Assembly VI Normal Packing Color Packing

04
1254 0679207886
Input &VI + Scan

Install Bracket AVI visual


Install FanSink (screw 4pcs) inspection
13
Stick bumper (3 pcs) 690 Binding 8 packing color box
PCB

Printer
1
(screw 2 pcs) 2 3 6 5 9 to Master carton
QC spot check 7

BC
TOP inspection Bottom inspection
Input PCBA to

Printer
box
2 4 3 6 inner box
9 AOI
10 BC Testing
Insert color box to
Screw
Fixture Fixture Fixture
Screw

5G172
Package bag , scale

AOI
BC Testing

12
Scale

BC
12

Printer
AOI AOI

顶升
Printer
Printer

顶升
Screw

Printer
Screw

Fixture Fixture Fixture Printer


Conveyor Conveyor
装置 装置

Trolley
Conveyor Conveyor
Conveyor 2 layer

PUT & VI tear off control label


Heat dissipation paste Install Bracket
(2PCS )
Install FanSink VI & remove Power port

BC
(screw 2 pcs) (screw 4pcs) Printer Printer
inner box
VI accessori 2
1 Printer Scale
02 03 05 In put &VI Tearing off Control 7 Stick label 900 BC, UKCA
Scan UPC label + Put inner box to Stick UPC label
OBA & SFQC
703 1324 2044 Accessori 2+ color box color box to color box +
label+ Paste QC
5 3 OF2 VI accessori 1 Iron frame

BC
Remove the electrostatic label/&BIOS label
2 OF1 VI & Fold color print PCA SN
bag//scan the plate +Sticking 1 BC Testing
1 input accessori box
UKCA label 3 11 4 1 to small black 8 11 Trolley
AVI visual inspection
box, & scale
OF4
4

1500 10005 22278 800 79911 1200 14 1301 16 1600 1881920


Asem PCBA
10
Lock PCBA screw

13
Input &VI + Scan

Install the leaf spring Scan _ Install top Scan out VI packing color box
4

Printer
Lock screw II (2PCS 9
(6PCS)

Install the cable. Install the cable. Pasting GPU thermal 690 Binding + screw cover
short) 5 to Master carton
PCB

paste. Of line
1 Print and paste 900 labels
7

BC
2 3
Screw

Printer
Fixture online, and tear off 699 SN. box
TOP inspection Bottom inspection QC spot check 3 AOI 6 Scan binding &
13
BRKT extenstion packing color box

Printer
BC Testing packing to box 5 9 to Master carton
7

BC
IPut the product

Printer
box
Screw

Fixture Fixture

AOI
Fixture
Fixture Fixture Fixture Fixture Scale 3 6
Screw

Screw

Fixture Paste 900 BIOS label & tear off 699 LABEL into the color box

BC
12 Tear off protective film
AOI

PG190-0510
BC Testing
Insert color box to
Printer
Printer Package bag , scale

AOI Scale

BC
顶升 Conveyor Conveyor
顶升 12
Screw

Screw

Screw

Screw

Screw

Fixture Fixture Fixture Fixture Fixture Fixture Fixture Printer


装置
Fixture
装置 Printer

顶升 顶升
Lock PCBA screw

Conveyor 2 layer Conveyor


Conveyor
Screw

Fixture Power port

PUT & VI tear off protect film & scan plate


(6PCS)

BC
Paste TIM 1
(4pcs)
Paste TIM 2
(4pcs) Install the cable.
Lock Line Card
Assembly heat sink Install the leaf spring Scan _ Install top Install the bracket
Visual inspection AVI
Printer
装置 装置
+ screw cover and lock the screw I Scale
2 6 12 (2PCS screw long)
19 1 Power port

BC
Printer Stick BIOS & BLU label
7 9 13 15 17 3 OF2
Iron frame OBA & SFQC Printer

BC
In put &VI
2 OF1 Scale
1 Tear protective film +
Scanning casting plate Paste tape x2 to

810 700 1000 1203 701 1800 1017 1199 1300 1180 Trolley Scan UPC label + Input PCBA to Stick UPC label
Print online 900 SN LABEL
4 8 11 Remove the PE
OF4 3 Iron frame to color box + color box OBA & SFQC
OF1 bag, removeOF2 Put the cabel inner box
Accessori 2+ color box
2 (Arrange print PCA SN
AVI visual inspection 1 the color box and manual*2 (attachment)
4 into the color attachments)
4 for visual 8 11 Trolley
inspection box and weigh OF4
it
6
2 3 2 8
4 11 14 16 18 20 TOP inspection Bottom inspection QC spot check 4 Scan and 9
5 8
FA_06 Heat dissipation
block pressing
10 Install the iron frame & Sticking PPID 2D
Sticking PPID 2D
check, tear
699SN
BOT VI,
TOP VI 10 12
Lock the cover screw turn over the lock iron label(2PCS)
label(2PCS) AOI
Take off the cover &
Binding PCBA

