Professional Documents
Culture Documents
10 Arif Bagus Permadi Project Control SPD (7-10 Juni 2023) 2,500,000,- (Dinas Bogor)
TOTAL SPD belum di bayar 2,500,000,-
Daftar SPD (Feb-Jul 2023) yang Belum Dibayarkan kepada Pekerja
PMC PT. Rekayasa Engineering
Divisi Project Engineering & Planning PT. Pertamina EP Zona 4 Prabumulih.
Iqbal Prasetya Contract Management SPD-01 (23 Jul 23 - 02 Aug 23) = Rp. 7.277.595,- (Dinas
20
Barrelvi Engineer Bandung & Jkt)
SPD-01 (3 April) = Rp 375,000 (Site survey)
SPD-02 (12 April) = Rp 375,000 (Site survey)
Hersya Agung SPD-03 (22-23 Mei) = Rp 750,000 (Site survey)
21 Process Safety Engineer
Perdana SPD-04 (5-6 Juni) = Rp 750,000 (Site survey)
SPD-05 (7-10 Juni) = Rp 3,464,475 (HAZOP HAZID)
Total SPD belum dibayar = Rp 5,714,475
SPD-01 (Jan 2023) = Rp. 1.825.000
SPD-02 (Feb 2023) = Rp. 2.550.000
SPD-03 (Mei 2023) = Rp. 1.500.000
22 Nuzul ramadhani QAQC
SPD-04 (Mei 2023) = Rp. 2.567.000
SPD-05 (Juli 2023) = Rp. 2.125.000
Total SPD belum dibayar = Rp 10,567,000,-
SPD 1 (Juni 2023) = Rp. 4.890.400
SPD 2 (Juni 2023) = Rp. 2.500.000
23 Merry Rakhmayanti Cost Estimate SPD 3 (Juli 2023) = Rp. 2.500.000
SPD 4 (Juli 2023) = Rp. 1.125.000
Total SPD belum dibayar = Rp. 11.015.400;
Muhammad Faisal
24 Piping designer Total SPD belum dibayar = Rp 10,000,000,-
setiawan
25 Amira Hany Support Engineer Total SPD belum dibayar = Rp 24,273,188,-
26 Eldo Pratama Putra Process Engineer Total SPD belum dibayar = Rp.48,112,159,-
27 Wasimin Civil Designer Total SPD belum dibayar = Rp. 1,000,000,-
Pipeline Construction
28 Andriawan Subekti Total SPD belum dibayar = Rp. 31,000,000,-
Engineer