000
4 CIMENTACION 3.000 1.000 3.00 3.000 3.000 3.000
5 MUROS Y CASTILLOS PLANTA BAJA 5.990 1.997 3.00 5.990 5.990 5.990
6 LOSA DE ENTREPISO 4.400 1.467 3.00 4.400 4.400 4.400
7 MUROS Y CASTILLOS PLANTA ALTA 5.900 1.967 3.00 5.900 5.900 5.900
8 LOSA DE AZOTEA Y ESCALERA 4.800 1.600 3.00 4.800 4.800 4.800
9 ALBAÑILERIA EN AZOTEA 3.400 1.133 3.00 3.400 3.400 3.400
10 SOBRESUELO EN AZOTEA. TIERRA, LADRILLO, 5.000 1.667 3.00 5.000 5.000 5.000
ENMACILLADO, CHAPALQUEADO, IMPER QUIMICA
13 PRUEBAS EN AZOTEA, DETALLADO 1.000 0.333 3.00 1.000 1.000 1.000
11 APLANADOS EN PATIO 2.450 0.817 3.00 2.450 2.450 2.450
12 APLANADOS Y RECUB. EN FACHADA 3.500 1.167 3.00 3.500 3.500 3.500
19 CISTERNA 1.400 0.467 3.00 1.400 1.400 1.400
14 PISO PATIO, HUELLAS, LAVADERO 2.000 0.667 3.00 2.000 2.000 2.000
16 RELLENOS EN PATIO Y JARDIN 0.500 0.167 3.00 0.500 0.500 0.500
17 REPELLADOS EN INTERIOR 0.500 0.167 3.00 0.500 0.500 0.500
18 AZULEJOS Y BARRAS 3.000 1.000 3.00 3.000 3.000 3.000
19 FIRME Y ENHUACALADOS O TABLAROCA DE WC 2.000 0.667 3.00 2.000 2.000 2.000
20 PISOS 6.100 2.033 3.00 6.100 6.100 6.100
21 COLOC.Y SUM. ALUMINIO Y DOMOS 6.100 2.033 3.00 6.100 6.100 6.100
22 COLOC. ACCESORIOS BAÑO 0.500 0.167 3.00 0.500 0.500 0.500
23 BARDAS 2.000 0.667 3.00 2.000 2.000 2.000
24 INSTALACION ELEC. POL. LOSA 1/5 0.850 0.283 3.00 0.850 0.850 0.850
25 I. ELECT EN MUROS 2/5, 4 CIRCUITOS 0.950 0.317 3.00 0.950 0.950 0.950
26 CABLEADOS 3/5, ATERRIZAR TODO 0.900 0.300 3.00 0.900 0.900 0.900
27 ACC. ELECTRICOS CASA, INCLUYE 6 FOCOS AH. CONT FT 2.150 0.717 3.00 2.150 2.150 2.150
28 PRUEBAS ELECTRICAS 5/5 0.800 0.267 3.00 0.800 0.800 0.800
29 INSTALACION SANITARIA 2.050 0.683 3.00 2.050 2.050 2.050
30 RAMALEO HIDRAULICO Y GAS 1.950 0.650 3.00 1.950 1.950 1.950
31 ALIMENTACION, CUADRO Y TINACO 1.000 0.333 3.00 1.000 1.000 1.000
32 MUEBLES, TARJA, CALENTADOR 2.000 0.667 3.00 2.000 2.000 2.000
33 PRUEB. HIDRAULICAS, SANIT Y GAS 1.000 0.333 3.00 1.000 1.000 1.000
34 YESO 4.450 1.483 3.00 4.450 4.450 4.450
35 TIROL Y PINTURA INTERIOR 4.450 1.483 3.00 4.450 4.450 4.450
36 PINTURAS EXTERIORES 3.500 1.167 3.00 3.500 3.500 3.500
37 MARCO-PUERTA DE ACCESO, PASAMANOS 1.000 0.333 3.00 1.000 1.000 1.000
38 PUERTAS INTERIORES 5.000 1.667 3.00 5.000 5.000 5.000
39 LIMPIEZA PARA ENTREGA 3.000 1.000 3.00 3.000 3.000 3.000
TOTAL FACTORES = 100.00 100.00 100.00 100.00
PORCENTAJE 1, 2 NIVELES SEGUNDA
11/8/2022
5/23/2022
0.150
0.260
1.000
3.000
5.990
4.400
5.900
4.800
3.400
5.000
1.000
2.450
3.500
1.400
2.000
0.500
0.500
3.000
2.000
6.100
6.100
0.500
2.000
0.850
0.950
0.900
2.150
0.800
2.050
1.950
1.000
2.000
1.000
4.450
4.450
3.500
1.000
5.000
3.000
100.00
10/18/2022
4.500
1.000
2.500
3.500
1.400
2.000
0.500
0.500
3.000
2.000
6.200
6.100
0.500
2.000
0.850
0.850
0.850
2.000
0.850
2.100
2.000
1.000
2.000
1.000
4.450
4.450
3.500
1.000
5.000
3.000
100.00
8/15/2022
FRENTE: EL CANTO SEMANA: 1 ENVIO: DIRECCION CTO. COLIBRI
No. CONTRATO: IPSL 02/22 CNTO-CONCRETA-OT08-7 VIV FEBRERO PROTOTIPO HABITA HABITA CONFORT
CONTRATISTA: CONCRE-TA SH SA DE CV INICIO: 2/15/2021 TERMINO: 7/30/2022 AMPLIACION RUV
