You are on page 1of 18
CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8™ to 10 june 2022 Item No, NWR 0.1 Jaipur ~Asarva’ HMT Daily S.F. Express Tentative timings [_JP-ASV S.F. Express [__JP-ASV S.F-E Station Arr Dep. 19.35 oP Th 21.34 | MDIN 01.05 01.08 CNA - 01.23 BEC 03.20 voz | 06.55 HMT | ASV Distance — TOR | [Avg Speed | Frequency Dally Commercial Stoppages over NWR: KSG, All, NSD, BHL, CNA, MVJ, RPZ, UDZ, ZW, DNRP, LSD, HMT, NHM, SDGM. Composition : SLR/D-02, GS-03, GSCN-06, ACCN-02, ACCW-01=14 Coaches Rake Required: Two Maintenance : PM at JP on RBPC Loco Required: Two Traction ; Diesel Repercussion: T. No. 19602 NJP-UDZ Exp shall H/o at CNA 01.20 Hrs. instead of 01.05 hrs. and T/o at BEC at 01.40 Hrs. instead of 01.25 Hrs. WJakoring a—d ws & he Bre ak UBL as freee are mb oreilable rd fosling 6° CPTM-NWR cpTM-WR RB ~ 56 6/8/22, 6:32 PM PRINT-NWR docx - Google Docs CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8™ to 10" June 2022 Item No. NWR 0.2 Udaipur-Asarva Via HMT Daily Intercity SF Express Tentative timings: UDZ-ASV Intercity SF ‘ASV-UDZ Intercity SF Express Daily Station Express Daily ar. Dep. Arr Dep. = uDz 20.00 [= 09.00 09.05 HMT 16.25 16.30 10.55 =| _ ASV 14.30 303 Distance 303 05.25 TOR 05.30 55.93 KMPH ‘Avg Speed 55.09 KMPH Frequency: Daily Commercial Stoppages over NWR :-ZW, DNRP, LSD. WR- SDGM, NRD, NHM, TOD, PRJ, HMT Composition: SLR-02, GS-04, GSCN-10, ACCN-04, ACCW-2 = 22 Coaches Rake Required:- Nil (Lie over of Train No. 19329/19330 INDB-UDZ) Maintenance:~ PM at INDB on RBPC Loco Required:~ Nil Traction :- Diesel Proposed Rake Link: INDB Wobrauy vel pullin inetliby ut avediabte at rgy. NOL 40 entene aes au Gmelliy ol UDZ eee {oa PTM-NWR cPTM-WR RB + 67 hntipa:lidoes.google.comidocumentapluKkKOWWQv7ma0_GJtgoulNZAl2x6Cxiedt . 28 618/22, 6:11 PM PRINT-NWR.docx - Google Docs CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8™ to 10" June 2022 m_No. NWR 0. Udaipur-Asarva Via HMT Daily Intercity Express Tentative timings :- UDZ-ASV Intercity Express ‘ASV-UDZ Intercity Express Daily Station Daily Arr, |__Dep. Arr. Dep. = 17.00 ubz 12.30 = 21.00 21.05 MT 08.30 08.35 23.00 = ASV = 06.30 303; Distance 303 6.00 TOR 6.00 50.5 ‘Avg Speed 50.5 Frequency: Dally Commercial Stoppages over NWR :-ZW, JYM, DNRP, BHWA, RDD WR: SDGM, NRD, NHM, TOD, PRJ, HMT Composition :- SLR-02, GS-04, GSCN-03, ACCN-01, CZAC-02 = 12 Coaches Rake Required:- One Maintenance:- PM at JP on RBPC (L/O of Train No. 09721/09722 JP-UDZ TOD) Loco Required:- One Traction :- Diesel Proposed Rake Link: IP 06.15 >. -09721 22.15 09722< 06.15 > Repeat Preredy weber avd Fading ppaitlilice ustaveilabte at aay - Nee enol teal wating and Paelay oh UOT moe, DP, PTH NWR cPTM-WR RB ~ 16B-- htps:idocs