QC02002 CNP DRW PLN Id 04 Ce1 00005 00 (PDF)

You might also like

You are on page 1of 1

KEY PLAN

Q
11

10
4
9
2 3
6
5 8
7

ENGINEER DOCUMENT REVIEW

SUBMITTAL REVIEW STATUS

A APPROVED
B APPROVED W ITH COMMENTS
C REVISE & RESUBMIT
D REJECTED
E REVIEW NOT REQUIRED

Any review, check certificate, consent, examination, inspection, instruction, notice,


proposal,test request or similar act by the Engineer / Engineers Assistants
(Including the absence of disapproval) shall not relieve the Contractor from any
responsibility he has under the Contract, Including for any errors, omission,
discrepancies and non-compliance.
O P Q R S T U V W X Y Z AA BB should the Contractor consider the above response constitutes a variation, he shall
notify and get approval from the Engineer prior to incurring any additional cost or
delay and/or in compliance with the Contract Conditions
ENGINEER
ENGINEERS ASSISTANT
OTHER (CONTRACT ROLE)
VIEW REFERENCE NO: 1 /QC02002-CNP-DRW-PLN-ID-04-CE1-00006
VIEW REFERENCE NO: 1 /QC02002-CNP-DRW-PLN-ID-04-CE1-00004

REVIEW ER DATE

FFL +680.52
ABBREVIATIONS AND SYMBOLS LEGEND
FFL +680.52 SSL +680.52 9449
0.00 FFL
SSL +680.52 ABSOLUTE LEVEL FROM FINISH FLOOR LEVEL

FLH FULL HEIGHT WALL CONNECTED


FFL FINISH FLOOR LEVEL
STL SCREED TOP LEVEL

16148
ROOM TAG FLOOR TAG
ROOM NAME RETAIL FLOOR CODE FL-F01
5425 FFL +680.52 ROOM NUMBER FL-XXX CEILING TAG
SSL +680.52
WALL FINISH TAG
CEILING CODE CL-C01
WALL CODE WF-P01 CEILING HEIGHT 0000
13 WALL HEIGHT 2000
BOILER ROOM & SKIRTING TAG
HOT WATER
H SKIRTING CODE SK-P01
PLANTROOM
CHLORINE
0412-B1-17 NOTES:
CLG SC-10 SOFFIT GENERATION 1.DO NOT SCALE FROM THE DRAWINGS.
1) Contractor responsibility to check the plans, dimensions, levels, ROOM
H 2.ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES UNLESS NOTED OTHERWISE.

materials and verify all changes (if any) with actual site conditions. WL CP-6/AWP-2 AWP-2 FROM 3.THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE RELEVANT SECTION OF THE
SPECIFICATION AND SCHEDULES.
REFER TO RFI: QC02002-CNP-TEC-RFI-ARC-04-CE1-00001 0412-B1-10
800 TO 2200 4.FOR FINISHES & CEILING FIXTURES SCHEDULES, KINDLY CHECK SHEETS QC02002-CNP-DRW-SCH-
The contractor shall notify the SC in writing of any discrepancies CLG CP-6 SOFFIT ID-00-V00-99021& QC02002-CNP-DRW-SCH-ID-00-V00-99022

prior to execution of any Work on site. SK PS-1 150 MAIN CONTRACTOR:-


FL CSF-1 -
WL CP-6 F.L.H 14 C E R T I F I C A T I O N (Contract No.: ------)
THE MAIN CONTRACTOR REVIEWED THE DRAWING BASED ON CONTRACT DOCUMENTS
2) Secure MAT/SAM/MST approval by SC for all materials to be APPROVED SIGNATORY:
NAME :...........................................................................................
used in this area prior to installation. SK - - SIGNATURE:..................................................................................