CONTRATANTE IPSL M2 CONST. 124.7 124.7 94.41
FECHA: 6/1/2021 LOTE-MANZ. L28 M1 L27 M1 L30 M1
PERIODO: No. VIV. 4 SEMANAS 26 26 26
26 SEMANAS No. OFICIAL 154 152 158
CONCEPTOS : VIVIENDA DE 2 NIVELES FACTOR FACTOR NUMERO AVANCE INICIO 3/2/2022 3/2/2022 3/2/2022
1 viv. 4 VIV LOTES ETAPA TERMINO 7/30/2022 7/30/2022 7/30/2022
1 TRAZO Y NIVELACION 0.150 0.038 4.00 0.150 0.150 0.150 0.150
2 EXCAVACION DRENAJE 6", RELLENOS 0.260 0.065 4.00 0.260 0.260 0.260 0.260
3 REGISTRO SANITARIO 1.000 0.250 4.00 1.000 1.000 1.000 1.000
4 CIMENTACION 3.000 0.750 4.00 3.000 3.000 3.000 3.000
5 MUROS Y CASTILLOS PLANTA BAJA 5.990 1.498 4.00 5.990 5.990 5.990 5.990
6 LOSA DE ENTREPISO 4.400 1.100 4.00 4.400 4.400 4.400 4.400
7 MUROS Y CASTILLOS PLANTA ALTA 5.900 1.475 4.00 5.900 5.900 5.900 5.900
8 LOSA DE AZOTEA Y ESCALERA 4.800 1.200 4.00 4.800 4.800 4.800 4.800
9 ALBAÑILERIA EN AZOTEA 3.400 0.850 4.00 3.400 3.400 3.400 3.400
10 SOBRESUELO EN AZOTEA. TIERRA, LADRILLO, ENMACILLADO, 5.000 1.250 4.00 5.000 5.000 5.000 5.000
CHAPALQUEADO, IMPER QUIMICA
13 PRUEBAS EN AZOTEA, DETALLADO 1.000 0.250 4.00 1.000 1.000 1.000 1.000
11 APLANADOS EN PATIO 2.450 0.613 4.00 2.450 2.450 2.450 2.450
12 APLANADOS Y RECUB. EN FACHADA 3.500 0.875 4.00 3.500 3.500 3.500 3.500
19 CISTERNA 1.400 0.350 4.00 1.400 1.400 1.400 1.400
14 PISO PATIO, HUELLAS, LAVADERO 2.000 0.500 4.00 2.000 2.000 2.000 2.000
16 RELLENOS EN PATIO Y JARDIN 0.500 0.125 4.00 0.500 0.500 0.500 0.500
17 REPELLADOS EN INTERIOR 0.500 0.125 4.00 0.500 0.500 0.500 0.500
18 AZULEJOS Y BARRAS 3.000 0.750 4.00 3.000 3.000 3.000 3.000
19 FIRME Y ENHUACALADOS O TABLAROCA DE WC 2.000 0.500 4.00 2.000 2.000 2.000 2.000
20 PISOS 6.100 1.525 4.00 6.100 6.100 6.100 6.100
21 COLOC.Y SUM. ALUMINIO Y DOMOS 6.100 1.525 4.00 6.100 6.100 6.100 6.100
22 COLOC. ACCESORIOS BAÑO 0.500 0.125 4.00 0.500 0.500 0.500 0.500
23 BARDAS 2.000 0.500 4.00 2.000 2.000 2.000 2.000
24 INSTALACION ELEC. POL. LOSA 1/5 0.850 0.213 4.00 0.850 0.850 0.850 0.850
25 I. ELECT EN MUROS 2/5, 4 CIRCUITOS 0.950 0.238 4.00 0.950 0.950 0.950 0.950
26 CABLEADOS 3/5, ATERRIZAR TODO 0.900 0.225 4.00 0.900 0.900 0.900 0.900
27 ACC. ELECTRICOS CASA, INCLUYE 6 FOCOS AH. CONT FT 2.150 0.538 4.00 2.150 2.150 2.150 2.150
28 PRUEBAS ELECTRICAS 5/5 0.800 0.200 4.00 0.800 0.800 0.800 0.800
29 INSTALACION SANITARIA 2.050 0.513 4.00 2.050 2.050 2.050 2.050
30 RAMALEO HIDRAULICO Y GAS 1.950 0.488 4.00 1.950 1.950 1.950 1.950
31 ALIMENTACION, CUADRO Y TINACO 1.000 0.250 4.00 1.000 1.000 1.000 1.000
32 MUEBLES, TARJA, CALENTADOR 2.000 0.500 4.00 2.000 2.000 2.000 2.000
33 PRUEB. HIDRAULICAS, SANIT Y GAS 1.000 0.250 4.00 1.000 1.000 1.000 1.000
34 YESO 4.450 1.113 4.00 4.450 4.450 4.450 4.450
35 TIROL Y PINTURA INTERIOR 4.450 1.113 4.00 4.450 4.450 4.450 4.450
36 PINTURAS EXTERIORES 3.500 0.875 4.00 3.500 3.500 3.500 3.500
37 MARCO-PUERTA DE ACCESO, PASAMANOS 1.000 0.250 4.00 1.000 1.000 1.000 1.000
38 PUERTAS INTERIORES, BARRA DE COCINA 5.000 1.250 4.00 5.000 5.000 5.000 5.000
39 LIMPIEZA PARA ENTREGA 3.000 0.750 4.00 3.000 3.000 3.000 3.000
