0% found this document useful (0 votes)
3K views1 page

Pilot Report

This pilot run report summarizes the results of a test production run. It indicates that the approved sample and pattern were used correctly. It also notes that the fabric was tested and approved. Any non-conformances from the size set approval were addressed. The number of pieces completed in the pilot run by color and size are recorded. Measurements were checked and recorded. Remarks on the pilot run are included. The report concludes by indicating whether the pilot run was approved for further production.

Uploaded by

nagasundaram77
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3K views1 page

Pilot Report

This pilot run report summarizes the results of a test production run. It indicates that the approved sample and pattern were used correctly. It also notes that the fabric was tested and approved. Any non-conformances from the size set approval were addressed. The number of pieces completed in the pilot run by color and size are recorded. Measurements were checked and recorded. Remarks on the pilot run are included. The report concludes by indicating whether the pilot run was approved for further production.

Uploaded by

nagasundaram77
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Pilot Run Report

Report Nr. : ........................................... Date : ...........................................


Customer : ........................................... Sub Contractor : ...........................................
Ord Nr. : ........................................... Style Nr. : ...........................................

1. Is Approved Sam-ple available ? Yes / No

2. Are Approved Patternbeing used ? Yes / No


(If No, take corrective action immediately by checking the
pattern against master pattern & report to prod. Exc.)

3. Are fabric used for Pilot run tested and approved ? Yes / No

4. Are corrective action taken as reported in the


size set approval Yes / No
If No, report on the non conformance (defects) being repeate d

a. .............................................................................................................................
b. .............................................................................................................................
c. .............................................................................................................................
d. .............................................................................................................................
e. .............................................................................................................................
f. .............................................................................................................................
5. Indicate Nr. of pces completed as pilot run

Colour
Size
Nr. of Pcs
Appr.

6. Record measurement check in measurement verification report

7. Remarks on the Pilot Run............................................................................................


..... ...........................................................................................................................
... .............................................................................................................................
... .............................................................................................................................

8. Wheter Pilor Run is approved for further Production Yes / No

Q.C. Supervisor Q.C. Manager Section Incharge

You might also like