SE. | WEST QURNAFIELD 2% PHASE PROJECT [eje
Document Title INSPECTION AND TEST PROCEDURE WITH PLAN AT SITE (API620TANKS) | Page | 11 of 34
Document No. 8015-0151-22-PO-45-0009-4617-Q04-00032, Rev. ot
86.3 Flat spots in the vertical plane shall not exceed the appropriate plate flatness and waviness
requirements of paragraph 8.4.3 of this procedure.
VY
Ty SES mae
1)
t
Flatness & Waviness
Check! View)
87 Nozzle and Manhole
Before opening of the hole for the nozzles and manholes in the tank shell and roof, the
marked location such as orientation, elevation and diameter shall be inspected with the
applicable drawing.
All lugs, brackets, nozzles, manhole frames, reinforcement around openings, and other
appurtenances shall fit and conform to the curvature of the surface to which they are attached.
8.7.1 Nozzle, Manhole and Draw-off Sump;
Unless otherwise specified in the applicable drawing, the dimensional tolerances are as
follows. It is modified from API Std. 650.
“Tolerance, mm
Check Points ‘Shel
Nozzle | Manhole
Elevation from bottom (A) 26 £13
Radial location ofa roof nozzle (B) 26 £13)
Projection (C) 25 213
Flange tit in any plane, measured on the flange face (D) £13
= for nozzies greater than NPS 12 in nominal diameter 1m :
~at the outside of flange diameter for NPS 12 and smaller | __£3 a
Rotational orientation of flange bolt hole 23 5
Distance from roof or bottom center to nozzle, manhole and
draw off sump (F) td a<> SEE. | WEST QURNAFIELD 2™ PHASE PROJECT
Document Title | INSPECTION AND TEST PROCEDURE WITH PLAN AT SITE (API620TANKS) | Page | 12 of 34
Document No. '8015-0151-22-PO-45-0009-4617-004-00032 Rev. OF
88
89
8.10
Verticality of Gauge Well (Gauge Pole)
If gauge well tare required through the roof, the verticality of each gauge well shalll be checked
land not exceed the tolerance provided by the instrument manufacturer information or given in
Contractor's information.
Measurements
When measurements are required by agreement between the Contractor and the
Manufacturer, they shall be taken before the hydrostatic test. Measurements of local
deviations shall be taken during construction. They shall be taken with a steel tape - making
corrections for temperature, sag, and wind — when the length being measured makes such
corrections necessary. Deviation measurements shall be taken on the surface of the plates
and not on welds.
‘Construction Practice
Excessive hammering during construction should be avoided on the inner shell and
‘components so that the material is not hardened or severely dented. Any objectionable local
thinning caused by hammering can be repaired by welding a qualified procedure, followed by
grinding.> S55. | WEST QURNAFIELD 2" PHASE PROJECT
Document Title | INSPECTION AND TEST PROCEDURE WITH PLAN AT SITE (API620 TANKS) | Page | 13 of 34
Document No. ‘8015-0151-22-PO-45-0009-4617-Q04-00032 Rev. of
ot
92
93
93.4
932
933
93.4
94
95
96
FIT-UP INSPECTION
The surfaces to be welded shall be cleaned out to be free from scale, rust, oll and other
deleterious foreign material for distance of at least 13 mm from the welding joint. For
galvanized surface, the coat shall be removed by approximately 25 mm from the welding joint.
Plates to be joined by butt welding shall be such that the misalignment shall not be greater
than the tolerances below. The aligned plates shall be retained in position during the welding
operation
2. For plates 6 mm in thickness and less, 1.6 mm.
b. For plates over 6 mm in thickness, 25% of the plate thickness or 3 mm, whichever is
lesser,
‘The plates that are being welded shall be accurately matched and retained in position during
the welding operation. Tack welds may be used to hold the plate edges in line if the
requirements of paragraph 9.3.1 through 9.3.4 are followed.
‘The tack welds in butt joints to be welded manually are removed before welding.
‘The tack welds need not be removed before welding manually if they will be thoroughly
removed by means of the back gouging or grinding on the root side to sound weld deposited
metal.
The tack welds in butt joints to be machine welded by a process that will re-melt the tack
welds shall be thoroughly cleaned of all welding stag and examined for soundness.
‘Tack weld in lap and filet welded joints need not be removed if they are sound and the
subsequently applied weld beads are thoroughly fused into the tack welds.
‘Tack welds, whether removed or left in place, shall be made using a fillet-weld or butt-weld
Procedure qualified in accordance with Section IX of the ASME Code. Tack welds to be left in
lace shall be made by welders qualified in accordance with Section IX of the ASME Code
and shall be examined visually for defects; if welds are found to be defective, they shall be
removed.
Unless otherwise specified in the applicable drawing or WPS, the configuration and dimension
of the joints shall be prepared for manual and/or semiautomatic welding processes as shown
below. ate
eure Unit: mm,
324 a
oes"
stele
Of ope
Back chipped surface shall be inspected by visual, and shall be free from defects.