FA_04 Install The Leaf Stick TIM2 to PCBA visual examination


FA_01 Scan

(4PCS) frame screws(4pcs) BC Testing


Binding with PCBA
Spring And Screw
Fixture

1
AOI 13
packing color box

Printer
5 9

PG192-0510
Printer to Master carton
Printer
7

BC

Printer
Printer
box
顶升 Check & arrange Stick UPC label
Fixture
顶升
Fixture
Screw

Fixture Fixture Fixture 3 6


Screw
Screw

AOI Attachments to color box

Trolley
Conveyor Conveyor Print online 900 SN LABEL Tear off 699SN & compare BC Testing
Insert color box to
Conveyor 2 layer
装置 装置 Package bag,scan ,

AOI scale Scale

BC
Printer
12
Screw

Screw

Screw

Screw

Screw

Fixture Fixture Fixture Fixture Fixture Fixture Fixture Printer


Printer

Tear off the protective film & scan the casting board
1 Printer
Tearing protective film &
scanning projection plate
Sticking BIOS&
Warning Label (2PCS)
5 顶升 Conveyor Conveyor
顶升
Screw

Fixture In put &VI


3 7
1 装置 装置
BC Testing
FA_02 Paste GPU FA_03 Stick FA_04 Install The Leaf Install the cover and Lock the cover screw Install the iron frame &
Stick TIM1 to PCBA
Cooling Paste Thermal paste Spring And Screw
FA_05 Reinforcing plug in the fan wire. (4PCS)
Install the iron frame &
turn over the lock iron
turn over the lock iron Adhesive tape & 11
to Heatsink Heat Dissipation frame screws(4pcs) packing
2 3PCS
6 Block Screw 12 frame screws(4pcs)
21 Power port

BC
7 9 13 15 17 19 AVI visual inspection
4
Printer

Scale

600 1
Stick BIOS/ HPSN label

2
3 OF1
Unpacking &
picking up OF2
color box &
the Attachment
scale, attaching
Acessori Iron frame
Scan UPC label + IPut the productStick UPC label
into the color box to color box
Scanning & display
box, accessory box
Paste tape x2 to
color box OBA & SFQC

2350
1. Air pressure
2. Electric 4 unpacking the attachments 8 Trolley
OF4 11
PE bag

5 FA_08 Heat dissipation


6
FA_05 Install The Leaf block pressing x2 2 8
2 3 4 Scan and 9
4
Spring And
11 14 16 18 20 Bottom inspection QC spot check check, tear
BOT VI,
8 10
TOP inspection Sticking PPID 2D TOP VI 10
Fixture

Screw(Pre-lock)
FA_14 Install the
Sticking PPID 2D
label(2PCS)
label(2PCS) 699SN AOI 12
FA06_Print online FA_11 Take off the FA1_13 Lock the Backplane (8pcs) BC Testing
Binding PCBA

FA_10 Stick TIM2 to FA_16 visual


FA_01 Scan

cover & Binding with Bracket (2PCS)


PCBA examination
1
AOI
PCBA
Screw

Fixture

Fixture

PG192-0550
Printer Printer
Printer

顶升 顶升
Printer
Fixture Fixture
Screw
Screw

Trolley
Conveyor Conveyor
装置 装置
Conveyor 2 layer Printer
Fixture
Screw

Screw

Screw

Fixture Fixture Fixture Fixture


Tearing protective film & Sticking BIOS&
scanning projection plate Warning Label (2PCS)
1 Printer 5
1 3 7
Screw

Screw

BC Testing
Fixture Fixture In put &VI
FA_02 Paste GPU FA_03 Stick
FA_09 Stick TIM1 to
FA_12 Install the cover
and plug in the fan FA1_13 Lock the FA_14 Install the
11
Cooling Paste TIM2 FA_14 Install the FA_15 AVI

2
FA_04 Install The Leaf
Spring And 7 PCBA wire.
12
Bracket (2PCS) Backplane (8pcs) Backplane (8pcs)

3 6
Screw(pre-lock)
FA_07 Reinforcing
17 19 21
Heat Dissipation
Block Screw 9 13 15 AVI visual inspection
4

1955 1. Air pressure


2. Electric

1236