Professional Documents
Culture Documents
04
1254 0679207886
Input &VI + Scan
Printer
1
(screw 2 pcs) 2 3 6 5 9 to Master carton
QC spot check 7
BC
TOP inspection Bottom inspection
Input PCBA to
Printer
box
2 4 3 6 inner box
9 AOI
10 BC Testing
Insert color box to
Screw
Fixture Fixture Fixture
Screw
5G172
Package bag , scale
AOI
BC Testing
12
Scale
BC
12
Printer
AOI AOI
顶升
Printer
Printer
顶升
Screw
Printer
Screw
Trolley
Conveyor Conveyor
Conveyor 2 layer
BC
(screw 2 pcs) (screw 4pcs) Printer Printer
inner box
VI accessori 2
1 Printer Scale
02 03 05 In put &VI Tearing off Control 7 Stick label 900 BC, UKCA
Scan UPC label + Put inner box to Stick UPC label
OBA & SFQC
703 1324 2044 Accessori 2+ color box color box to color box +
label+ Paste QC
5 3 OF2 VI accessori 1 Iron frame
BC
Remove the electrostatic label/&BIOS label
2 OF1 VI & Fold color print PCA SN
bag//scan the plate +Sticking 1 BC Testing
1 input accessori box
UKCA label 3 11 4 1 to small black 8 11 Trolley
AVI visual inspection
box, & scale
OF4
4
13
Input &VI + Scan
Install the leaf spring Scan _ Install top Scan out VI packing color box
4
Printer
Lock screw II (2PCS 9
(6PCS)
Install the cable. Install the cable. Pasting GPU thermal 690 Binding + screw cover
short) 5 to Master carton
PCB
paste. Of line
1 Print and paste 900 labels
7
BC
2 3
Screw
Printer
Fixture online, and tear off 699 SN. box
TOP inspection Bottom inspection QC spot check 3 AOI 6 Scan binding &
13
BRKT extenstion packing color box
Printer
BC Testing packing to box 5 9 to Master carton
7
BC
IPut the product
Printer
box
Screw
Fixture Fixture
AOI
Fixture
Fixture Fixture Fixture Fixture Scale 3 6
Screw
Screw
Fixture Paste 900 BIOS label & tear off 699 LABEL into the color box
BC
12 Tear off protective film
AOI
PG190-0510
BC Testing
Insert color box to
Printer
Printer Package bag , scale
AOI Scale
BC
顶升 Conveyor Conveyor
顶升 12
Screw
Screw
Screw
Screw
Screw
顶升 顶升
Lock PCBA screw
BC
Paste TIM 1
(4pcs)
Paste TIM 2
(4pcs) Install the cable.
Lock Line Card
Assembly heat sink Install the leaf spring Scan _ Install top Install the bracket
Visual inspection AVI
Printer
装置 装置
+ screw cover and lock the screw I Scale
2 6 12 (2PCS screw long)
19 1 Power port
BC
Printer Stick BIOS & BLU label
7 9 13 15 17 3 OF2
Iron frame OBA & SFQC Printer
BC
In put &VI
2 OF1 Scale
1 Tear protective film +
Scanning casting plate Paste tape x2 to
810 700 1000 1203 701 1800 1017 1199 1300 1180 Trolley Scan UPC label + Input PCBA to Stick UPC label
Print online 900 SN LABEL
4 8 11 Remove the PE
OF4 3 Iron frame to color box + color box OBA & SFQC
OF1 bag, removeOF2 Put the cabel inner box
Accessori 2+ color box
2 (Arrange print PCA SN
AVI visual inspection 1 the color box and manual*2 (attachment)
4 into the color attachments)
4 for visual 8 11 Trolley
inspection box and weigh OF4
it
6
2 3 2 8
4 11 14 16 18 20 TOP inspection Bottom inspection QC spot check 4 Scan and 9
5 8
FA_06 Heat dissipation
block pressing
10 Install the iron frame & Sticking PPID 2D
Sticking PPID 2D
check, tear
699SN
BOT VI,
TOP VI 10 12
Lock the cover screw turn over the lock iron label(2PCS)
label(2PCS) AOI
Take off the cover &
Binding PCBA
1
AOI 13
packing color box
Printer
5 9
PG192-0510
Printer to Master carton
Printer
7
BC
Printer
Printer
box
顶升 Check & arrange Stick UPC label
Fixture
顶升
Fixture
Screw
Trolley
Conveyor Conveyor Print online 900 SN LABEL Tear off 699SN & compare BC Testing
Insert color box to
Conveyor 2 layer
装置 装置 Package bag,scan ,
BC
Printer
12
Screw
Screw
Screw
Screw
Screw
Tear off the protective film & scan the casting board
1 Printer
Tearing protective film &
scanning projection plate
Sticking BIOS&
Warning Label (2PCS)
5 顶升 Conveyor Conveyor
顶升
Screw
BC
7 9 13 15 17 19 AVI visual inspection
4
Printer
Scale
600 1
Stick BIOS/ HPSN label
2
3 OF1
Unpacking &
picking up OF2
color box &
the Attachment
scale, attaching
Acessori Iron frame
Scan UPC label + IPut the productStick UPC label
into the color box to color box
Scanning & display
box, accessory box
Paste tape x2 to
color box OBA & SFQC
2350
1. Air pressure
2. Electric 4 unpacking the attachments 8 Trolley
OF4 11
PE bag
Screw(Pre-lock)
FA_14 Install the
Sticking PPID 2D
label(2PCS)
label(2PCS) 699SN AOI 12
FA06_Print online FA_11 Take off the FA1_13 Lock the Backplane (8pcs) BC Testing
Binding PCBA
Fixture
Fixture
PG192-0550
Printer Printer
Printer
顶升 顶升
Printer
Fixture Fixture
Screw
Screw
Trolley
Conveyor Conveyor
装置 装置
Conveyor 2 layer Printer
Fixture
Screw
Screw
Screw
Screw
BC Testing
Fixture Fixture In put &VI
FA_02 Paste GPU FA_03 Stick
FA_09 Stick TIM1 to
FA_12 Install the cover
and plug in the fan FA1_13 Lock the FA_14 Install the
11
Cooling Paste TIM2 FA_14 Install the FA_15 AVI
2
FA_04 Install The Leaf
Spring And 7 PCBA wire.
12
Bracket (2PCS) Backplane (8pcs) Backplane (8pcs)
3 6
Screw(pre-lock)
FA_07 Reinforcing
17 19 21
Heat Dissipation
Block Screw 9 13 15 AVI visual inspection
4
1236