qoogle-com/dacumentd/taMvI7WyCAdd3EaqzRtRddVpYmHFAck/Pledit CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8™ to 10 June 2022 Item No. NWR 1.4 New Train between Bhagat ki Kothi-Gorakhpur Weekly Express Via FL, BKI, AWR. Tentative timings BGKT-GKP Station GKP-BGKT Arrl Der | Ard. Dep. | 06.30 (Thu) | BGKT 21.15 (Sat) = iio | 11.12 FL. 16.18 14.57 15.00 AWR 12.40 |__ 22.00 22.05 ETW | _05.45 05.50 03.05 | 03.15(Fri) | PRYI 00.45 01.15 (Sat) 04.40 04.42 _PBH 21.55 22.00 05.40 05.42 ‘SLN 20.25 20.30 06.55 07.05 AYC 19.25 19.30 07.40 07.45 AY 18.55 19.00 (10.50 (Fri) = GKP _ 14.40 (Fri) | 1440 Distance | mo 28.20 TOR 30.35 _ 50.82 ‘Avg. Speed 47.21 Frequency: Weekly Days of run: Ex BGKT- Thu Ex GKP- Fri Commercial stoppage: (NWR) - JU, MTD, DNA, MKN, KMNC, FL, JP, GADJ, DO, BKI, AWR; (NCR)- RAH, GVH, BINR, DEG, GDO, MT), AGC, FAB/ (NER): KLD,’EST, BU, MUR. Composition: LWLRRM-2, LS~4, LWSCN-8, LWACCN-6, LWACCW-02= 22 Coaches Rake Required- One Maintenance- PM at BGKT with RBPC Loco Required- One . so ro h ion- cto oven NCR - Electric du. lamp Traction- Diesel/Electric. g raction over ET pens eT. AGE 09 [o6lr=w eh CPTM-NWR ot IER EA cPTM-| a RB - 159- CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8" to 10 June 2022 Item No. RBNWR New Train between Sri Ganganagar-Agra Cant Weekly Exp. Via BTI, HSR, RE Tentative timing: ~__ SGNR-AGC Station AGC-SGNR DEP ARR DEI "| 15.15 (WED)| _SGNR 01.55 (Fri) = _ [18.30 BI = 22.40 01.15 01.25 RE 15.05 | 15.15 02.55 03.25 AWR 12.40 13.05 | 07.00 (Thu) AGC 09.00 (Thu) —_7iL KM Distance Til | 1545Hrs | TOR 45.14 ‘Avg speed Frequency: WEEKLY Days of Run: Ex. SGNR- Wednesday Ex. AGC- Thursday Commercial stoppage: (NWR) - SDS, HMH, SGRA, MBY, RMN, KNL, SSA, BHT, ADR, HSR, HNS, BWK, BNW, CKD, KSI, RE, AWR; (NCR) ~ RAH, GVH, BINR, DEEG, GDO, MT) Composition: LWLRRM-2, LS-4, LWSCN-7, LWACCN-6, LWACCW-02, LWFACCW-1=22 Rake required: Nil (L/o of 12485/12440 NED-SGNR) Maintenance: PM at SGNR with RBPC Loco required: Nil Traction: Diesel Remarks (NWR) - Bathinda bypass shall made fit for passenger. weer FER CPTM-N' RB ~- 160-- CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8™ to 10" June 2022 Ttem No. RBNWR Extension of Train No 12555/56 GKP-HSR SF EXP Up to BTI (with Lie-over) Tentative timings :~ 12555 GKP- 12556 BTI/HSR- 12555 GKP-HSR HeR/BTI cn 12556 HSR-GKP Gee Existing Proposed | Existing | _ Proposed Ar. | Dep. | Am | Dep. Arr | Dep. | Arr. [ Dep. - | 1635.) - | 16.35 | GkP | 0945 | - | 0945) - | 07.25 | 07.50 | 07.22 | 07.25 ROK 19.13 | 19.15 | 19.25 | 19.27 10.00 | - | 09.27 | 09.32 | HSR =| 17.00 | 17.00 | 17.05 [ f-- 12.40 = BTI = ~ - 74.00 - 1120 Dist. 963 1120 20.05 TOR 16.45 19.45 55.29 55.76 Ava. 57.49 5670 | | Speed Frequency: Dally Days of run: Daily