TOTAL FACTORES = 100.00 100.00 100.000 100.000 100.000
PORCENTAJE 1, 2 NIVELES SEGUNDA
CASAS CON SOBRESUELO E IMPER. QUIMICO, TUBERIA DE PVC 6" EN RED PRINCIPAL, 4 CIRCUITOS, ATERRIZADA TODA LA CASA, VARIOS CONT
OCTAVIO INDICAR FECHA DE INICIO,
CONTRATANTE IPSL M2 CONST. 94.41 94.41 94.41 94.41 105.59 105.59 105.59 124.7 124.7 124.7
FECHA: 9/5/2023 LOTE-MANZ. M2 L13 M2 L14 M2 L15 M2 L7 M2 L6 M2 L5 M2 L4 M2 L3 M2 L2 M2 L1
PERIODO: No. VIV. 10 SEMANAS 26 26 26 26 26 26 26 26 26 26
26 SEMANAS No. OFICIAL 127 129 131 174 172 170 168 166 164 162
CONCEPTOS : VIVIENDA DE 2 NIVELES FACTOR FACTOR NUMERO AVANCE INICIO 4/25/2022 4/25/2022 4/25/2022 4/25/2022 4/25/2022
1 viv. 10 VIV LOTES ETAPA TERMINO 10/17/2022 10/17/2022 10/17/2022 10/17/2022 10/17/2022
1 TRAZO Y NIVELACION 0.150 0.015 10.00 0.150 0.150 0.150 0.150 0.150 0.150 0.150 0.150 0.150 0.150 0.150
2 EXCAVACION DRENAJE 6", RELLENOS 0.260 0.026 10.00 0.260 0.260 0.260 0.260 0.260 0.260 0.260 0.260 0.260 0.260 0.260
3 REGISTRO SANITARIO 1.000 0.100 10.00 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
4 CIMENTACION 3.000 0.300 10.00 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000
5 MUROS Y CASTILLOS PLANTA BAJA 5.990 0.599 10.00 5.990 5.990 5.990 5.990 5.990 5.990 5.990 5.990 5.990 5.990 5.990
6 LOSA DE ENTREPISO 4.400 0.440 10.00 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400
7 MUROS Y CASTILLOS PLANTA ALTA 5.900 0.590 10.00 5.900 5.900 5.900 5.900 5.900 5.900 5.900 5.900 5.900 5.900 5.900
8 LOSA DE AZOTEA Y ESCALERA 4.800 0.480 10.00 4.800 4.800 4.800 4.800 4.800 4.800 4.800 4.800 4.800 4.800 4.800
9 ALBAÑILERIA EN AZOTEA 3.400 0.340 10.00 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400
10 SOBRESUELO EN AZOTEA. TIERRA, LADRILLO, ENMACILLADO, 5.000 5.000
CHAPALQUEADO, IMPER QUIMICA 0.500 10.00 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000
13 PRUEBAS EN AZOTEA, DETALLADO 1.000 0.100 10.00 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
11 APLANADOS EN PATIO 2.450 0.245 10.00 2.450 2.450 2.450 2.450 2.450 2.450 2.450 2.450 2.450 2.450 2.450
12 APLANADOS Y RECUB. EN FACHADA 3.500 0.350 10.00 3.500 3.500 3.500 3.500 3.500 3.500 3.500 3.500 3.500 3.500 3.500
19 CISTERNA 1.400 0.140 10.00 1.400 1.400 1.400 1.400 1.400 1.400 1.400 1.400 1.400 1.400 1.400
14 PISO PATIO, HUELLAS, LAVADERO 2.000 0.200 10.00 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000
16 RELLENOS EN PATIO Y JARDIN 0.500 0.050 10.00 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500
17 REPELLADOS EN INTERIOR 0.500 0.050 10.00 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500
18 AZULEJOS Y BARRAS 3.000 0.300 10.00 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000
19 FIRME Y ENHUACALADOS O TABLAROCA DE WC 2.000 0.200 10.00 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000
20 PISOS 6.100 0.610 10.00 6.100 6.100 6.100 6.100 6.100 6.100 6.100 6.100 6.100 6.100 6.100
21 COLOC.Y SUM. ALUMINIO Y DOMOS 6.100 0.610 10.00 6.100 6.100 6.100 6.100 6.100 6.100 6.100 6.100 6.100 6.100 6.100
22 COLOC. ACCESORIOS BAÑO 0.500 0.050 10.00 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500
