Q
11
10
4
9
2 3
6
5 8
7
A APPROVED
B APPROVED W ITH COMMENTS
C REVISE & RESUBMIT
D REJECTED
E REVIEW NOT REQUIRED
REVIEW ER DATE
FFL +680.52
ABBREVIATIONS AND SYMBOLS LEGEND
FFL +680.52 SSL +680.52 9449
0.00 FFL
SSL +680.52 ABSOLUTE LEVEL FROM FINISH FLOOR LEVEL
16148
ROOM TAG FLOOR TAG
ROOM NAME RETAIL FLOOR CODE FL-F01
5425 FFL +680.52 ROOM NUMBER FL-XXX CEILING TAG
SSL +680.52
WALL FINISH TAG
CEILING CODE CL-C01
WALL CODE WF-P01 CEILING HEIGHT 0000
13 WALL HEIGHT 2000
BOILER ROOM & SKIRTING TAG
HOT WATER
H SKIRTING CODE SK-P01
PLANTROOM
CHLORINE
0412-B1-17 NOTES:
CLG SC-10 SOFFIT GENERATION 1.DO NOT SCALE FROM THE DRAWINGS.
1) Contractor responsibility to check the plans, dimensions, levels, ROOM
H 2.ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES UNLESS NOTED OTHERWISE.
materials and verify all changes (if any) with actual site conditions. WL CP-6/AWP-2 AWP-2 FROM 3.THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE RELEVANT SECTION OF THE
SPECIFICATION AND SCHEDULES.
REFER TO RFI: QC02002-CNP-TEC-RFI-ARC-04-CE1-00001 0412-B1-10
800 TO 2200 4.FOR FINISHES & CEILING FIXTURES SCHEDULES, KINDLY CHECK SHEETS QC02002-CNP-DRW-SCH-
The contractor shall notify the SC in writing of any discrepancies CLG CP-6 SOFFIT ID-00-V00-99021& QC02002-CNP-DRW-SCH-ID-00-V00-99022
3) All Work and finishes shall be as per IFC, Schedules & Specs FL CSF-1 - REFER TO RFI: QC02002-CNP-TEC-RFI- 1
2
unless otherwise agreed with SC/Client to change. ARC-04-CE1-00002 ITEM SPECIFICATION No. DESCRIPTION
4) All materials shall be installed with good workmanship and in SPECIFICATIONS REFERENCE
accordance with industry standards. Comply with manufacturer’s 1
2
installation instructions and install in recommended environment
QC02002‐ELSAL‐TEC‐ 3
conditions.
RFI‐ARC‐04‐CE1‐00002
15 4
5
5) Secure MEP clearance before the installation of any finishes that 16148 6
may affect the Work. Contractor shall secure WIR approval of ITEM DRAWING TITLE DRAWING NO. REV
concealed items prior to closing of any wall, ceiling or floor finishes. CONTRACT DRAWINGS REFERENCE
1 Pump room Finishes Schedule DRW-SCH-ARC-04-CE1-12600
2
AHU
H 3
4
0412-B1-18 5
6
CLG SC-10 SOFFIT 16 7
WL CP-6/AWP-2 AWP-2 FROM 8 Pump Room Finishes Schedule DRW-SCH-ARC-04-CE1-12601
800 TO 2200 REFER TO RFI: QC02002-CNP-TEC-RFI- 21925 9
ARC-04-CE1-00001 ITEM DRAWING TITLE DRAWING NO. REV
SK PS-1 150 3 SHOP DRAWINGS REFERENCE
11925
FFL +680.52 FL CSF-1 - REFER TO RFI: QC02002-CNP-TEC-RFI-
0 ISSUED FOR APPROVAL 30/3/2023 M.I AS
SSL +680.52 ARC-04-CE1-00002 3
N 04-CE1-00004
1
2
3
4
34085
17 QC02002‐ELSAL‐TEC‐
17 REV DESCRIPTION DATE DRAWN CHKD
DRAWING REVISIONS
RFI‐ARC‐04‐CE1‐00002
SURGE TANK CLIENT:
Dewan Qiddiya Water Theme
3900
APPROVED
18 18
APPROVED AS NOTED
10548
3 3 DESIGN CONSULTANT
3 04-CE1-00004 REVISE & RESUBMIT
Dubai
2740
3 FFL +680.52 Building 5, Area B, 4th Floor
04-CE1-00004
SSL +680.52 REJECTED Dubai Design District, UAE
3 T +971 (4) 240 2010
21075
04-CE1-00004 3 FOR INFORMATON
F +971 (4) 770 7698
PO Box 60990
W dubai@dewan-architects.com
04-CE1-80016
MARBLE Construction and Planning Co.Ltd.
THRESHOLD ﺷﺭﻛﺔ ﺍﻻﻋﻣﺎﺭ ﻭﺍﻟﺗﻧﺳﻳﻖ ﺍﻟﻣﺣﺩﻭﺩﺓ
2890
1
2600
21 FFL +680.52
STAIRS-03
04-CE1-80017 21 PROJECT NAME :
1451
SSL +680.52
0412-B1-08 QIDDIYA WATER THEME PARK