Commercial Stoppages: SSA on extended portion. Proposed composition: Same as Existing Rake Required: Nil Maintenance: PM- At GKP with RBPC Loco Required: Nil Traction: Diesel/ Electric 4 in tela alee % Permitted voile ~! sil meet wD as cPTM-AWR Cicer “CPTM-NR RB - 161-- 18/22, 4:27 PM PRINT-NWR.dosx - Google Docs CONFIDENTIAL North Western Rallway Minutes of IRTTC held at Bengaluru From 8” to 10” June 2022 Item No. NWR 2.3 Extension of Train No 17019/20 Hyderabad ~Jaipur Weekly Express Up to Fl/ sap Tentative timings :~ HYBIP HYB-HSR JP-HYB HSR-HYB Existing Proposed STN Existing Proposed Are Dep. ‘Are | Dep. Arr | Dep. | Arm | Dep. _ 15.10 |_| 15.10 | y,_ | 0730; [07.307 (Sa) (sa) a) (Th) 05.25 05.25 15.20 15.20 - 06.05 | 3P - 14.35 (mM) (M) (mu) (Tu) i140 | 11.45 [LAU 09.25 | 09.30 15.10 06.50 HSR. - (mM) (Tu) 2002 KMS 2352 Dist. 2002 KMS 2352 38.15 Hrs 48.00 TOR 40.10 Hrs: 48.40 52.35 KMPH 49.00 AV. | 49.81 KMPH 48.33 Speed Frequency: Weekly Days of run: Ex HYB-Sat, Ex HSR-Tue Commercial Stoppages over NWR: COM, RGS, SIKR, NWH, JJN, CRWA, LHU, RMB, SWNT on. extended portion. Proposed composition of train :- Same as Existing Rake Required:- Nil Maintenance:- PM- At HYB & SM at HSR Loco Required- Nil Traction- Diesel ” Me D sdpe CPTM-NWR CPTM-SCR: RB ~162 hntps:ldocs.google.con/documenti/1FO0s-wKFVEYAJeX73C|JNJH2Vih-gapTledt CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8" to 10" June 2022 ‘Item No. NWR 2.2 Extension of Train No 20973/20974 Ajmer- Rameshwaram Weekly Humsafar Up to Firozpur. Tentative timings :- RMM-AIT[RMM-AII/FZR | | RMM-AIT | FZR/ATI-RMM Humsafar | Humsafar coy Humsafar Humsafar Existing | _ Proposed Existing Proposed ‘Arr. | Dep. | Arr. | Dep. (Arr. | Dep. | Arr. | Dep. 22:30 22:30 [21 21:00] - ~ | tue | ~ | tue | RM | Mon | 7 | Mon 23:05 23:05 20:10 | 20:00 | 20:10 fot | 7 thy 7370) AM sat Sat - - - MDIN | - = ~ [19:45 ~ =| 01:30 P = = [17:20 | 17:45 | 5 = [05:20 cur | 13:35 | 14:00 | : =| 41:20 BIT - = [07:40 | 07:50 13.15 05.50 - or | AR . - *_ | sat 2792 3501 Dist. 2792 3501 48:35 62:45 TOR | _48:50 63:10 57.47 KMPH | 55.79 KMPH | OVS" 57.16 KMPH | 55.43 KMPH Speed Frequency: Weekly Days of run: Ex RMM-Tue, Ex FZR-Sat Commercial Stoppages: KSG, JP, RGS, SIKR, FPS, CUR, SDLP, HSR, ADR, SSA, BTI, GNA, KkP, FDK on extended portion Proposed composition of train: Same as Existing Rake Required: Nil Maintenance: PM- At FZR & SM at RMM Loco Required: Nil Traction: Diesel/ Electric Wie ae, Aig CPTM-NWR CPTM-SR ~163-- 16/8/22, 6:32 PM PRINT-NWR docx - Google Docs CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8™ to 10" June 2022 Item No. WR Extension of Train No 22919/20 ADI-MAS (Weekly) Humsafar S.F. Express Up to Hisar via SMR- BLDI-JU- DNA-RTGH Tentative timings : 22919 