23 BARDAS 2.000 0.200 10.00 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000
24 INSTALACION ELEC. POL. LOSA 1/5 0.850 0.085 10.00 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850
25 I. ELECT EN MUROS 2/5, 4 CIRCUITOS 0.950 0.095 10.00 0.950 0.950 0.950 0.950 0.950 0.950 0.950 0.950 0.950 0.950 0.950
26 CABLEADOS 3/5, ATERRIZAR TODO 0.900 0.090 10.00 0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900
27 ACC. ELECTRICOS CASA, INCLUYE 6 FOCOS AH. CONT FT 2.150 0.215 10.00 2.150 2.150 2.150 2.150 2.150 2.150 2.150 2.150 2.150 2.150 2.150
28 PRUEBAS ELECTRICAS 5/5 0.800 0.080 10.00 0.800 0.800 0.800 0.800 0.800 0.800 0.800 0.800 0.800 0.800 0.800
29 INSTALACION SANITARIA 2.050 0.205 10.00 2.050 2.050 2.050 2.050 2.050 2.050 2.050 2.050 2.050 2.050 2.050
30 RAMALEO HIDRAULICO Y GAS 1.950 0.195 10.00 1.950 1.950 1.950 1.950 1.950 1.950 1.950 1.950 1.950 1.950 1.950
31 ALIMENTACION, CUADRO Y TINACO 1.000 0.100 10.00 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
32 MUEBLES, TARJA, CALENTADOR 2.000 0.200 10.00 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000
33 PRUEB. HIDRAULICAS, SANIT Y GAS 1.000 0.100 10.00 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
34 YESO 4.450 0.445 10.00 4.450 4.450 4.450 4.450 4.450 4.450 4.450 4.450 4.450 4.450 4.450
35 TIROL Y PINTURA INTERIOR 4.450 0.445 10.00 4.450 4.450 4.450 4.450 4.450 4.450 4.450 4.450 4.450 4.450 4.450
36 PINTURAS EXTERIORES 3.500 0.350 10.00 3.500 3.500 3.500 3.500 3.500 3.500 3.500 3.500 3.500 3.500 3.500
37 MARCO-PUERTA DE ACCESO, PASAMANOS 1.000 0.100 10.00 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
38 PUERTAS INTERIORES 5.000 0.500 10.00 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000
39 LIMPIEZA PARA ENTREGA 3.000 0.300 10.00 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000
TOTAL FACTORES = 100.00 100.00 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000
FRENTE: EL CANTO SEMANA: 1 ENVIO: DIRECCION CTO. COLIBRI
No. CONTRATO: IPSL 16/22 CNTO-CONCRETA-10 VIV PROTOTIPO CONFORT HABITA CONFORT TRRRACE
CONTRATISTA: CONCRE-TA SH SA DE CV INICIO: 2/15/2021 TERMINO: 7/30/2022 AMPLIACION RUV
CONTRATANTE IPSL M2 CONST.
CONCEPTOS : VIVIENDA DE 2 NIVELES FACTOR FACTOR NUMERO AVANCE INICIO 9/28/2022 9/28/2022 9/28/2022 9/28/2022
1 viv. 4 VIV LOTES ETAPA TERMINO 3/30/2023 3/30/2023 3/30/2023 3/30/2023
1 TRAZO Y NIVELACION 0.150 0.038 4.00 0.150 0.150 0.150 0.150 0.150
2 EXCAVACION DRENAJE 6", RELLENOS 0.260 0.065 4.00 0.260 0.260 0.260 0.260 0.260
3 REGISTRO SANITARIO 1.000 0.250 4.00 1.000 1.000 1.000 1.000 1.000
4 CIMENTACION 3.000 0.750 4.00 3.000 3.000 3.000 3.000 3.000
5 MUROS Y CASTILLOS PLANTA BAJA 5.990 1.498 4.00 5.990 5.990 5.990 5.990 5.990
6 LOSA DE ENTREPISO 4.400 1.100 4.00 4.400 4.400 4.400 4.400 4.400
7 MUROS Y CASTILLOS PLANTA ALTA 5.900 1.475 4.00 5.900 5.900 5.900 5.900 5.900
8 LOSA DE AZOTEA Y ESCALERA 4.800 1.200 4.00 4.800 4.800 4.800 4.800 4.800 compra de aceros
9 ALBAÑILERIA EN AZOTEA 3.400 0.850 4.00 3.400 3.400 3.400 3.400 3.400
