EXHIBIT II

Price

The service is charged in daily-rate based on flowrate as stipulated by below table, calculated on the
20th of the month, as per TCO invoicing cycle, whereby in some cases standby rate will apply as
stipulated in term 7 and 8 of this Exhibit II.

Flowrate Motor HP Genset Daily Rate


<500 75 IDR 1.736.000
501-1000 105 IDR 1.736.000
1001-2000 160 IDR 2.142.250
2001-3500 176 IDR 2.830.570
>3501 298 IDR 3.040.000

Terms:
1. Rates are CIF (Cost, Insurance, and Freight) wellsite location.
2. Rates exclude: PPN 10% and Includes: PPH 23 (2%)
3. Rates include mobilization and demobilization cost for all equipment and vendor’s personnel
4. Rates include all requirement stipulated in Exhibit II.
5. Generator set should be running for operations 24 (twenty four) hours per day and 7 (seven)
days per week
6. Delivery scheme will be partially as requested by Imeco
7. Standby charge calculation for Asset 3

When any of following root cause for shut off/pull out happens, then standby charge will apply.

Standby Charge Applies Note


Standby
Standby Standby
Root Cause for ESP Charge Standby Charge
No. Charge 50% charge 25%
Shut Off / Pull Out Position Calculation Calculation End
No Charge from Daily from Daily
Start
Rate per Rate per
Well Well
Manual off and/or
Day 1 to Standby manual
requested by From when Until ESP restarts Day 4
1 In the well day 3 - off/PBU/requested
Pertamina and/or ESP is off onward
by Pertamina
flowline job, PBU
Pull out due to
moving to another
well and/or
From when
requested by Until rig is ready to
In the well ESP is Day 1 to Day 31 Standby waiting
2 Pertamina and/or operate/checklist -
off/declared day 30 onward for the rig
non-economical,
EDHP/MDHP
(Either if it is related
to ESP failure or
not)
Pull out due to
moving to another
well and/or
requested by From when Until ESP is
ESP is pulled Day 1 to Day 31 Standby at the
3 Pertamina and/or ESP is at the installed at the -
day 30 onward surface
non-economical, surface next well
(Either if it is related
to ESP failure or
not)
8. Standby charge calculation for Asset 5 (when there is project involving Vendor in Asset 5)
When any of following root cause for shut off/pull out happens, then standby charge will
apply.

Standby Charge Applies Note


Standby
Standby
Root Cause for ESP Charge Standby Charge Standby
No. Charge 50%
Shut Off / Pull Out Position Calculation Calculation End charge 25%
No Charge from Daily
Start from Daily
Rate per
Rate per Well
Well
Manual off and/or
Immediately, Standby manual
requested by From when Until ESP restarts
1 In the well - - proportional off/PBU/request
Pertamina and/or ESP is off
ed by Pertamina
flowline job, PBU
From when
Until rig is ready to Day 15 to
ESP is declared as In the well ESP is Day 1 to Day 31 Standby waiting
2 operate/checklist day 30
idle/ not running off/declared day 14 onward for the rig
EDHP/MDHP
Pull out due to
moving to another
well and/or
requested by From when Until ESP is Day 15 to
ESP is pulled Day 31 Standby at the
3 Pertamina and/or ESP is at the installed at the - day 30
onward surface
non-economical, surface next well
(Either if it is related
to ESP failure or
not)