MAS-ADI MAS-ADI/HSR. 22920 ADI-MAS- HSR/ADI-MAS Existing Proposed | STN. | _ Existing Proposed are Dep. | Arn | Dep. am | Dep. | Ar. | Dep. 7 16.00 |_| 16.00 | yg | 16.00] | 1540 _ (Wed) (wea) (Tue) (Tue) 20.55 25 09.40 toy | | 2055 | ay | ADE || Gwen | 0240 | 09.40 05.50 o1s | 020 | sir 05.45 (Mon) 540 | 550 | 00 23.40 | 23.55 40.55_| 11.00 | RTGH 18.25 | 18.30 14.25 15.25 cy | HSR ~ | (Sun) 773 2655 Dist i739 3655 38.55 46.25 TOR 30.40 48.15 59.44 57.19 Ava 56.05, 55.02 Speed Frequency: Weekly Days of run: Ex MAS-Wed, Ex HSR-Sun Stoppages on extended portion: MSH, PTN, BLDI, MBNL, MON, JOR, JU, MTD, DNA, LAU, SUIH, RTGH, CUR, SDLP, HSR. Proposed composition of trai Rake Required: Nil Composition: As existing. Maintenance: PM- At HSR (instead of ADI) & SM at MAS Loco Required: 01 ‘Traction: MAS-ADI- Electric, ADI-HSR= Diesel Same as Existing cave at ) oa R cPTM-SR cPTM-WR RB Note tren w mor be @y burda ably tend ti bebe JOM-MSH ~-1G4.. httpsidocs google.con/documentidpjukkO]WQv7mae_GJ1goulNZAi2x6Cx/ecit 618/22, 427 PM PRINT-NWR docx - Google Docs North Western Railway Minutes of IRTTC held at Bengaluru From 8™ to 10” June 2022 Item No. NWR 2.4 CONFIDENTIAL Extension of Train no. 22977/78 Jaipur ~Jodhpur SF up to Pali Marwar(Zser Ja/ore) Tentative Timings 3P-3U 3P-PMY 3U-3P PMy-3P Existing Proposed Station Existing Proposed Ar | Dep. | Am | Dep. [Pare] Dep. [are | Dep. =| 06.00 | -- | 06.00 P 215 | | 2a |= i105 [| -- | 10.55 | 11.05 51) ~ | 16.00 | 15.45 | 16.00 12.40 | = PMY =| 4445 312 KMs 385 KMs Dist. 312 Kis 385 KMs 05.05 Hrs. 06.40 His. TOR 05.15 Hrs. 7.00 Hrs. 61.32 KMPH 57.75 KMPH [Avg Speed| 59.42 KMPH 55.0 KMPH Frequency - Daily Commercial Stoppages:~ BGKT, LUNI on extended portion Rake Required:~ Nil Composition: As existing. Maintenance :- PM at JP on RBPC Loco Required:-Nil ‘Traction :-Existing Awa, sepeelot CPTM-NWR ~-166>- htpeidocs.google-condocumentis' FO0g-wKF vEyAJeX7SCHINJH2Vih-gapTedit CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8" to 10" June 2022 Item No. RBNWR New Train between Bhiwani- Kalka ViaROK-PNP-UMB Tentative timings :~ BNW-KLK Station | KLK-BNW | Arr. I Dep. Arr, Dep. - 04.30 BNW 23.30 = 05.30 05.32 ROK 22.16 22.18 (06.57 07.20 PNP | 20.16 | 20.40 09.30 09.35 UMB 18.20 18.25 10.17 10.25 CDG 17.27 17.33 Fe a 0 299 Distance 299 06.30 TOR 6.35 46.0 Frequency: Daily Commercial Stoppages: KLNK (NWR),_ NR- ROK, GHNA, IRA, PNP, GRA, KUN, NLKR, KKDE, SHDM, UMB, CDG, CNDM. Composition :- SLR/D-02, GSCZ-07, GSCN-02 = 11 Coaches Rake Required:- One = PM at BNW on RBPC Loco Required:- One Traction :- Diesel/ Electric Maintenan: Note: BNW-KLK-BNW will be feasible subject to cancellation of 14095/96 ‘E> Himalayan Queen. ("- non ty Keer part ingore oe expt lie Precos sls 