10 SOBRESUELO EN AZOTEA. TIERRA, LADRILLO, ENMACILLADO, 5.000 5.000
CHAPALQUEADO, IMPER QUIMICA 1.250 4.00 5.000 5.000 5.000 5.000
13 PRUEBAS EN AZOTEA, DETALLADO 1.000 0.250 4.00 1.000 1.000 1.000 1.000 1.000
11 APLANADOS EN PATIO 2.450 0.613 4.00 2.450 2.450 2.450 2.450 2.450
12 APLANADOS Y RECUB. EN FACHADA 3.500 0.875 4.00 3.500 3.500 3.500 3.500 3.500
19 CISTERNA 1.400 0.350 3.95 1.383 1.400 1.400 1.400 1.330
14 PISO PATIO, HUELLAS, LAVADERO 2.000 0.500 4.00 2.000 2.000 2.000 2.000 2.000
16 RELLENOS EN PATIO Y JARDIN 0.500 0.125 4.00 0.500 0.500 0.500 0.500 0.500
17 REPELLADOS EN INTERIOR 0.500 0.125 4.00 0.500 0.500 0.500 0.500 0.500
18 AZULEJOS Y BARRAS 3.000 0.750 3.17 2.375 3.000 3.000 3.000 0.500
19 FIRME Y ENHUACALADOS O TABLAROCA DE WC 2.000 0.500 4.00 2.000 2.000 2.000 2.000 2.000
20 PISOS 6.100 1.525 4.00 6.100 6.100 6.100 6.100 6.100
21 COLOC.Y SUM. ALUMINIO Y DOMOS 6.100 1.525 4.00 6.100 6.100 6.100 6.100 6.100
22 COLOC. ACCESORIOS BAÑO 0.500 0.125 3.00 0.375 0.250 0.500 0.500 0.250
23 BARDAS 2.000 0.500 4.00 2.000 2.000 2.000 2.000 2.000
24 INSTALACION ELEC. POL. LOSA 1/5 0.850 0.213 4.00 0.850 0.850 0.850 0.850 0.850
25 I. ELECT EN MUROS 2/5, 4 CIRCUITOS 0.950 0.238 4.00 0.950 0.950 0.950 0.950 0.950
26 CABLEADOS 3/5, ATERRIZAR TODO 0.900 0.225 4.00 0.900 0.900 0.900 0.900 0.900
27 ACC. ELECTRICOS CASA, INCLUYE 6 FOCOS AH. CONT FT 2.150 0.538 4.00 2.150 2.150 2.150 2.150 2.150
28 PRUEBAS ELECTRICAS 5/5 0.800 0.200 4.00 0.800 0.800 0.800 0.800 0.800
29 INSTALACION SANITARIA 2.050 0.513 4.00 2.050 2.050 2.050 2.050 2.050
30 RAMALEO HIDRAULICO Y GAS 1.950 0.488 4.00 1.950 1.950 1.950 1.950 1.950
31 ALIMENTACION, CUADRO Y TINACO 1.000 0.250 4.00 1.000 1.000 1.000 1.000 1.000
32 MUEBLES, TARJA, CALENTADOR 2.000 0.500 4.00 2.000 2.000 2.000 2.000 2.000
33 PRUEB. HIDRAULICAS, SANIT Y GAS 1.000 0.250 4.00 1.000 1.000 1.000 1.000 1.000
34 YESO 4.450 1.113 4.00 4.450 4.450 4.450 4.450 4.450
35 TIROL Y PINTURA INTERIOR 4.450 1.113 3.94 4.383 4.272 4.450 4.450 4.361
36 PINTURAS EXTERIORES 3.500 0.875 3.93 3.439 3.325 3.500 3.500 3.430
37 MARCO-PUERTA DE ACCESO, PASAMANOS 1.000 0.250 4.00 1.000 1.000 1.000 1.000 1.000
38 PUERTAS INTERIORES, BARRA DE COCINA 5.000 1.250 4.00 5.000 5.000 5.000 5.000 5.000
39 LIMPIEZA PARA ENTREGA 3.000 0.750 3.85 2.888 2.700 3.000 3.000 2.850
TOTAL FACTORES = 100.00 98.99 99.097 100.000 100.000 96.871
PORCENTAJE 1, 2 NIVELES SEGUNDA
CONCEPTOS : VIVIENDA DE 2 NIVELES FACTOR FACTOR NUMERO AVANCE INICIO 12/19/2022 12/19/2022 12/19/2022
1 viv. 3 VIV LOTES ETAPA TERMINO 6/19/2023 6/19/2023 6/19/2023
1 TRAZO Y NIVELACION 0.100 0.033 3.00 0.100 0.100 0.100 0.100
2 EXCAVACION DRENAJE 6", RELLENOS 0.350 0.117 3.00 0.350 0.350 0.350 0.350
3 REGISTRO SANITARIO 0.820 0.273 3.00 0.820 0.820 0.820 0.820
4 CIMENTACION 2.000 0.667 2.00 1.333 2.000 2.000 2.000
5 MUROS Y CASTILLOS PLANTA BAJA 5.000 1.667 3.00 5.000 5.000 5.000 5.000
6 LOSA DE ENTREPISO 5.500 1.833 3.00 5.500 5.500 5.500 5.500
7 MUROS Y CASTILLOS PLANTA ALTA 7.180 2.393 3.00 7.180 7.180 7.180 7.180
8 LOSA DE AZOTEA Y ESCALERA 4.800 1.600 3.00 4.800 4.800 4.800 4.800