For erection purpose, temporary materials that have to be welded to tank sections shall be the
‘same P-number (with regardless of group number) as that of the base material. Welding
‘materials shall be in accordance with the paragraph 10.5 of this procedure.a
Ses. | WEST QURNAFIELD 2 PHASEPROJECT | UMGD
Document Title | INSPECTION AND TEST PROCEDURE WITH PLAN AT SITE(API620 TANKS) | Page | 14 of 34
Document No. ‘8016-0151-22-PO-45-0009-4617 -Q04-00032 Rev. of
10.
10.1
10.1.1
10.1.2
10.2
10.2.4
10.2.2
10.23
10.3
10.3.4
10.3.2
WELDING CONTROL
General
All welding control shall be performed in accordance with the WPS approved by the Contractor.
‘The Manufacturer shall assign each welder or welding operator an identifying number, letter,
‘or symbol. Except for all lap-welded roof seams and flange-to-neck joints, this identifying mark
shall be stamped or paint marked, either by hand or machine, on all tanks adjacent to and at
intervals of not more than 900 mm (3 ft) along the welds made by welder or welding operator,
altematively, the Manufacturer may keep a record of welders employed on each joint and
shell-opening joint and omit the stamping. if such a record is kept, it shall be maintained until
tests are completed and shall be available to the Inspector.
Cleaning Surfaces to be Welded
Immediately before any welding operation, the surface to be welded or to which weld metal is
to be applied shall be cleaned thoroughly of all scale, slag, grease, and any oxide that would
lower the quality of the deposited weld metal. A light oxide film resulting from flame cutting is
not considered detrimental.
n all multilayer welding, each layer of weld metal shall be cleaned of slag and other
deposits before the next layer is applied
The reverse side of double welded butt joints shall be prepared by chipping, grinding, or
melting out to ensure sound metal at the base of the weld metal first deposited before weld
‘metal is applied from the reverse side. This operation shall be done to ensure complete
penetration and proper fusion in the final weld. When melting out is done, particular care shall
be exercised to prevent contamination of the melted area by foreign materials, especially
‘carbon.
‘Weather Condition for Welding
No welding of any kind shall be done:
@. when the surfaces to be welded are wet from rain, snow, or ice;
b. when rain or snow is falling on such surfaces;
¢. during periods of high winds, unless the welder and work are properly shielded.
Preheat shall be applied when the metal temperature is below the temperature required by the
following table. In that case the base metal shall be heated to at least the temperature
indicated in the following table within 75 mm of the place where welding is to be started and
maintained 75 mm ahead of the arc. Material P-Numbers and Groups shall be as designated
in Table QW-422 of ASME IX or in 6.7.2 of API Std. 620 for materials not listed in Table QW-
422,
Thickness (t) imum
pices of Thicker Plate Preheat
Z (mm) ‘Temperature (°C)
ts32 0
P-No.1
Group 1 32 Sq | WEST QURNAFIELD 2" PHASE PROJECT
Document Tite | INSPECTION AND TEST PROCEDURE WITH PLAN AT SITE (API620 TANKS) | Page | 32 0f34
Document No. 8016-0164-22-PO-46-0008-4617-Q04-00032 Rev | of
dix 1 - INSPECTION AND TEST PLAN AT SITE
Submia
icable Spec Code ‘Acceptance Inspected By
No. Description of ins i Record Re
emer /StandardProcedure Crea woo | sect | ume | Seer co
90 | Nozzle & Manhole to Shell with Reinforcing Pad, ifnot at shop
9.1 | Fitup check Inspection & Test Procedure at site | Para. tw]. | .-
82 | Vieua & dimensional inepecton Inspection & Test Procedure at site | Para 7.1 811. 1 | sw] re | ves
93 | miTon completed welds /ASME Sec VI, Dit App. 6 Porae3.64,a65 | 1 | sw] R | YES |WmennoPWHT is required
94 | Airleakage testo completed welds Inspection & Test Procedure at site | Para 12. Note 8.2 1 | sw} or | ves
95 | PWHT, where applicable PWT Procedure 1 | oR | Rk | ves |ohert review
96 | MT after PWT, where applicable ASME Sec Vl, Dit App. 6 Pamos.e4ces | 1 | R | R | YES
10.0 | Compression Ring Together orto Shell and to Root Plate
10.1 | Visual inspection on completed welds Inspection & Test Procedure at site | Para 1. 1 | sw| re | ves
1100 | Stiffener Ring Together or to Shell Plates
41.1 | Visual inspection on completed welds Inspection & Test Procedure at ste | Para 1. 1 | sw] re | ves
112 | MT on completed welds ASME Sec Vil, Dit App. 6 Pomoae4aes | 1 | sw| R | yes
120 | Root Plates ~
1211 | Material identification Inspection & Test Procedure at site| Para’. 1 | sw} | ~ [byshop record
122 | Fitup inapection Inspection & Test Procedure at site [Pera 9. ito]. |.