3) All Work and finishes shall be as per IFC, Schedules & Specs FL CSF-1 - REFER TO RFI: QC02002-CNP-TEC-RFI- 1
2
unless otherwise agreed with SC/Client to change. ARC-04-CE1-00002 ITEM SPECIFICATION No. DESCRIPTION
4) All materials shall be installed with good workmanship and in SPECIFICATIONS REFERENCE
accordance with industry standards. Comply with manufacturer’s 1
2
installation instructions and install in recommended environment
QC02002‐ELSAL‐TEC‐ 3
conditions.
RFI‐ARC‐04‐CE1‐00002
15 4
5
5) Secure MEP clearance before the installation of any finishes that 16148 6
may affect the Work. Contractor shall secure WIR approval of ITEM DRAWING TITLE DRAWING NO. REV

concealed items prior to closing of any wall, ceiling or floor finishes. CONTRACT DRAWINGS REFERENCE
1 Pump room Finishes Schedule DRW-SCH-ARC-04-CE1-12600
2
AHU
H 3
4
0412-B1-18 5
6
CLG SC-10 SOFFIT 16 7
WL CP-6/AWP-2 AWP-2 FROM 8 Pump Room Finishes Schedule DRW-SCH-ARC-04-CE1-12601
800 TO 2200 REFER TO RFI: QC02002-CNP-TEC-RFI- 21925 9
ARC-04-CE1-00001 ITEM DRAWING TITLE DRAWING NO. REV
SK PS-1 150 3 SHOP DRAWINGS REFERENCE

11925
FFL +680.52 FL CSF-1 - REFER TO RFI: QC02002-CNP-TEC-RFI-
0 ISSUED FOR APPROVAL 30/3/2023 M.I AS
SSL +680.52 ARC-04-CE1-00002 3
N 04-CE1-00004
1
2
3
4

34085
17 QC02002‐ELSAL‐TEC‐
17 REV DESCRIPTION DATE DRAWN CHKD

DRAWING REVISIONS
RFI‐ARC‐04‐CE1‐00002
SURGE TANK CLIENT:
Dewan Qiddiya Water Theme
3900

Architects + Park - Riyadh - KSA


0412-B1-29
Engineers A19-128
17775 REVIEW NOTE

APPROVED
18 18
APPROVED AS NOTED
10548
3 3 DESIGN CONSULTANT
3 04-CE1-00004 REVISE & RESUBMIT
Dubai

2740
3 FFL +680.52 Building 5, Area B, 4th Floor
04-CE1-00004
SSL +680.52 REJECTED Dubai Design District, UAE
3 T +971 (4) 240 2010

21075
04-CE1-00004 3 FOR INFORMATON
F +971 (4) 770 7698
PO Box 60990
W dubai@dewan-architects.com

Approved / Approved As Noted does not relieve


19 19the Contractor / Supplier from full compliance
with his Contractual ObligationMAIN CONTRACTOR (JV) :
ELECTRICAL EQUIP.
H
0412-B1-09
CLG CP-6 SOFFIT FFL +680.52
2600 SSL +680.52
12905

FFL +680.52 WL CP-6 F.L.H


3 SSL +680.52
3 04-CE1-00004 SK PS-1 150
20 STAIRS-02
FL CSF-1 - 20 SUB-CONTRACTOR:
3
0412-B1-07 04-CE1-00004
MARBLE
THRESHOLD
1 5700 3
6000

04-CE1-80016
MARBLE Construction and Planning Co.Ltd.
THRESHOLD ‫ﺷﺭﻛﺔ ﺍﻻﻋﻣﺎﺭ ﻭﺍﻟﺗﻧﺳﻳﻖ ﺍﻟﻣﺣﺩﻭﺩﺓ‬
2890

1
2600

21 FFL +680.52
STAIRS-03
04-CE1-80017 21 PROJECT NAME :
1451

SSL +680.52
0412-B1-08 QIDDIYA WATER THEME PARK

Model Ref. file: QC02002-CNP-MOD-BIM-ID-04-P04-99004-00


DRAWN: M.I CHECKED: AS
SCALE: 1 : 100 @A1 APPROVED: AA
DRAWING TITLE:
Zone 04 - Camel Rock
N O P Q R S T U V W X Y Z AA BB Area CE1 - Pump room(BOH, MEP & M4
Plantroom)
BASEMENT FLOOR PLAN-GA PLAN - PART 2 Basement Floor Plan-GA-part 2
1 1 : 100
QC02002-CNP-DRW-PLN-ID-04-CE1-00005-00
PROJECT ORG. DOC. SUB UNIQUE
DISC. AREA VENUE REVISION
CODE CODE TYPE DOC.TYPE NUMBER

You might also like