9 ALBAÑILERIA EN AZOTEA 6.000 2.000 3.00 6.000 6.000 6.000 6.000
10 SOBRESUELO EN AZOTEA. TIERRA, LADRILLO, ENMACILLADO, 4.000 4.000
CHAPALQUEADO, IMPER QUIMICA
1.333 3.00 4.000 4.000 4.000
13 PRUEBAS EN AZOTEA, DETALLADO 1.200 0.400 3.00 1.200 1.200 1.200 1.200
11 APLANADOS EN PATIO 1.400 0.467 3.00 1.400 1.400 1.400 1.400
12 APLANADOS Y RECUB. EN FACHADA 2.800 0.933 3.00 2.800 2.800 2.800 2.800
19 CISTERNA 1.750 0.583 3.00 1.750 1.750 1.750 1.750
14 PISO PATIO, HUELLAS, LAVADERO 1.500 0.500 3.00 1.500 1.500 1.500 1.500
16 RELLENOS EN PATIO Y JARDIN 0.500 0.167 3.00 0.500 0.500 0.500 0.500
17 REPELLADOS EN INTERIOR 0.500 0.167 3.00 0.500 0.500 0.500 0.500
18 AZULEJOS Y BARRAS 1.500 0.500 3.00 1.500 1.500 1.500 1.500
19 FIRME Y ENHUACALADOS O TABLAROCA DE WC 2.000 0.667 3.00 2.000 2.000 2.000 2.000
20 PISOS 7.600 2.533 3.00 7.600 7.600 7.600 7.600
21 COLOC.Y SUM. ALUMINIO Y DOMOS 8.000 2.667 2.98 7.947 8.000 8.000 7.840
22 COLOC. ACCESORIOS BAÑO 0.300 0.100 3.00 0.300 0.300 0.300 0.300
23 BARDAS 2.500 0.833 3.00 2.500 2.500 2.500 2.500
24 INSTALACION ELEC. POL. LOSA 1/5 0.900 0.300 3.00 0.900 0.900 0.900 0.900
25 I. ELECT EN MUROS 2/5, 4 CIRCUITOS 0.950 0.317 3.00 0.950 0.950 0.950 0.950
26 CABLEADOS 3/5, ATERRIZAR TODO 0.900 0.300 3.00 0.900 0.900 0.900 0.900
27 ACC. ELECTRICOS CASA, INCLUYE 6 FOCOS AH. CONT FT 2.400 0.800 3.00 2.400 2.400 2.400 2.400
28 PRUEBAS ELECTRICAS 5/5 0.700 0.233 3.00 0.700 0.700 0.700 0.700
29 INSTALACION SANITARIA 1.200 0.400 3.00 1.200 1.200 1.200 1.200
30 RAMALEO HIDRAULICO Y GAS 2.200 0.733 3.00 2.200 2.200 2.200 2.200
31 ALIMENTACION, CUADRO Y TINACO 0.500 0.167 3.00 0.500 0.500 0.500 0.500
32 MUEBLES, TARJA, CALENTADOR 4.000 1.333 3.00 4.000 4.000 4.000 4.000
33 PRUEB. HIDRAULICAS, SANIT Y GAS 0.500 0.167 3.00 0.500 0.500 0.500 0.500
34 YESO 3.800 1.267 2.98 3.775 3.800 3.800 3.724
35 TIROL Y PINTURA INTERIOR 3.800 1.267 2.98 3.775 3.800 3.800 3.724
36 PINTURAS EXTERIORES 2.800 0.933 2.98 2.781 2.800 2.800 2.744
37 MARCO-PUERTA DE ACCESO, PASAMANOS 2.200 0.733 3.00 2.200 2.200 2.200 2.200
38 PUERTAS INTERIORES, BARRA DE COCINA 3.450 1.150 3.00 3.450 3.450 3.450 3.450
39 LIMPIEZA PARA ENTREGA 2.400 0.800 2.90 2.320 2.400 2.400 2.160
TOTAL FACTORES = 100.00 99.13 100.000 100.000 99.392
PORCENTAJE 1, 2 NIVELES SEGUNDA
CONCEPTOS : VIVIENDA DE 2 NIVELES FACTOR FACTOR NUMERO AVANCE INICIO 20/02/23 20/02/23 20/02/23 20/02/23 20/02/23
1 viv. 5 VIV LOTES ETAPA TERMINO 21/08/23 21/08/23 21/08/23 21/08/23 21/08/23
1 TRAZO Y NIVELACION 0.100 0.020 5.000 0.100 0.100 0.100 0.100 0.100 0.100
2 EXCAVACION DRENAJE, RELLENOS 0.350 0.070 5.000 0.350 0.350 0.350 0.350 0.350 0.350
3 REGISTRO SANITARIO 0.800 0.160 4.980 0.797 0.800 0.800 0.800 0.800 0.784
4 CIMENTACION 2.000 0.400 5.000 2.000 2.000 2.000 2.000 2.000 2.000
5 FIRME 2.500 0.500 5.000 2.500 2.500 2.500 2.500 2.500 2.500
6 MUROS Y CASTILLOS PLANTA BAJA 5.600 1.120 4.100 4.592 5.600 5.600 5.600 0.560 5.600
7 LOSA DE ENTREPISO 6.000 1.200 5.000 6.000 6.000 6.000 6.000 6.000 6.000
8 MUROS Y CASTILLOS PLANTA ALTA 6.050 1.210 5.000 6.050 6.050 6.050 6.050 6.050 6.050