123 | Ascbult ketch Inspection & Test Procedure at site | Para 72. |r | rR | ves
12.4 | Visual inspection on completed welds Ingpection & Test Procedure at site| Para 11. 1 | sw} rR | ves
125 | RT on completed welds at but-welded joints | ASME See Vil, Dit ws) 1] Rr | Rr | ves
43.0 | Nozzle & Manhole to Roof with or without Reinforcing Pad
13.1 | Fitup check Inspection & Test Procedure at site | Para. s}sw]-] -
132 | Visual inspection on completed welds Inepection & Test Procedure at site | Para tt. 1 | sw| Rr | ves
133 | Mon welds JASME Sec Vil, Di App. 8 Poa63.64a65 | 1 | sw | R | ves
134| Aiteskage test Inepection & Test Procedure at site | Para 12. Note 8.2 1 | sw} re | ves> Bere | WESTQURNAFIELD 2™ PHASE PROJECT | EES
Document Titie INSPECTION AND TEST PROCEDURE WITH PLAN AT SITE (API 620 TANKS) Page | 33 of 34
Document No. 8015-0151-22-PO-45-0009-4617-Q04-00032 Rev. ot
idix 1 - INSPECTION AND TEST PLAN AT SITE
: icable Spec./Code Acceptance Inepected By Submit
No. Description of ng Appl Record Rer
ition ipection ‘[Standard/Procedure Criteria inco | secu | UME | yes7- sled
14.0 | Permanent Attachments to Shell Plates
14. | Visual inspection on completed welds nepecton & Test Procedure at ste ‘| Para ‘1. fealeenalece ee
14.2 | MT on completed welds linspection & Test Procedure at site Para 6-3, 6-4, &6-5 ! R R | Yes
180 | Permanent Attachments to Botiom & Annular Pate
18.1 | Visual inspection on completed welds Inspection & Test Procedure at ste | Para tt riow]- |].
15.2 | MT on completed welds ASME Sec VIII, Div.1 App. 6 Para 6-3, 6-4, & 6-5 t R R ‘YES
16.0 | Temporary Attachments Removal Area
16.1 | Visual inspection on removal area Inspection & Test Procedure at ste | Para 11. riw]. |.
162 | MT on removal areas JASME Sec Vl, Dit App. 6 Poaese4ses | 1 | rR | R | ves
16.3 | MT on repaired welds | ASME Sec Vill, Div.1 App. 6 Para 6-3, 6-4, & 6-5 t R R ‘YES
17.0 | Atachments Wolds Around Bottom Openinga In Bottom, any
17.1 | Visual inspection on completed welds Inspection & Test Procedure at site Para 11 t sw - .
17.2 | MT on completed welds |ASME Sec Vill, Div.1 App. 6 Para 6-3, 6-4, & 6-5 t R R YES
1800 | Wolde in internal Piping
18.1 | Visual inspection on completed weics Inspection & Test Procedure at site | Para tt. 1 | w]e | ves
182 | MT or PT on completed welds JASME Sec Vil, Dit App. 6 or 8 Pora6.3,64,865o/ 1 | sw | R | YES |excopt manufactured pipe
19.0 | Completed Tank
419.1 | Confim all NDEs were completed Inspection & Test Procedure at site | Para 12. rf. f.].
19.2 | Hydrostatic-pneumatic test Hydrostatic & Pneumatic Test Proc” t H H YES
19.3 | Settlement check Hydrostatic & Pneumatic Test Proc’ t sw R YES:@® Sex | WEST QURNAFIELD 2™ PHASEPROJECT | ERED
Document Title | INSPECTION AND TEST PROCEDURE WITH PLAN AT SITE (API620TANKS) | Page | 34 of 34
‘Document No. '8015-0151-22- PO-45-0009-4617-@04-00032 Rev [of
‘Appendix 4 - INSPECTION AND TEST PLAN AT SITE
[Subrita
Applicable Spec /Code ‘Acceptance Inspected By
No. Description of inspection ete etal woo [secu] we | S24 Remarks
20.0 | Cleaning of Tank Inspection & Test Procedure at site | Para 17. 1 [sw] R | ves
21.0 | Painting inspection
21.4 | Surface preparation check Painting Procedure 1 | sw] or | ves
21.2 | DFT check Inspection & Test Procedure at ste 1 | swt] re | ves
/& Painting Procedure Para 16.
22.0 | Water Spray System Piping
22.1 | Visual inspection on completed welds Inspection & Test Procedure at site Para 11. i | RY |e Reel aves)
22.2 | Functional test, if required AAs per drawings 1 | sw] Rr | ves
23.0 | Foam System Piping, If Applicable
23.1 | Visual inspection on completed welds Inspection & Test Procedure at site Para 11. 1] R | R | ves