6 (DEON . CPTM-NWR ‘CPTM-NR ON RB come? Eg ~ 166 -- (CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8" to 10" June 2022 WR 2.6 DROPPED Extn. of Train no. 2497/98 SGNR-TPJ-SGNR from SGNR to FZR & TP] to RMM Remarks: Proposal has been dropped due to PF & Washing line constraints at NR. CPTM-NR RAILWAY BOARD ~-167- CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8™ to 10 June 2022 DROPPED Extn. of Train no.22475/76 HSR-CBE from HSR to SVDK & from CBE to TPJ/ERS Remarks: Proposal has been dropped due to path constraints at NR. L eal Os Tay K cPTM:NWR deem Ne RAILWAY BOARD ~- 168 CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8" to 10" June 2022 IWR 1.7 DROPPED Bikaner - Kalka Weekly Express via SOG, BTI, DUI, UMB, CDG Remarks: Proposal has been dropped due to path constraints at NR. wD Pee” ete ae CPTM-NWR (Qeorm: NR RAILWAY BOARD ~- 169 ~- CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8™ to 10" June 2022 Item No. ~ NWR1.3 Barmer -Dadar Weekly Express via SMR-BLDI Remarks: Proposal has been dropped due to path constraints at WR. - iN etn OLB CPTM-NWR CPTM- WR RAILWAY BOARD >- 10 CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8™ to 10 June 2022 DROPPED New Train between Jaipur to Amritsar (Daily) via SDLP-BTI-HMH Remark Proposal has been dropped due to path constraints at NR. spay cPTM-NWR RAILWAY BOARD -19t-- CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8™ to 10” June 2022 Item No. NWR- 1.1 New Train between Dehar Ka Balaji (Jaipur) - Tirupati Weekly S.F. Express Via SWM, NAD, JUH Tentative timings DKBJ-TPTY SF Exp. i - TPTY-DKB) SF Exp. } ee P—_____Station +——_ ree eee ‘Arr Dep. _ Ari. Dep. - 21.20(Sat) DKBI ~ 06.35 (Thu) = 21.30 _21.40 05.55 06.05 23.35 23.55 03.50 | 04.10 (Thu) 04.30 04.55 (Sun) _| (22.30 08.45 08.47 18.18 | | - ("11.10 - 19.30 | 19.35 07.00 14.30 (Mon) | = "11.30 (Tue) 2373 | Distance 2373 41.10 TOR 43.05 _ 57.64 — ‘Ava. Speed 55.08 Frequency: Weekly Days of run: Ex DKBI/JP-Sat_ Ex TPTY-Tue Commercial stoppages: (NWR)JP, SHRN; (WR) NAD, UJN; (CR) BZU, UR, MBNR, GWD, RC, GTL, GY, TU, Composition: LWLRRM-2, LWACCN-. Rake Required - One DPA; (WCR) SWM, KOTA, RMA, BWN, ET, HBB, BPL, NGP, CD, 8PQ; (SCR) SKZR, MCI, PDPL, KZJ, KCG, MJF, YA, HX, RUP, RU. Maintenance- PM at JP & SM at TPTY Loco Required - One Traction- Electric > Chom PAGO CR CPTM-NWR CPTM-WCR CPTM-WR 14, LWACCNE -6= 22 Coaches Dsakje___ CPTM-CR CPTM-SCR RB ~-1RP- CONFIDENTIAL North Western Railway Minutes of IRTTC held at Bengaluru From 8" to 10" June 2022 NWR 3.4 DROPPED Increase in Frequency of Train No 16311/12 SGNR-KCVL From Weekly to Ti-Weekly Remarks: Proposal has been dropped due to path & terminal constraints at SR. a CPTM- SR RAILWAY BOARD <7 173 ~

You might also like