9 LOSA DE AZOTEA Y ESCALERA 6.000 1.200 5.000 6.000 6.000 6.000 6.000 6.000 6.000
10 ALBAÑILERIA EN AZOTEA 3.700 0.740 5.000 3.700 3.700 3.700 3.700 3.700 3.700
11 SOBRESUELO EN AZOTEA 3.000 0.600 5.000 3.000 3.000 3.000 3.000 3.000 3.000
12 PRUEBAS EN AZOTEA, DETALLADO 1.000 0.200 4.850 0.970 1.000 1.000 0.950 0.950 0.950
12 APLANADOS EN PATIO 2.000 0.400 5.000 2.000 2.000 2.000 2.000 2.000 2.000
13 APLANADOS Y RECUB. EN FACHADA 3.000 0.600 5.000 3.000 3.000 3.000 3.000 3.000 3.000
15 CISTERNA 1.700 0.340 5.000 1.700 1.700 1.700 1.700 1.700 1.700
16 PISO PATIO, HUELLAS, LAVADERO 2.000 0.400 4.980 1.992 2.000 2.000 2.000 2.000 1.960
17 RELLENOS EN PATIO Y JARDIN 0.500 0.100 5.000 0.500 0.500 0.500 0.500 0.500 0.500
18 REPELLADOS, AZULEJOS, BARRAS 1.500 0.300 5.000 1.500 1.500 1.500 1.500 1.500 1.500
19 ENHUACALADOS WC O TABLAROCA 0.900 0.180 5.000 0.900 0.900 0.900 0.900 0.900 0.900
20 PISOS 7.200 1.440 4.980 7.171 7.200 7.200 7.200 7.056 7.200
21 COLOC.Y SUM. ALUMINIO Y DOMOS 7.900 1.580 4.360 6.889 7.742 7.742 7.505 3.950 7.505
22 COLOC. ACCESORIOS BAÑO 0.400 0.080 2.800 0.224 0.400 0.200 0.120 0.200 0.200
23 BARDAS 2.500 0.500 5.000 2.500 2.500 2.500 2.500 2.500 2.500
24 INSTALACION ELEC. POL. LOSA Y CIMENT 0.900 0.180 5.000 0.900 0.900 0.900 0.900 0.900 0.900
25 RANURADOS EN MUROS 2/5 0.900 0.180 5.000 0.900 0.900 0.900 0.900 0.900 0.900
26 CABLEADOS 3/5 0.900 0.180 5.000 0.900 0.900 0.900 0.900 0.900 0.900
27 ACC. ELECTRICOS CASA 2.300 0.460 5.000 2.300 2.300 2.300 2.300 2.300 2.300
28 PRUEBAS ELECTRICAS 5/5 0.800 0.160 4.500 0.720 0.800 0.800 0.800 0.400 0.800
29 INSTALACION SANITARIA 1.200 0.240 5.000 1.200 1.200 1.200 1.200 1.200 1.200
30 RAMALEO HIDRAULICO Y GAS 2.300 0.460 5.000 2.300 2.300 2.300 2.300 2.300 2.300
31 ALIMENTACION, CUADRO Y TINACO 0.500 0.100 5.000 0.500 0.500 0.500 0.500 0.500 0.500
32 MUEBLES, TARJA, CALENTADOR 4.000 0.800 3.950 3.160 4.000 4.000 2.000 2.000 3.800
33 PRUEB. HIDRAULICAS, SANIT Y GAS 0.500 0.100 4.000 0.400 0.500 0.400 0.300 0.400 0.400
34 YESO 3.900 0.780 5.000 3.900 3.900 3.900 3.900 3.900 3.900
35 TIROL Y PINTURA INTERIOR 3.900 0.780 3.480 2.714 3.900 3.822 1.950 1.170 2.730
36 PINTURAS EXTERIORES 3.000 0.600 4.250 2.550 3.000 2.550 2.550 2.100 2.550
37 MARCO-PUERTA DE ACCESO, PASAMANOS 2.300 0.460 3.700 1.702 2.300 2.300 1.380 1.150 1.380
38 PUERTAS INTERIORES 3.500 0.700 4.050 2.835 3.500 3.500 1.925 1.925 3.325
39 LIMPIEZA PARA ENTREGA 2.400 0.480 3.650 1.752 2.400 2.280 1.200 1.200 1.680
TOTAL FACTORES = 100.00 93.168 99.842 98.894 90.980 80.561 95.564
PORCENTAJE 1, 2 NIVELES SEGUNDA
INICIO REAL: SE DA AVANCE 0 14 DE FEBRERO DEL 2023, SE ENTREGAN PLANOS 15 DE FEBRERO DEL 2023, FECHA DE INICIO REAL SE ERECORRE 1 SEMANA POR SER A MEDIADOS
CASAS CON SOBRESUELO E IMPER QUIMICO, TUBO PVC 6", 4 CIRCUITOS, ATERRIZADA TODA LA CASA Y CONTACTOS FALLA TIERRA INDICADOS
FRENTE: CANTO SEMANA: 6 ENVIO: DIRECCION COLIBRI
No. CONTRATO: CVP 01/23 CANTO CONCRETA 8 VIV FEB PROTOTIPO HABITA TERRACE CONFORT
CONTRATISTA: CONCRETA INICIO: 2/13/2023 TERMINO: 8/14/2023 AMPLIACION NO RUV
CONTRATANTE CVP M2 CONST. 124.7 94.71 108.59
FECHA: 9/5/2023 LOTE-MANZ. L1 M1 L 19 M3 L 18 M3
PERIODO: No. VIV. 3 SEMANAS 26 26 26
26 SEMANAS No. OFICIAL 100 139 137
CONCEPTOS : VIVIENDA DE 2 NIVELES FACTOR FACTOR NUMERO AVANCE INICIO 20/02/23 20/02/23 20/02/23
1 viv. 3 VIV LOTES ETAPA TERMINO 21/08/23 21/08/23 21/08/23
1 TRAZO Y NIVELACION 0.100 0.033 3.000 0.100 0.100 0.100 0.100
2 EXCAVACION DRENAJE, RELLENOS 0.350 0.117 3.000 0.350 0.350 0.350 0.350
3 REGISTRO SANITARIO 0.800 0.267 3.000 0.800 0.800 0.800 0.800
4 CIMENTACION 2.000 0.667 3.000 2.000 2.000 2.000 2.000
5 FIRME 2.250 0.750 3.000 2.250 2.250 2.250 2.250
6 MUROS Y CASTILLOS PLANTA BAJA 5.500 1.833 3.000 5.500 5.500 5.500 5.500
7 LOSA DE ENTREPISO 5.900 1.967 3.000 5.900 5.900 5.900 5.900
8 MUROS Y CASTILLOS PLANTA ALTA 6.000 2.000 3.000 6.000 6.000 6.000 6.000
9 LOSA DE AZOTEA Y ESCALERA 6.000 2.000 3.000 6.000 6.000 6.000 6.000
10 ALBAÑILERIA EN AZOTEA 3.500 1.167 3.000 3.500 3.500 3.500 3.500
11 SOBRESUELO EN AZOTEA 2.500 0.833 2.900 2.417 2.500 2.375 2.375
12 PRUEBAS EN AZOTEA, IMPER QUIMICO Y 2.000 1.887
DETALLADO 0.667 2.830 1.800 1.900 1.960
13 APLANADOS EN PATIO 2.000 0.667 3.000 2.000 2.000 2.000 2.000
14 APLANADOS Y RECUB. EN FACHADA 3.000 1.000 3.000 3.000 3.000 3.000 3.000
15 CISTERNA 1.700 0.567 2.800 1.587 1.360 1.700 1.700
16 PISO PATIO, HUELLAS, LAVADERO 2.000 0.667 3.000 2.000 2.000 2.000 2.000
17 RELLENOS EN PATIO Y JARDIN 0.500 0.167 2.400 0.400 0.250 0.500 0.450
18 REPELLADOS, AZULEJOS, BARRAS 1.500 0.500 3.000 1.500 1.500 1.500 1.500
19 ENHUACALADOS WC O TABLAROCA 0.900 0.300 2.500 0.750 0.450 0.900 0.900
20 PISOS 7.200 2.400 3.000 7.200 7.200 7.200 7.200
21 COLOC.Y SUM. ALUMINIO Y DOMOS 7.900 2.633 2.200 5.793 5.925 7.505 3.950
22 COLOC. ACCESORIOS BAÑO 0.400 0.133 1.600 0.213 0.200 0.240 0.200
23 BARDAS 2.500 0.833 3.000 2.500 2.500 2.500 2.500
24 INSTALACION ELEC. POL. LOSA 1/5 0.950 0.317 3.000 0.950 0.950 0.950 0.950
25 RANURADOS EN MUROS 2/5 0.850 0.283 3.000 0.850 0.850 0.850 0.850
26 CABLEADOS 3/5 0.850 0.283 3.000 0.850 0.850 0.850 0.850
27 ACC. ELECTRICOS CASA 2.500 0.833 2.100 1.750 0.250 2.500 2.500
28 PRUEBAS ELECTRICAS 5/5 0.850 0.283 3.000 0.850 0.850 0.850 0.850
29 INSTALACION SANITARIA 1.200 0.400 3.000 1.200 1.200 1.200 1.200
30 RAMALEO HIDRAULICO Y GAS 2.300 0.767 3.000 2.300 2.300 2.300 2.300
31 ALIMENTACION, CUADRO Y TINACO 0.500 0.167 3.000 0.500 0.500 0.500 0.500
32 MUEBLES, TARJA, CALENTADOR 4.000 1.333 2.400 3.200 3.200 4.000 2.400
33 PRUEB. HIDRAULICAS, SANIT Y GAS 0.500 0.167 1.400 0.233 0.000 0.450 0.250
34 YESO 3.900 1.300 3.000 3.900 3.900 3.900 3.900
35 TIROL Y PINTURA INTERIOR 3.900 1.300 1.980 2.574 1.560 3.822 2.340
36 PINTURAS EXTERIORES 3.000 1.000 2.380 2.380 2.100 2.940 2.100
37 MARCO-PUERTA DE ACCESO, PASAMANOS 2.300 0.767 1.900 1.457 1.150 1.150 2.070
38 PUERTAS INTERIORES Y CUBIERTA DE BARRA 3.500 1.167 1.980 2.310 1.750 3.430 1.750
39 LIMPIEZA Y DETALLADO PARA ENTREGA 2.400 0.800 1.600 1.280 0.960 1.920 0.960
TOTAL FACTORES = 100.00 90.231 85.46 97.33 87.91
PORCENTAJE 1, 2 NIVELES SEGUNDA